HomeMy WebLinkAboutResolution - 2020-R0357 - Change Order #1 to Contract 15243, Garney Companies, Inc.Resolution No. 2020-RO357
Item No. 6.7
October 13, 2020
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute
for and on behalf of the City of Lubbock, Change Order No. 1 to that certain Public Works
Contract No. 15243 for Pump Station No 7 Demo and Water Line Replacement as per RFP
20-15243-JM, by and between the City of Lubbock and Garrey Companies, Inc., of Midland,
Texas, and related documents. Said Change Order No. 1 is attached hereto and incorporated
in this resolution as if fully set forth herein and shall be included in the minutes of the City
Council.
Passed by the City Council on _ .
October 13, 2020
DANIEL M. POPE, MAYOR
ATTEST:
Re eGarza, City Secr c a
APPROVED AS TO CONTENT:
Jesica McEachern, Assistant City Manager
APPROVED AS TO FORM:
Amy L. ,Deputy City Att
ccdocs/RES.Change Order 1, Contract 15243 Pump Station No 7 Demo and Water Line Replacement
September 29, 2020
Office of Purchasing and Contract Management
Change Order
Contract No: 15243 Contractor: Gamey Construction
Change Order No: 01 Contract Title: Demolition of PS 7 and Waterline Replacement
Bid/RFP No: 20-15243-JM Project No: 92255.9241.30000
"Change Order" means a written order to a Contractor, executed by the Owner, in accordance with the Contract authorizing an addition to, deletion
from, or adjustment or revision of the requirements of the Contract documents, or an adjustment to the compensation payable to the Contractor, or to
the time for performance of the Contract and completion of the project, or a combination thereof, which does not alter the nature of project and is an
integral part of the project objective. Adjustments to "Estimated Quantities" to a line time in a Unit Price Contract do not require a Change Order. All
work that alters the nature of the construction or that is not an integral part of the project objective must be let out for public bid.
Description of Change (alteration, deviation, addition, or deletion) caused by conditions encountered during construction not covered by the
specifications and drawings of the project attached additional pages is necessary:
CP-01 - Additional asbestos abatement
CP-02 - Add 42" and 20" Line Stops (Emergency Work)
Add 20 days to the contract for work associated with the additional asbestos abatement and installation of line stops. See attached
documentation.
Where the Change Order is negotiated, the Change Order must be fully documented and itemized as to costs, including material quantities, material
costs, taxes, insurance, employee benefits, other related costs, profit and overhead. Where certain unit prices are contained in the initial Contract, no
deviations are allowed in computing negotiated change order costs.
ITEMIZED COSTS MUST BE FULLY DOCUMENTED AND ATTACHED TO THIS FORM.
ITEM
DESCRIPTION
AMOK
A.
ORIGINAL CONTRACT VALUE:
$2 550 358.00
B.
AMOUNT OF THIS CHANGE ORDER: Note: Council approval reuired if +/- $50,000
$409 319.14
COST CENTER: ACCOUNT:
C.
PERCENT OF CONTRACT VALUE THIS CHANGE ORDER(B..-'A)
1$.04%
D.
I AMOUNT OF PREVIOUS CHANGE ORDERS:
$0
E.
TOTAL AMOUNT OF ALL CHANGE ORDERS B+D
$409 319.14
F.
PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): 255f. maximum
16.04%
G.
NEW CONTRACT AMOUNT A+E : 1
$2 959 677.14
It is mutually agreed that the above dollar amount and the time extension, as applicable, as set forth in this Change Order constitutes full compensation
to the Contractor for all costs, expenses and damages to the Contractor, whether direct, consequential or otherwise, in anyway incident to, or ansing
out of, or resulting directly or indirectly; from the work performed or modified by the Contractor under this Change Order.
This Change Order is not valid without the following
signatures (please sign in order and return 3 originals with the Contract Cover Sheet to
Purchasing and Contract Management de artment :
(I ontra
a�
'Acttect/Engmeer
Date
(3) Owns ' Repres
ntative
Da
*Dirrrchasing & Contract
Date
(5) Capital Project Manager
Date
M5 CitJ'At
Date
:hap a i2rders o er SO 000.00 re wire a Contract Cover Sheet and the JbIlowingr si natures:
10/13/2020 10/13/2020
(7) Mayor Date (8) CityS,.Vetary Date
Council Date: October 13, 2020 Agenda Item #: 6.7 Resolution #: 2020-RO357
PUR45 (Rev 08/2018)
Change Proposal - 001
Project Demolition of Pump Station 7 and Waterline Replacement Project Number
Owner City of Lubbock Contract # 15243
Contractor Garney Construction 7318
Construction Manager Freese and Nichols (Bret Calvert) LUB18411
Design Professional Freese and Nichols (Michael McBee) LUB18411
Change Proposal No. 7318-01 Description Pump Station 7 — Plaster Ceiling Abatement
Specification 02 82 33 — Removal and Disposal of Asbestos Containing Materials & Appendix A
Drawing No. Detail Description
Reference Document
® Request for a Change Proposal No. 01 ❑ Request for information No.
❑ Shop Drawing Deviation Request No. ❑ Field Order No.
Contractor proposes the following modifications to the Contract Documents:
Inclusions of Pump Station 7 PLM Report Dated 05/08/1998 to Specifications Appendix A.
Revised Abatement Scope to include the abatement of 900 additional square feet of asbestos containing ceiling
from the main pump room.
Basis of Compensation
❑ Unit Prices ® Lump Sum calculated using Cost of Work provisions in the Contract
❑ Time and Materials using Cost of Work provisions in the Contract
The compensation offered for this Change Proposal is the full, complete, and final compensation for all costs
Contractor may incur because of or relating to this change whether said costs are known, unknown, foreseen, or
unforeseen at this time, including without limitation, any cost for delay, extended overhead, ripple or impact cost,
or any other effect on changed or unchanged Work because of this Change Proposal. Requested changes in
Contract Times are the complete and final adjustments for impacts to the ability of Contractor to complete the
Work within the Contract Times and are the only adjustments to which Contractor is entitled. All terms and
provisions of the Contract Documents remain in effect except as specifically modified by this Change Proposal.
Proposed Net Change in Contract Price this Change Proposal $ 30,946.25
Proposed Net Change in Contract Times this Change Proposal 10 days
Required Documentation
® Detailed cost breakdown attached showing labor, materials, equipment, and all other costs for this change
® Schedule attached to show impacts and justification for requested change in Contract Times
Reason for the Change Proposal
It has been discovered that an additional 900 Square Feet of the Pump Station No. 7 Ceiling contains Asbestos and
will need to be abated.
Change Proposal Page 1 of 2
., Attachments Change
Change Proposal 7318 — 01
• Attachment A— PLM Report
Attachment B — Change Proposal Breakdowns
• Attachment C -- Schedule Impact
Requested Action
❑ Issue a Field Order ® Issue a Work Change Directive or Change Order for the described changes
Requested by
Date
Action by Owner's Project Team
Change Proposal No. Q"Accepted C] Not Accepted -Revise and Resubmit ❑ Cancelled
Comments
Response by Date
Change Proposal Page 2 of 2
Ey
City of Lubbock
1314 Ave K
Lubbock, Texas, 79401
Attn: Josh Kristinek
Re: Pump Station 7 Ceiling Abatement
Dear Mr. Kristinek,
1333 NW Vivion Road, Kansas City, MO 64118
Phone: 816.741,4600
www.gamey.com
7/25/2020
Please see the attached Change Proposal 7318-01 which includes costs associated with the Asbestos
Abatement of an additional 900 Square Feet of Ceiling over the main pump room.
Garney would like to propose an increase in contract time of 10 days.
Garney would like to propose the Change Proposal in the amount of $30,946.25.
This proposal represents the direct cost of the referenced work only. if additional work is required as a
result of this change due to circumstances outside of Garney's control, this will be discussed and
addressed under a separate cover.
Sincerely,
GARNEY COMPANIES, INC.
Taylor Kennedy
Project Manager
Garney Construction
Change Proposal 7318 - 01
Attachment A - Original PLM Report dated May 1998
Type/Percent Asbestos c)O Z
Sampling Contractor ,,2
■
5 HOMOGENEOUS AREA LOG
Building;_
HA#
Total # of Samples 3 Assumed
Description of Material kow tL
( 4LI4-C✓ C t .1 i".,, f
Approx. Amount of Material (linear or square feet)
Location of Material: �� a vk.5 ;L
Sample #
P - 9 /a-
P57 - So I
urfacin TSI Misc.
Friable Non -friable
Sample Location
* Quality Asswmce (sprit Sampl)
. dew of"Upk it otter tMS tm orwEd sarny &a
a
QUEST PLM REPORT
MicroAnal- d Inc.
