HomeMy WebLinkAboutResolution - 3665 - Accept Water & Sewer Improvements- Craft Construction- Lots 231-256, PR Addition - 07/25/1991Resolution No. 3665
July 25, 1991
Item #13
JWF:dw
RESOLUTION
RESOLUTION ACCEPTING WATER AND SEWER SYSTEM IMPROVEMENTS FOR LOTS 231
THROUGH 256, PHEASANT RUN ADDITION.
WHEREAS, the developer of Lots 231 through 256, Pheasant Run Addition
has complied with the provision of the City of Lubbock Code, Chapter 28,
Article IV, by providing the water and sewer improvements for said addition
in accordance with paragraph 156 of said Chapter 28, and
WHEREAS, the total utility cost to the developer is $36,958.50 with
the improvements constructed by Craft Construction Corporation having a
value of $27,430.11 as determined by the unit prices established by said
Chapter 28, and $9,528.44 cash paid to the City, including adjacent line
costs of $8,432.30, with W. R. Hutson, the developer to receive a refund of
$9,989.34 in accordance with Chapter 28 of the Code of the City of Lubbock
and a refund of deposit in the amount of $00.00; and
WHEREAS, the construction of the said water and sewer improvements was
performed under the supervision of the Water Utilities Engineer and
completed in accordance with the City of Lubbock's plans and specifications;
NOW THEREFORE:
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
SECTION 1. THAT the improvements be and the same are hereby accepted
as an integral part of the water and sewer system of the City of Lubbock.
SECTION 2. THAT the refundable cost in the amount of $9,989.34 be
made in accordance with said Chapter 28.
SECTION 3. THAT a refund of deposit be made in the amount of $00.00.
SECTION 4. THAT this Resolution shall take effect and be in force
from and after its passage.
Passed by the City Council this 25th
n
ecre
APPR VEO A 0 CONTENT:
r
r D . Watson, Chief Water
Utili ies Engineer
day of July , 1991.
B. C. Cmc ION, MAYOR
v
APPR EO S TO FORTAA*OA4w
7A?
J4 Woth Fullingim, Assistan
City =Attorney