Loading...
HomeMy WebLinkAboutResolution - 3737 - CO #1 To Project - 1990 Assessment Paving Program - Sidewalks, Curb, Sewer, Etc. - 10/22/1991HW:js RESOLUTION Resolution No. 3737 October 22, 1991 Item #10 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock Change Order No. 1 adding paving quantities to Project No. 9403 (1990 Assessment Paving Pro- gram, 34th Street from West Loop 289 to Milwaukee Avenue) to an existing Contract for paving improvements between said City and C. B. Thompson Con- struction Company, attached herewith, which shall be spread upon the minutes of the Council and as spread upon the minutes of this Council shall constitute and be a part of this Resolution as if fully copied herein in detail. Passed by the City Council this 22nd day of ATTEST: , City Secreta APPROVED AS TO CONTENT: . m rte , City Lngineer APPROVED AS TO FORM: litrold Willard, Assistant City Attorney October , 1991. x/. e _ B. C. McMIN , MAYOR CHANGE ORDER NO. 1 TO PROJECT 9403 1990 ASSESSMENT PAVING PROGRAM (34TH STREET FROM WEST LOOP 289 TO MILWAUKEE AVENUE) TO: C.B. Thompson Construction Co. P.O. Box 6456 Lubbock, TX 79493-6456 Gentlemen: WHEREAS, it is desirable to make changes in the plans and specifications for this project, being namely the addition of the following: Sidewalk Removal and Replacement Curb and Gutter Removal and Replacement Changes to Storm Sewer Design WHEREAS, the Contractor herein agrees to the following change: Original Amount of Contract $1,299,881.95 Increased by Change Order No. 1 82,026.87 Total Amount of Contract $1,381,908.82 30 Additional working days is allowed with this Change Order. THIS AGREEMENT WITNESSETH: In consideration of the mutual advantages gained, the Owner and the Contractor agree to the change shown herein and in the revised plans, the Owner agrees to pay the Contractor the amount of increase in cash. The Contractor agrees to proceed with construction and to adhere to applicable specifications, under the direction of the Engineer. Furthermore, the parties agree that the original contract between the Owner and the Contractor shall be modified to the extent herein indicated, including one (1) attachment. IN WITNESS WHEREOF, the Owner and the Contractor have hereto set their hands this 22nd day of October , 1991. C.B. THOMPSON CONSTRUCTION CO. (Contractor) BY: TITLE: A� i CITY OF LUBBOCK (Owner) C BY: � ATTE ,lB.C. McMinn Ranet Boyd UT Mayor City Secretary A FOR APPROVAL City Engineer APPROVED AS TO FORM: J. North Fullingim, Assis nt Cit Attorney 3737 CHANGE ORDER NO. 1 TO PROJECT NO. 9403 (1990 Assessment Paving Program - 34th Street from West Loop 289 to Milwaukee Avenue) Change Order No. 1 Consists of the Following: 1. Add 145.80 SY to Item No. 2 for remove, stockpile, and salvage existing concrete slabs at $9.53/SY = $ 1,389.47 2. Add 145.80 SY of 4" thick concrete sidewalk as Item No. 33 @ $13.34/SY = $ 1,944.97 3. Add 1,115.27 L.F. to Item No. 3 for remove, stockpile and salvage existing concrete curb and gutter at $3.18 = $ 3,546.56 4. Add 1,115.27 L.F. to Item 9 for 24" concrete curb and gutter at $5.82/L.F. _ $ 6,490.87 5. Add 2 concrete junction boxes as Item No. 34 to connect storm sewer pipes at crossing of sanitary sewer at $2,000.00 each = $ 4,000.00 6. Add as Item No. 35 additional labor and materials required by design change resulting from conflict of storm sewer with telephone duct = $ 64,655.00 TOTAL CHANGE ORDER NO. AMOUNT = $ 82,026.87 ORIGINAL CONTRACT AMOUNT = $1,299,881.95 NEW CONTRACT AMOUNT = $1,381,908.82 Mr. Larry D. Hertel, P.E. City Engineer City of Lubbock P.O. Box 2000 Lubbock, Texas 79457 Re: 34th Street Reconstruction Drainage Modifications Dear Larry: October 14, 1991 We have received, reviewed and evaluated the additional package of information furnished by Midwest Concrete to document costs associated with the changes to the drainage system on West 34th Street as a result of conflict with a telephone duct bank. Our evaluation has resulted in the identification of a recommended response to the Contractor concerning his request. The Contractor has requested a total of $77,628.61 for the modifications. The following revisions to the Contractor's request appear to be in order. The six percent (6%) increase on each item is the Contractor's mark-up for Thompson and bond. I. The Contractor's records list pipe laying prices as follows. Parkhill, Smith & Cooper, Inc. Engineers • Architects • Planners 4010 Avenue R, Lubbock, Texas 79412 (806) 747-0161 FAX (806) 747-7146 Lubbock El Paso Midland Change Size Original Request Difference Length Amount 2-24" -- $40.00* $10.00* 90' $900 36" $12.00 $15.00 $3.00 596' $1788 48" $15.00 $15.00 $0.00 1000' $0 60" $20.00 $25.00 $5.00 106' 530 $3218 x 1.06 — $3411 *$40.00 per foot for 2-24" appears too high. We have used $30.00 per foot as more reasonable based on original/change request for 36". Parkhill, Smith & Cooper, Inc. Engineers • Architects • Planners 4010 Avenue R, Lubbock, Texas 79412 (806) 747-0161 FAX (806) 747-7146 Lubbock El Paso Midland Mr. Larry D. Hertel, P.E. Page 2 October 14, 1991 2. The Contractor's Change Request lists pea gravel at $13,500 x 1.06 — $14,310. The backup provided indicates a total of 615 cubic yards at $13.50 per cubic yard or $8,302 x 1.06 a $8,800. It appears that a reduction of $14,310 - $8,800 — $5,510 is appropriate. 3. We understand that Midwest has already agreed to delete the amount of $9,500 x 1.06 — $10,070 for Midwest markup on Weaver items. The revisions listed above are summarized as follows: Pipe Laying $ 3,411 Pea Gravel $ 5,510 Midwest markups $10,070 $18,991 We have used the information provided by the Contractor, the backup to his original bid, as well as his current change request in making our evaluation and recommendations. A summary of the change request and our recommendations follows. Original Request Recommended Initial Installation, Remove & Clean Pipe $11,666 $ 9,546* Reinstall per Revised Design $38,178 $29,467 Trench Safety $ 4,242 $ 3,180. Pea Gravel $15,907 $ 8,800 Structures _ 7,636 7,636 $77,629 $58,629 *PSC will compensate Contractor for initial installation, removing and cleaning pipe. Larry, we would be happy to review all of this with you and the Contractor and look forward to quick resolution of these issues. Sincerely, PARKHILL, SMITH & COOPER, INC. By Teri G.Bilderback, P.E. TGB/ds