Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Resolution - 3472 - Contract- Wright Tel Com- Telephone Facilities, Municipal Hill Operations Center - 10/11/1990
DGV:js RESOLUTION Resolution #3472 BID #10891 October 11, 1990 Item #33 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock a Contract by and between the City of Lubbock and Wright Tel Com for Municipal Hill Operations Center - Telephone Facilities, attached herewith, which shall be spread upon the minutes of the Council and as spread upon the minutes of this Council shall constitute and be a part of this Resolution as if fully copied herein in detail. Passed by the City Council this 11th ATTEST: Bane _te oy Ci ty " ecr APPROVED AS TO CONTENT: F Gene Ea s, Purc asing Manager uamia u. van-aiver, virst AssIs City Attorney day of October B. C. McMIN , MAYOR , 1990. 46 # 3* 7z CITY OF LUBBOCK SPECIFICATIONS FOR MUNICIPAL HILL OPERATIONS CENTER TELEPHONE FACILITIES BID # 10891 CITY OF LUBBOCK Lubbock, Texas2(j,,,e '7C' BID # 10891 ADDENDUM ## 1 MAILED TO VENDOR: 9/20/90 CLOSE: 9/27/90 2:00 p.m. PLEASE NOTE THE FOLLOWING: 1. Change in Drawing Number 5, location of tie cable. See attached drawing. 2. Note Bid Proposal, Page 11, Lump Sum Bid is required. 3. Ceiling tile grid is in place, ceiling tile will not be in place. 4. The buildings associated with the project will be accessible at any time for the work to be pursued. THANK YOU, GENE EADS, C.P.M. CITY OF LUBBOCK PURCHASING DEPARTMENT PLEASE RETURN ONE COPY WITH YOUR BID BLDG "A" FLOOR PLAN POLICE ACADEMY DRAWING 5 CITY OF LUBBOCK SPECIFICATIONS for TITLE: MUNICIPAL HILL OPERATIONS CENTER TELEPHONE FACILITIES ADDRESS: 600 MUNICIPAL DRIVE BID NUMBER: 10891 PROJECT NUMBER: 2113-552101-9428 CONTRACT PREPARED BY: Purchasing Department -1- (THIS PAGE LEFT BLANK INTENTIONALLY) 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. INDEX -2- PAGE NOTICE TO BIDDERS ................. GENERAL INSTRUCTIONS TO BIDDERS .................................. BID PROPOSAL - BID FOR LUMP SUM CONTRACTS........... PAYMENT BOND ....................... PERFORMANCE BOND .................... CERTIFICATE OF INSURANCE ............................... CONTRACT ........................ GENERAL CONDITIONS OF THE AGREEMENT........... CURRENT WAGE DETERMINATIONS .............. SPECIFICATIONS ............................ SPECIAL CONDITIONS .................... NOTICE OF ACCEPTANCE ................................................. -2- (THIS PAGE LEFT BLANK INTENTIONALLY) w NOTICE TO BIDDERS -3- (THIS PAGE LEFT BLANK INTENTIONALLY) NOTICE TO BIDDERS BID # 10891 Seated proposals addressed to Gene Eads, C.P.M., Purchasing Manager, City of Lubbock, Texas, will be received at the office of the Purchasing Manager, 1625 13th St., Room L-04, Lubbock, Texas, 79401, until 2:00 o'clock P.m. on the 27th day of September, 1990 or as changed by the issuance of formal addenda to all planholders, to furnish all labor and materials and perform all work for the construction of the following described project: MUNICIPAL HILL OPERATIONS CENTER TELEPHONE FACILITIES ,. After the expiration of the time and date above first written, said sealed proposals will be opened by the Purchasing Manager at his office and publicly read aloud. It is the sole responsibility of the bidder to insure that his bid is actually in the office of Gene Eads, Purchasing Manager for the City of Lubbock, prior to the expiration of the date above first written. The City Council will consider the bids on the 11th day of October, 1990 at Municipal Bldg., Lubbock, Texas, or as soon thereafter as may be reasonably convenient, subject to the right to reject any or all bids and waive any formalities. The successful bidder will be required to furnish a performance bond and payment bond in accordance with Article 5160, Vernon's Ann. Civil St., in the amount of 100% of the total contract price in the event that said contract price exceeds $25,000.00. Said statutory bonds should «.. be issued by a company carrying a current Best Rating of B or superior, as the rating of the bond company is a factor that will be considered in determination of the lowest responsible bidder. If the contract price does not exceed $25,000.00 the said statutory bonds will not be required. Bidders are required, whether or not a payment or performance bond is required, to submit a cashier's or certified check issued by a bank satisfactory to the City of Lubbock, or a proposal bond from a reliable surety company, payable without recourse to the order of the City of Lubbock in an amount not less than 5% of the total amount of the bid submitted as a guarantee that bidder will enter into a contract and execute all necessary bonds (if required) within 10 days after notice of award of the contract to him. It shall be each bidders sole responsibility to inspect the site of the work and to inform himself regarding all local conditions under which the work is to be done. It shalt be understood and agreed that all such factors have been thoroughly investigated and considered in the preparation of the bid submitted. The plans, specifications, proposal forms and contract documents may be examined at the office of the Purchasing Manager for the City of Lubbock, Texas. Attention of each bidder is particularly called to the schedule of general prevailing rate of per diem wages included in the contract documents on file in the office of the Purchasing Manager of the City of Lubbock, which document is specifically referred to in this notice to bidders. Each bidder's attention is further directed to provision of Article 5159a, Vernon's Ann. Civil St., and the requirements contained therein concerning the above wage scale and payment by the contractor of the prevailing rates of wages as heretofore established by owner in said wage scale. The City of Lubbock hereby notifies all bidders that in regard to any contract entered into pursuant to this advertisement, minority and women business enterprises will be afforded equal opportunities to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, sex, or national origin in consideration for an award. There will be a pre-bid conference on 19th day of September, 1990 at 10:00 o'clock a.m., Committee Room #103, Municipal Building, 1625 13th Street. CITY OF LUBBOCK _2'z� - ze�c BY: Gene Eads, C.P.M. Purchasing Manager r ADVERTISEMENT FOR BIDS BID # 10891 Sealed proposals addressed to Gene Eads, C.P.M., Purchasing Manager, City of Lubbock, Texas, will be received at the office of the Purchasing Manager, Municipal Building, 1625 13th Street, Room L-04, Lubbock, ... Texas, 79401 until 2:00 o'clock p.m. on the 27th day of September, 1990 or as changed by the issuance of formal addenda to all planholders, to furnish all labor and materials and perform all work for the construction of the following described project: MUNICIPAL HILL OPERATIONS CENTER TELEPHONE FACILITIES After the expiration of the time and date above first written, said sealed proposals will be opened by the Purchasing Manager at his office and publicly read aloud. The plans, specifications, proposal forms and contract documents may be examined at the office of the Purchasing Manager for the City of Lubbock, Texas. Attention of each bidder is particularly called to the Schedule of General Prevailing Rate of Per "^ Diem Wages included in the contract documents on file in the office of the Purchasing Manager of the City of Lubbock, Texas. Each bidder's attention is further directed to the provisions of Article 5159a, Vernon's Ann. Civil St., and the requirements contained therein concerning such wage scales and payment by the contractor of the prevailing rates of wages as heretofore established by the City of Lubbock. The City of Lubbock hereby notifies all bidders that in regard to any contract entered into pursuant to this advertisement, minority and women business enterprises will be afforded equal opportunities to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, sex, or national origin in consideration for an award. There will be a prebid conference on 19th day of September, 1990, at 10:00 o'clock a.m., Conference Committee Room 103, Municipal Building, 1625 13th Street. BY: Gene Eads, C.P.M. PURCHASING MANAGER I-- (THIS PAGE LEFT BLANK INTENTIONALLY) Im GENERAL INSTRUCTIONS TO BIDDERS -4- (THIS PAGE LEFT BLANK INTENTIONALLY) GENERAL INSTRUCTIONS TO BIDDERS 1-1 1. SCOPE OF WORK The work to be done under the contract documents shall consist of the following: To provide wiring for building at 600 Municipal Drive. The contractor shall furnish all labor, superintendence, machinery, equipment and all materials necessary to complete this project in accordance with contract documents. 2. CONTRACT DOCUMENTS All work covered by this contract shall be done in accordance with contract documents described in the Gen- eral Conditions. All bidders shall be thoroughly familiar with all of the requirements set forth on the contract documents for the construction of this project and shalt be responsible for the satisfactory completion of all work contemplated by said contract documents. 3. PLANS FOR USE BY BIDDERS It is the intent of the City of Lubbock that all parties with an interest in submitting a bid on the project covered by the contract documents be given a reasonable opportunity to examine the documents and prepare a bid without charge of forfeiture of deposit. The contract documents, may be examined without charge as noted in the Notice to Bidders. 4. TIME AND ORDER FOR COMPLETION The construction covered by the contract documents shall be fully completed within 30 (THIRTY) calendar days from the date specified in the Notice to Proceed issued by the City of Lubbock to the successful bidder. The Contractor will be permitted to prosecute the work in the order of his own choosing, provided, however, the City reserves the right to require the Contractor to submit a progress schedule of the work contemplated by the contract documents. In the event the City requires a progress schedule to be submitted, and it is determined by the City that the progress of the work is not in accordance with the progress schedule so sub- mitted, the City may direct the Contractor to take such action as the City deems necessary to insure comple- tion of the project within the time specified. 5. PAYMENT All payments due to Contractor shall be made in accordance with the provisions of the General Conditions of the contract documents. 6. AFFIDAVITS OF BILLS PAID The City of Lubbock reserves the right, prior to final acceptance of this project to require the Contractor to execute an affidavit that all bills for labor, materials and incidentals incurred in the construction ofthe improvements contemplated by the contract documents have been paid in full and that there are no claims pending, of which the Contractor has been notified. -5- 7. MATERIALS AND WORKMANSHIP The intent of these contract documents is that only materials and workmanship of the best quality and grade will be furnished. The fact that the specifications may fail to be sufficiently complete in some detail will not relieve the Contractor of full responsibility for providing materials of high quality and for pro- tecting them adequately until incorporated into the project. The presence or absence of a representative of the City on the site will not relieve the Contractor of full responsibility of complying with this provi- sion. The specifications for materials and methods set forth in the contract documents provide minimum standards of quality which the Owner believes necessary to procure a satisfactory project. 8. GUARANTEES All equipment and materials incorporated in the project and all construction shall be guaranteed against de- fective materials and workmanship. Prior to final acceptance, the Contractor shall furnish to the Owner, a written general guarantee which shall provide that the Contractor shall remedy any defects in the work, and pay for any and all damages of any nature whatsoever resulting in such defects, when such defects appear within ONE year from date of final acceptance of the work as a result of defective materials or workmanship, at no cost to the Owner (City of Lubbock). 9. PLANS FOR THE CONTRACTOR The contractor will be furnished one set of plans and specifications, and related contract documents for his use during construction. Plans and specifications for use during construction will only be furnished di- rectly to the Contractor. The Contractor shall then distribute copies of plans and specifications to sup- pliers, subcontractors or others, as required for proper prosecution of the work contemplated by the Con- tractor. 10. PROTECTION OF THE WORK The Contractor shall be responsible for the care, preservation, conservation, and protection of all materi- als, supplies, machinery, equipment, tools, apparatus, accessories, facilities, and all means of construc- tion, and any and all parts of the work whether the Contractor has been paid, partially paid, or not paid for such work, until the date the City issues its certificate of completion to Contractor. The City re- serves the right, after the bids have been opened and before the contract has been awarded, to require of a bidder the following information: (a) The experience record of the bidder showing completed jobs of a similar nature to the one covered by the proposed contract and all work in progress with bond amounts and percentage completed. (b) A sworn statement of the current financial condition of the bidder. (c) Equipment schedule. 11. TEXAS STATE SALES TAX This contract is issued by an organization which qualifies for exemption provisions pursuant to provisions of Article 20.04 of the Texas Limited Sales, Excise and Use Tax Act. The Contractor must obtain a limited sales, excise and use tax permit which shall enable him to buy the ma- terials to be incorporated into the work without paying the tax at the time of purchase. -6- 12. PROTECTION OF SUBSURFACE LINES AND STRUCTURES It shall be the Contractor's responsibility to prosecute the work contemplated by the contract documents in such a way as to exercise due care to locate and prevent damage to all underground pipelines, utility lines, conduits or other underground structures which might or could be damaged by Contractor during the construc- tion of the project contemplated by these contract documents. The City of Lubbock agrees that it will fur- nish Contractor the location of all such underground lines and utilities of which it has knowledge. How- ever, such fact shall not relieve the Contractor of his responsibilities aforementioned. All such under- ground lines or structures cut or damaged by Contractor during the prosecution of the work contemplated by this contract shall be repaired immediately by Contractor to the satisfaction of the City of Lubbock, Texas, at Contractor's expense. 13. BARRICADES AND SAFETY MEASURES The contractor shall, at his own expense, furnish and erect such barricades, fences, lights and danger sig- nals, and shall take such other precautionary measures for the protection of persons, property and the work as may be necessary. The Contractor will be held responsible for all damage to the work due to failure of barricades, signs, and Lights to protect it, and when damage is incurred the damaged g portion shall be immediately removed and re- placed by Contractor at his own cost and expense. The Contractor's responsibility for maintenance of barri- cades, signs, and lights shall not cease until the date of issuance to Contractor of City's certificate of acceptance of the project. 14. EXPLOSIVES The use of explosives will not be permitted unless written permission to do so is obtained by the Contractor from the City. In all cases where written permission is obtained for the use of explosives, the Contractor shall assume full responsibility for all damage which may occur as a direct or indirect result of the blast- ing. In addition, in all cases where explosives are authorized to be used, the Contractor shall use utmost care so as not to endanger life or property and the Contractor shall further use only such methods as are currently utilized by persons, firms, or corporations engaged in similar type of construction activity. Explosive materials shall not be stored or kept at the construction site by the Contractor. In all cases where explosives are to be used during the construction of the project contemplated by this .� contract, it shall be the duty of the Contractor to notify each utility company having structures (above or below the ground) in proximity to the site of the work of Contractor's intention to use explosives, and such notice shall be given sufficiently in advance to enable the companies to take such steps as they may deem necessary to protect their property from injury. Such notice, however, shalt not relieve the Contractor of responsibility for any damage resulting from his blasting operations. 15. CONTRACTOR'S REPRESENTATIVE The successful bidder shall be required to have a responsible local representative available at all times while the work is in progress under this contract. The successful bidder shall be required to furnish the name, address and telephone number where such local representative may be reached during the time that the work contemplated by this contract is in progress. 