HomeMy WebLinkAboutResolution - 3816A - CO #4-1 To Contract - Advance Tank & Construction Company - WTP Improvements - 02/13/1992Resolution No. 3816A
February 13, 1992
Item 430
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock a Change Order
No. 4-1 to C.O.L. Water Treatment Plant Improvements Contract with the
Contractor, Advance Tank & Construction Company, attached herewith, which
shall be spread upon the minutes of the Council and as spread upon the
minutes of this Council shall constitute and be a part of this Resolution as
if fully copied herein in detail.
Passed by the City Council this 13th
T:
Ranett Boy , City Secretary
P
t
VENTQC CNTENT:
►/
D n A. Haviki ns, -Di rector of Water
U ilities
APPROVED AS TO F RM:
c
J. Vro FulTingim, Assis ant City
At rev
JWF:dw
agenda-D#1/Chg0r4-1.Res
day of February 1992.
Cc
B. C. McMflefN, MAYOR
Change Proposal
Request No. 1
(Not a Change Order)
P.oL�UBE C 0'"
K WTP - CONTRACT 4 "'«'Pr pd No. (if a spp ft):
CITY OF LUBBOCK Ri;ji�Aq-�Ky PMjWNo.
Or8WkMWt:
FDR Prrqo�.�t No.: NwtiWd by: Engirwer Contractor D":
OOOOti-111-037 U � 01-22-92
Contractor:
Attention:
The following change in the contract on this project is proposed.
• A breakdown of cost SHALL be attached.
• Work shall not commence until authorized by the Owner.
Descrirpton 0 the Proposed Chane:
Remove concrete rubble encountered in tank si
L and replace with select material in accordance with Specification Section 02200.
L The cost to remove concrete and replace with fill at a cost of $11,297.00 Recommend
that Turco, the earthwork subcontractor, be allowed to take ownership of the
railroad track at the tank site which will revise the cost of change to $7,357.00.
i
i
....................................... ........ ._.......................
All work shall be in accordance with the terms,
s6pulaticns, and conditions of the or inal Contract
Documents. If the work herein proved for is
Approved by Change Order, the time of completion will
be:
U irw"WAW U Deareawd U wawvw
by calender days.
Will: W Add L J Deduct U Not CWW
.00
RAO
twctor
Date
Ver 1.0 June 1990
HDR Recommendation:
�Reaormlerd U Do Not Reoomrtwld
Aaoepmrloe Aaoepta =
I/
By: FDR En9i
3250.2
SO'd T00'oN 6S:ZT Z6 ZT upt
2 i CA y
3 .1
PAY
x 3246.3
I/ P177 t
3245.7
OT86-VVZ-908-T:-131
3?
Op"
11
OSd/dGH
A
Change Order
No. 4-1
Project Name:HDR Project No.:
C.O.L. WATER TREATMENT PLANT IMPRMTS-CONTRACT 4:6MG CLRWL 00008-111-037
"act Owner: (Name, Address) OwneesProject
B:
I # 11622
CITY OF LUBBOCK, TEXAS-P.O. BOX 2000
LUBBOCK, TEXAS 79457 Date of Issuance:
2/5/92
Project contractor. (Name, Address) ADVANCE TANK AND CONSTRUCTION C 0 . Date of Contract:
P.O. B 0 X 219 contract Period: DEC. 16, 1991 --
WELLINGTON, CO. 80549 FEB. 28, 1993
It Is agreed to modify the Contract referred to above as follows:
Item No. Item and Description of Changes Contract Priem Contract Time
Decrease Incxease Decrease Increase
�I CHANGE PROPOSAL REQUEST NO. 1 (ATTACHED) I� $ 7357.00 XX XX
Sub -Total $ 7357.00 xx xx
Difference Not $ 7357.00 XX XX
Summary: It is agreed to modify the Contract referred to above as follows:
Contract Price prior to this Change Order Contract Time prior to this Change Order
$1,393,559.00 440 CALENDAR DAYS
Net increase (decrease) of this Change Order Net Increase (decrease) of this Change Order
I$ 7,357.00 0
Revised Contract Price with all approved Change Orders Revised Contract Time with all approved Change Orders
$1,400,916.00 440 CALENDAR DAYS
The changes Included In this Change Order are to be accomplished In accordance with the terms,stipu tions and conditions
of iglnal contract as ough in d ther In.
4. z / e �42
Accepted for Qqydnsoor by � L`e /J Date
Recommended for Approval By (HDR Engineering, low, Date
V
Approved for Owner by: D t Attest Date
C- 29� I February 13, 1992
Quad:(Omer -
whenr uired) B. C. McMinn, Mayor Ritet ecrrD a
Distribution: U Owner u Contractor Office Field U Omer
ver 1.0 od. 1990
Transmittal HDR Engineering, Inc. Suite 125
12700 Hillcrest Road
Dallas, Texas
75230-2096
Telephone:
(214) 960-4000
fal
(Attention TERRY ELLERBROOK Date 2/5/92 1Job No. 00008-111-037
iT CITY OF LUBBOCK
Bearding LUBBOCK WTP IMPROVEMENTS- CONTRACT 4: 6MG CLEARWELL
We are sending you:
U Shop drawings
U Copy of letter
Copies Date
I Attached
U Prints
UChange order
No. Description
" Under separate cover via
the following items:
U Plans U Samples U Specifications
Other
�— I ORIGINAL CHANGE ORDER
L I ORIGINAL HDR LETTER
CPR # 1
ADVANCE TANK LETTER
L— I MAP OF AREA SHOWING CONCRETE PITS
These are transmitted as checked below:
U For approval L -J Approved as submitted
L_J For your use L -J Approved as noted
U As requested L_I Returned for corrections
" For review/comment Other
L -I For bids due 19
If enclosures are not as noted please notify us at once.
L_J Resubmit copies for approval
L_I Submit copies for distribution
L_I Return corrected prints
" Prints returned after loan to us
l