2630 Electronic Lane, Suite 712 NVLAP Lab No. 200249
Dallas, Texas 75220-1229 TDH License No.30-0218
Tel 214.351.4441 Fax 214.351.4487
Client: Grimes and Associates Request No.: 001112
Project: City of Lubbock, Pump Station 7 Report Date: 5/08/98
Project No.: Sample Date: 4/30/98
Identification: Polarized Light Microscopy/Dispersion Staining (PLM/DS)
Test Method: Method 40 CFR, Ch. 1, Part 763, Subpart F, Appendix A
On 514198, seven 17) bulk material samples were submitted by Terry Adams of Grimes and Associates Y
for PLMIDS analysis. The results are outlined below:
Client No. Lab No. Sample Description Fibrous Components Asbestos Content
PS7-912
8-04333
Brown Insulation
40% Vermiculite
20% Chrysotile
PS7-501
8-04334
Brown Insulation
40% Vermiculite
20% Chrysotile
PS7-198
B-04335
Brown insulation
40% Vermiculite
20% Ch sotile
PS7-447
B-04336
Beige Ceiling Tile
30% Cellulose
None Detected
VV /u 1 IYQIaPQaa
30% Perlite
PS7-0371:qBlack
rey/White Floor Tile (A) with
Mastic (B)
Floor Tile (A)
ith Black Mastic (B)
Brown Cove Base (A) with
Yellow Mastic (B)
None
A) None Detected
8) 15% Chrysotile
A) None Detected
B) 591i Chrysotile
A) None Detected
None Detected
PS7-706eige/White
None
PS7-116 B-04338
B) 10% Cellulose
AB)
The EPA test method for bulk analysis (EPAI800IR-931116) states in paragraph 2.2.2. that "the detection limit for
visual estimation is a function of the quantity of the sample analyzed, the nature of matrix Interference, sample
preparation, and fiber size and distribution. Asbestos may be detected in concentrations of leas than one percent
by area if sufficient material is analyzed. Samples may contain fibers too small to be resolved by PLM (<0.25
micrometers in diameter) so detection of those fibers by this method may not be possible."
Samples are analyzed by layers, and percentages estimated visually during microscopic examination. Individual analysis
sheets available upon request. Results may not be reproduced except in full. This test report relates only to the samples
tested, and results must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.
Analyst: Jennifer Jaber
Lab Director: Jennifer D. Jaber
Page 1 of 1
Approved Signatory
r,vlnP:1
r'3
z
w
[—
W�
M.
U)
n
0
z
fir
G
v
J
G
O
�u
u
cd
cd
14
J
K
La 07
0 cry
o Q
o r
4-1
r
VJ
CO I
-14 CO
//y? V
00
c0 0
rr000 Mw0
W
4
W
a
a
�
P
Z3
V
2
u
T!
Garney Construction
Change Proposal 7318-01
Attachment B -Change Order Breakdowns
CONTRACT MnniFIr_ATInu ocema ficwr
PROJECT: Demolition of Pump Station 7 and Waterline Replacement PROJECT NUMBER
OWNER: City of Lubbock _ 15243
CONTRACTOR: Gamey Construction 7318
CM: Freese & Nichols Bret Calvert LUB18411
ENGINEER: Freese and Nichols Michael McBee LUB18411
CHANGE PROPOSAL NO: 001
SUMMARY OF CHANGE PROPOSAL REQUEST VALUES FROM ATTACHED TABULATIONS
Contractor: Gamey Construction
Date: 7 27 20
Recommended for Payment by
Engineer
By
Date
Approved for Payment by
[OWNER]
By
Date
By
Taylor Kennedy
Approved for Payment by
Construction Manager
By
Date
Approved for Payment by
[OWNER]
By
Date
|
f
AIL
}
Kit
2--------
§
§
&
E|
I
----
E
||■
§;§■�
IA
if
|■||
��
■■■§�
----
|■E��
�
!
■§■§�
�
----
|
!I�'
||■■|
----
!
■■|■�
����
|
|
..|■�
" ■|■
h
8 $
k
� onall.1!l1r�
I rtf+1,. y S I, yr• -°r a!1
Proposal#3
Date
07/27/2020
Client
Garney Construction
Contact
Taylor Kennedy
Title:
Project Manager
Address
1030 Andrews Highway; Suite 104
City/State
Midland, Texas 79701
Phone #
Email tkennedy@garne .com
Pump Station #7
Site Name
Site Address
5502 29" Place
City/State Lubbock, Texas 79407
Scope of Work
I. PROJECT DESIGNISPECIFICATIONS
•
Utilize licensed/accredited individuals to design asbestos abatement specifications.
•
Prepare drawings of project areas for inclusion in specifications.
•
Conduct site reviews/inspection as necessary to design project and prepare specifications.
•
Prepare bid documents for the project.
II. PROJECT ADMINISTRATIONICOMPLIANCE MONITORING
•
Act as Owner's full time project representative throughout the abatement project and
coordinate project with all staff.
•
Conduct pre -construction conference with selected Contractor prior to beginning work.
•
Utilize licensed/accredited individuals to conduct full-time monitoring of the activities of the
Contractor throughout the project.
•
Coordinate activities of Contractor, General Contractor, Construction Management Team, air
monitoring technicians, etc., required for the project.
•
Help insure compliance with all state and Federal laws regulating asbestos
abatement/demolition projects.
•
Document project activities for Owner's records.
•
Review, verify and approve Applications for payment from the Contractor prior to payment by
Owner.
•
Evaluate all bids received from Abatement Contractors.
•
Review Abatement Contractor's pre and post job submittals.
•
Review required ten (10) day notification
III. AIR MONITORING ACTIVITIES
•
Utilize NIOSH-682 trained and licensed/accredited individuals to collect air samples.
•
Complete detailed daily air sampling analytical sheet showing location, volume, and other
pertinent data for each air sample.
•
Collection and archiving of PCM baseline samples for project documentation and contractor's
reference prior to beginning project.
• Collection and analysis by a licensed/accredited laboratory of PCM area samples included
with full-time project administration.
• Collection of PCM final clearance samples as required by all regulatory agencies.
Review and/or interpretation of analysis results.
• Collection and preparation of appropriate documentation for Owner's records.
Break Down of Estimated Cost
Original Proposal
• King - Consulting and asbestos abatement specifications
• King - Project Managing/Air Monitoring
• Estimated abatement cost by Independent Abatement Contractor
Change Order Proposal
• Installation of scaffolding $12,221.43
• Asbestos Abatement by 1 Priority Environmental $13,200.00
• King - Additional days of project managing/air monitoring $ 3,750.00
Total Estimated Cost for Change Order Request ! $29,171.43
The above services include $1,000,000 per claim/$1,000,000 aggregate Professional Liability Insurance (With
pollution liability coverage) on a "claims made" basis, as well as $1,000,000 General Liability Insurance for
each project.
We trust this estimate answers all the questions you might have regarding our activities on this project. If you
should have any questions or require additional information, please contact me at 806-763.6157.
Signature
Thank you,
lace Hassoldt
Environmental Consultant
King Consultants, Inc.
i Priority Abatement Quote
WETE AB
I*AB M T
a D8A of 4 Pri Environmental Services, LLC
208 Paris Ave. • Lubbock, TX 79401 •Office (806) 744-9802 • Fax (806) 793-0671
07/27/20
Jace Hassoldt
Consultant, King Consultants
Office- 806.763.6157
Mobile- 210.878.5995
J hassoldt0kingcomaanies. net
Re: Pump Station #7 (Change Order)
500129th Drive Lubbock Tx 79409
1 Priority Environmental Services, dba West Texas Abatement Company proposes to provide
supplies, equipment, materials, documentation, environmental insurance, labor, supervision and
disposal to complete this project.I PES is a trained, experienced, and licensed mold remediation,
asbestostlead abatement, and HVAC system decontamination contracting company with
employees possessing current medical evaluations and training in these fields of work.
Texas State notification fees are excluded for this proposal, as well as third party consulting
fees.
1 PES requires the following to be provided by the Owner or Client: notification fees, third party
consulting services, access and parking, electricity and water.
The attached quotation page includes the scope of work, method(s) of remediation, work duration,
price information and acceptance statement.
1 PES appreciates the opportunity to submit this proposal and looks forward to working with you in
the future. Should you have any questions or require further information, please feel free to contact
me.
All bids valid for 60 days
Sincerely,
David "Kat" Hayes
Project Manager/Estimator
806-241-1859
khaves@golpriodiy.com
208 Paris Ave
Lubbock Tx, 79401
1 pamm 4"If. VzFk 80"MON.
1 Priority Environmental services, Inc., 4028 Daley Ave, Fort Worth, Texas 76180
24-Hour Emergency (877) 595-0790 - (817) 595-0790 Office - (817) 595-4480 Fax
www.golprio6ty.com
Proposal
This proposal is based on a project provided by Kings Consultants. A licensed environmental consultant
has provided West Texas Abatement with a location survey, set written specs, and/or a scope of work
This price Is based on minimum requirements as set by the TDSHS Asbestos Program, Laws and
Rules.
SCOPE OF WORK
BASE BID --The work to be performed is the abatement of asbestos containing materials, (ACM) as
designated and detailed below.
•:• Any items to be salvaged will need to be relocated by the owner prior to abatement activities.
❖ Work will be performed from scaffolding provided by GC
Approximate quantities and locations of the ACM to be abated/demo under
ABATEMENT BID:
• 1000 sf Ceiling Texture
A 10-working day notification tM need to be filed with the TDSHS prior to the abatement of ACM,
this service may be performed by 1 PES, but fees for the notification are excluded from this proposal and
will automatically be billed to the owner listed on the notification.
METHOD OF REMOVAL
The work areas will be regulated in accordance with all applicable state and federal regulations and laws
under the state of Texas guidelines. ACM shall be removed as full containment, RFCI, NESHAP, and/or
Glove bag method. Materials shall be adequately wet as to reduce and/or eliminate the disturbance of fibers.
All waste will be double bagged and disposed of in accordance with all state and federal regulations and
laws. Non -ACM will be removed, bagged, and disposed of as non -regulated waste, unless the removal of
these materials will disturb the ACM. Employee PPE will meet all qualifications of applicable state and
federal regulations.
❖ This price does not include third party consulting fees for personal air monitoring.