16. INSURANCE The Contractor shall not commence work under this contract until he has obtained all insurance as required in the General Conditions of the contract documents, from an underwriter authorized to do business in the r-- State of Texas and satisfactory to the City. Proof of coverage shall be furnished to the City and written -7- notice of cancellation or any material change will be provided ten (10) days in advance of cancellation or change. ALL policies shall contain an agreement on the part of the insurer waiving the right to subroga- tion. The insurance certificates furnished shall name the City as an additional insured and shall further state that all subcontractors are named as additional insureds, or in the alternative, shall be accompanied by a statement from the Contractor to the effect that no work on this particular project shall be subcontracted. 17. LABOR AND WORKING HOURS Attention of each bidder is particularly called to the schedule of general prevailing rate of per diem wages included in these contract documents. The wage rate which must be paid on this project shalt not be less than specified in the schedule of general prevailing rates of per diem wages as above mentioned. The bidders' attention is further directed to the requirements of Article 5159a, Vernon's Annotated Civil Statutes providing for the payment of the wage schedules above mentioned and the bidder's obligations there- under. The inclusion of the schedule of general prevailing rate of per diem wages in these contract docu- ments does not release the Contractor from compliance with any wage law that may be applicable. Construc- tion work under this contract requiring an inspector will not be performed on weekends or holidays unless the following conditions exist: (1) The project being constructed is essential to the City of Lubbock's ability to provide the necessary service to its citizens. (2) Delays in construction are due to factors outside the control of the Contractor. The Contractor is approaching the penalty provisions of the contract and Contractor can show he has made a diligent effort to complete the contract within the allotted time. Before construction work requiring an inspector is to be performed on weekends or holidays, the Contractor must notify the Owner's Representative not less than three full working days prior to the weekend or holiday he desires to do work and obtain written permission from the Owner's Representative to do such work. The final decision on whether to allow construction work requiring an inspector on weekends or holidays will be made by the Owner's Representative. In any event, if a condition should occur or arise at the site of this project or from the work being done under this contract which is hazardous or dangerous to property or life, the Contractor shall immediately commence work, regardless of the day of the week or the time of day, to correct or alleviate such condition so that it is no longer dangerous to property or life. 18. PAYMENT OF EMPLOYEES AND FILING OF PAYROLLS The contractor and each of his subcontractors shall pay each of his employees engaged in work on the project under this contract in full (less mandatory legal deductions) in cash, or by check readily cashable without discount, not less often than once each week. The Contractor and each of his subcontractors engaged at the site of the work shall not later than the seventh day following the payment of wages, file with the Owner's Representative, or Engineer, a certified, sworn, legible copy of such payroll. This shall contain the name of each employee, his classification, the number of hours worked on each day, rate of pay, and net pay. The affidavit shall state that the copy is a true and correct copy of such payroll, that no rebates or deduc- tions (except as shown) have been made, or will in the future be made from the wages paid as shown thereon. The Contractor must classify employees according to one of the classifications set forth in the schedule of general prevailing rate of per diem wages, which schedule is included in the contract documents. -8- The Contractor shall forfeit as a penalty to the City of Lubbock on whose behalf this contract is made, ten dollars for each laborer, workman, or mechanic employed for each calendar day, or portion thereof, such taborer, workman or mechanic is paid less than the wages assigned to his particular classification as set forth in the schedule of general prevailing rate of per diem wages included in these contract documents. .� 19. PROVISIONS CONCERNING ESCALATOR CLAUSES Proposals submitted containing any conditions which provide for changes in the stated bid price due to in- creases or decreases in the cost of materials, labor or other items required for the project will be re- jected and returned to the bidder without being considered. 20. PREPARATION FOR PROPOSAL The bidder shall submit his proposal on forms furnished by the City. All blank spaces in the form shall be correctly filled in and the bidder shall state the price both in words and numerals, for which he proposes to do the work contemplated or furnish the materials required. Such prices shall be written in ink, dis- tinctly and legibly, or typewritten. In case of discrepancy between the price written in words and the price written in figures, the price written in words shall govern. If the proposal is submitted by an indi- vidual, his name must be signed by him or his duty authorized agent. If a proposal is submitted by a firm, association, or partnership, the name and address of each member must be given and the proposal signed by a member of the firm, association or partnership, or person duly authorized. If the proposal is submitted by a company or corporation, the company or corporate name and business address must be given, and the proposal signed by an official or duly authorized agent. Powers of attorney authorizing agents or others to sign proposals must be properly certified and must be in writing and submitted with the proposal. The proposal shall be executed in ink. Each proposal shalt be enclosed in a sealed envelope, addressed as specified in the Notice to Bidders, and endorsed on the outside of the envelope in the following manner: (a) Bidder's name (b) Proposal for (description of the project). Bid proposals may be withdrawn and resubmitted at any time prior to the time set for opening of the bids, but no proposal may be withdrawn or altered thereafter. 21. BOUND COPY OF CONTRACT DOCUMENTS Bidder understands and agrees that the contract to be executed by bidder shall be bound and include the fol- lowing: Wa (a) Notice to Bidders. (b) General Instructions to Bidders. (c) Bidder's Proposal. (d) Statutory Bond (if required). (e) Contract Agreement. (f) General Conditions. (g) Special Conditions (if any). (h) Specifications. (i) Insurance Certificates. �» (j) All other documents made available to bidder for his inspection in accordance with the Notice to Bidders. If Plans and Specifications are too bulky or cumbersome to be physically bound, they are to be considered .W. incorporated by reference into the aforementioned contract documents. 1",+ -9- (THIS PAGE LEFT BLANK INTENTIONALLY) BID PROPOSAL -10- (THIS PAGE LEFT BLANK INTENTIONALLY) PLACE_ Z6 Z %— PROJECT N0. a ,,,D Proposal of BID PROPOSAL BID FOR LUMP SUM CONTRACTS (hereinafter called Bidder) . To the Honorable Mayor and City Council City of Lubbock, Texas (hereinafter called Owner) Gentlemen: The Bidder, in compliance with your invitation for bids for the'construction of a " i c _ _ n r t 4� ., ., .-. e having carefully examined thelans s p pecifications, instructions to bidders, notice to bidders and all other re- tated contract documents and the site of the proposed work, and being familiar with all of the conditions surround- ing the construction of the proposed project including the availability of materials and labor, hereby proposes to furnish all labor, materials, and supplies; and to construct the project in accordance with the plans, specifica- tions and contract documents, within the time set forth therein and at the price stated below. The price to cover all expenses incurred in performing the work required under the contract documents, of which this proposal is to be a part, is as follows: BID Amos �_ ate, . h words and figures. In case of discrepancy, the amount shown in words shall govern.) Bidder hereby agrees to commence the work on the above project on or before a date to be specified in a written "Notice to Proceed" of the Owner and to fully complete the project within 30 (THIRTY) consecutive calendar days thereafter as stipulated in the specifications and other contract documents. Bidder hereby further agrees to pay to Owner as liquidated damages the sum of $50.00 (Fifty dollars) for each consecutive calendar day in excess of the time set forth hereinabove for completion of this project, all as more fully set forth in the general conditions of the contract documents. Bidder understands and agrees that this bid proposal shall be completed and submitted in accordance with in- struction number 20 of the General Instructions to Bidders. Bidder understands that the Owner reserves the right to reject any or all bids and to waive any formality in ~ the bidding. The Bidder agrees that this bid shalt be good and may not be withdrawn for a period of thirty (30) calendar days after the scheduled closing time for receiving bids. .., The undersigned Bidder hereby declares that he has visited the site of the work and has carefully examined the plans, specifications and contract documents pertaining to the work covered by this bid, and he further agrees to commence work on or before the date specified in the written notice to proceed, and to substantially complete the work on which he has bid; as provided in the contract documents. s Enclosed with tis proposal is a Cashier's Check or Certified Check forO_X_4�MAIVJ Dollars or a Proposal Bond in the sum of Dollars (S )• __ which it is agreed shall be collected and retained by the Owner as liquidated damages in the event the proposal is accepted by the Owner and the undersigned fails to execute the necessary: contract documents and the required bond (if any) with the Owner within ten (10) days after the date of receipt of written notification of acceptance of said proposal; otherwise, said check or bond.shall be returned to the undersigned upon demand. Bidder understands and agrees that the contract to be executed by Bidder shall be bound and include all con- ' tract documents made available to him for his inspection in accordance with the Notice to Bidders. - Contracto _ BY: i (Seal if Bidder is a Corporation) ATTEST: Secretary PAYMENT BOND -13- (THIS PAGE LEFT BLANK INTENTIONALLY) STATUTORY PAYMENT BOND PURSUANT TO ARTICLE 5160 OF THE REVISED CIVIL STATUTES OF TEXAS AS AMENDED BY ACTS OF THE 56TH LEGISLATURE, REGULAR SESSION, 1959 KNOW ALL MEN BY THESE PRESENTS, that (hereinafter called the Principal(s), as Principal(s), and (hereinafter called the Surety(s), as Surety(s), are held and firmly bound unto the City of Lubbock (hereinafter called the Obligee), in the amount of Dollars (8 ) lawful money of the United States for the payment whereof, the said Principal and Surety bind themselves, and their heirs, adminis- trators, executors, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has entered into a certain written contract with the Obligee, dated the day of 19 , to and said Principal under the law is required before commencing the work provided for in said contract to execute a bond in the amount of said contract which contract is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein. NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall pay all claimants supplying labor and material to him or a sub -contractor in the prosecution of the work provided for in said con- tract, then, this obligation shall be void; otherwise to remain in full force and effect; PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Article 5160 of the Revised Civil Statutes of Texas as amended by Acts of the 56th Legislature, Regular Session, 1959, and all liabilities on this bond shall be determined in accordance with the provisions of said Article to the same extent as if it were copied at length herein. -14- IN WITNESS WHEREOF, the said Principal (s) and Surety (s) have signed and sealed this instrument this day of 19_ Principal By: By: By: (Title) (Title) (Title) Surety *By: (Title) The undersigned surety company represents that it is duly qualified to do business in Texas, and hereby des- ignates an agent resident in Lubbock County to whom any requisite notices may be delivered and on whom service of process may be had in matters arising out of such suretyship. Surety *By: (Title) Approved as to form: City of Lubbock By: City Attorney *Note: If signed by an officer of the Surety Company there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation.. If signed by an Attorney in Fact, we must have copy of power of attorney for our files. -15- PERFORMANCE BOND -16- (THIS PAGE LEFT BLANK INTENTIONALLY) STATUTORY PERFORMANCE BOND PURSUANT TO ARTICLE 5160 OF THE REVISED CIVIL STATUTES OF TEXAS AS AMENDED BY ACTS OF THE 56TH LEGISLATURE, REGULAR SESSION 1959 a-. KNOW ALL MEN BY THESE PRESENTS, that (hereinafter called the Principal(s), as Principal(s), and (hereinafter called the Surety(s), as Surety(s), are held and firmly bound unto the City of Lubbock (hereinafter called the Obligee), in the amount of Dollars ($ ) lawful money of the *^ United States for the payment whereof, the said Principal and Surety bind themselves, and their heirs, administra- tors, executors, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has entered into a certain written contract with the Obligee, dated theday of 19_, to —' and said principal under the law is required before commencing the work provided for in said contract to execute a bond in the amount of said contract which contract is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein. NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall faithfully per- form the work in accordance with the plans, specifications and contract documents, then this obligation shall be void; otherwise to remain in full force and effect. PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Article 5160 of the Revised Civil Statutes of Texas as amended by Acts of the 56th Legislature, regular session 1959, and all liabilities on this bond shall be determined in accordance with the provisions of said article to the same extent as if it were copied at length herein. IN WITNESS WHEREOF, the said Principal (s) and Surety (s) have signed and sealed this instrument this day of 19_ Surety Principal r– *By. (Title) By. ~~* (Title) By: (Title) By: (Title) -17- The undersigned surety company represents that it is duly qualified to do business in Texas, and hereby designates an agent resident in Lubbock County to whom any requisite notices may be delivered and on whom service of process may be had in matters arising out of such suretyship. Surety *By: Approved as to Form City of Lubbock By: City Attorney (Title) *Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If signed by an Attorney in Fact, we must have copy of power of attorney for our files. -18- r• - CERTIFICATE OF INSURANCE -19- (THIS PAGE LEFT BLANK INTENTIONALLY) PRODUCER QUISENBERRY PO BOX 65208 LUBBOCK, TX CODE INSURED CA.TE O INS & ASSOCIATES, INC. 79464 SUB -CODE BILL WRIGHT TELECOM RT 8 BOX 47B-5 LUBBOCK, TX 79407 ISSUE DATE (MMIDD/YY) ,10-15-90 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW COMPANIES AFFORDING COVERAGE COMPANY LETTER A COMMERCIAL UNION INS CO COMPANY B LETTER COMPANY LETTER C+ COMPANY D LETTER COMPANY E LETTER THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS ECT TO ALLO HEI TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. CO TYPE OF INSURANCE POLICY EFFECTIVE POLICY EXPIRATION: TR • POLICY NUMBER DATE (MM/DD/YY) DATE (MM/DD/YY) ! ALL LIMITS IN THOUSANDS GENERAL LIABILITY _. GENERAL AGGREGATE $ AIX COMMERCIAL GENERAL LIABILITY i PRODUCTS-COMP/OPS AGGREGATE $ 1, 0 0 0 j CLAIMS MADE; X OCCUR.' CRR1 9 7 6 31 12-2-89 .12-02-90 ; PERSONAL & ADVERTISING INJURY $ 1,000, OWNER'S & CONTRACTOR'S PROT.i EACH OCCURRENCE $ 1,000, FIRE DAMAGE (Any one fire) $ 50o. -- MEDICAL EXPENSE (Any one person) $ 5, AUTOMOBILE LIABILITY — COMBINED j ANY AUTO SINGLE $ ALL OWNED AUTOS ;LIMIT i BODILY ;SCHEDULED AUTOS INJURY $ (Per person) I HIRED AUTOS BODILY NON -OWNED AUTOS INJURY ; $ (Per accident); GARAGE LIABILITY PROPERTY $ P DAMAGE zz r• EXCESS LIABILITY EACH AGGREGATE 3 OCCURRENCE $ $ OTHER THAN UMBRELLA FORM WORKER'S COMPENSATION STATUTORY AND $ (EACH ACCIDENT) EMPLOYERS' LIABILITY $ (DISEASE—POLICY LIMIT) $ (DISEASE—EACH EMPLOYEE OTHER r DESCRIPTION OF OPERATIONSlLOCATIONS/VEHICLES/RESTRICTIONS/SPECIAL ITEMS TELEPHONE WIRING — 600 MUNICIPAL DRIVE LUBBOCK, TX CITY OF LUBBOCK IS NAMED AS ADDITIONAL INSURED CITY OF LUBBOCK PO BOX 2000 LUBBOCK, TX 79417 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, THE ISSUING COMPANY WILL ENDEAVOR TO MAIL 10 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO MAIL SUCH NOTICE SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE COMPANY, ITS AGENTS OR REPRESENTATIVES. AUTHORIZED REPRESENTATIVE ' �I ASSOCIATES, INC. 79464 ISSUE DATE (MM/DD/YY) 10-15-90 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW COMPANIES AFFORDING COVERAGE i CAGESS LIABILITY OTHER THAN UMBRELLA FORM WORKER'S COMPENSATION AND EMPLOYERS' LIABILITY OTHER 3 i i i i DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES/RESTRICTIONSISPECIAL ITEMS TELEPHONE WIRING - 600 MUNICIPAL DRIVE LUBBOCK, TX GERT.IFICAT6 HOr DER' ` CANGELtdTiOIV SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE CITY OF LUBBOCK