RESOLUTION
Resolution No. 3538
February 14, 1991
Item #10
RESOLUTION ACCEPTING IMPROVEMENTS ON THE 1988 ASSESSMENT PAVING PROGRAM
AS LISTED BELOW AND ORDERING THE ISSUANCE OF CERTIFICATES IN EVIDENCE OF
ASSESSMENTS LEVIED.
WHEREAS, the City of Lubbock heretofore passed various street improve-
ment Ordinances and Resolutions and entered into a Contract with Williams &
Peters Construction Company, Inc. (Project No. 9062) for the making and con-
struction of street improvements on a portion of Quirt Avenue and 78th Street
in said City including the following:
Quirt Avenue from its intersection with the South raw edge of East 50th
Street to its intersection with the North raw edge of Slaton Highway
known and designated as Sub -Unit Number 79 of Unit Number 2240.
78th Street from I-27 to the centerline of Avenue F known and designated
as Sub -Unit Number 77 of Unit Number 2240.
78th Street from the centerline of Avenue F to the East curb line of
Avenue D known and designated as Sub -Unit Number 78 of Unit Number 2240.
WHEREAS, the improvements upon the said portion of the above-mentioned
streets have been inspected and found to have been constructed in accordance
with the terms of said Contract (Project No. 9062); NOW THEREFORE:
BE IT RESOLVED THE CITY COUNCIL OF THE CITY OF LUBBOCK:
SECTION 1. THAT the improvements on said portions of the above-
mentioned streets and the same are hereby accepted and the City Engineer BE
and he is hereby authorized to direct payment of the one percent (1%) re-
tainage in the amount of $11,232.02.
SECTION 2. THAT the Mayor and City Secretary BE and they are instruct-
ed to execute and deliver certificates in evidence of the assessments levied
against the parcels of property abutting upon the said portion of Quirt
Avenue and 78th Street listed above and against the owners of such property
in accordance with law and in the manner provided in said Contract, and the
proceedings with reference to said improvements and assessments where such
assessments were levied.
Resolution No.
February 14, 1991
Item X610
SECTION 3. THAT this Resolution shall take effect and be in force from
nd after its passage.
assed by the City Council this 14th day of February 1991.
TTEST:
netpe boys, city secretary
PROVED AS TO CONTENT:
:�� /6' - &-Z�
arry D. Hertel, City Engineer
PPROVED AS TO FORM:
c
.
1 -19 -ah Fu ingim, Assistant Cit
tt rv
- 2 -
B. C. McMIN , MAYOR
� 353
1988 ASSESSMENT PAVING PROGRAM
CONSOLIDATED FINAL ESTIMATE
Unit 2240-77 78th Street from I-27 to Avenue F $ 14,598.05
Unit 2240-78 78th Street from Avenue F to Avenue D $ 263.072.40
Unit 2240-79 Quirt Avenue from East 50th Street to Slaton Highway $1,028,082.01
TOTAL $1,068,752.46
J
1=" A. C. Paying on 911
46
36 3
$16.00
$746,818.56
Asphalt StabillZed Base,
MONTHLY ESTIMATE
9.
CITY OF LUBBOCK
S. Y.-
-200
85.59
Project:
1988
ASSESSMENT PAVING
PROGRAM
Project No.
9062
Y.
4,soo
4,389.55
6.50
$ 28,532:08
10.
Contractor:
WILLIAMS
AND PETERS CONSTRUCTION
CO
Estimate No.
Final
Address:
P. 0.
BOX 5215
Contract $
1,024,190.15
8" Concrete Paving
S.
LUBBOCK,
TEXAS 79417
2,304.34
Change Order No. 1 $18,127.50
17
$1,042,317.65
Estimate Period From
November 6
, 19 90 to January 1
'1991
24" Curb and Gutter
L,
F
14 400
On First estimate and final estimate use actual work dates
1 1,462.30
$"76,450"84
Driveway repair
ITEM
UNIT OF PROJECT WORK DONE CONTRACT
5.
MEASURE EST. QUANTITIES ON CONTRACT
PRICE
AMOUNT
1.
1=" A. C. Paying on 911
46
46 676.16
$16.00
$746,818.56
Asphalt StabillZed Base,
9.
Concrete Slab Removal
S. Y.-
-200
85.59
$ 5.00
427,95
2.
11" A. C. Paving on 6"
S.
Y.
4,soo
4,389.55
6.50
$ 28,532:08
10.