DURATION OF WORK
Work may start 10 working days after the 10 — working day DSHS notification has been submitted. 1 PES
can complete all scopes in the BASE BID in 4 working day. Working days are based on Mon -Fri 7:00am-
5:00pm
PRICE INFORMATION
BASE BID: $13,200.00
This proposal excludes any consultant fees, and/or any other fees above and beyond any items included above. The price excludes
the removal of structural members. Replacement of building materials, fixtures, furnishings, or repairs due to tape used in
containment construction or remediation is timited to those described above. This proposal only includes the Items addressed
above. If other items are discovered during the performance of the work, they will be brought to the clients' attention, priced out, and
performed only after appropriate approval. Terns of payment: P.O. # due prior to commencement, monthly billings, net 30. Please
submit payment made out to 1 Priority Environmental Services at the above address. Thank You.
HEADQUARTERS
1 Priority Environmenta I Services, LLC • 4028 Daley Ave- Fort Worth, TX 7G180.24-Hour Emergency (877) 595.0790.Office (817) 59S-0790 • Fax (817)
595-4480 • www.601 Priority.com
REGIONAL OFFICES
Dallas/Fort Worth • Houston - Austin/San Antonio • Gatesville/Fort Hood • Corpus Christi • Lubbock/New Mexico - Raton Rouge, LA • Shreveport. LA
West Texas Abatement is a dba of 1 Priority Environmental Services, LLC
W6 TL AIS
ACCEPTANCE STATEMENT
1, an authorized representative of the facility and facility's
ownership/management accept this proposal and authorize 1 Priority Environmental Services to perform services
as stated in this proposal.
Location Owner: P.O.
Billing address:
Printed Name:
Signed:
Title:
Date:
HEADQUARTERS
1 Priority Environmental Services, LLC - 4028 Daley Ave' Fort Worth, TX 76180. 24-Hour Emergency (877) 595-0790. Office (817) 595-0790 • Fax (817)
S95.4480 • www.Gol Priority.com
REGIONAL OFFICES
Dallas/Fort Worth • Houston - Austin/San Antonio • Gatesville/Fort Hood - Corpus Christi • Lubbock/New Mexico • baton Rouge. LA - Shreveport, LA
West Texas Abatement is a dba of 1 Priority Environmental Services, LLC
AB TB A8
BRAND SAPWAY
sou+rme-
ad07 URBANA AVENUE
LUBBOCK, TX 7W24
Phone: (an) weo122
Fax: (SO) 4724eee
Customer. K02 CQNSMJobsite: WMR
ATTN: UTUngsU
1205 EAST 46TH STREETLUBBOCK,DRIVE
LUB
LUBBOCK, TX 79404 LUBBOCKTX T840T
Contact: JACE HASSOLDT
Contact Phone: Phone: (210) 878-5995
Contact Fax:
Quotation No842 Quobs Date: 7/23120 OPPortun ty 0 747118, $ales Rep: { JEFF PETTY
a � ...a:..:•. f: - - ri�it�rrrlriG'i-
Part Number Part Description Quantity Item Extended
Ordered Weight Weight
STSA SYS SCREW JACK HT 21" 1 8.30 8.30
Totals. i 8.30
WA Bon of W rk
SaMmy system scaffold at approximately 15' wide x 55' long x 12' tall. The scaffold will have guardrails, toe boards, and ladder access
with safety gate.
Labor: $ 4.800.00 Includes erection and dismantle.
Rental: $ 1,990.00 Per 28 days.
Freight: $ 1,800.00 Includes freight in and out.
Travel: $1.200.00
Per diem: $1,500.00
Taxes not included.
Tax rate is 8.25% on entire amount.
Scaffolding Quote - total $12,221.43
765-942
71 WO
Garney Construction
Change Order 7318-01
Attachment C -Schedule
Impact
... ... C
ii
CL rx
aa0
.
Q o
0
�c�
oo�
In o
I
y -n n
v
a) o 0
o
m aw
Co3
r+
fD :3n
I
r rr
7 O
rt
3
Mm
0
D
b 3
m
D
O
M
fD
7
rt
C. a
s
�
ID
m
D
0
a
A
m
C
3
cn
Q r.
0
X -4
O
m
3
0
0
90
ZL �
i
� � o
0 0 0
CD
1� ,,.i1F
Jul
a
v
NN
\N
T
o 'O
a
�
a
a
r"
f
f
a
Change Proposal - 002
Chanaa Prnnncal
Project Demolition of Pump Station 7 and Waterline Replacement Project Number
Owner City of Lubbock Contract # 15243
Contractor Garney Construction 7318
Construction Manager Freese and Nichols (Bret Calvert) LUB18411
Design Professional Freese and Nichols (Michael McBee)
Change Proposal No. 2 Description Emergency Installation of 421nch & 201nch Line Stops
Specification
Drawing No. Detail Description
Reference Document
® Request for a Change Proposal No. 2 Q Request for Information No.
❑ Shop Drawing Deviation Request No. ❑ Field Order No.
Contractor proposes the following modifications to the Contract Documents:
The addition of the 42-Inch Line Stop & 20-Inch Line Stop to the Project Scope.
Basis of Compensation
❑ Unit Prices ® Lump Sum calculated using Cost of Work provisions in the Contract
❑ Time and Materials using Cost of Work provisions in the Contract
The compensation offered for this Change Proposal is the full, complete, and final compensation for all costs
Contractor may incur because of or relating to this change whether said costs are known, unknown, foreseen, or
unforeseen at this time, including without limitation, any cost for delay, extended overhead, ripple or impact cost,
or any other effect on changed or unchanged Work because of this Change Proposal. Requested changes in
Contract Times are the complete and final adjustments for impacts to the ability of Contractor to complete the
Work within the Contract Times and are the only adjustments to which Contractor is entitled. All terms and
provisions of the Contract Documents remain in effect except as specifically modified by this Change Proposal.
Proposed Net Change in Contract Price this Change Proposal $ 378,372.89
Proposed Net Change in Contract Times this Change Proposal 10 days
Required Documentation
® Detailed cost breakdown attached showing labor, materials, equipment, and all other costs for this change
® Schedule attached to show impacts and justification for requested change in Contract Times
Reason for the Change Proposal
To ensure proper isolation of the existing 42-Inch Water Main as well as the existing 20-Inch Water Main, so that
the Cut & Plugs per the contract documents may be installed. This was performed on Emergency Installation.
Change Proposal Page I of 2
Change Prnnncal
Attachments
Attachment A — Change Order Breakdowns
Attachment B — Garney Daily Reports
Attachment C — Supporting Documents
Attachment D—Schedule Impact
Requested Action
❑ Issue a Field Order ❑ Issue a Work Change Directive or Change Order for the described changes
Requested by Taylor Kennedy Date 8/28/20
Action by Owner's Project Team
Change Proposal No. J Accepted , J Not Accepted - Revise and Resubmit ❑ Cancelled
Comments
Response by Date
Change Proposal Page 2 of 2
Carney 1333 NW Vivion Road, Kansas City, MO 64118
Phone: 816,741,4600
www.gamey.com
City of Lubbock 8/28/2020
1314 Ave K
Lubbock, Texas, 79401
Attn: Josh Kristinek
Re: Pump Station 7 - 42-Inch & 20-Inch Emergency Line Stops
Dear Mr. Kristinek,
Please see the attached Change Proposal 7318-02 which includes costs associated with the isolation of
the existing 42-Inch Water Main and the existing 20-Inch Water Main Utilizing Emergency Line Stops.
Garney would like to propose an increase in contract time of 10 days.
Garney would like to propose the Change Proposal in the amount of $378,372.89.
This proposal represents the direct cost of the referenced work only. If additional work is required as a
result of this change due to circumstances outside of Garney's control, this will be discussed and
addressed under a separate cover.
Sincerely,
GARNEY COMPANIES, INC.
Taylor Kennedy
Project Manager
Garney Construction
Change Proposal 7318-02
Attachment A -Change Order Breakdowns
OWNER:
CONTRACTOR:
CM:
ENGINEER:
SU
CONTRACT MODIFICATION REQUEST
Demolition of Pump Station 7 and Waterline Replacement PROJECT NUMBER
City of Lubbock 15243
Garvey Construction
Freese & Nichols (Bret Calvert)
Freese and Nichols (Michael McBee)
CHANGE PROPOSAL NO:
PROPOSAL REQUEST VALUES FROM ATTACHED TABULATIONS
7318
LUB18411
LUB18411
002
Item #
Engineering
Directive #
Description
Qty
Unit
Cost Per
Extended Cost
1I
Pump Station 7 - 42" & 20" Linestops
1
LS
$ 378,372.89
$ 378,372.89
Total
$ 378,372.89
Contractor: Garvey Construction
Date: August 28th, 2020
Recommended for Payment by
Engineer
By
Approved for Payment by
[OWNER]
By
BY 9_
Taylor Kertody
Approved for Payment by
Construction Manager
By
Date
Date
Approved for Payment by
[OWNER]
By
Date
Date
fn1
!n1 q
pp
1jSI
(� �_
x
3
g
8
S
»
$
S $
$ $
8
$ $
$
8 S
$ 8
$
NNN»»
�a
N�u
8
3
O
$
N
N N
N
O
ffi N�
W
S
c
T
P
A
u O
�
a 3
»
»
»
N
8
$ $
$ $
8
S
8
N
L
S
A 5
Q
z
�
Z
�
A
p
Q 9
1p
1p 1;
p p
P
K
P
v C$
S
e o
Y Y
N
»
N »
N N
$
$ R
$ R
& 3t
$ $
$ 6
i
»NN»NN»
N
E€
S
N
N N
N N
N N
N N
A
M f
N N
N
V ib+
e� a
N N
wI
0 m
Fi
u Pu
� 0
m 0
tiC w
a
N
O
E
!