EXPIRATION DATE THEREOF, THE ISSUING COMPANY WILL ENDEAVOR TO PO BOX 2000 MAIL 10 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LUBBOCK, TX 79417 LEFT, BUT FAILURE TO MAIL SUCH NOTICE SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE COMPANY, ITS AGENTS OR REPRESENTATIVES. AUTHORIZ REPRESENTATIV/E o ©A�ORn rORPCfRATIAN ibito COMPANY A CODE SUB -CODE LETTER COMMERCIAL UNION INS CO. _ _ . _. _.._. _ __ __ , . ..,....... _.... COMPANY B INSURED LETTER CO PANY LETTER C+ CITY OF LUBBOCK PO BOX 2000 LUBBOCK, TX 79417 COMPANY LETTER D COMPANY E LETTER THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. CO LTTR; TYPE OF INSURANCE POLICY NUMBER POLICY EFFECTIVE i POLICY EXPIRATION DATE (MM/DD/YY) : DATE (MM/DDIYY) ALL LIMITS IN THOUSANDS GENERAL LIABILITY GENERAL AGGREGATE $ ] 0 Q 0 COMMERCIAL GENERAL LIABILITY I PRODUCTS-COMP/OPS AGGREGATE: $ CLAIMS MADE OCCUR.!PERSONAL & ADVERTISING INJURY: $ A; X OWNER'S&CONTRACTOR'SPROT. TO BE ASSIGNED 10-15-90 10— 15— 91, EACH OCCURRENCE $ 11000,, FIRE DAMAGE (Any one fire) $ MEDICAL EXPENSE (Any one person) $ AUTOMOBILE LIABILITY COMBINED ,.. ANY AUTO '• SINGLE $ 2 'LIMIT.. ALL OWNED AUTOS BODILYa 1 SCHEDULED AUTOS INJURY $ X, - - (Per person) ; ,, HIRED AUTOS BODILY NON -OWNED AUTOS I JURY ; N $ r� (Per accident) GARAGE LIABILITY PROPERTY $; DAMAGE i CAGESS LIABILITY OTHER THAN UMBRELLA FORM WORKER'S COMPENSATION AND EMPLOYERS' LIABILITY OTHER 3 i i i i DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES/RESTRICTIONSISPECIAL ITEMS TELEPHONE WIRING - 600 MUNICIPAL DRIVE LUBBOCK, TX GERT.IFICAT6 HOr DER' ` CANGELtdTiOIV SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE CITY OF LUBBOCK EXPIRATION DATE THEREOF, THE ISSUING COMPANY WILL ENDEAVOR TO PO BOX 2000 MAIL 10 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LUBBOCK, TX 79417 LEFT, BUT FAILURE TO MAIL SUCH NOTICE SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE COMPANY, ITS AGENTS OR REPRESENTATIVES. AUTHORIZ REPRESENTATIV/E o ©A�ORn rORPCfRATIAN ibito TEXAS AUTO INSURANCE' IDENTIFICATION CARD [State Farm Mutual Automobile Insurance Company ❑ State Farm Fire And Casualty Company ANY ALTERATIONS ❑ State Farm County Mutual Insurance Company Of Texas WILL VOID THIS CARD i Policy Number Effective Date Expiration Date c/0 �o Signature of State Farm Agent LIABILITY INSURANCE IS IN EFFECT WHICH MEETS THE MINIMUM LIABILITY LIMITS REQUIRED BY THE TEXAS COMPULSORY INSURANCE LAW G 4180 TXa.1 KEEP THIS IDENTIFICATION CARD IN YOUR VEHICLE OR POSSESSION Named Insured Address QC �O /� • / '' � W/LI ��{Jl� 't,��� Vehicle Year Make Vehicle Identifiption Number CONTRACT -21- (THIS PAGE LEFT BLANK INTENTIONALLY) CONTRACT STATE OF TEXAS COUNTY OF LUBBOCK r-- THIS AGREEMENT, made and entered into this 11th day of October, 1990, by and between the City of Lubbock, County of Lubbock, State of Texas, acting by and through B.C. McMinn, Mayor, thereunto authorized to do so, hereinafter referred to as OWNER, and WRIGHT TELECOM of the City of LUBBOCK, County of LUBBOCK and the State of TEXAS, hereinafter termed CONTRACTOR. WITNESSETH:" That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the OWNER and under the conditions expressed in the bond bearing even date herewith (if any) the CON- TRACTOR hereby agrees with OWNER to commence and complete the construction of certain improvements described as fol - Lows: �... BID #10891 -MUNICIPAL HILL OPERATIONS CENTER - TELEPHONE FACILITIES IN THE AMOUNT OF $22,059.00. and all extra work in connection therewith, under the terms as stated in the contract documents and at his (or their) own proper cost and expense to furnish all materials, supplies, machinery, equipment, tools, superintendence; Labor, insurance and other accessories and services necessary to complete the said construction in accordance with the contract documents as defined in the General Condition of Agreement. The CONTRACTOR hereby agrees to commence work within ten days after the date written notice to do so shall have been given to him and to substantially complete same within the time specified in the contract documents. The OWNER agrees to pay the CONTRACTOR in current funds for the performance of the contract in accordance with the proposal submitted therefore, subject to additions and deductions, as provided in the contract documents and to make payment on account thereof as provided therein. IN WITNESS WHEREOF, the parties to these presents have executed this agreement in Lubbock, Lubbock County, Texas in the year and day first above written. T: CITY OF LUBBOCK, TEXAS (OWNER) Q ' By: l� ' Sec etary .— APVED AS TO CONTENT: MAYOR A—, APRO D AS TO FORM: WRIGHT TELECOM CONTRACTOR '-- TITLE: ATTEST: COMPLETE ADDRESS: Rt. 8. Box 47 B-5 Corporate Secretary Lubbock. TX 79407 -22- (THIS PAGE LEFT BLANK INTENTIONALLY) K GENERAL CONDITIONS OF THE AGREEMENT -23- (THIS PAGE LEFT BLANK INTENTIONALLY) P- 7. OWNER GENERAL CONDITIONS OF THE AGREEMENT Whenever the word Owner, or the expression Party of the First Part, or First Party, are used in this con- tract, it shall be understood as referring to the City of Lubbock, Texas. 2. CONTRACTOR Whenever the word Contractor, or the expression Party of the Second Part, or Second Party, is used, it shalt be understood to mean the person, persons, co -partnership or corporation, to -wit: WRIGHT TELECOM, who has agreed to perform the work embraced in this contract, or to his or their legal representative. 3. OWNER'S REPRESENTATIVE Whenever -the word Owner's Representative or representative is used in this contract, it shall be understood as referring to JERRY SMITH, DIRECTOR OF BUILDING SERVICES, City of Lubbock, under whose supervision these contract documents, including the plans and specifications, were prepared, and who will inspect construc- tions; or to such other representative, supervisor, or inspector as may be authorized by said Owner to act in any particular under this agreement. Engineers, supervisor or inspectors will act for the Owner under the direction of Owner's Representative, but shall not directly supervise the Contractor or men acting in behalf of the Contractor. 4. CONTRACT DOCUMENTS The contract documents shall consist of the Notice to Bidders, General Instructions to Bidders, Proposal, Signed Agreement, Statutory Bonds (if required), General Conditions of the Agreement, Special Conditions of the Agreement (if any), Specifications, Plans, Insurance Certificate, and all other documents made available to Bidder for his inspection in accordance with the Notice to Bidders. 5. INTERPRETATION OF PHRASES Whenever the words "Directed," "Permitted," "Designated," "Required," "Considered Necessary," "Prescribed," or words of like import are used, it shall be understood that the direction, requirement, permission, order, designation or prescription of the Owner's Representative is intended; and similarly, the words "Approved," "Acceptable," "Satisfactory," or words of like import shall mean approved by or acceptable or satisfactory to the Owner's Representative. Whenever in the Specifications or drawings accompanying this agreement, the terms of description of various qualities relative to finish, workmanship, or other qualities of.similar kind which cannot, from their na- ture, be specifically and clearly described and specified, but are necessarily described in general terms, the fulfillment of which must depend on individual judgment, then, in all such cases, any question of the fulfillment of said Specifications shall be decided by the Owner's Representative, and'said work shall be done in accordance with his interpretations of the meaning of the words, terms, or clauses defining the character of the work. 6. SUBCONTRACTOR. �^ The term Subcontractor, as employed herein, includes only those having a direct contract with the Contractor for performance of work on the project contemplated by these contract documents. Owner shall have no re- sponsibility to any Subcontractor employed by Contractor for performance of work on the project contemplated by these contract documents, but said Subcontractors will look exclusively to Contractor for any payments due Subcontractor. -24- 7. ` WRITTEN NOTICE Written notice shall be deemed to have been duty served if delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended, or if delivered at or sent certified mail to the last business address known to him who gives the notice. 8. WORK Unless otherwise stipulated, the Contractor shall provide and pay for all materials, supplies, machinery, equipment, tools, superintendence, labor, insurance, and all water, tight, power, fuel, transportation and all other facilities necessary for the execution and completion of the work covered by the contract docu- ments. Unless otherwise specified, alt materials shall be new and both workmanship and materials shall be of a good quality. The Contractor shall, if required, furnish satisfactory evidence as to the kind and quality of materials. Materials or work described in words which so applied have well known, technical or trade meaning shall be held to refer such recognized standards. All work shalt be done and all materials furnished in strict conformity with the contract documents. 9. SUBSTANTIALLY COMPLETED The term "Substantially Completed" is meant that the structure or project contemplated by the contract docu- ments has been made suitable for use or occupancy or the facility is in a condition to serve its intended purpose, but still may require minor miscellaneous work and adjustment. 10. LAYOUT Except as specifically provided herein, the Contractor shall be responsible for laying out all work and shall accomplish this work in a manner acceptable to the Owner's Representative. The Owner's Representative will check the Contractor's layout of all major structures and any other layout work.done by the Contractor at Contractor's request, but this check does not relieve the Contractor of the responsibility of correctly Locating all work in accordance with the Plans and Specifications. 11. KEEPING OF PLANS AND SPECIFICATIONS ACCESSIBLE The Contractor shall be furnished with one copies of all Plans, Profiles and Specifications without expense to him and he shall keep one copy of same consistently accessible on the job site. 12. RIGHT OF ENTRY The Owner's Representative may make periodic visits to the site to observe the progress of quality of the executed work and to determine, in general, if the work is proceeding in accordance with the contract docu- ments. He will not be required to make exhaustive or continuous on-site inspections to check the quality or quantity of the work, nor will he be responsible for the construction means, methods, techniques, sequences or procedures, or the safety precautions incident thereto. His efforts will be directed towards providing assurances for. the Owner that the completed project will conform to the requirements of the contract docu- ments, but he will not be responsible for the Contractor's failure to perform the work in accordance with the Contract Documents. On the basis of his on-site observations, he will keep the Owner informed of the progress of the work and will endeavor to guard the Owner against defects and deficiencies in the -work of the Contractor. -25- 13. LINES AND GRADES All lines and grades shall be furnished by the Owner's Representative whenever necessary for the commence- ment of the work contemplated by these contract documents or the completion of the work contemplated by these contract documents. Whenever necessary, Contractor shall suspend his work in order to permit Owner's «-. Representative to comply with this requirement, but such suspension will be as brief as practical and Con- tractor shall be allowed no extra compensation therefore. The Contractor shall give the Owner's Repre- sentative ample notice of the time and place where tines and grades will be needed. All stakes, marks, etc., shall be carefully preserved by the Contractor, and in case of careless destruction or removal by him, r•. his Subcontractors, or his employees, such stakes, marks, etc., shall be replaced by the Owner's .Representa- tive at Contractor's expense. 14. OWNER'S REPRESENTATIVE'S AUTHORITY AND DUTY Unless otherwise specified, it is mutually agreed between the parties to this Agreement that the Owner's Representative shalt review all work included herein. He has the authority to stop the work whenever such stoppage may be necessary to insure the proper execution of the contract. In order to permit delays and disputes and to discourage litigation, it is further agreed that the Owner's Representative shall, in all cases, determine the amounts and quantities of the several kinds of work which are to be paid for under this contract. He shall determine all questions in relation to said work and the construction thereof, and shall, in all cases, decide every question which may arise relative to the execution of this contract on the part of said Contractor. The Owner's Representative's estimates and findings shalt be conditions precedent .— to the right of the parties hereto to arbitration or to any action on the contract, and to any rights of the Contractor to receive any money under this contract; provided, however, that should Owner's Representative render any decision or give any direction, which in the opinion of either party hereto, is not in accordance with the meaning and intent of this contract, either party may file with said Owner's Representative within M., 30 days his written objection to the decision or direction so rendered, and by such action may reserve the right to submit the questions so raised to arbitration as hereinafter provided. It is the intent of this Agreement that there shall be no delay in the execution of the work, therefore, written decisions or direc- tion of the Owner's Representative as rendered shall be promptly carried out, and any claim arising there- from shall be thereafter adjusted to arbitration as hereinafter provided. The Owner's Representative shall, within a reasonable time, render and deliver to both the Owner and the Contractor a written decision on all claims of the parties hereto and on all questions which may arise rela- tive to the execution of the work or the interpretation of the contract, specifications and plans. Should the Owner's Representative fait to make such decision within a reasonable time, an appeal to arbitration may be taken as if his decision had been rendered against the party appealing. 15. SUPERINTENDENCE AND INSPECTION It is agreed by the Contractor that the Owner's Representative shall be and is hereby authorized to appoint from time to time such subordinate engineers, supervisors, or inspectors as the said Owner's Representative may deem proper to inspect the materials furnished and the work done under this Agreement, and to see that said material is furnished and said work is done in accordance with the specifications therefore. The Con- tractor shall furnish all reasonable aid and assistance required by the subordinate engineers, supervisors or inspectors for the proper inspection and examination of the work. The Contractor shall regard and obey the directions and instructions of any subordinate engineers, supervisors or inspectors so appointed, when such directions and instructions are consistent with the obligations of this Agreement and accompanying plans and specifications provided, however, should the Contractor object to any orders by any subordinate .., engineer, supervisor or inspector, the Contractor may within six (6) days make written appeal to the Owner's Representative for his decision. -26- 16. CONTRACTOR'S DUTY AND SUPERINTENDENCE The Contractor shall give personal attention to the faithful prosecution and completion of this contract and shall keep on the work, during its progress, a competent superintendent and any necessary assistants, all satisfactory to Owner's Representative. The superintendent shall represent the Contractor in his absence and all directions given to him shall be binding as if given to the Contractor. Adequate supervision by competent and reasonable representatives of the Contractor is essential to the proper performance of the work and lack of such supervision shall be grounds for suspending operations of the Contractor. The work, from its commencement to completion, shall be under the exclusive charge and control of the Con- tractor and all risk in connection therewith shall be borne by the Contractor. The Owner or Owner's Representatives will not be responsible for the acts or omissions of the Contractor, or any subcontractors, or any of his agents or employees, or any other persons performing any of the work. 17. CONTRACTOR'S UNDERSTANDING It is understood and agreed that the Contractor has, by careful examination, satisfied himself as to the na- ture and location of the work, the confirmation of the ground, the character, quality and quantity of mate- rials to be encountered, the character of equipment and facilities needed preliminary to and during the prosecution of the work, and the general and local conditions, and all other matters which in any way effect the work under this contract. No verbal agreement or conversation with any officer, agent, or employee of the Owner, either before or after the execution of this contract, shall effect or modify any of the terms or obligations herein contained. 