Loading...
HomeMy WebLinkAboutResolution - 3816A - CO #4-1 To Contract - Advance Tank & Construction Company - WTP Improvements - 02/13/1992Resolution No. 3816A February 13, 1992 Item 430 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock a Change Order No. 4-1 to C.O.L. Water Treatment Plant Improvements Contract with the Contractor, Advance Tank & Construction Company, attached herewith, which shall be spread upon the minutes of the Council and as spread upon the minutes of this Council shall constitute and be a part of this Resolution as if fully copied herein in detail. Passed by the City Council this 13th T: Ranett Boy , City Secretary P t VENTQC CNTENT: ►/ D n A. Haviki ns, -Di rector of Water U ilities APPROVED AS TO F RM: c J. Vro FulTingim, Assis ant City At rev JWF:dw agenda-D#1/Chg0r4-1.Res day of February 1992. Cc B. C. McMflefN, MAYOR Change Proposal Request No. 1 (Not a Change Order) P.oL�UBE C 0'" K WTP - CONTRACT 4 "'«'Pr pd No. (if a spp ft): CITY OF LUBBOCK Ri;ji�Aq-�Ky PMjWNo. Or8WkMWt: FDR Prrqo�.�t No.: NwtiWd by: Engirwer Contractor D": OOOOti-111-037 U � 01-22-92 Contractor: Attention: The following change in the contract on this project is proposed. • A breakdown of cost SHALL be attached. • Work shall not commence until authorized by the Owner. Descrirpton 0 the Proposed Chane: Remove concrete rubble encountered in tank si L and replace with select material in accordance with Specification Section 02200. L The cost to remove concrete and replace with fill at a cost of $11,297.00 Recommend that Turco, the earthwork subcontractor, be allowed to take ownership of the railroad track at the tank site which will revise the cost of change to $7,357.00. i i ....................................... ........ ._....................... All work shall be in accordance with the terms, s6pulaticns, and conditions of the or inal Contract Documents. If the work herein proved for is Approved by Change Order, the time of completion will be: U irw"WAW U Deareawd U wawvw by calender days. Will: W Add L J Deduct U Not CWW .00 RAO twctor Date Ver 1.0 June 1990 HDR Recommendation: �Reaormlerd U Do Not Reoomrtwld Aaoepmrloe Aaoepta = I/ By: FDR En9i 3250.2 SO'd T00'oN 6S:ZT Z6 ZT upt 2 i CA y 3 .1 PAY x 3246.3 I/ P177 t 3245.7 OT86-VVZ-908-T:-131 3? Op" 11 OSd/dGH A Change Order No. 4-1 Project Name:HDR Project No.: C.O.L. WATER TREATMENT PLANT IMPRMTS-CONTRACT 4:6MG CLRWL 00008-111-037 "act Owner: (Name, Address) OwneesProject B: I # 11622 CITY OF LUBBOCK, TEXAS-P.O. BOX 2000 LUBBOCK, TEXAS 79457 Date of Issuance: 2/5/92 Project contractor. (Name, Address) ADVANCE TANK AND CONSTRUCTION C 0 . Date of Contract: P.O. B 0 X 219 contract Period: DEC. 16, 1991 -- WELLINGTON, CO. 80549 FEB. 28, 1993 It Is agreed to modify the Contract referred to above as follows: Item No. Item and Description of Changes Contract Priem Contract Time Decrease Incxease Decrease Increase �I CHANGE PROPOSAL REQUEST NO. 1 (ATTACHED) I� $ 7357.00 XX XX Sub -Total $ 7357.00 xx xx Difference Not $ 7357.00 XX XX Summary: It is agreed to modify the Contract referred to above as follows: Contract Price prior to this Change Order Contract Time prior to this Change Order $1,393,559.00 440 CALENDAR DAYS Net increase (decrease) of this Change Order Net Increase (decrease) of this Change Order I$ 7,357.00 0 Revised Contract Price with all approved Change Orders Revised Contract Time with all approved Change Orders $1,400,916.00 440 CALENDAR DAYS The changes Included In this Change Order are to be accomplished In accordance with the terms,stipu tions and conditions of iglnal contract as ough in d ther In. 4. z / e �42 Accepted for Qqydnsoor by � L`e /J Date Recommended for Approval By (HDR Engineering, low, Date V Approved for Owner by: D t Attest Date C- 29� I February 13, 1992 Quad:(Omer - whenr uired) B. C. McMinn, Mayor Ritet ecrrD a Distribution: U Owner u Contractor Office Field U Omer ver 1.0 od. 1990 Transmittal HDR Engineering, Inc. Suite 125 12700 Hillcrest Road Dallas, Texas 75230-2096 Telephone: (214) 960-4000 fal (Attention TERRY ELLERBROOK Date 2/5/92 1Job No. 00008-111-037 iT CITY OF LUBBOCK Bearding LUBBOCK WTP IMPROVEMENTS- CONTRACT 4: 6MG CLEARWELL We are sending you: U Shop drawings U Copy of letter Copies Date I Attached U Prints UChange order No. Description " Under separate cover via the following items: U Plans U Samples U Specifications Other �— I ORIGINAL CHANGE ORDER L I ORIGINAL HDR LETTER CPR # 1 ADVANCE TANK LETTER L— I MAP OF AREA SHOWING CONCRETE PITS These are transmitted as checked below: U For approval L -J Approved as submitted L_J For your use L -J Approved as noted U As requested L_I Returned for corrections " For review/comment Other L -I For bids due 19 If enclosures are not as noted please notify us at once. L_J Resubmit copies for approval L_I Submit copies for distribution L_I Return corrected prints " Prints returned after loan to us l