Caliche Base
S. y. 1
160
159.70
07.10
2,730.87
3.
8" Concrete Paving
S.
Y
2,305
2,304.34
$29.157
17
4.
24" Curb and Gutter
L,
F
14 400
14 506.80
1 1,462.30
$"76,450"84
Driveway repair
5.
As halt'Stabilized Base
12,150
12 540.80
2.50
31 352.00
13.
Below Curb and Gutter
402
402.00
4.50
1,809.00
6.
Pavino Resurfacina
s_
v_
inn
-0-
$ 5.00
8.
Concrete Valley Gutter
bS.UU
$18.00
- 1,1/0.00
9.
Concrete Slab Removal
S. Y.-
-200
85.59
$ 5.00
427,95
10.
Concrete Overlay Median
S. y. 1
160
159.70
07.10
2,730.87
11.
Cement Stabilized
C. Y.
100
418.77
$50,00
$ 20
938.50
12.
4" Concrete Sidewalk
S. Y.
200
146.23
00.00
1 1,462.30
Driveway repair
13.
Drainage Channel Excavation
402
402.00
4.50
1,809.00
14.
Concrete Drainage Channel
S, Y,
830
841.18
S19.15
$ 16,108.60
15.
Alley Paving
Deleted
__
MONTHLY ESTIMATE
CITY OF LUBBOCK
Project: _..__.19_88
.ASSESSMENT RAVING
-.PROGRAM _ -_„
Project No. 9062
Contractor:
WILL I AMS AND PETERS CONSTRUCTION CO.
Estimate No. Final
Address:
P. 0.. BOX 5.215
_ ...__
Contract $ 1 ,024, 1q 1 S
LU_BBO_CK,_TEXAS 79417
Change Order No. 1 $ 18,127.50
1,042,317.65
Estimate Period From November 6
, 19 90 to January 1
19 91
17.00
On First estimate and final estimate use actual work dates
ITEM
UNIT OF PROJECT
WORK DONE CONTRACT
MEASURE EST. QUANTITIES
ON CONTRACT PRICE AMOUNT
16. Alley
u
Delete
17. Curb
and.Gutter Removal
Delete
1.1
Driveway Ad•..ustmen.t.
19. Preformed Pavement Marking L. F, 19,98o 21,000.00 1.25. $ 26,2 0.00
24" Wide
.1.
Preformed pavement Marking
E. A.
18
17.00
$150,00$
2,550.00
_
Words and -Symbols
Chane Order. No . _1
1.
Class C Reinforced Concrete
S.Y.
165
162.70
39.60
1
6.442-92
Paving
-
.2 —
Concret-Slab Removal
S.Y.
'165
162.70
29.70
4,832.19
Curb and Gutter Removal
L.F.
70
57.00
5.50
$
313.50
4.
Curb and Gutter Sawtooth
L.F.
100
70.32
$
7.15
502.79
Curb and Gutter
5.
Ditch Grading
L.F.
275
275.00
$
2.00
$
550.00
6.
Joint Sawing and Seal
L.F. 1
130 1
218.00
$
3.30
719.40
7.
5" Thick Concrete Flatwork
S.Y. 1
45 1
41.
1,146.75
MONTHLY ESTIMATE
CITY OF` LUBBOCK
Project: 1988 ASSESSMENT PAVING PROGRAM Project No. 9062
Contractor: WILLIAMS AND PERTERS CONSTRUCTION CO. Estimate No. Final
Address: P.O. DOX 5215 Contract $ 1,024,190.15
Change Order No. 1 $ 18.4127.50
LUQBOCK, TEXAS 79417 1,042,317.65
Estimate Period From November 6 , 19 90 to January 1
On First estimate and final estimate use actual work dates
ITEM UNIT OF PROJECT WORK DONE CONTRACT
MEASURE EST. QUANTITIES ON CONTRACT PRICE
8. 27" Toe Wall L.F. 125 12 $ 15.4C
AMOUNT
9. 9" Toe Wall L. F. 170 170.00 $ 1,496.00
APPROVED:
t'n, Fn,,•s r ,"v
Tial of Work Done .......
aAmount
Less 5 °?, Retained S
Diffeience ..... .. . .. . .... ... y
Less Special Deduction . ......... S
Less LiCluidated Damage .. ... . 5
Less Previous Payments. ......... SS
Amount Due this Estimate......... $
1,068,752,46
1.057,520.44
11,232.02
`
Engineer Date
ctiecwen l,y:
Dept. Head Date
Director Date