18. CHARACTER OF WORKMEN The Contractor agrees to employ only orderly and competent men, skillful in the performance in the type of work required under this contract, to do the work; and agrees that whenever the Owner's Representative shall inform him in writing that any manor men on the work, are, in his opinion, incompetent, unfaithful, or dis- orderly, such man or men shall be discharged from the work and shall not again be employed on the work with- out the Owner's Representative's written consent. 19. CONSTRUCTION PLANT The Contractor shall provide all labor, tools, equipment, machinery and materials necessary in the prosecu- tion and completion of this contract where it is not otherwise specifically provided that Owner shall fur- nish same, and it is also understood that Owner shall not be held responsible for the care, preservation, conservation, or protection of any materials, tools, equipment or machinery or any part of the work until it is finally completed and accepted. The building of structures for the housing of men or equipment will be permitted only at such places as the Owner's Representative shall direct, and the sanitary conditions of the grounds in or about such structure shall at all times be maintained in a manner satisfactory to the Owner's Representative. 20. SANITATION Necessary sanitary conveniences for the use of laborers on the work site, property secluded from public ob- servation, shall be constructed and maintained by the Contractor in such manner and at such points as shall be approved by the Owner's Representative and their use shall be strictly enforced. -27- 21. OBSERVATION AND TESTING The Owner or Owner's Representative shall have the right at all reasonable times to observe and test the work. Contractor shall make necessary arrangements and provide proper facilities and access for such obser- vation and testing at any location wherever work is in preparation or progress. Contractor shall ascertain "^ the scope of any observation which may be contemplated by Owner or Owner's Representative and shall give am- ple notice as to the time each part of the work will be ready for such observation. Owner or Owner's Rep- resentative may reject any work found to be defective or not in accordance with the contract documents, re- gardless of the stage of its completion or the time or place of discovery of such errors and regardless of whether Owner's Observer has previously accepted the work through oversight or otherwise. If any work should be covered without approval or consent of the Owner, it must, if requested by Owner or Owner's Repre- sentative, be uncovered for examination at Contractor's expense. In the event that any part of the work is being fabricated or manufactured at a location where it is not convenient for Owner or Owner's Representa- tive to make observations of such work or require testing of said work, then in such event Owner or Owner's Representative may require Contractor to furnish Owner or Owner's Representative certificates of inspection, .�. testing or approval made by persons competent to perform such tasks at the location where that part of the work is being manufactured or. fabricated. All such tests will be in accordance with the methods prescribed by the American Society for Testing and Materials or such other applicable organization as may be required by law or the contract documents. If any work which is required to be inspected, tested, or approved is covered up without written approval or consent of the Owner or Owner's Representative, it must, if requested by the Owner or Owner's Representa- tive, be uncovered for observation and testing at the Contractor's expense. The cost of all such inspec- tions, tests and approvals shall be borne by the Contractor unless otherwise provided herein. Any work which fails to meet the requirements of any such tests, inspections or approval, and any work which meets the requirements of any such tests or approval but does not meet the requirements of the contract documents shall be considered defective. Such defective work shall be corrected at the Contractor's expense. Neither observations by the Owner or Owner's Representative, nor inspections, tests, or approvals made by Owner, Owner's Representative, or other persons authorized under this agreement to make such inspections, tests, or approvals shall relieve the Contractor from his obligation to perform the work in accordance with the requirements of the contract documents. 22. DEFECTS AND THEIR REMEDIES It is further agreed that if the work or any part thereof, or any material brought on the site of the work .., for use in the work or selected for the same, shall be deemed by the Owner or Owners' Representative as un- suitable or not in conformity with plans, specification and contract documents, the Contractor shall, after receipt of written notice thereof from the Owner's Representative, forthwith remove such material and re- build or otherwise remedy such work so that it shalt be in full accordance with this contract. It is fur- ther agreed that any remedial action contemplated as hereinabove set forth shall be at Contractor's expense. 23. CHANGES AND ALTERATIONS The Contractor further agrees that the Owner may make such changes and alterations as the Owner may see fit, in the line, grade, form dimensions, plans or or materials for the work herein contemplated, or any part .� thereof, either before or after the beginning of the construction, without affecting the validity of this contract and the accompanying bond. �--* If such changes or alterations diminish the quantity of the work to be done, they shall not constitute the basis for a claim for damages, or anticipated profits on the work that may be dispensed with. If they in- crease the amount of work, and the increased work can fairly be classified under the specifications, such increase shall be paid according to the quantity actually done and at the unit price established for such work under this contract; otherwise such additional work shall be paid for as provided under Extra Work. In -28- case the Owner shall make such changes or alterations as shall make useless any work already done or mate- rial already furnished or used in said work, then the Owner shall recompense the Contractor for any material or labor so used, and for any actual loss occasioned by such change, due to actual expenses incurred in preparation for the work as originally planned. 24. EXTRA WORK The term "extra work" as used in this contract shall be understood to mean and include all work that may be required by the Owner or Owner's Representative to be done by the Contractor to accomplish any change, al- teration or addition to the work as shown on the plans and specifications or contract documents and not cov- ered by Contractor's proposal, except as provided under Changes and Alterations herein. It is agreed that the Contractor shalt perform alt extra work under the direction of the Owner's Representa- tive when presented with a written work order signed by the Owner's Representative; subject, however, to the right of the Contractor to require written confirmation of such extra work order by the Owner. It is also agreed that the compensation to be paid to the Contractor for performing said extra work shall be determined by the following methods: Method (A) - By agreed unit prices; or Method (B) - By agreed lump sum; or Method (C) - If neither Method (A) or Method (B) be agreed upon before the extra work is com- menced, then the Contractor shalt be paid the actual field cost of the work, plus fifteen (15%) per cent. In the event said extra work be performed and paid for under Method (C), then the provisions of this para- graph shall apply and the "actual field cost" is hereby defined to include the cost of all workmen, such as foremen, timekeepers, mechanics and laborers, materials, supplies, teams, trucks, rentals on machinery and equipment, for the time actually employed or used on such extra work, plus actual transportation charges necessarily incurred, together with all expenses incurred directly on account of such extra work, including Social Security, Old Age Benefits, Maintenance Bonds, Public Liability and Property Damage and Workmen's Compensation and all other insurances as may be required by law or ordinances or directed by the Owner or Owner's Representative, or by them agreed to. Owner's Representative may direct the form in which accounts of the actual field cost shalt be kept and records of these accounts shall be made available to the Owner's Representative. The Owner's Representative may also specify in writing, before the work commences, the method of doing the work and the type and kind of machinery and equipment to be used; otherwise, these mat- ters shall be determined by the Contractor. Unless otherwise agreed upon, the prices for the use of machin- ery and equipment shall be determined by using 100%, unless otherwise specified, of the latest Schedule of Equipment and Ownership Expenses adopted by the Associated General Contractors of America. Where practical, the terms and prices for the use of machinery and equipment shalt be incorporated in the written extra work order. The fifteen percent (15%) of the actual field cost to be paid to Contractor shall cover and com- pensate him for his profit, overhead, general superintendence and field office expense, and all other ele- ments of cost and expense not embraced within the actual field cost as herein defined, save that where the Contractor's Camp or Field Office must be maintained primarily on account of such Extra Work, then the cost to maintain and operate the same shalt be included in the "actual field cost." No claim for extra work of any kind will be allowed unless ordered in writing by Owner's Representative. In case any orders or instructions appear to the Contractor to involve extra work for which he should receive compensation or an adjustment in the construction time, he shalt make written request to the Owner's Repre- sentative for a written order authorizing such extra work. Should a difference of opinion arise as to what does or does not constitute extra work or as to the payment therefore, and the Owner's Representative in- sists upon its performance, the Contractor shalt proceed with the work after making written request for written order and shalt keep adequate and accurate account of the actual field cost thereof, as provided under Method (C). The Contractor will thereby preserve the right to submit the matter of payment to arbi- tration as herein below provided. -29- UQ 25. DISCREPANCIES AND OMISSIONS It is further agreed that it is the intent of this contract that all work described in the proposal, the specifications, plans and other contract documents, is to be done for the prices quoted by the Contractor and that such price shall include all appurtenances necessary to complete the work in accordance with the r--- intent of these contract documents as interpreted by Owner's Representative. If the Contractor finds any discrepancies or omissions in these plans, specifications, or contract documents, he should notify the Owners' Representative and obtain a clarification before the bids are received, and if no such request is received by the owner's Representative prior to the opening of bids, then it shall be considered that the Contractor fully understands the work to be included and has provided sufficient sums in his proposal to complete the work in accordance with these plans and specifications. It is further understood that any re- quest for clarification must be submitted no later than five days prior to the opening of bids. 26. RIGHT OF OWNER TO MODIFY METHODS AND EQUIPMENT — If at any time the methods or equipment used by the Contractor are found to be inadequate to secure the quality of work with the rate of progress required under this contract, the Owner or Owner's Representative may order the Contractor in writing to increase their safety or improve their character and efficiency and the Contractor shall comply with such order. If, at any time, the working force of the Contractor is inadequate for securing the progress herein speci- fied, the Contractor shall, if so ordered in writing, increase his force or equipment, or both, to such an extent as to give reasonable assurance of compliance with the schedule of progress. 27. PROTECTION AGAINST ACCIDENT TO EMPLOYEES AND THE PUBLIC The Contractor shall take out and procure a policy or policies of Workmen's Compensation Insurance with an insurance company licensed to transact business in the State of Texas, which policy shall comply with the Workmen's Compensation laws of the State of Texas. The Contractor shall at all times exercise reasonable precaution for the safety of employees and others on or near the work and shall comply with all applicable provisions of federal, state and municipal laws and building and construction codes. All machinery and equipment and other physical hazards shall be guarded in accordance with the "Manual of Accident Prevention in Construction" of Associated General Contractors of America, except where incompatible with federal, state or municipal laws or regulations. The Contractor, his sureties and insurance carriers shall defend, indem- nify and save harmless the Owner and all of its officers, agents and employees from all suits, actions, or claims of any character whatsoever, brought for or on account of any injuries or damages received or sus- tained by any person or persons or property, on account of any negligent act or fault of the Contractor or any subcontractor, their agents or employees, in the execution and supervision of said contract, and the project which is the subject matter of this contract, on account of the failure of Contractor or any subcon- tractor to provide necessary barricades, warning lights, or signs and will be required to pay any judgment with costs which may be obtained against the Owner or any of its officers, agents, or employees including attorney's fees. The safety precautions taken shall be the sole responsibility of the Contractor, in his sole discretion as an Independent Contractor; inclusion of this paragraph in the Agreement, as well as any notice which may be given by the Owners or the Owner's Representative concerning omissions under this paragraph as the work pro- gresses, are intended as reminders to the Contractor of his duty and shall not be construed as any assump- tion of duty to supervise safety precautions by either the Contractor or any of his subcontractors. -30- 28. CONTRACTOR'S INSURANCE The Contractor shall procure and carry at his sole cost and expense through the life of this contract, in- surance protection as hereinafter specified. Such insurance shall be carried with an insurance company au- thorized to transact business in the State of Texas and shall cover all operations in connection with this contract, whether performed by the Contractor or a subcontractor, or separate policies shall be provided covering,the operation of each subcontractor. A. Comprehensive General Liability Insurance The contractor shall have Comprehensive General Liability Insurance with limits of $300,000 Bodily Injury and $300,000 Property Damage per occurrence to include: Premises and Operations Explosion & Collapse Hazard Underground Damage Hazard Products & Completed Operations Hazard Contractual Liability Independent Contractors Coverage Personal Injury (with exclusion "c" waived) The City is to be named as an additional insured on this policy for this specific job, and copy of the endorsement doing so is to be attached to the Certificate of Insurance. B. Owner's Protective or Contingent Public Liability Insurance and Property Damage Liability Insurance. The Contractor shall obtain an Owner's Protective or Contingent Public Liability Insurance policy naming the City of Lubbock as insured and the amount of such policy shall be as follows For bodily injuries, including accidental death, $500,000 per occurrence, and $100,000 for Property Damage. C. Comprehensive Automobile Liability Insurance The Contractor shall have Comprehensive Automobile Liability Insurance with limits of not less than; Bodily Injury $250/500,000 Property Damage $100,000 to include all owned and non -owned cars including: Employers Non -ownership Liability Hired and Non - owned Vehicles. The City is to be named as an additional insured on this policy for this specific job and copy of the endorsement doing so is to be attached to the Certificate of Insurance. D. Builder's Risk Insurance The Contractor shall obtain a Builder's Risk policy in the amount of (100% of poten- tial loss) naming the City of Lubbock as insured. -31- E. Excess or Umbrella Liability Insurance The Contractor shall have Excess or Umbrella Liability Insurance in the amount of ($1,000,000 minimum) with coverage to correspond with Comprehensive General Liability and Comprehen- sive Automobile Liability coverages. The City is to be named as an additional insured on this policy for this specific job and copy of the endorsement doing so is to be attached to the Certificate of Insurance. F. Worker's Compensation and Employers Liability Insurance As required by State statute covering all employees whether employed by the Contractor or any Sub- contractor on the job with Employers Liability of at least $100,000 limit. G. Proof of Coverage Before work on this contract is commenced, each Contractor and subcontractor shalt submit to the Owner for approval five Certificates of Insurance covering each insurance policy carried and offered as evidence of compliance with the above insurance requirements, signed by an authorized representative of the insurance company setting forth: (1) The name and address of the insured. (2) The location of the operations to which the insurance applies. (3) The name of the policy and type or types of insurance in force thereunder on the date borne by such certificate. (4) The expiration date of the policy and the limit or limits of liability thereunder on the date borne by such certificate. (5) A provision that the policy may be canceled only by mailing written notice to the named in- sured at the address shown in the bid specifications. (6) A provision that written notice shalt be given to the City ten days prior to any change in or cancellation of the policies shown on the certificate. (7) The certificate or certificates shall be on the form (or identical copies thereof) con- tained in the job specifications. No substitute of nor amendment thereto will be accept- able. 29. PROTECTION AGAINST CLAIMS OF SUBCONTRACTORS LABORERS MATERIALMEN AND FURNISHERS OF MACHINERY EQUIPMENT AND SUPPLIES The Contractor agrees that he will indemnify and save the Owner harmless from all claims growing out of any demands of subcontractors, laborers, workmen, mechanics, materialmen and furnishers of machinery and parts thereof, equipment, power tools, all suppliers, including commissary, incurred in the furtherance of the performance of this contract. When Owner so desires, the Contractor shall furnish satisfactory evidence that all obligations of the nature hereinabove designated have been paid, discharged or waived. If during the progress of the work, Contractor shall allow any indebtedness to accrue for work furnished by any of those designated in the preceding paragraph and shall fail to pay and discharge any such indebtedness within five (5) days after demand is made, then Owner may, during the period for which such indebtedness -32- shall remain unpaid, withhold from the unpaid portion of this contract, a sum equal to the amount of such unpaid indebtedness or may apply the sum so withheld to discharge any such indebtedness. Any and all communications between any party under this paragraph must be in writing. 