�SL
d--------
£
2
§
E
�,.
■
.�|,s;�
Garnet' Construction
Change Proposal 7318-02
Attachment B -Daily Report
(Wednesday 8/12/20 -Monday 8/17/20)
Ig rney
Daily Logs for August 13th, 2020 - Monday 17th, 2020
1333 NW Vivion Road, Kansas City, MO 64118
Phone: 816.741.4600
www.gamey.com
Thursday. August 131h, 2020
Jerald and Crew prepared to Cut & Plug the 18-Inch Discharge Lines. Jerald began cutting the 18 Inch
Discharge Line at 10:40 a.m. At 11:00 a.m. Jerald called Taylor to let him know that the Line Still had
pressure on it. Taylor, called OL at approximately 11:08 a.m. The City arrived and sounded
24-Inch Grace Line Valve & the 42-Inch Mainline Valve from Noon to 12:45 p.m. It was determined that
the valves must be shut as much as possible after the City brought their valve truck back out and got
several more turns on the 42-Inch Mainline Valve. OL thought that they would shut the City Pump
Station down on Friday morning at 10:30 a.m. to allow for the pressure to stop and give Garney a chance
to either close the valve or fix the leak. Garney, then installed steel plates over the trenchbox to prevent
the spraying 1-8-Inch line to shoot into the powerlines so that the bucket could be removed. Garney
ended the day cutting down and removing the remaining LP&L poles.
Friday. August 14t+. 2020
Jerald and Crew were prepared for a Pump Station 16 Shutdown at 10:30 a.m. so that the pressure &
flow would drop and that the 18"" Discharge Line could continue to be cut and capped. The City was not
able to shut the pump station down completely, but did run a small test to see if a small shut
down would reduce flow and the valve would close further, upon this attempt it was discovered pressure
drop was minimal and that further shutting down of the Pump Station was not an option. A conference
call between FNI, COL, and Garney was scheduled for 2:00 pm to determine the action forward. FNI
informed Garney that they were working with Rangeline to see if a linestop was an option. The 2:00 pm
meeting determined that a 42" linestop is to be installed leaving two options for repairs - install a 42" x
24" reducer, 24" Flange, and a 24" Valve or continue forward with the Cut & Plugs. A 24" linestop is to be
installed on the discharge line to the North to stop flow from looping around the building.
A third line stop is to be installed stopping the flow on the 24" Grace Clinic Line from back feeding the
42"" Main. The City authorized Garney to move forward with the Line Stops. FNI & Garney redefined the
scope with Rangeline based upon the call. Garney worked until 9:30 p.m. excavating and preparing for
the line stops. Taylor installed a Pressure Gauge on the existing 36"" line that loops around the building
and ties into the 24"" & 42"" Respectively. The pressure read 100 PSI. "
August 15th. 202
Garney began assembling Trench Boxes with the help of United Rentals (Justin Wilson). Taylor began to
work on an alternative solution to the line stop attempting to find an outlet point on the 24" on the
Northside of the Pump Station. Jason Jansen and Andrew Beck arrived on site at 11:00 a.m. Rangeline
arrived onsite at 2:00 p.m. Jerald installed the 12' x 12' Trench box late afternoon and moved to
assemble the 24" trench box. Jason, Andrew, and Taylor worked to find an alternative solution. Andrew
issued Rangeline a subcontract. Jason and Taylor attempted to open discharge valves to see if directing
flow into the pump station would work, yet to no prevail. The 42" was to be installed, and both 24"" were
to be prepped. At 11:15 p.m. Jerald and crew unloaded Rangellne's hotshot ending the night at
midnight.
Sunday,16th. 2020
Rangeline arrived on site at 7:20 a.m. and begun installing the 42" Saddle. Garney supported and
assisted Rangeline with this installation. At 11:00 a.m. Garney and Rangeline shifted to the 24"
Linestop to the North only to discover it was actually a 20" line. Garney ordered a new sleeve to arrive by
Monday morning. 30 CY of Concrete was poured Sunday afternoon at 3:00 p.m. At 3:30 p.m. Rangeline
began to cut the 42"". The 20"" Saddle is set to arrive Monday morning at 6:00 a.m. with Rangeline
arriving to install it. Concrete is set to be poured at 9:00 a.m.
Monday. August 17t+, 2020
Garvey arrived onsite at 6:00 a.m. to unload the 20-Inch saddle and assist Rangeline in installation.
Concrete was poured at 11:45 a.m. At 10:07 a.m. the 42 Inch Line Stop was installed. The Pump
Station had to be shut down for 15 minutes to reduce flow to allow for the proper insertion
of the Line Stop. Upon insertion Garney proceeded to Cut the remaining 18-Inch Line and begin their cut
and plugs. Water continued to pump until the line was drained. At 1:00 p.m. a second meeting was held
with FNI, COL, and Garvey to provide an update and action plan. Garney was given the go ahead
by FNI to proceed forward with the 20-Inch Line Stop Installation. By 4:00 p.m. the 20-Inch Line Stop
was installed. By 7:00 p.m. both 18-Inch discharges were plugged.
n
j
n
n;
m
w
w
0
CL
o
X
m
'G
Al
Cr
a
m
w
c
a
- G!
m`
r;
ro
Z
n
av
n
W
N
a
r�i
x
o
m
lb
Q
C
m fD
S'
�
a
3
3
r�
z 00 �
N
A
A
A
N
N
a O
w
� o
0o �*
,%% 0
00
00
00
00
0
N
N
a
co
a
Ln
41
N
O
d
r Pj
I�
�
A
Ab
O
N
m
u
Ln
L
o�
w
w
w
w
OLn
1-4
vi
Cn
In
t!+
N
O
u,
u,
N
n
C
o.
00
N
�-b
N
N
O
c
a
o►
PC
00
o
N
D
Ocl
D
2
Cl
a
G A
m
m
O
00
00
00
00
00
00
00
00
O
O
�
Garney Construction
Change Proposal 7318-02
Attachment C -Supporting Documents
` EquipmentWatch
www.equipmentwatch.com
All prices shown in US dollars ($)
Rental Rate Blue Book® August 21, 2020
Airman PDS185S
Portable Rotary Screw Air Compressors
Size Class:
125 - 249 elm
Weight:
NIA
Configuration for PDS185S
M1
ri.
Air Delivery Rating
177 cu lit/min Horsepower
Power Mode
Diesel
Blue Book Rates
V
" FHWA Rate is equal to the
monthly ownership cost divided by 176 plus the hourly estimated pora g cost.
Ownership Costs
Estimated
FHWA Rate'*
Operating Costs
Monthly Weekly Daily 3�:;}:
Hourly Hourly
Hourly
Published Rates
USD $1,050.00 USD $295.00 USD $74:1'7&-_ c4 .
USD $11.00 USD $8.53
USD $14.50
Adjustments
Region ( 100%)
kp
Model Year
• -
(2020: 100%)
Adjusted Hourly
Ownership Cost (100%)
Hourly Operating Cost (100%)
Total:
USD $1,050.00 LIsD,$20!L06y USD $74.00
USD $11.00 USD $8.53
USD $14.50
ik
Non -Active Use Rates
Hourly
Standby Rate
USD $2.15
Idling Rate
USD $10.36
Rate Element Allocati� x
Element x�
Percentage
Value
Depreciation (ownershi6j,
26%
USD $273.001mo
Overhaul (ownership)
64%
USD $672.00/mo
CFC (ownership)
4%
USD $42.00/mo
Indirect (ownership)
61%
USD $63.00/mo
Fuel (operating) @ USD 2.40
51%
USD $4.39/hr
Revised Date: 2nd half 2020
These are the most accurate rates for the selected Revision Date(s). However, due to more frequent online updates, these rates may not match
Rental Rate Blue Book Print, Visit the Cost Recovery Product Guide on our Help page for more information.