30. PROTECTION AGAINST ROYALTIES OR PATENT INVENTION The contractor shall pay all royalties and license fees, and shall provide for the use of any design, de- vice, material or process covered by letters patent or copyright by suitable legal agreement with the Paten- tee or Owner thereof. The Contractor shall defend all suits or claims for infringement of any patent or copyrights and shall indemnify and save the Owner harmless from any loss on account thereof, except that Owner shall defend all such suits and claims and shalt be responsible for all such loss when a particular design, device, material or process or the product of a particular manufacturer or manufacturers is speci- fied or required in these contract documents by Owner; provided, however, if choice of alternate design, de- vice, material or process is allowed to the Contractor, then Contractor shalt indemnify and save Owner harm- less from any loss on account thereof. If the material or process specified or required by Owner is an in- fringement, the Contractor shall be responsible for such loss unless he promptly gives written notice to the Owner of such infringement. 31. LAWS AND ORDINANCES The Contractor shall at all times observe and comply with all federal, state and local laws, ordinances and regulations, which in any manner effect the contract or the work, and shall indemnify and save harmless the Owner against any claims arising from the violation of any such laws, ordinances, and regulations, whether by the Contractor or his employees. If the Contractor observes that the plans and specifications are at variance therewith, he shall promptly notify the Owners' Representative in writing and any necessary changes shall be adjusted as provided in the contract for changes in the work. If the Contractor performs any work knowing it to be contrary to such laws, ordinances, rules and regulations, and without such notice to the Owner's Representative, he shall bear all costs arising therefrom. The Owner is a municipal corporation of the State of Texas and the law from which it derives its powers, in- sofar as the same regulates the objects for which, or the manner in which, or the conditions under which the Owner may enter into contracts, shall be controlling, and shall be considered as part of this contract to the same effect as though embodied herein. 32. ASSIGNMENT AND SUBLETTING The Contractor further agrees that he will retain personal control and will give his personal attention to the fulfillment of this contract. The Contractor further agrees that subletting of any portion or feature of the work, or materials required in the performance of this contract, shall not relieve the Contractor from his full obligations to the Owner, as provided by this contractual agreement. 33. TIME FOR COMPLETION AND LIQUIDATED DAMAGES It is hereby understood and mutually agreed by and between the Contractor and the Owner, that the date of beginning and time for completion as specified in the contract of work to be done hereunder are essential conditions of this contract; and it is further mutually understood and agreed that the work embraced in this contract shall be commenced on a date to be specified in the Notice to Proceed. If the Contractor should neglect, fail, or refuse to complete the work within the time herein specified, or any proper extension thereof granted by the Owner, then the Contractor does hereby agree as part of the con- sideration for the awarding of this contract, the Owner may withhold permanently from Contractor's total compensation, the sum of $50.00 (FIFTY DOLLARS) PER DAY, not as a penalty, but as liquidated damages for the -33- breach of the contract as herein set forth for each and every calendar day that the Contractor shall be in default after the time stipulated for completing the work. It is expressly understood and agreed, by and between Contractor and the Owner, that the time for the com- pletion of the work described herein is reasonable time for the completion of the same, taking into consid- eration the average climatic change and conditions and usual industrial conditions prevailing in this Local- ity. The amount is fixed and agreed upon by and between the Contractor and the Owner because of the impractica-bility and extreme difficulty in fixing and ascertaining actual damages the Owner would in such event sus- tain, and the amount is agreed to be damages the Owner would sustain and shall be retained by the Owner from current periodical estimates for payments or from final payment. It is further agreed and understood between the Contractor and Owner that time is of the essence of this contract. 34. TIME AND ORDER OF COMPLETION It is the meaning and intent of this contract, unless otherwise herein specifically provided, that the Con- tractor shall be allowed to prosecute his work at such time and sessions, in such order of precedence, and in such manner as shall be most conductive to economy of construction; provided, however, that the order and time of prosecution shall be such that the work shall be substantially completed as a whole and in part, in -- accordance with this contact, the plans and specifications, and within the time of completion designated in the proposals; provided, also, that when the Owner is having other work done, either by contract or by his own force, the Owner's Representative may direct the time and manner of constructing work done under this contract so that conflicts will be avoided and the construction of the various works being done for the Owner shall be harmonized. The Contractor shall submit, at such times as may reasonably be requested by the Owner's Representative, schedules which shall show the order in which the Contractor proposes to carry on the work, with dates at which the Contractor will start the several parts of the work and estimated dates of completion of the sev- eral parts. 35. EXTENSION OF TIME The Contractor agrees that he has submitted his proposal in full recognition of the time required for the completion of this project, taking into consideration the average climatic range and industrial conditions prevailing in this locality, and has considered the liquidated damage provisions of paragraph 33 hereinabove set forth and that he shall not be entitled to, nor will he request, an extension of time on this contract, except when his work has been delayed by an act or neglect of the Owner, Owner's Representative, employees of the Owner or other contractors employed by the owner, or by changes ordered in the work, or by strike, walk -outs, acts of God or the public enemy, fire or flood. The Contractor may apply in writing for an ex- tension of time, submitting therewith all written justification as may be required by Owner's Representative for such an extension as requested by Contractor. The Owner's Representative within ten (10) days after re- ceipt of a written request for an extension of time by the Contractor supported by all requested docu- mentation shall then submit such written request to the City Council of the City of Lubbock for their con- sideration. Should the Contractor disagree with the action of City Council on granting an extension of time, such disagreement shall be settled by arbitration as hereinafter provided. 36. HINDRANCE AND DELAYS In executing the contract agreement, the Contractor agrees that in undertaking to complete the work within the time herein fixed, he has taken into consideration and made allowances for all hindrances and delays in- cident to such work, whether growing out of delays in securing material or workmen or otherwise. No charge -34- shall be made by the Contractor for hindrance or delays from any cause during the progress of any part of the work embraced in this contract except where the work is stopped by order of the Owner or Owner's Representative for the Owner's convenience, in which event, such expense as in the judgment of the Owner's Representative that is caused by such stoppage shall be paid by Owner to Contractor. 37. QUANTITIES AND MEASUREMENTS No extra or customary measurements of any kind will be allowed, but the actual measured or computed length, area, solid contents, number and weight only shall be considered, unless otherwise specifically provided. In the event this contract is let on a unit price basis, then Owner and Contractor agree that this contract, including the specifications, plans and other contract documents are intended to show clearly all work to be done and material to be furnished hereunder. Where the estimated quantities are shown for the various classes of work to be done and material to be furnished under this contract, they are approximate and are to be used only as a basis for estimating the probable cost of the work and for comparing their proposals of- fered for the work. It is understood and agreed that the actual amount of work to be done and the materials to be furnished under this contract may differ somewhat from these estimates, and that where the basis for payment under this contract is the unit price method, payment shall be for the actual amount of work done and materials furnished on the project. 38. PROTECTION OF ADJOINING PROPERTY The Contractor shall take proper means to protect the adjacent or adjoining property or properties in any way encountered, which may be injured or seriously affected by any process of construction to be undertaken under this agreement, from any damage or injury by reason of said process of construction; and he shall be liable for any and all claims for such damage on account of his failure to fully protect all adjacent property. The Contractor agrees to indemnify, save and hold harmless the Owner against any claim or claims for damages due to any injury to any adjacent or adjoining property, arising or growing out of the perfor- mance of this contract, but such indemnity shall not apply to any claim of any kind arising out of the exis- tence or character of the work. 39. PRICE FOR WORK in consideration of the furnishing of all necessary labor, equipment and material and the completion of all work by the Contractor, and on the delivery of all materials embraced in this contract in full conformity with the specifications and stipulations herein contained, the Owner agrees to pay the Contractor the price set forth in the proposal attached hereto, which has been made a part of this contract, and the Contractor hereby agrees to receive such price in full for furnishing all materials and all labor required for the aforesaid work, also, for all expenses incurred by him and for well and truly performing the same and the whole thereof in the manner and according to this agreement, the attached specifications, plans, contract documents and requirements of Owner's Representative. 40. PAYMENTS No payments made or certificates given shall be considered as conclusive evidence of the performance of the contract, either wholly or in part, nor shall any certificate or payment be considered as acceptance of de- fective work. Contractor shall at any time requested during the progress of the work furnish the Owner or Owner's Representative with a verifying certificate showing the Contractor's total outstanding indebtedness in connection with the work. Before final payment is made, Contractor shall satisfy Owner, by affidavit or otherwise, that there are no outstanding liens against Owner's premises by reason of any work under the con- tract. Acceptance by Contractor of final payment of the contract price shall constitute a waiver of all claims against Owner which have not theretofore been timely filed as provided in this contract. -35- 41. PARTIAL PAYMENTS On or before the tenth day of each month, the Contractor shalt submit to owner's Representative an applica- tion for partial payment. Owner's Representative shalt review said application for partial payment and the progress of the work made by the Contractor and if found to be in order shall prepare a certificate for par -tial payment showing as completely as practical the total value of the work done by the Contractor up to and including the last day of the preceding month; said statement shalt also include the value of all sound ma- teriats delivered on site of the work that are to be fabricated into the work. The Owner shalt then pay the Contractor on or before the fifteenth day of the current month the total amount of the Owner's Representative's Certificate of Partial Payment, less 5% of the amount thereof, which 5% shall be retained until final payment, and further, less all previous payments and all further sums that may .— be retained by Owner under the terms of this agreement. It is understood, however, that in case the whole work be near to completion, and this fact is certified to by Owner's Representative and some unexpected and some unusual delay occurs due to no fault or negligence on the part of the Contractor, the Owner may upon written recommendation of Owner's Representative pay a reasonable and equitable portion of the retained per- centage due Contractor. 42. FINAL COMPLETION AND ACCEPTANCE Within thirty-one (31) days after the Contractor has given the Owner's Representative written notice that the work has been completed or substantially completed, the Owner's Representative and the Owner shall in- spect the work and within said time, if the work be found to be completed or substantially completed in ac- cordance with the contract documents, the Owner's Representative shall issue to the Owner and Contractor his certificate of completion, and thereupon it shall be the duty of the Owner within thirty-one (31) days to issue a certificate of acceptance of the work to the Contractor. 43. FINAL PAYMENT Upon the issuance of the certificate of completion, the Owner's Representative shalt proceed to make final measurement and prepare a final statement of the value of all work performed and materials furnished under the terms of the agreement, and shalt certify same to the Owner, who shall pay to the Contractor on or be- fore the 31st day after the date of certificate of completion, the balance due Contractor under the terms of this agreement, provided he has fully performed his contractual obligations under the terms of this con- tract; and said payment shall become due in any event upon said performance by the Contractor. Neither the certificate of acceptance nor the final payment, nor any provisions in the contract documents shall relieve the Contractor of the obligation for fulfillment of any warranty which may be required in the special condi- tions (if any) of this contract or required in the specifications made a part of this contract. 44. CORRECTION OF WORK BEFORE FINAL PAYMENT FOR WORK Contractor shall promptly remove from Owners' premises all materials condemned by the Owner's Representative on account of failure to conform to the contract, whether actually incorporated in the work or not, and Con- tractor shall at his own expense promptly replace such condemned materials with other materials conforming to the requirements of the contract. Contractor shalt also bear the expense of restoring all work of other contractors damaged by any such removal or replacement. If Contractor does not remove and replace any such condemned work within a reasonable time after a written notice by the Owner or the Owner's Representative, Owner may remove and replace it at Contractor's expense. 45. CORRECTION OF WORK AFTER FINAL PAYMENT Neither the final payment nor certificate nor any provision in this contract shall relieve the Contractor of responsibility for faulty materials or workmanship, and he shall remedy any defects due thereto and pay for any damage to other work resulting therefrom, which shall appear within a period of one (1) year from the -36- date of substantial completion. The Owner or the Owner's Representative shall give notice of observed de- fects with reasonable promptness. 46. PAYMENT WITHHELD The Owner may, on account of subsequently discovered evidence, withhold or nullify the whole or part of any certificate to such extent as may be necessary to protect himself from loss on account of: (a) Defective work not remedied. (b) Claims filed or reasonable evidence indicating possible filing of claims. (c) Failure of the Contractor to make payments promptly to subcontractors or for materials or labor. (d) Damage to another contractor. When the above grounds are removed, or the Contractor provides a surety bond satisfactory to the Owner, which will protect the Owner in the amount withheld, payment shalt be made for amounts withheld because of them. 47. TIME OF FILING CLAIMS It is further agreed by both parties hereto that all questions of dispute or adjustment presented by the Contractor shall be in writing and filed with the Owner's Representative within fifteen (15) days after the Owner's Representative has given any directions, order or instruction to which the Contractor desires to take exception. The Owners' Representative shall reply to such written exceptions by the Contractor and render his final decision in writing. In case the Contractor should appeal from the decision of the Owner's Representative, any demand for arbitration shall be filed with the Owner's Representative and the Owner in writing within ten (10) days after the date of delivery to Contractor of the final decision of the Owner's Representative. It is further agreed that final acceptance of the work by the Owner and the acceptance by the Contractor of the final payment shall be a bar to any claim by either party, except where noted other- wise in the contract documents. 48. ARBITRATION All questions of dispute under this agreement shall be submitted to arbitration at the request of either party to the dispute. The parties may agree upon one arbitrator, otherwise, there shall be three; one named in writing by each party and the third chosen by the two arbiters selected; or if the arbiters fail to se- lect a third within ten (10) days, he shall be chosen by the District Judge, 72nd Judicial District of Texas. Each arbiter shall be a resident of the City of Lubbock. Should the party demanding arbitration fail to name an arbiter within ten (10) days of the demand, his right to arbitrate shall lapse, and the de- cision of the Owner's Representative shall be final and binding on him. Should the other party fail to choose an arbiter within ten (10) days, the Owner's Representative shall appoint such arbiter. Should ei- ther party refuse or neglect to supply the arbiters with any papers or information demanded in writing, the arbiters are empowered by both parties to take Ex Parte Proceedings. The arbiters shall act with promptness. The decision of any two shall be binding on both parties to the contract, unless either or both parties shall appeal within ten (10) days from date of the award by the ar- biters, and it is hereby agreed that each party shall have the right of appeal and all proceedings shall be according to and governed by Arbitration Statutes of Texas, being Article 224, et seq., Vernon's Annotated Civil Statutes. THE DECISION OF THE ARBITERS UPON ANY QUESTION SUBMITTED TO ARBITRATION UNDER THIS CONTRACT SHALL BE A CONDITION PRECEDENT TO ANY RIGHT OF LEGAL ACTION. -37- The arbiters, if they deem the case demands it, are authorized to award the party whose contention is sus- tained, such sums as they deem proper for the time, expense and trouble incident to the appeal, and if the appeal was taken without reasonable cause, they may award damages for any delay occasioned thereby. The ar- biters shall fix their own compensation, unless otherwise provided by agreement, and shall assess the costs and charges of the arbitration upon either or both parties. The award of the arbiters must be made in writ- ing and shall not be open to objection on account of the form of proceedings or award. 49. ABANDONMENT BY CONTRACTOR In case the Contractor should abandon and fail or refuse to resume work within ten (10) days after written notification from the Owner or the Owner's Representative, or if the Contractor fails to comply with the or- ders of the Owner's Representative, when such orders are consistent with this contract, this Agreement, or the Specifications hereto attached, then the Surety on the bond shall be notified in writing and directed to complete the work and a copy of said notice shall be delivered to the Contractor. After receiving said notice of abandonment, the Contractor shall not remove from the work any machinery, equipment, tools, materials or supplies then on the job, but the same, together with any materials and equipment under the contract for work, may be held for use on the work by the Owner or the Surety of the Contractor, or another contractor, in completion of the work; and the Contractor shall not receive any rental or credit therefore (except when used in connection with Extra Work, where credit shall be allowed as provided for under paragraph 24 of this contract); it being understood that the use of such equipment and materials will ultimately reduce the cost to complete the work and be reflected in the final settlement. In case the Surety should fait to commence compliance with the notice for completion hereinbefore provided for within ten (10) days after service of such notice, then the Owner may provide for completion of the work in either of the following elective manners: (a) The Owner may employ such force of men and use of machinery, equipment, tools, materials and sup- plies as said Owner may deem necessary to complete the work and charge the expense of such labor, machinery, equipment, tools, materials and supplies to said Contractor, and the expense so charged shall be deducted and paid by the Owner out of such moneys as may be due, or that may thereafter at any time become due to the Contractor under and by virtue of this Agreement. In case such expense is less than the sum which would have been payable under this contract, if the same had been com- pleted by the Contractor, then said Contractor shall receive the difference. In case such expense is greater than the sum which would have been payable under this contract, if the same had been com- pleted by said Contractor, then the Contractor and/or his Surety shall pay the amount of such excess to the Owner; or (b) The Owner, under sealed bids, after notice published as required by law, at least twice in a newspa- per having a general circulation in the County of location of the work, may let the contract for the completion of the work under substantially the same terms and conditions which are provided in this contract. In case of any increase in cost to the Owner under the new contract as compared to what would have been the cost under this contract, such increase shalt be charged to the Contractor and the Surety shall be and remain bound therefore. However, should the cost to complete any such new contract prove to be less than that which would have been the cost to complete the work under this contract, the Contractor or his Surety shall be credited therewith. When the work shall have been substantially completed, the Contractor and his Surety shall be so notified and certificates of completion and acceptance, as provided in paragraph 42 hereinabove set forth, shall be issued. A complete itemized statement of the contract accounts, certified to by Owner's Representative as being correct shall then be prepared and delivered to Contractor and his Surety, whereon the Contractor or his Surety, or the Owner as the case may be, shall pay the balance due as reflected by said statement within 30 days after the date of certificate of completion. -38- In the event the statement of accounts shows that the cost to complete the work is less than that which would have been the cost to the Owner had the work been completed by the Contractor under the terms of this contract, or when the Contractor and/or his Surety shall pay the balance shown to be due by them to the Owner, then all machinery, equipment, tools, materials or supplies left on the site of the work shall be turned over to the Contractor and/or his Surety. Should the cost to complete the work exceed the contract price, and the Contractor and/or his Surety fail to pay the amount due the Owner within the time designated hereinabove, and there remains any machinery, equipment, tools, materials or supplies on the site of the work, notice thereof, together with an itemized list of such equipment and materials shall be mailed to the Contractor and his Surety at the respective addresses designated in this contract; provided, however, that actual written notice given in any manner will satisfy this condition. After mailing, or other giving of such notice, such property shall be held at the risk of the Contractor and his Surety subject only to the duty of the Owner to exercise ordinary care to protect such property. After fifteen (15) days from the date of said notice the Owner may sell such machinery, equipment, tools, materials or supplies and apply the net sum derived from such sale to the credit of the Contractor and his Surety. Such sale may be made at either public or private sale, with or without notice, as the Owner may elect. The Owner shall release any machin- ery, equipment, tools, materials, or supplies which remain on the *jobsite and belong to persons other than the Contractor or his Surety, to their proper owners. 50. ABANDONMENT BY OWNER In case the Owner shall fail to comply with the terms of this contract, and should fail or refuse to comply with said terms within ten (10) days after written notification by the Contractor, then the Contractor may suspend or wholly abandon the work, and may remove therefrom all machinery, tools, and equipment, and all materials on the ground that have not been included in payments to the Contractor and have not been incorpo- rated into the work. Thereupon, the Owner's Representative shall make an estimate of the total amount earned by the Contractor, which estimate shall include the value of all work actually completed by said Con- tractor at the prices stated in the the attached proposal, the value of all partially completed work at a fair and equitable price, and the amount of all Extra Work performed at the prices agreed upon, or provided for by the terms of this contract, and a reasonable sum to cover the cost of any provisions made by the Con- tractor to carry the whole work to completion, and which cannot be utilized. The Owner's Representative shalt then make a final statement of the balance due the Contractor by deducting from the above estimate all previous payments by the Owner and all other sums that may be retained by the Owner under the terms of this Agreement, and shalt certify same to the Owner who shalt pay to the Contractor on or before thirty (30) days after the date of the notification by the Contractor the balance shown by said final statement as due the Contractor, under the terms of this Agreement. 51. BONDS The successful bidder shall be required to furnish a performance bond and payment bond in accordance with Article 5160, Vernon's Annotated Civil Statutes in the amount of 100% of the total contract price, in the event said contract price exceeds $25,000.00. If the contract price does not exceed $25,000.00, the statu- tory bonds will not be required. All bonds, if required, shall be submitted on forms supplied by the Owner, and executed by an approved Surety Company authorized to do business in the State of Texas. And it is fur- ther agreed that this contract shall not be in effect until such bonds are so furnished. 52. SPECIAL CONDITIONS In the event special conditions are contained herein as part of the contract documents and said special con- ditions conflict with any of the general conditions contained in this contract, then in such event the special conditions shall control. -39- 53. LOSSES FROM NATURAL CAUSES Unless otherwise specified herein, all loss or damage to the Contractor arising out of the nature of the work to be done, or from the action of the elements, or from any unforeseen circumstance and the prosecution of the same, or from unusual obstructions or difficulties which may be encountered in the prosecution of the work, shall be sustained and borne by the Contractor at his own cost and expense. 54. INDEPENDENT CONTRACTOR Contractor is, and shall remain, an independent contractor with full, complete and exclusive power and au- thority to direct, supervise, and control his own employees and to determine the method of the performance of the work covered hereby. The fact that the Owner or Owner's Representative shall have the right to ob- serve Contractor's work during his performance and to carry out the other prerogatives which are expressly reserved to and vested in the Owner or Owner's Representative hereunder, is not intended to and shall not at any time change or effect the status of the Contractor as an independent contractor with respect to either the Owner or Owner's Representative or to the Contractor's own employees or to any other person, firm, or corporation. 55. CLEANING UP The Contractor shall at all times keep the premises free from accumulation of debris caused by the work, and at the completion of the work he shall remove all such debris and also his tools, scaffolding, and surplus .. materials and shall leave the work room clean or its equivalent. The work shall be left in good order and condition. In case of dispute owner may remove the debris and charge the cost to the Contractor. -40- (THIS PAGE LEFT BLANK INTENTIONALLY) 0 CURRENT WAGE DETERMINATIONS -41- (THIS PAGE LEFT BLANK INTENTIONALLY) Resolution #2502 r January 8, 1987 • Agenda Item #18 DGV:da RESOLUTION WHEREAS, the City Council has heretofore established the general prevailing rate of per diem wages for each craft or type of workmen or mechanics needed to execute public works contracts for the City of Lubbock in accordance with the provisions of Vernons Ann.Civ.St., Art. 5159a; and WHEREAS, such wage rates were established by Resolution No. 719 enacted February 12, 1981, updated by Resolution No. 1590 enacted February 23, 1984; and WHEREAS, such rates need to be updated at the present time in order to reflect the current prevailing rate of per diem wages; NOW THEREFORE: BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the general prevailing rate of per diem wages for public works .contracts shall be as set forth in the following named exhibits, which exhibits shall be attached hereto and made a part hereof for all intents and purposes: _ Exhibit A: Building Construction Trades �., Exhibit B: Paving and Highway Construction Trades Exhibit C: Electrical Trades Exhibit D: Overtime Rate Exhibit E: Weekend and Holiday Rate Such wage rates are hereby found and declared to be the general prevailing rate of per diem wages in all localities where public works are undertaken -- on behalf of the City of Lubbock and such wage rates shall be included in all public works contracts as provided by law. Passed by the City Council this 8th day of January 1987. B.C. MCMLNN, MAYOR Ranettc-Boyd, City Secretary v APPROVED T ONTENT: APPROVED AS TO FORM: Bi 1 Pyne, D rector of Building Do ld G. Vandiver, First Services Assistant City Attorney EXHIBIT A City of Lubbock Building Construction Trades Prevailing Rates Craft Hourly Rate Acoustical Ceiling Installer $11.60 Air Conditioner Installer Air Conditioner Installer -Helper 8.35 Bricklayer 5.50 Bricklayer -Helper 10.50 Carpenter 5.00 Carpenter -Helper 11.00 Cement Finisher 5.50 Drywall Hanger 7.35 _ Electrician 8 70 Electrician -Helper 10.50 Equipment Operator - 5.25 Heavy Light 8.00 Floor Installer 5.70 Glazier 8.00 Insulator, Piping/Boiler 7.50 Insulator -Helper 9.50 Iron Worker 5.00 Laborer, General 7.30 Mortar Mixer 4.75 Painter 5.60 Plumber 8.75 Plumber -Helper 9.25 Roofer 6.00 Roofer -Helper 7.65 Sheet Metal Worker 4.75 Sheet Metal Worker -Helper 8.75 Welder - Certified 5.50 8.00 EXHIBIT B Paving and Highway Construction Prevailing Wage Rates �. Craft Asphalt Heaterman Asphalt Shoveler Concrete Finisher Concrete Finisher -Helper Electrician Flagger Form Setter Form Setter -Helper Laborer, General Laborer, Utility Mechanic Mechanic -Helper POWER EQUIPMENT OPERATORS Asphalt Paving Machine Bulldozer Concrete Paving Machinist Front End Loader Heavy Equipment Operator Light Equipment Operator Motor Grade Operator. Roller Scraper Tractor Truck Driver - Light Heavy Hourly Rate $5.25 4.75 7.35 4.75 10.50 4.75 6.50 5.50 4.75 5.80 6.50 6.00 6.00 5.25 6.50 5.85 6.40 6.40 8.00 5.25 5.25 5.50 5.25 5.25 EXHIBIT C Electric Construction Trades Prevailing Wage Rates Craft Hourly Rate Power Line Foreman $11.00 Lineman Journeyman 10.45 Lineman Apprentice Series 8.90 Groundman Series 7.25 EXHIBIT D Prevailing Wage Rates Overtime Rate The rate for overtime (in excess of forty hours per week) is 1 1/2 times base rate. EXHIBIT E Prevailing Wage Rates Weekend and Holiday Rate The rate for weekend and holiday is.l 1/2 times base rate. SPECIFICATIONS -42- (THIS PAGE LEFT BLANK INTENTIONALLY) PLANS AND SPECIFICATIONS FOR 600 MUNICIPAL DRIVE 1.0 General 1.1 These plans and specifications include installation of inside wiring in new and remodeled buildings, and installation of cable and wiring to be placed in a new conduit system. Location of the work is at 600 Municipal Drive, Lubbock, Texas. 