The equipment represented in this report has been exclusively prepared for DUSTIN CRONIN
(dcronin@garney.com)
All material herein (02003 2020 Informs All rights reserved
aiVnrrea 1' e"ra1S' (i iiiiiiimiiiiiiiipillllililloluj lio RENTAL AND SERVICE
'BMWCs 093 AGREEMENT
317 90RTBZA87' LOOP 28
tUR 9
185066354
LUBBOCIC TZ 79401-582A
096-745_9796
PUMP STATION 7 WATER LINE
„♦ 29TH DR & SLIDE RD
x:29TH DR@SLIDE RD
O LUBBOCK TX 79401
h Offices 303-791-3600 Cells 915-503-0456
GARNEY CONSTRUCTION
1333 NW VIVION RD
KANSAS CITY MO 64118-4554
HLS1Y'fAL VrEMS :
Qty E i meat _ DeSC. iption
1 10698213 CHIPPING GUN AIR 15#
Make: APT Model: 05300 06 (653)
Serial: 1611075
Customer # s 382816 i
Agreement Date : 08/19/20
Rental Out : 08/19/20 07:58 AM
Scheduled in t O8/26/20 o8:00 AM
VR Job We 29TH DR & SLTDE RD,
UR Job # : 2267
Customer Job ID-
P.O. # : 7318
Requested By : ALEX BAKER
Reserved By : JOHN KENJURA
Salesperson : MARTIN SNYDER
----ma7iP.::a:N.ttao>:xao-vicecxcxseral -- — —
This is not an invoice
Please do not pay from this document
i.'SGW.`#FNFi.fAvtih`is�f,OLS%O�:t•Mb}4]M:.JCSCb!?GbJUR:�b%.:48::' p16.16-0R-Y,9Mr,p �ppppp�y y' hC Nd'::.{
Minimum _ Day Week Month
26.00 53.00 125.00 ' 287.00
SALES/MISCELLANEOUS ITEMS: Rental Subtotal:
_ QtY Item Price
Unit of Measure
BLADE, DIAMOND 4X4
COMMENTS/NOTES:
CONTACT: TAYLOR KENNEDY
CELL#: 915-503-0456
(70164684547/NORTN] 209.990 BLADE
A CLEANING CHARGE WILL APPLY TO EQUIPMENT RETURNED WITH EXCESSIVE
DIRT, CONCRETE, AND/OR PAINT. CUSTOMER IS RESPONSIBLE FOR ALL
DAMAGE INCLUDING TIRES. THERE WILL BE AN ADDITIONAL CHARGE FOR
MISSING KEYS. A REFUELING SERVICE CHARGE WILL BE APPLIED TO
ALL UNITS NOT RETURNED FULL OF FUEL
SEE BELOW FOR EXPLANATION OF REFUELING SERVICE CHARGE
ARE YOU OR YOUR EMPLOYEES IN NEED OF OPERATOR CERTIFICATION TRAINING?
CONTACT UNITED ACADEMY TODAY 844-222-2345 OR WWW.UNITEDACADEMY.UR.COM
TRAINING IS NOT AVAILABLE ON CERTAIN EQUIPMENT IN CANADA.
Sales/Mist Subtotal:
Agreement Subtotal:
Tax:
Estimated Total:
125.00
125.00
Extended Amt.
209.99
209.99
334.99
27.63
362.62
- - Rental Protecti
-_- __-_ - __..._..._._�... ,^...-.,,,, �.o...,.. „, ,,,,e,,, w,,,,,v,�, can m uPon accepting Ins OPIN l on Plan. Customer _
pay a e • ls� of the rental rlurpq an tM Equipment Custwnar Walls Q"OrOd by the R•Md Protection Plan. In relum. United agrees to Waive ceAwl Gahm logsceld
Equipment Occumnp during normal and carafW use. Customer Re NOW@ for I* otherdamag•a n aot fill in the Rental and Service Tome. entel danuges to or Ihsrl of such covered
NOTICE FOR !n[fTR T/FYV:r F: THE CONTRACrOFFERS. FORAM ADDIhONAL CHARGE A DAMAGE WAIYERI. TeYa PrNwarn Plvq TOLMTOUSTIRIt'5 nNWAAL RESPONSIOILITYFOROAMAGE toot IIEFTOF THE RtoTOR VEHICLE BEFORE f)ECJDINc'
WHE4" TO PURCHASE THE DAMAGE WAIVER, CUSTOIAM MY WISH TODETEnNwE WHETHER CWTOMERa OWN Pe{WNCE GWES CUSTOMER COVERAGE THEriate LSE OPfW DAAIAOE wAnfER IS NOT rAAApAid1Y ANp MAY eE WAhED OR DECLINED DY KFORER
ACLEAMIGHMSE: WILL AMY TO EQUIPMENT RETUFNED With ENC-WA DIRT CONCAETE_,y10.�0RPAINT OUsrONERIs REEPON84KEFORALLDAMAGE THE REWILL aE ANAI101rI W`U ER ISM FOR DATORYUSSM rAN
REFURUmiliEYS
CultO m is required b return the Equipment with a Rost" of fuel. If CustoNyr teturm Me Equipment with leas than a ads tank of tual, Cusbmr agrees to pay a RafueUng Service Charge at the per gallon nits
applicable at the tine Customer r„urns the Equipment. (The current rate is avaHable from the Store Location; but, en final ride may differ based en market condition al the time of relum)_ For additional inbrlretion, see the Rental
and SeMcs Tema
Due to the hazardous rylun of some Waste MW otter products. b with federal and state environmarrbl Ghsrye r udeirt raMels- TIHa EnvYoramraer Service la not a ,g designated for ad49regulations,ni end b Pmmots a emcee itonmeYlent. United Cho gsa an E 0% at the T Sery cs
and will not eac•ad Site. Cuelemer ackneW Faroe goYaresubf rlendere m a n b al d and jouirn , me, and Is used M Charge
diacrNlen. TTHs EmrlronmaMer Service Charge le 2.00% 01 fM revel charge
srW@d de harm sHdicalup above are d. C st 1M P_mlinmme pat a Service Chards all Cwmmr sprees Ie pay that Charge
f�ELBCf:$Y; If Cusbmer tlgosea b have Wined dslrrr and pirJr uP Ill EgTdprelaM. Customer apnea b pay a Delivery and Pickup Service Charge
REM BEFORE SIGIIM: By slgnhrp below, "olomer. (q apnea that Customer has ecshed, read and agreed to the Rental and Service Terms and Ill optional Rental Ptotactlon Plan 'R
which an peste4 online „ h 91wW W.unGadeMale.c0011h aYnnlatyeMg4onso tt3 and hilt!JhrW W.unlbdneRal•.comha « U:t, respectively, and sn incorporated I Turns {H the RPP f• appllcabN trdh of
United R•rital• to charge the Paymen rm a__ _ by ntennce Into this AgrssmoM: (11) authorizes
Indemnify Unoled far bows nlaUng to his transaction; (2 that Unllad'a IIANINEes se mRed,(and (3) Ile U„ nntl Inalea y sMfes as tiquipawroo Is. M meoondloon as stated an Ill condition nporl(%� By agreeing to Ill Terms, you agree (1) to
Terms afbeling your rights. pWpmanl'a awmhanUWRty, quality or folnass for a particular Purpose; as wool as other
X
CUSTOMER SIGNATURE DATE CUSTOMER NAME PRINTED
UNITED RENTALS REPRESENTATIVEMELIVERED BY DATE
NOTICE; By accepting delivery of the Equipment listed above or making payment(al to United for the Equipment listed above, Customer agrees to be hound by the Rental and Service Terms at the referenced
URLs, even if the Rental and Service Agreement has not been fully exectned. COPIES OF THE RENTAL AND SERVICE TERMS AND, IF APPLICABLE, THE RPP ARE AVAILABLE IN PAPER FORM UPON
REQUEST.
Page:
v u►nrwu rrenrals"
BRANCN 993
3I7 SOUTHEAST LOOP 289
LUBBOCK Tx 79404-5820
606-745-9796
I IllilillillllllllllplilllllallllllllllllflllI
0 PUMP STATION 7 WATER LINE
29TH DR & SLIDE RD
x:29TH DR@SLIDE RD
LUBBOCK TX 79401
h Office: 303-791-3600 Cell: 915-503-0456
GARNEY CONSTRUCTION
1333 NW VIVION RD
KANSAS CITY MO 64118-4554
RLWAL RETURN
INVOICE
184869539-001
Customer # : 382816
Invoice Date s 08/17/20
Rental Out 08/13/20 07:47 AM
Rental In s 08/17/20 02-57 PM
UR Job Loo s 29TH DR & SLIDE RD,
UR Job # s 2267
Customer Job ID:
P.O. # c 7318
Requested By c ALEX BAKER
.Reserved By : APRIL GUERRERO
j8ale8Pers0n : MARTIN SNYDER
Invoice Amount: $358.02
,,,,, ,.., ...................... ..v
TemnS: Due Vpon Receipt
PaYmen, lions: Conlaci our credit office 704414.4843 $
REMIT TO: UNITED RENTALS (NORTH AMERICA),INC. f
PO BOX 840514
'g DALLAS TX 75284-0514
RENTAL ITEMS: ... ........... .-.
Qty Equipment_ - Description Minimum Day Week Month_
1 10715657 SAW CUT-OFF 14" GAS 34.00 69.00 232.00 604.00
Make: HUSQVARNA Model: K760 II
Serial: 2017 4900907
232.00
SALES/MISCELLANEOUS ITEMS:
Rental Subtotal: 232.00
Qty _Item. Price Unit of Measure Extended Amt.
11 BLADE, CONC ABRSV 14"X1/8"X1"/201414 [66252837842/NORTN] 0.430 EACH 92.73
1 REFUELING SERVICE CHARGE SMALL EQUIPMEN [FUEL SMALL EQ/MCI] 6.000 EACH 6.00
Sales/Misc Subtotal: 98.73
Agreement Subtotal: 324.73
Fuel: 6.00
Tax: 27.29
COMMENTS/NOTES:
Total: 358.02
CONTACT: TAYLOR KENNEDY
CELW 915-503-0456
NOTICE: Thin invoke Is MA*-t to the tame and corm igerq of the Rental end Smite Agreement, which we avabble at A::ps:llwww.gnitadrsn:als.comlkgelfrental-aarvice-tarme-VS and which
are incormated herein by reference. A COPY OF THE RENTAL AND SERVICE AGREEMENT TERMS ARE AVAILABLE IN PAPER FORM UPON REQUEST.