1.2 The intent of this specification is to define the requirement necessary for a complete turnkey installation that meets all specifications contained herein and reflects fully terminated cable and wiring costs. Unless expressly excluded and listed as an exception, any and all labor and materials that may be necessary for the completion of this project are to be furnish- ed by the bidder without additional cost to the City of Lubbock. 1.3 The successful bidder must be able to design completely, and install and test, the wire and cabling in total compliance with descriptions and features contained in these specifications. M Further, the bidder will install materials and equipment that meet all FCC and industry standards as well as City of Lubbock, and State of Texas building and safety codes, and the National Electrical Code dated 1990. �.. 1.4 Bids will be evaluated by Hicks and Ragland Engineering Co., Inc., an unbiased private engineering firm, on the following items, and any resulting order will be placed with the bidder whose bid appears best for the City of Lubbock with all factors considered. Ei These factors include: 1.4.1 Quality, cost, and capability of manufacturer's standard materials and equipment. 1.4.2 Capability, quality, and pricing of additional installation work including changes and additions of equipment or wiring. 1.4.3 The bidder's compliance with all requirements of the plans and specifications. 1.5 The bidder, by making this bid, represents that the firm has the capabilities, hardware, and personnel necessary to provide an efficient and successful installation of the proposed wiring and equipment. 1.6 Proposals should include all information solicited by this request, plus any additional data, prints, literature, etc., that the bidder deems pertinent to the understanding and evaluation of his bid. All items listed on the unit price sheets, requesting a unit price must be answered. 1.7 Modifications of bids will be permitted only to the extent that the City of Lubbock may change the specifications, or change the qualities or types of materials and equipment. 1.8 It is intended that a single "turn key" contractor will have total responsibility for the proposed work. This includes, but is not limited to, in-house cabling, placement of cable and wiring in ducts or conduit, mounting of equipment, termination of wiring and cabling, and testing of facilities to meet standards set forth by the City of Lubbock. 1.9 All exhibits and drawings attached to these specifications are a part of the contract as a result of a successful bid. The following exhibits are attached: 2 1.10 Wiring and cabling is described on the attached floor plan, and associated drawings, and may be modified by amendments, dele- tions, or changes made by the City of Lubbock. 1.11 The City of Lubbock reserves the right to purchase any, or all, of the required materials from other suppliers for installation by the successful bidder. 3 Exhibits Exhibit 1. Main equipment room - wiring layout. Exhibit 2. Satellite Terminal room - typical wiring layout. Exhibit 3. Bus Duct Termination Boxes. Exhibit 4. 66M type connecting block and distribution ring layout. ._. Exhibit 5. Wiring distribution, typical - 66M1-25 blocks. Exhibit 6. Wiring distribution, typical - 66M1-50 blocks. Exhibit 7. Telephone and computer termination, typical - 66M1-50 blocks. Exhibit 8. Radio termination typical - 66M1-50 blocks. Exhibit 9. Ground bar detail. Drawings Drawing 1. Building "A" Floor Plan. Drawing 2.- Building "A' Floor Plan - Water Department. Drawing 3. Building "A" Floor Plan - LP&L Department, One of Two. Drawing 4. Building "A" Floor Plan - LP&P Department, Two of Two. Drawing S. Building "A" Floor Plan - Police Academy. Drawing 6. Building "B" Floor Plan. Drawing 7. Building "C" Floor Plan. Drawing 8. Building "D" Floor Plan. Drawing 9. Building "F" Floor Plan. Drawing 10. 600 Municipal Drive, Site and Conduit Layout. 1.10 Wiring and cabling is described on the attached floor plan, and associated drawings, and may be modified by amendments, dele- tions, or changes made by the City of Lubbock. 1.11 The City of Lubbock reserves the right to purchase any, or all, of the required materials from other suppliers for installation by the successful bidder. 3 1. 12 Base Bid. The base bid should be for completion of the job according to the submitted floor plan, and should include all labor and material costs. 1.13 Alternate pricing must be provided, on a unit basis, for the individual units detailed in the unit section. Unit prices quoted by the successful bidder will be used to calculate any increase, or decrease in contract price due to changes submitted by the City of Lubbock. 2.0 EQUIPMENT SPECIFICATIONS 2.1 General 2.1.1 Equipment units, plugs, jacks and terminal blocks shall be adequately designated and numbered. They shall be stencilled with identification of building destination for inter -building cables; room destination for intra - building cables, and lead designation so that testing and maintenance activities can be done without frequent reference to descriptive literature. All such marking and labeling will be done in a permanent manner. 2.2 Protection Requirements 2.2.1 Protection shall be required at the main equipment room located in building A, and at the radio equipment building (radio shack) located at the base of the radio tower. 2.2.2 Protector blocks utilizing 400 volt gas tube protectors . shall be placed at all locations requiring protection. 2.2.3 Protection, when required, shall be placed in sufficient quantity at the required location to terminate all 4 circuits at the required location that are placed under this specification. 2.2.4 Protectors shall be capable of being flush mounted against a backboard, while allowing access to both field side and office side connections of the protector. 2.2.5 Protector assemblies shall be Cook R,,; Irl; — V- . . Protectors or equivalent. "^ 2.2.5.1 For location requiring 25 pairs of protection, a Cook protector assembly, C-552-25 with quick clip, or equivalent, is required. 2.2.5.2 For locations requiring 26 to 50 pairs of protec- tion, a Cook protector assembly, C-550-50 with quick clip, or equivalent, is required. 2.2.6 Gas tube protectors shall be Cook model 303-0950 (400 VDC) 3 -Electrode Fail -Short Gas Protector modules or equivalent. 2.2.7 A pure annealed copper ground bar, measuring 4" x 1/4" x 20" shall be mounted as indicated on the drawings. The ground bar shall be drilled with two rows of nine 3/8" holes, spaced two (2) inches on center. See Exhibit 7, and Exhibit 9. 2.2.8 A separate ground wire shall be provided from the ground bar to the Multigrounded Neutral (MGN) of the local power company. The ground wire shall be an insulated, solid copper, #6 AWG. The ground wire shall be a single continuous unbroken run. No splices will be allowed without specific authorization of the City of Lubbock or Hicks and Ragland Engineering Co., Inc. 5 2.3 Termination of Cable and Wiring in Equipment Rooms 2.3.1 In equipment rooms all wiring shall be terminated on the following types of terminal blocks except as otherwise designated; 2.3.1.1 66M1-25 terminal blocks or equivalent 2.3.1.2 66M1-50 terminal blocks or equivalent 2.3.2 All 66 type terminal blocks shall be mounted on 89B type brackets. 2.3.3 All 66 type terminal blocks will be covered with S-66BC6 protective covers. 2.3.4 The supplier shall provide sufficient, blocks of each type required to terminate all wire and cabling installed under this specification. 2.3.5 "D" type distribution rings of at least five (5) inches, or an approved substitute, shall be placed above the terminal blocks and between each column of blocks. See Exhibit 4, Exhibit 5, and Exhibit 6 for typical drawings. 2.3.6 The cable field in the main equipment room shall be separated into distinct areas as defined in Exhibit 1. A specific area of the backboard shall be reserved for use by each department sharing the facility. 66M1 type blocks for each department will be divided into sections as shown on Exhibit 7, and Exhibit 8. Areas on each terminal block shall be designated for each type of service and no service shall be terminated on terminals other than those providing a like kind of service. 2.4 Termination of Cable and Wiring at User's Location 2.4.1 The type of connector block required at each work location will vary according to the function of the work C: 0 area as designated by the City of Lubbock. The specific type of connector to be used at each location is designated by accompanying drawings and tables. The type of connecting block to be used for additions under unit pricing, shall be designated by the City of Lubbock at the time additions are ordered. 2.4.2 Station connector jacks shall be of a flush mount type and will consist of the following types except as otherwise designated. r.. 2.4.2.1 Unit designation "T/C" shall be an eight conductor, modular, duplex jack assembly, (Suttle identification number SE -625B3-4, or equivalent), and shall be ivory or ash in color. 2.4.2.2 Unit designations "T" and "C" shall be a four conductor modular jack assembly, (Suttle identification number SE -625B1-4, or equivalent), and shall be ivory or ash in color. 2.4.2.3 Cover plates for use at locations other than those requiring 625B type jacks shall be CPL units (Suttle jack plate assembly, identification number SE -625B4-4, or equivalent), and shall be ivory or ash in color. CPL units are a part of R and RE units. 2.5 Wiring and Cabling 2.5.1 Distribution terminal blocks provided must accommodate «A; #22 through #26 AWG wire. 2.5.2 All cross connecting jumpers shall be of a minimum size of #24 AWG. 7 2.5.3 Wire wrapped terminals shall be tinned, or of a material suitable for wire wrapped connections. 2.5.4 Wire wrapped connections shall be made with a wire wrapping tool. Connections will have the following minimum number of successive non -overlapping turns of bare tinned solid copper wire in contact with each terminal: 6 turns of 24 gauge 5 turns of 22 gauge. 2.5.5 Conduit cabling for computer and telephone connections shall be fused aluminum shield - REA PE -22 standard, or equivalent, and shall contain solid annealed #24 AWG conductors, with a high density polyethylene insulation and a non-hydoroscopic, wrapped dielectric tape core. The cable shall contain an eight (8) mil aluminum shield coated and bonded to the jacket. The jacket shall be of high molecular weight polyethylene, and shall be sequentially marked at two (2) foot intervals. 2.5.6 Conduit wiring and inside wiring for radio connections, used as a part of unit RE, shall be Belden, six -wire - stranded, shielded, with center ground member, part number 83556, or equivalent. 3.0 Installation Specifications 3.0.1 All work shall be done in a neat, workmanlike manner. Equipment shall be correctly located, carefully aligned with the walls, and firmly anchored. Cables shall be carefully laid, with sufficient bend radius to prevent damage, and shall have sufficient supports to prevent sagging, and shall be properly secured to ensure they 8 will remain in place. Cabling and wiring shall be placed in a neat, orderly fashion with a minimum number of routes, bends, and crosses. -~^ 3.0.2 All work must meet City of Lubbock, and State of Texas building and safety codes, and the National Electrical Code dated 1990. 3.0.3 All equipment must be free from damage of any kind including external and internal rust or corrosion, and must be free of nicks, mars, scrapes, or scratches. 3.0.4 All wiring terminations must be securely fastened, and have lug screws tight, crimps secure, solder joints properly flowed, and have wire wraps properly made. 3.0.5 The successful bidder must obtain the City of Lubbock's permission before proceeding with any work requiring cutting into or through any part of the building structure such as girders, beams, concrete or tile floors, partitions, walls, or ceilings. This does not apply to the installation of lag screws, expansion bolts and similar devices used for fastening equipment or wiring to floors, columns, walls and ceilings. Approval must be obtained before cutting into or through any part of the building structure where the fire proofing or moisture -proofing could be impaired. 3.0.6 All cables, regardless of length, shall be individually identified, labeled or numbered at both ends. - Information included in the labeling shall be sufficient to, determine where the cable terminates at the far end, and readily identify the cable at the far end. 3.0.7 No splices will be allowed in system wiring other than at approved terminal locations. 3.0.8 No splices shall be allowed in any wiring placed in the conduit system. All runs through the conduit system from IDF's in outer buildings to the main equipment room located in building "A` shall be unbroken runs. No splices of any kind will be allowed in the handholds of the conduit system. 3.0.9 All wiring placed in the inter -building conduit system shall be placed only in the designated conduit(s). See Exhibit 3 4.0 Unit Pricing 4.1 Labor and Material Units. 4.1..1 "T/C" This unit consists of the labor and material necessary to establish one user location of designation "T/C". Material shall consist of one, four (4) pair, plastic insulated, inside wiring cable (BrandRex part number SWP-04P24CMX or equivalent), and one eight conductor, modular, duplex jack assembly (Suttle part number SE -625B3- 4 or equivalent). All 625B3-4 type jacks shall be orientated the same way at all locations. Four pair wiring terminated on 625B3-4 duplex type jacks shall be terminated as follows. The top module on each jack will be for telephone use only. The blue/white pair, and the orange/white pair shall be terminated on the top module of the 625B3-4 type jack. The lower module on each jack shall be for computer use only. The green/white pair, and the 10 11 brown/white pair shall be terminated on the lower module of the 625B3-4 type jack. 4.1.2 "T" This unit consists of the labor and material necessary to establish one user location of designation "T". Material shall consist of one, four (4) pair, plastic insulated, inside wiring cable (BrandRex part number SWP-04P24CMX or equivalent), and one four conductor, modular jack assembly (Suttle part number SE-625B1-4 or equivalent). The blue/white pair, and the orange/white pair shall be terminated on the 625B1- 4 type jack. 4.1.3 "C" This unit consists of the labor and material necessary to establish one user location of designation "C". Material shall consist of one, four (4) pair, plastic insulated, inside wiring a=: cable (BrandRex part number SWP-04P24CMX or equivalent), and one, four conductor, modular jack assembly (Suttle part number SE-625B1-4 or equivalent). The green/white pair, and the ,.- brown/white pair shall be terminated on the 625B1- 4 type jack. �^ 4.1.4 "RE" This unit consists of the labor and material necessary to establish one user location of designation "RE". Material shall consist of one, three (3) pair (six-wire-stranded), shielded, with center ground member, inside wiring cable (Belden w.. part number 83556 or equivalent), and one, jack plate cover assembly (Suttle part number SE -625B4- 11 12 4 or equivalent). Wiring shall not be terminated at these locations, but shall be brought through the outlet cover and coiled up. A minimum of fifteen (15) feet of wire shall be coiled and left. 4.1.5 "R" This unit consists of the labor and material necessary to establish one user location of designation "R". Material shall consist of one, two-pair, 22 gauge, plastic insulated, inside wiring cable (BrandRex part number SWP-0422CMX or equivalent), and one, jack plate cover assembly (Suttle part number 5E-625B4-4 or equivalent). Wiring shall not be terminated at these locations, but shall be brought through the outlet cover and coiled up. A minimum of fifteen (15) feet of wire shall be coiled and left. 4.1.6 "RS" This unit consists of the labor and material necessary to establish one user location of designation "RS". Material shall consist of one, two-pair, 22 gauge, plastic insulated, inside wiring cable (BrandRex part number SWP-0422CMX or equivalent). Wiring under the RS unit will be tied off to structures in the ceiling at the location shown on the floor plans, and a coil of twenty (20) feet of wire will be left. Wiring will be terminated by others at the user location. 4.2 Labor Only Units (owner furnished material) 4.2.1 "L-T/C" This unit consists of the labor necessary to establish one user location of designation "T/C". Material shall be furnished by owner. 12 r� Installation details for this unit are the same 13 as the installation details under the T/C unit. 4.2.2 •L -T• This unit consists of the labor necessary to establish one user location of designation "T". Material shall be furnished by owner. Installation details for this unit are the same as the installation details under the T unit. 4.2.3 "L -C" This unit consists of the labor necessary to establish one user location of designation "C". Material shall be furnished by owner. Installation details for this unit are the same as the installation details under the C unit. 4.2.4 "L -RE" This unit consists of the labor necessary to establish one user location of designation "RE". Material shall be furnished by owner. Installation details for this unit are the same as the installation details for the RE unit. 4.2.5 "L -R" This unit consists of the labor necessary to establish one user location of designation "R". Material shall be furnished by owner. Installation details for this unit are the same as the installation details for the R unit. 4.2.6 "L -RS" This unit consists of the labor necessary to establish one user location of designation "RS". Material shall be furnished by owner. Installation details for this unit are the same as for the RS unit. 4.2.7 "CWC" This unit consists of all labor required to place 10 ft., of cable or wire into the inter - 13 building conduit system. This unit includes any necessary cutting to length and labeling at both ends of the wire or cable run per this specification. The quantity of units will be determined by scaling the drawing and approximating the actual route of the cable, including vertical distances from conduit entrance point to ceiling, floor, etc. This estimated distance will then be rounded to the nearest whole unit for the basis of cost determination. 4.2.8 "IWC" This unit consists of all labor required to place 10 ft., of cable inside existing or remodeled buildings. This unit includes any necessary cutting to length and labeling at both ends of the wire or cable run per this specification. The quantity of units will be determined by scaling the drawing and approximating the actual route of the cable, including vertical distances from termination point to ceiling, floor, etc. This estimated distance will then be rounded to the nearest whole unit for the basis of cost determination. 4.2.9 "L66" This unit consists of all labor required to mount a 66M type terminal block and an 89B type bracket on a backboard, and terminate wire or cable on 66M type terminal blocks. This unit includes terminating the full count of both 66M1-25, and 66M1-50 terminal blocks. 14 4.2.10 "L625" This unit consists of all labor required to terminate wire or cable on 625 type jacks. 4.2.11 "RJJ" This unit consists of all labor required to install wire or cable for radio units. 4.3 Wire and Cable Units 4.3.1 All wire and cable units will consist of 10 ft. lengths of the required material. Labor to install wire or .. cabling units will be covered separately 4.3.2 "IW2" This unit consists of 10 ft., of 2 pair, 22 gauge, plastic insulated, inside wiring cable only; BrandRex part number SWP-0422CMX, or equivalent. 4.3.3 "IW4" This unit consists of 10 ft., of 4 pair, 24 gauge, plastic insulated, inside wiring cable only; BrandRex part number SWP-04P24CMX, or equivalent. 4.3.4 "IW25" This unit consists of 10 ft. of 25 pair 24 guage, plastic insulated, inside wiring cable , only, BrandRex part number SWP-25P24CMX, or equivalent. .., 4.3.5 "SH3" This unit consists of 10 ft., of Belden, 3 pair (six -wire -stranded), shielded, with center ground member, inside wiring, part number 83556, or equivalent. 4.3.6 "C06" This unit consists of 10 ft., of six (6) pair, #22 AWG, REA PE -22 standard, cable. 4.3.7 "C12" This unit consists of 10 ft., of twelve (12) pair, #24 AWG, REA PE -22 standard, cable. 15 4.3.8 NC25N This unit consists of 10 ft., of twenty-five pair, #24 AWG, REA PE -22 standard, cable. 4.4 Terminal and Jack Units 4.4.1 "625B3" This unit will consist of one Suttle jack assembly, identification number 625B3-4, or one Suttle jack assembly, identifi- cation number 625B1-4, or equivalent. Labor to install 625B3 jack units will be covered separately. 4.4.2 "66M1-25" This unit will consist of one 66M1-25 ter- minal block and one 89B bracket. Labor to install and terminate 66M1-25 terminal units will be covered separately. 4.4.3 "66M1-50" This unit will consist of one 66M1-50 ter- minal block and one 89B bracket. Labor to install and terminate 66M1-50 terminal units will be covered separately. 4.4.4 "CPL" This unit will consist of one Suttle jack plate assembly, identification number SE - 625B4 -4, or equivalent, and shall be ivory or ash in color. 5.0 Construction Sequence 5.1 The construction sequence shall be designated by the City of Lubbock at the start of construction, and the City of Lubbock may change the construction sequence during construction. 6.0 Testing of Installed Wiring and Cabling 6.1 All wiring and cabling shall, after completion of install- ation, be tested for continuity, shorts, grounds, and crosses. Tests shall be made to the terminal connector for conductors 16 that are terminated, and shall be made to the conductor end for any wiring or cabling that is not terminated. All tests shall be conducted in the presence of representatives of the City of Lubbock or Hicks and Ragland Engineering Co., Inc. 7.0 Warranty 7.1 For defects uncovered during the warranty period the bidder shall repair or replace the defective material at his own expense. Any repairs to materials must be in compliance with these plans and specifications. Specifically no splices will be allowed in any cable or wiring placed in any conduit' run, or in any inside wiring run without specific authorization of the City of Lubbock or Hicks and Ragland Engineering Co., Inc. 8.0 Documentation 8.1 The bidder shall provide listings and drawings of all cable and wiring placed under this document. Details shall be furnished of the following; 8.1.1 Drawings and termination lists of all cable and wiring placed through the inter -building conduit system. 8.1.2 Drawings and termination lists of all cable and wiring placed inside of each building. 8.2 One (1) set of documentation shall be delivered to Hicks and Ragland Engineering Co., Inc., and two (2) sets of documentation shall be delivered to the City of Lubbock. 9.0 Explanatory Notes .� 9.1 See the attached floor plan exhibits for the location of the equipment rooms and the proposed user locations. 9.2 The design of the building includes certain areas that are designed and built to withstand violent storms. These areas consist of heavily reinforced walls and ceilings, and may be 17 0 more difficult to wire than other office buildings The bidder should specifically acquaint himself with these areas. Any additional entrance holes into these areas will be placed by the City of Lubbock. 10.0 Wiring Detail: List of buildings and work 10.1 Wiring 10.1.1 Building A 10.1.1.1 Building "A" work will require placing and terminating inter -building wiring, and placing and terminating inside wiring and jacks for radios, telephones, computers, and radio speakers. 10.1.1.2 All wiring, except the Police Academy area, will be home runs back to room 122. 10.1.1.3 Three (3), separate #24 AWG, twenty-five (25) pair cables (total seventy-five pairs), shall be placed from the main equipment room in building "A", to a satellite terminal room located in the Police Academy. This wiring will be terminated on 66M1- 50 blocks at each location. 10.1.2 Building B 10.1.2.1 Building "B" work will require placing and terminating inter -building wiring, and placing and terminating inside wiring and jacks for radios, telephones, computers, and radio speakers. 10.1.2.2 All wiring for this building will be home runs back to room 122 in Building "A". 10.1.3 Building C 10.1.3.1 Building "C" work will require placing and terminating inter -building wiring, and will require is termination of wire and cable on 66M type connector blocks only, on an IDF backboard located in Building *CO. 10.1.3.2 Underground cable for this building will be one (1), twenty-five (25) pair, #24 .AWG, REA PE -22 r. standard, cable for telephone and computer, and one (1), six (6) pair, #22 AWG, REA PE -22 standard, cable for radio. 10.1.4 Building D 10.1.4.1 Building "D" work will require placing and terminating inter -building wiring, and placing and terminating inside wiring and jacks for radios, telephones, computers, and radio speakers. 10.1.4.2 Under ground cable for this building will be one (1), twelve (12) pair, #24 AWG, REA PE -22 standard, cable for telephone and computer, and one (1), six (6) pair, #22 AWG, REA PE -22 standard, cable for radio. 10.1.5 Building E 10.1.5.1 Building "E" will require placing, and terminating inter -building cable only, on an IDF backboard located in Building 10.1.5.2 Under ground cable for this building will be one (1), six (6) pair, #24 AWG, REA PE -22 standard, cable for telephone and computer, and one (1), six - (6) pair, #22 AWG, REA PE -22 standard, cable for radio. 19 10.1.6 Building F 10.1.6.1 Building "F" will require placing and terminating inter -building wiring, and placing and terminating inside wiring and jacks for radios, telephones, computers, and radio speakers, on an IDF backboard located in Building "E". 10.1.6.2 Under ground cable for this building will be one (1), six (6) pair, #24 AWG, PE -22 standard, cable for telephone and computer, and one (1), six (6) pair, #22 AWG, REA PE -22 standard, cable for radio. 10.1.7 Radio Building 10.1.7.1 The radio building will require placing and terminating inter -building wiring. 10.1.7.2 Under ground cable for this building will be five (5), six (6) pair, 22 AWG, REA PE -22 standard cables. * Note: All underground cables will be home runs from Building "A, Room 122 to the satellite IDF room of each off premises building. 20 r -- UNIT PRICING SUMMARy FOR LABOR and MATERIAL UNITS Unit Price T/C T C R RE RS UNIT PRICING SUMMARY FOR CABLE and WIRING Unit Price IW2 IW4 IW25 SH3 COG C12 C25 21 UNIT PRICING SUMMARY FOR TERMINALS and JACKS UNIT PRICE 625B3 66M1-25 66M1-50 CFL UNIT PRICING SUMMARY FOR LABOR ONLY UNITS Unit Price L-T/C L -T L -C L -RE L -R L -RS CWC IWC L66 L625 RJJ Fla VENDOR SUMMARY FOR MATERIALS Indicate the manufacturer and part number of materials to be used by you in the work performed under this specification. Unit Manufacturer & Part No. IW2 IW4 IW25 SH3 C06 C12 C25 625B3-4 625B1-4 625B4-4 66M1-25 66M1-50 m-. CPL r *- 23 SUMMARY OF OUTLET UNITS CITY OF LUBBOCK BUILDING A WATER LP&L STREETS TOTAL T/C 20 14 34 T 5 17 22 C 3 2 5 R 4 11 15 RE 8 0 8 RS 2 ---- 10 12 42 ---- 54 ---- 0 ---- 96 BUILDING B WATER LP&L STREETS TOTAL T/C 3 3 T 0 0 C 0 0 R 2 2 RE 0 0 RS 4 4 0 9 0 9 BUILDING C WATER LP&L STREETS TOTAL T/C 5 5 T 3 3 C 0 0 R 3 3 RE 4 4 RS ---- 1 1 0 ---- 0 ---- 16 - ---- 16 BUILDING D WATER LP&L STREETS TOTAL T/C 2 2 T 0 0 C 0 0 R 2 2 RE 0 0 RS ---- 3 ---- 3 0 7 ---- 0 ---- 7 24 BUILDING E T/C T C R RE RS BUILDING F T/C T C R RE RS TOTALS T/C T C R RE RS SUMMARY OF OUTLET UNITS CITY OF LUBBOCK WATER LP&L STREETS 0 WATER 1 0 0 1 0 0 2 WATER 21 5 3 5 8 2 44 0 LP&L 0 LP&L 19 17 2 15 0 17 70 25 0 STREETS 0 STREETS 5 3 0 3 4 1 16 TOTAL 0 0 0 0 0 0 0 TOTAL 1 0 0 1 0 0 2 TOTAL 45 25 5 23 12 20 130 BUILDING C RUNS 500 FEET 6 -PAIR 1 12 -PAIR 25 -PAIR 1 BUILDING D RUNS 1060 FEET 6 -PAIR 1 12 -PAIR 1 25 -PAIR BUILDING E RUNS 675 FEET 6 -PAIR 2 12 -PAIR 25 -PAIR BUILDING F RUNS 575 FEET 6 -PAIR 2 12 -PAIR 25 -PAIR RADIO TOWER RUNS 1200 FEET 6 -PAIR 5 12 -PAIR 25 -PAIR TOTALS RUNS 6 -PAIR 11 12 -PAIR 1 25 -PAIR 1 SUMMARY OF CONDUIT UNITS CITY OF LUBBOCK WATER LP&L 0 WATER 0 WATER 135 0 0 135 WATER 115 0 0 115 WATER 200 0 0 200 WATER 450 0 0 450 26 0 LP&L 106 106 0 212 LP&L 0 LP&L 0 LP&L 200 0 0 200 LP&L 306 106 0 412 STREETS 50 0 50 100 STREETS 0 STREETS 0 STREETS 0 STREETS 200 0 0 200 STREETS 250 0 50 300 TOTAL 50 0 50 100 TOTAL 106 106 0 212 TOTAL 135 0 0 135 TOTAL 115 0 0 115 TOTAL 600 0 0 600 TOTAL 1006 106 50 1162 BUILDING A RUNS 200 FEET 25 -PAIR 3 r-� w-, SUMMARY OF INSIDE CABLE UNITS CITY OF LUBBOCK POLICE ACADEMY TOTAL 60 60 0 0 60 60 27 11'-6" 3'-0"3'-0"-72'-0"T2'-0"11'-6" RESERVED FOR DISTRIBUTION WIRING 6" INCOMING STATION INTER- WATER GROWTH LINES EQUIPMENT O BUILDING DEPT. (BELL TELEPHONE) I PROTECTION N I INTER- (YJ BUILDING CABLE O i CO ELEC . DEPT. Lo Ln (n I Rl PLYWOOD" GROUND BAR I l FINISHED FLOOR TYPICAL STATION WIRING TYPICAL ELECTRICAL DEPT. INTER -BUILDING CABLE & WATER DEPT. BLDG A BLDG B BLDG C BLDG D BLDG E BLDG F EL comp. AD I OPO��� TEL comp. AO OPO�t� TEL OMP . AD OQ'O�A� DMP . AO oz OMP. AO OPO�AS TE ODMP, ADI OPO�A� r T - r - -I MAIN EQUIPMENT ROOM — WIRING LAYOUT Ex 1 i-we I --e —o" Cl a cn cn cn cn H Z Z ZI Z O O O O j O O Q Q Q Cl W W W W W Z Q Cl IZ Cl H H H H H Q 3 3 3 3 ca ca ca ca O F— W W W W J J J J U Ctl m m m J Q Q Q Q m U U I U U Q U J J J J Q Q Q W U U I U U H O O O O F— J JQ J J SATELLITE TERMINAL ROOM TYPICAL WIRING LAYOUT Ex 2 ss• x aa• JumcTsoN .Dx ,-,,V- L _. u 1 I 1 i i 1 I CH UR CONDUIT r •Yi DUCT DNA.INi! TO JUNCTION 60xli (IN rAfIKINO ILOT) I� V' — — — — — — — — — — — — — J NOTE: USE DUCT Ni FOR TELEPHONE 6 COMPUTER CABLES. NOTE: USE DUCT 02 FOR RADIO CABLES. X Si' JUNCTION .OX BUS DUCT TERMINATION BOXES Ex3 3 3/4' 'O' TYPE DISTRIBUTION RING GRAYBAR GS13C OR EQUIVALENT I - w Y U 2 m m m to m V) 66M TYPE CONNECTING BLOCK AND DISTRIBUTION RING LAYOUT Ex 4 DISTRIBUTION RING D' TYPE JUMPER `1(�MPER ( CABLE SIDE CABLE SIDE If) N I Q N I w a f E 0 m ft co w a FIELD SIDE fA 3 cc i N CABLE SIDE Ln m WIRING DISTRIBUTION TYPICAL - IL Ex 5 N N O I a o I•- Ip FIELD SIDE DISTRIBUTION RING D' TYPE JUMPER `1(�MPER CABLE SIDE D N I Q w a f 0 FIELD SIDE CABLE SIDE Q1 fA 3 i N Ln FIELD SIDE WIRING DISTRIBUTION TYPICAL - 66MI-25 BLOCKS Ex 5 X O fL a a a a m X O 2 a a a a m X O fL IL a a a m X O IZ a a a a m X O cc a a a Q m DISTRIBUTION RING D' TYPE DISTRIBUTION RINd D' TYPE 00 DISTRIBUTION RINd D' TYPE DISTRIBUTION RINd D' TYPE FIELD SIDE O O _CABLE SIDE X CABLE SIDE Dj Q rm SIDE .+ a AZT- CABLE SIDE i � a to a FIELD SIDE FIELD SIDE O O _CABLE SIDE X CABLE SIDE Dj Q rm SIDE .+ a CABLE SIDE FIELD SIDE M a FIELD SIDE FIELD SIDE O _CABLE SIDE jCABLE rm SIDE 1T— W FIELD SIDE WIRING DISTRIBUTION TYPICAL - 66M1-50 BLOCKS Ex6 PASR ! PASR ! TO ONE TO ONE USER PASR 2 PAIR 2 USER OUTLET OUTLET PAIR 3 PAIR 3 TO ONE USER OUTLET PAIR ! PAIR 2 PAIR 3 PASR! TO ONE PAIR 2 USER OUTLET PAIR 3 RADIO TERMINATION. TYPICAL — 66M1-50 BLOCKS Ex7 TELEPHONE & COMPUTER TERMINATION TYPICAL — 66M1-50 BLOCKS Ex8 PR f - TEL PR f - TEL TO ONE USER Pw 2 - TEL PR 2 - TEL TO ONE OUTLET USERPR pR a - comp. a - comp OUTLET PR ♦ - COMP. PR ♦ - COM►. PR 3 - TEL PR f - TEL TO ONE USER PR 2 - TEL PR 2 - TEL TO ONE OUTLET USER pw s - comp. PR a - comp. OUTLET PR 4 - COMP. PR 4 - COMP. TELEPHONE & COMPUTER TERMINATION TYPICAL — 66M1-50 BLOCKS Ex8 1 2 3 4 5 6 7 8 9 •/•o o—k o 0 0 0 0 0 0 a 0 0 0 0 0 0 0 A I 2C• GROUND BAR DETAIL Ex 9 ORA-ING 2 z Q J n rr O O J LL Q C� O J m T/C I T/C T/C 14T/C LEGENO 10- T/C TELEPHONE/COMPUTER T TELEPHONE d R REMOTE ..OIO P RE EKTENDED LOCAL RADIO m C COMPUTER O RS RADIO SPEAKER T/C RE C C INT/C 1, T T/C U T/C T/C R RE T T/C BLDG "A" FLOOR PLAN WATER DEPARTMENT DRAWING 2 Coz H 3 Q Q a W 0 CE W F- 3: W c w T/C O 'it. I�T.0 w w T/C T.o a o � T TlLl�NCN! T p O Qw r.c 1 �r.c------------------- \1 LEGEND 1 T/C TELEPHONE/COMPUTER -4 T TELEPHONE Q R REMOTE RADIO D RE EXTENDED LOCAL RADIO BLDG " A " FLOOR PLAN & C COMPUTER LP&L DEPARTMENT O RS RADIO SPEAKER ONE OF T W O Drawing 3 C LEGEND 1` T/C TELEPHONE/COMPUTER +\ T TELEPHONE "A �� FLOOR PLAN BLDGR Q REMOTE RADIO ` L P& L DEPARTMENT p RE EXTENDED LOCAL RADIO m C COMPUTER T W O OF T W O O RS RADIO SPEAKER DRAWING 4 T Z H 3 Q cl 0 Z O H i' - Q I— cn W U H J O n W W 1 1 i cD Z H 3 Q Q O J co Q. J W W w BLDG "A" FLOOR PLAN POLICE ACADEMY DRAWING 5 0 mz Q zn H ❑ T O1O H0 DS n mil DRAWING 6 O CL H w o F- Q Cl a- x E J O a Cl U O U w \ H O Y w 0 J Q z W Q w O Z C< 0 2 I = O w w Ul CL I w 0 F W I F- z D O J W O W CL H F- W W X O OQ Z H Q W U CC U \ W U) W H F- Cl Cl U CC -' ♦0060 N O a aOW a¢rz N Z O W Q J Y I Z Q U 6 O O U Q W I W (Lai W a ar n¢aw z 0.0 W¢a H W z 3 q rrva N OW ¢ H I r W I a X W X m 0 0 W ¢ W O m J¢Y O W W J U 0 0 3 Q r 0 0 3 r 0 W r O z uz Q zn H ❑ Fr DO HO mil � W F- 0 H p Q 0- I Q J O U \ W O H p Q U O J Q w Y Q z O 2 W z O Q ¢ ❑ w w Q a w cn a w J = d W w F- O p z W D O d H 0 z W f J W F- z W m F- X W z O Q U W CD W u F- F- ¢ w Q Fn U ¢ J •.00e0 DRAWING 8 of z W 0 LU J ❑z Q O _l zn H ❑ M 10 HO m Cl W F- D H 0 Q O n 7- T O 0 U W O H O Q U O J T W Y Q Z O 2 W Z O Q 1 0 W W 1 d W (n 1 W J I I W W F- O 0 Z W F- O O a H W F J W F z W Q F X W F O O Q U I O F- F CC W CL (n U Cl A V 7A<0 0 U 500 MUNICIPAL DRIVE SITE AND CONDUIT LAYOUT DRAWING 10 TO IAD I O OWER SPECIAL CONDITIONS -43- (THIS PAGE LEFT BLANK INTENTIONALLY) NOTICE OF ACCEPTANCE _ TO: The City of Lubbock, having considered the proposals submitted and opened on the _day of 199_, for work to be done and materials to be furnished in and for: as set forth in detail in the Specifications, Plans, and Contract Documents for such work for the City of Lubbock; it appearing that your proposal is fair, equitable and to the best interest of said City, please take notice that said proposal was accepted by the City Council of the City of Lubbock on the day of 198_ at the bid price contained therein, subject to the execution of and furnishing of all contract documents, bonds, cer- tificates of insurance, and all other documents specified and required to be executed and furnished under the con- tract documents. It wilt be necessary for you to execute and furnish to the City of Lubbock all such documents within ten (10) days from your receipt of this Notice. The five percent (5%) bid security, submitted with your proposal, will be returned upon the execution of such contract documents and bonds within the above specified ten (10) day period. In the event you should fail to execute and furnish such contract documents and bonds within the time limit specified, said bid security will be re- tained by the City of Lubbock. CITY OF LUBBOCK Owner's Representative r�- r-- -44- (THIS PAGE LEFT BLANK INTENTIONALLY)