You Can Now Access Invoke Metory and Updaa Pardom Ordwa On6na
To 54W Up, t:a"tea URCorrrro sivoorteeor.com Page: 1
�, Equipmentwatch .
www.equipmentwatch.com
All prices shown in US dollars {$)
Rental Rate Blue Book®
Miscellaneous 4 DIESELl35MT
Self Priming Trash Pumps
Size Class:
3-4
Weight-
N;A
Configuration for 4 DIESEL/35MT
Cpb Rating 351111T Horsepower$f1.0
Power Wde Diesel Pump Capacity sx� �f4000.0 gafrhr
Pump Size 4.0 In
Blue Book Rates
FHWA Rate is equal to the monthly ownership cost divided by 176 plus the hourly estitr Med operating cost.
Ownership Costs Estimated
Operating Costs
Monthly Weekly Deily.- Hourly Hourly
Published Rates USD $1,350.00 USD $380.00 USD.$96.Of)::,� USD $14.00 USD $15.15
Adjustments
Region ( 100%)
Model Year
(2020: 100%)
Adjusted Hourly
Ownership Cost (100'�,.)
Hourly Operating Cost (1rlr,`i.)
Total: USD $1,350.00
USD $95.00 USD $14.00
USD $15.15
August 21, 2020
FHWA Rate"
Hourly
USD $22.82
USD $22.82
Non -Active Use Rates, Hourly
Standby Rate ' USD $4.60
,x.
Idling Rate �A USD $17.75
Rate Element Allod"stlok
Element
Percentage
Value
Depreciation (ownership)
46%
USD $621.001mo
Overhaul (ownership;
40%
USD $540.001mo
CFC ?ownership)
40/6
USD $54.001mo
Indirect (ownership)
10%
USD $135.001mo
Fuel;operaling) @ USD 2 40
67%
USD $10.081hr
Revised Date: 2nd half 2020
These are the most accurate rates for the selected Revision Date(s). However, due to more frequent online updates, these rates may not match
Rental Rate Blue Book Print. Visit the Cost Recovery Product Guide on our Help page for more information.
The equipment represented in this report has been exclusively prepared for DUSTIN CRONIN
(dcronin@garney.com)
All material herein @ 2003 2020 Informa All rights reserved.
EquipmentWatch_
www.equipmentwatch.com
All prices shown in US dollars ($)
Rental Rate Blue Book&
Deere 317G
Compact Track Loaders
Size Class:
1751 - 2200 Ibs
Weight:
NIA
Configuration for 317G
Operator Protection ROPSIFOPS Power Mode
Blue Book Rates
FHWA Rate is equal to the monthly ownership cost divided by 176 plus the hourly estimated operatin4
Ownership Costs X .
Monthly
Published Rates USD $3,420,00
Adjustments
Region ( 100%)
Model Year
(2020: 100%)
Adjusted Hourly
Ownership Cost (100%)
Hourly Operating Cost (100%)
Total: USD $3,420.00
Non -Active Use Rates
Standby Rate
Idling Rate
Weekly Daily Houtyw
USD $960.00 USD $240.00 US[k.$1,
s
a
USD $980.00 /:�.00A 240.00 USD $36.00
Drexel v
-
cost
"Estimated
operating Costs
Hourly
USD $13 86
USD $13.86
August 19, 2020
FHWA Rate"
Hourly
USD $33 29
USD $33.29
Hourly
USD $9.52
USD $24.85
Rate Element Allocation
Element
Percentage
Value
Depreciation (ownership)
36%
USD $1.231.20/mo
Overhaul (ownership)
51%
USD $1,744.20/mo
CFC {ownership}
4%
USD $136.80Imo
Indirect (ownership}.:,.:'; "k
9%
USD $307.80lmo
Fuel (operating) @ USD 2:40
39%
USD $5.421hr
Revised Date: 2nd half 2020
These are the most accurate rates for the selected Revision Date(s). However, due to more frequent online updates, these rates may not match
Rental Rate Blue Book Print. Visit the Cost Recovery Product Guide on our Help page for more information.
The equipment represented in this report has been exclusively prepared for DUSTIN CRONIN
(dcronin@garney.com)
All material herein 0 2003.2020 Informa A I rights reserved
C. EquipmentWatch-
www.equipmentwatch.com
All prices shown in US dollars ($)
Rental Rate Blue Book®
Caterpillar 315F L
Crawler Mounted Hydraulic Excavators
Size Class:
16.1 - 19.0 MTons
Weight:
N/A
Configuration for 315F L
Bucket Capacity 1 cu yd
Operating Weight 36340 Ibs
Horsepower
Power Mode
97 hp
Dle.$ibl
Blue Book Rates
" FHWA Rate is equal to the monthly ownership cost divided by 176 plus the hourly estimated operating cost,...
Ownership Costs . Estimated
August 19, 2020
FHWA Rate"
Operating Costs
Monthly
Weekly
Dally
Hou>tly
Hourly
Hourly
Published Rates USD $9,715.00
USD $2,720.00
USD $680.00
U$[7405.00
USD $38.62
USD $9382
Adjustments
Region ( 100%)
Model Year
(2020: 100%)
Adjusted Hourly
Ownership Cost (100%)
Hourly Operating Cost (100%)
,'+y
Total: USD $9,715.00
USD $2,720.00
Ut;t?$680.00
USD $105.00
USD $38.62
USD $93.82
Non -Active Use Rates
Hourly
Standby Rate
USD $28.15
Idling Rate
USD $63.58
Rate Element Allocation
Element
Depreciation (ownership) x�
Overhaul (ownership)
CFC (ownership)
Indirect (ownership)"'
Fuel (operating) @ USD 2.40
Revised Date: 2nd half 2020
Percentage
40%
49%
6%
5%
22%
Value
USD $3,886.001mo
USD $4,760.351mo
USD $582.901mo
USD $485.75/mo
USD $8.381hr
These are the most accurate rates for the selected Revision Date(s). However, due to more frequent online updates, these rates may not match
Rental Rate Blue Book Print. Visit the Cost Recovery Product Guide on our Help page for more information.
The equipment represented in this report has been exclusively prepared for DUSTIN CRONIN
(dcronin�7a garney.com)
All material herein 0 2003.2020 Informa All rights reserved.
weudw
404 E Lehigh Street
Lubbock, TX 79403
806.781,9500
Sold To: Garney Construction
5100 29th Dr
Lubbock, TX 79410
Location: 5100 29th Drive
Sale Date Ticket
PO#: 7318
Invoice To:
INVOICE
Invoice #:
Date:
Customer No:
Job #:
Garvey Construction
tkennedy@garney.com
17404 ;
08/16/20
990541 ,
1�
Units UM Unh Price Mail Total TAX Toul
MATERIAL:
After Hours Dmer
08116/20
2007987
1.000
EA
$200.00 E
$2D0.00
00/16/20
2007988
1.000
EA
$200.00 E
$200.00
08/16/20
2007989
1.000
EA
$200.00 E
$200.00
MATERIAL:
After Hours Open
D8116120
2007987
1.000
EA
$500.00 E
$500.00
MATERIAL:
30D0 28 Day (594000P4.5)
08/16/20
2007987
10.000
CY
$95.00 E
$950.00
08116/20
2007988
10.000
CY
$95.00 E
$950.00
08/16/20
2007989
10.000
CY
$95.00 E
$950.00
Total:
CustPO: 7318
$3,950.00
Total Invoice:
$3,950.0
$16.50 $216.50
$16.50 $216.50
$16.50 $216.50
$41.25
$541.25
$78.38
$1,028,38
$78.38
$1028.38
$78.38
$1.028,38
$325.89 $4,275.89
$325.89 $4,275.89
Payment Terms: Due Upon Receipt Total : $4.275.89
Thank you for your business!
Please remit payment to: MUDco Ready -Mix, LLC 404 E Lehigh Street Lubbock, TX 79403 Phone: 806.781.9500
ORDERED BY
conc
P. O, NUMBER
806.474.2721
404 E. Lehigh Street
Mailing Address-
P.O. Box 1453
Wollforth; Texas 79382
Accounting Phone' 806.781.9600
DELIVER TO
SOLDTO
QUANTITY QUANTITY QUANTITY PRODUCT
THIS LOAD. I ORDERED DELIVERED CODI=
TICKET NOTES F
ORDER NUMBER
TESTED BY: _
DATE TIME OUT J TIME N JOB
/ 5
TIME OFF JOB TIME IN
PRODUCT DESCRIPTION
TRUCK DRIVER
UM UNIT PRICE EXTENDED
SUB -TOTAL
TAX
CAUTION UNLOADING YOU are allotted
May Cause eye or skin in,ury, Conta;ns Drivers are prohibited from delivering 1 hour t0 unload
Portland cement Freshly mixed cement, concrote except under the truck's
mortar concrete, or grout may cause in.ury. own power, and where site conditions this concrete. You ORDER TOTAL
TAKE THESE PRECAUTIONS permits the safe and proper operation Will be charged OT TIME OT RATE
1 Avoid a-1contact with eyes of the equipment Drivers are not' current overtime 2- Wear rubber boots and gloves Avoid permitted to add water to the mix or X _
prol-inged contact directly with skin or exceed the maximum slump nor to go j rate for each min- - -- �-
through porous materials beyond the curb line. except upon the i
aulhoriza& m of the customer and h-s I u t e beyond this
3. Incase of contact with skin or eyes acceptance of risk for loss or allotment. This will
FLUSH THOROUGHLY WITH WATER
damage. Purchaser cannot reject be in addition to
4. If irntation persists get medical , concrete based on temperature No
attention promptly credit will be given for over -ordered the price for the
5. Keep children away ` concrete. concrete. CUSTOMER SIGNATURE
1.5% interest accrued monthly for balances due beyond specified payment terms. $35 charge for returned check.
i-, T , � r.. .,.
- ( r1 r '-ll,..�liF3
}r:4 }•,t } r+E f4-,F': w `t• Iv�'i.fr'sl. I}-:fiRID4;r 05 S7:
4
WATER AD?VEp AT J SITE
GALLONS
13
40
con
ORDERED BY P. O, NUMBER
DELIVER TO
806.47'4.272-1
404 E. Lehigh Street
Mailing Address
P.O. Box 1453
Wolfforth, Texas 79382
Accounlog Phone- 8D6 781.95M
P-
#
SOLD TO
it a . . f
f F. tl s t l w s ; r-• t >G C r;
t�llr't r:` t 1-1
f _s4-f sir
QUANTITY7OUANT17TYOUANTITY
THfSLOADDELIVERED
PRODUCT
CODE
I10LIt_ a
4 TESTED BY; _
ORDER NUMBER DATE TIME OUT TfIWG--ODk' 0B
'I
TIME OFF JOB TIME IN
•x
1
jf�
PRODUCT DESCRIPTION I UM
rxa v
0I IAZlI r- .
WATER ADDED AT JOT
_
B-TOTAL
GALLONSTAX
CAUTION UNLOADING
T TOTAL
May Cause eye or skin injury Contains Drivers are prohibited from delivering
You are allo
Portland cement Freshly mixed cement. I concrete except under the truck's
1 h o u r to u n
mortar, concrete, or gmul may cause injury
TAKE THESE PRECAUTIONS-
own power, and where site conditions
this concrete.TOTAL
permits the safe and proper operation
1. Avoid all contact with eyes of the equipment. Drivers are not
Will be Char ed
9
' OT TIME
TOT RATE
2. Wear rubber boots and gloves Avoid I Permitted to add water to the mix or
Current overtime
prolonged contact directly with skin or exceed the maximum slump nor to go
rate for each min-
X =
through porous materials beyond the curb line, except upon the.
authorization of the customer and his
3. to case of contact with skin or eyes
u to beyond this
FLUSH THOROUGHLY WITH WATER
acceptance of risk for loss or
damage. Purchaser
allotment. This will
4. If in i persists, get medical
cannot reject :
be In addition to
attention mptly
promptly
concrete based on temperature No
credit will be given for over-orda redLthne Price for the
5. Keep children away.
--
j 1.5% interest accrued monthly
concrete crete.
for balances due beyond
CUSTOMER SIGNATURE
ispayment #erms.'3
charge f ror a ut reed check.
0, t r j r�,4+7rr7
0
con
ORDERED BY P.O. NUMBER
DELIVER TO
SOLD TO
QUANTITY
THIS LOAD
806-474.2721
404 E. Lehigh Street
Mailing Address
PO. Box 1453
Wolfforth, Texas 7M2
Accounting Phone: 806,781.950t1
r) a I 'iit�t
'F
QUANTITY QUANTITY PRODUCT
ORDERt=Q DELIVERED COD
r fi t 00 7riCii 1
I�I.Itit.17 -
TESTED BY:
ORDER NUMBER DATE TIME OUT
SID TIME OFF JOB
PRODUCT DESCRIPTION
TRUCK
UM UNIT PRICE EXTENDED
C',LI
Ra
TICKET NOTES
WATER ADDED T JOB SITE
SUB -TOTAL
GAL NS TAX
TICKET TOTAL
CAUTION UNLOADING You are Allotted
May Cause eye or skin injury, Contains Drivers are prohibited from delivering 1 hour to unload
Portland cement Freshly mixed cement, I concrete except under the truck's
mortar, concrete or grout may cause injury own power, and where site conditions , this concrete. You ORDER TOTAL
TAKE THESE PRECAUTIONS permits the safe and proper operation ! Will be charged oT TIME OT RATE
t Avoid all contact with eyes of the equipment Drivers are not! current overtime _ 2. Wear rubber toots and gloves Avoid permitted to add water to the mix or X
prolonged contact directty with skin or exceed the maximum slump nor to go rate for each
min -through porous materials beyond the curb line. except upon the U t e beyond this
3 In case of contact with skin or eyes I authorization of the customer and his
FLUSH THOROUGHLY WITH WATER acceptance of risk for loss or allotment. This will
damage. Purchaser cannot reject be in addition to
4. If irritation persists get medical concrete based on temperature. No
attention promptly - credit will be given for over -ordered the price for the
5. Keep children away concrete concrete.
1.5%" Interest accrued monthly for balances due beyond specified payment terms. $35
Ht
•�F,.
r
for returned check.
PBMaterials
O:A WALLACH CONCRETE Inc F.
CROCKETT COUNTY MINING Ltd
GARNEY CONSTRUCTION
1333 NW VIVION ROAD
KANSAS CITY, MO 64118
CUSTOMER INVOICE DATE
50149 304760 08/17/2020
PRODUCT # PRODUCT DESCRIPTION
PO#: 7318
Ticket Number 215-287170
G2515N65 2500 PSI W/ ASH
FS
FUEL
SURCHARGE
NCA1
1.0 %
NON CHLORIDE ACC
Ticket Number 215-287213
G2515N65
2500
PSI W/ ASH
FS
FUEL
SURCHARGE
NCA1
1.0 %
NON CHLORIDE ACC
TOTAL
YARDS:
JOB TAX
JOB TOTAL
Page: I
CITY OF LUBBOCK - PUMP STATION 97
5100 29TH DR
LUBBOCK,
TERMS
NET SAME DAY NEXT MONTH
QUANTITY UM PRICE AMOUNT
08/17/2020
10.00
CY
94.00
940.00
1.00
LD
10.00
10.00
10.00
CY
6.00
60.00
08/17/2020
2.00
CY
94.00
188.00
1.00
LD
10.00
10.00
2.00
CY
6.00
12.00
12.00
100.66
1320.66
TAXABLE AMOUNT 1,220.00
EXEMPT AMOUNT 0.00
SALES TAX 100.66
INVOICE TOTAL 1,320.66
Remit To: P.O. Box 14168 Odessa, TX. 79768 Phone: 432-563-8036 Fax: 432-563-8037
PBMaterials
ODA WALLACH CONCRETE Inc i
CitOCKETT COUNTY MINING Ltd
GARNEY CONSTRUCTION
1333 NW VIVION ROAD
KANSAS CITY, MO 64118
CUSTOMER INVOICE DATE
50149 305255 08/21/2020
PRODUCT # PRODUCT DESCRIPTION
PO#: 7318
Ticket Number 215-290560
G2515N65 2500 PSI W/ ASH
FS FUEL SURCHARGE
NCA1 1.0 % NON CHLORIDE ACC
TOTAL YARDS:
JOB TAX
JOB TOTAL
Page: 1
CITY OF LUBBOCK - PUMP STATION #7
5100 29TH DR
LUBBOCK,
TERMS
NET SAME DAY NEXT MONTH
QUANTITY UM PRICE AMOUNT
08/21/2020
5.00 CY 94.00 470.00
1.00 LD 10.00 10.00
5.00 CY 6.00 30.00
5.00
42.09
552.09
TAXABLE AMOUNT 510.00
EXEMPT AMOUNT 0.00
SALES TAX 42.09
INVOICE TOTAL 552.09
Remit To: P.O. Box 14168 Odessa, TX. 79768 Phone: 432-563-8036 Fax: 432-563-8037
PEIMaterials
RBA WALLACH CONCRETE Inc a
CROCKETT COUNTY 04111VtlYB Ltd
Customer R P.O Number
Sold TD
GARNE:Y CONSTRUCTION
S%"-:c: Placed
❑ Estimate
Leave Plant
❑ Actual
-oad Tested
Yes
Arrivefob
0 No
�fke� iy.
Finish pouring
•o,�s ❑ Yes Leave lob
❑ No
Fed —at —
request i Arrive Plant
—rr tt011 ocumi ivialteriais -- —
4001 E. 42nd St, Ste. 100
Odessa, TX. 79762
www.ob-materials.corrl
Phone: 844-266-6244 Fax! 432-S63 8037
Ticket Number
Job Number
iFRed To
PUMP STATION #7
51.00 29TH DR
ecial Instructions
BLOCK FILL
Instructions
Quart tYThis
Quantity
I ime
Quanti
Date
Dnver
Load
Ordered
Delivered
u[t
Code
Product
Description
2 00
2.00
12.00 1.00
1200 12-00
G2515N65
2500 PSI i1/ ASH
1-00
.
NCA!
rtr
1.0 7, NON CHLORIDE ACC
2,00
1.00
12.00
FUEL
ENVIRONMENTAL CHARGE
FUEL
nt Isfump �Due atJob Use Of Concrete
..•-1--r—rillano LeMaiw. Potential ll{J� *811s Yews:,CaX
cause skin irritation and burns. Read warnings on back of ticket for more
Information.
Signature: -
P8150 r
Unit of
MeasuI4
Yd
ea
CY
Order Number306909
Sub Total
Tax
Tots!
Fb)
don hereof. the Customer above named agrees6e,alld Iota 1
t not limited to the agreement here I s e o ,
by, by Customer
to the amount of the ticket. without offset or credit, within 30 days OF the dale of the ticket at .Odessa, ER•
bject account will accrue Interest from the date of the deliveryof materisis at the rate of t Sfs per month
um rate allowed by law, wh'rhever is lessPS is entitled to contact the contractor an ;
Customer and PB ..; d/ar owner an this Protect and require a joint check Payable to both
C
dj in the event of a claim by Cushier, and/or its customer, as egairnt Pa. , in no event is PB- liable for additional
ej consequential damages and PB maximum claifm, and recovery, Is the amount actually paid to PM for the subject
ethat it is not retying upon to design the proper materials for the subject job and that PB sole warranty s that
the materials are Provided in accordr nce with ar.y written specifications of Customer, and
fl there sr* NOWARRAfITIfS, EXPRESSED ORIMPUED"NCLUDINGANY WARRANTYOFMERCNANTABItITY,FITNESS
FOR USE, OR FITNESS FOR ANY PARTICULAR USE OR APPLICATION except as herein speci&agy articulated C*Yton o All tenet are job
site c fora specific AIMP wodabilRy AR water ft recorded at the batch plant to ensure quality
Addition of water n the job site an cause reduction of strimph and durability N a mix with Increased workability is dewred
contact your sales repnsentatjve
�IIIIIlI�I�Illll�llf I��
01421528
..E— 17 1
Phfe
PEIMaterials
99A WALLACH CUNCNETE Inc E.CROCRETT COUNTY MINING Ltd
u
Customer # P O. Number
Sold To
GARNEY CONSTRUCTION
Sit-up"'aced
❑ Estimate
Leave Plant
❑ Actual
Load Tested
❑
Yes
Ar-rve:�b
❑
No
reeled br
Fin ch Pouring
Cylinders Taken
O
Yes
Leave Mb
❑
No
Water added at
customer request
Arrive Plant
Zone
Time
Quantity'This Quantity
Quanti
uct
load
Ordered
Delivered
Code
10.00
12.00
10.00
G2515N65
10.00
1-00
10.00
NCA1
1.00
1-00
1-00
Env-lro
10.00
1.00
10-00
FUEL
Truck
Plant
5lumjx
Dueatjob
w • ContalKslAbritland
CeGg Potential 1
. •.rnuaur 6,04111 tvtAlClicll,
4001 E. 42nd St. Ste. 100
Odessa, TX. 79762
www, b-materials.com
Phone; 844-266-6244 Fax: 432-563-8037
Ticket Number I
Job Number or 1 f V
Aped To 306909
Order Number
PUMP STATION #7
5100 29TH DR
Special lnstructi-ow
t
BLOCK FILL
1
J
Delivery Instructions
Date Driver
Product
Unit of
knit EXtended
Description
Measure .
Price price
2500 PSI W/ ASH
d
yd
1.0 r/, NON CHLORIDE ACC
ENVIRONMENTAL CHARGE
lea
FUEL
Cy
Jse Of Concrete
Sub Total
s Eyes: Ca4rLI
cause skin Irritation and burns. Read warnings on back of ticket for more
Information.
I Total
aid. Totbl
By the execution hereof, the Customer above named agrees tolhe tan erms a hpr o e o _
Including, but not limited tothe agreement hereby, by Customer:
a) to pay the amount of the ticket, without offset or credit, within 30 days of the date of the ticket at .., Odessa, Era.
b) the subject account will accrue Interest from the date of the delivery of materials at the rate of l 5% per month
or the maximum rate allowed by law, whichever is less;
c) Pa. b entitled to contact the contractor and/or owner on this project and require a Joint check payable to both
Customer and Pe. ,
d) in the ever. toi a claim by Customer, and/or its customer, as against Pa._in no event Is Pg-.. liable for additional
or consequential damages and the maximum claim, and recovery, is the amount actually paid to PM for the subject
e) that it is not relying upon 9a- to design the proper materials for the subject lob and that Pa sole warranty is thal
the materials are provided In accordance with arty written specifications of Customer; and
0 there are NO WARRANITES, EXPRESSED OR IMPLIED, INCLUDINGANY WARRANTY OF MERCNANTA91UiY, FITNESS
FOR USE- OR FITNESS FOR ANY PARTICULAR USE OR APPLICATION except as 1weln specificatly articulated.
CSUifafl; All mixes are designed fora specific slump workablkty AN water is recorded at the batch plant to ensure quality
Addition of water at the Job Site can cause reduction of strength arrd durability If a mix with Increased workability is desired
contact your Saks represematlre
01421534
Signature:
PB150
0.1421534
CL
PBMaterials
Permian Basin Materials
4001 E. 42nd St. Ste.100
Odessa, TX. 79762
www.pb-materials.com
Phone:844-266-6244 Faw 432-563-8037
11191111111111111II
Ibl��llll
IIIIIoW
uPA 17ALLALN Lrr 1eLNYr6 rAC N
ctaocatett eoulvTr Asalaaws Lea
Tlcket'NUmber
__TO.
0560
Customers 50149
Number
7318
lJob Number J0*1
Sold To
Shipped To
Order Number
GARNEY CONSTRUCTION
PUMP STATION #7
5100 29TH DR
LUBBOCK
..I
Slump Placed fa Estimate
❑ Actuai
L
a
Special InstructionsNlit
BLOCK FILL
!�<a e• ;_;•.�
toad Tested ❑ YesA
r !�
❑ No
'
Tested By
Finish Pouring
Dellvery Instructions
CypndersTaken ❑ Yes
Leave)o6
No
Water added at
Customer
mrequest
ArrlvePWnt
Zone i
Time 11.09 AM
Date
Driver
Quantity This
Quantity
Quantity
Product
Product
Unit of.
llF�it�te �:
F,>Stended
Load
Ordered
Delivered
code
Description
re } 4
Measuie
F
t.
- -5700-
--5.00- _'-
5.00-
G25157� 5f-
2500"PSI W/ ASH
---5•.•00._._
_..._-1..00---
_•• _.5.00—
. NCA.1- ----
_-1-.0A NON-CHLOR-IDE ACC _. __—_. _-
- y4
1.00
1.00
1.00
Enviry
ENVIRONMENTAL CHARGE
ea
- ---5: 00-
----1-:00---
---'5-00 --
-pl1Ei- -
--- F�IEL- _• -- ---- -----. .. r _ .t__ . ------ -
C1=
-
--'�-F
Truck i Plant Slump DueatJob
Use Of Concrete , Sub Total
.., Tax ;.
WARNING: Contains Portland Cement. Potential Injurious to Eyes: Can + Total ?
cause skin Irritation and bums. Read warnings on back of ticket for more {
Information.
Grand Total
•�' :, •
By the execution hereof, the customveerabonamed agrees to t e to a erms ana 00FRIMCM1101e ot Pa_
Including, but not limited to the agreement hereby, by Customer. d
al to pay the amount of the ticket, without ulfset or credit, withal 39 days of the date of the tictret at _ ., Odassa, Sm
bl the subject account will accrue Interest from the date of the delawof materials at the rate of 1.5% per month
or the maximum rate allowed by law, whichever Is less;
cj P8_ Is entitled to contact the contractor and/or owner an this project and regplre a joint Chedf payable to both
Customerand Pa '
dj in the evert-.y of a claim by customer, and/or its customer, as against Pa..., in no avant Is pe... laabirfor additional
or consequential damages and the maximum dah% and recovery, is the amount actually paid toPM for the subject
of that it Is not relying upon PB_ to design the proper materials for the subject lob and that Pa sole warranty Is that
the materials are provided In accordance with any written spedacadons of.Customer; and
ry theta am NO WARRANTIES. EXPRESSED OR IMPLIED, INCLUDING ANY WARRANTY OF MERCHANTAWLITY, FITNESS
FOR USE OR FITNESS FOR ANY PARTICULAR USE OR APPLICATION except as herein spedRpllyarticulated.
C8Utl0n: All mixes are designed fora speel8esfump workability. AR water Is recorded at the batch plant to ensure quail
Addition of water at the job site can cause re6kilon of strength and dy9biRty, of a Mix with Increased workability Is desk
+ Hit
contact Your Saks representative •
' i
�..
.
?_r=
�,. :illlElIIIIIIIIIIIIIIIIII
: 01421280
Signature: -V-r.
01421260
1421260
11M oU
0United Rentals' ii�ii�i�iiiiii�ii�� �ii�� uiii���i �i
�i RENTAL RETURN
TRENCH SAFETY
INVOICE
BJL4A= 873
LUBB CK_TFRAUZ 704 A'�'m
LOBBOfaC TS 79107.3729
'184851083-001
806-3a8-1702
-- �-
Customer # : 382816
Invoice Date : 08/27/20
PUMP STATION 7 WATER LINE
Rental Out : 08/12/20 05:00 PM
N 29TH DR & SLIDE RD
Rental In : 08/21/20 05:00 PM
c t 22TH DR & SLIDE RD,
x:29TH DR®SLIDE RD
IIURR Job
67
A LUBBOCK TX 79401
CUstomer Zob IDs
P.O. # :7318-700-05M
h Office: 303-791-3600 Cell: 915-503-0456
Requested By : TAYLOR KENNEDY
Reserved By : JUSTIN WILSON
Salesperson : JUSTIN WILSON
GARNEY CONSTRUCTION
1333 NW VIVION RD
KANSAS CITY MO 64118-4554
RENTAL ITEMS:
Qty Equipment Description
4 942/0277 END MEMBER 10'
942/8276 END MEMBER 8'
20 940/9816 MODULAR SHIELD PANEL 24- X 8F
4 940/9790 MODULAR SHIELD STRUT 96"
8 940/9868 LIFTING LUGS FOR BUILD A BOX (EACH)
8 940/9828 2' EXTENSION LEGS PACKAGE FOR BOXES
112 940/9830 CONNECTOR PIN LITE SHIELD
1 330/7113 LIFTING BRIDLE 4 LEG X 6'
2 944/9924 ROAD PLATS 5' X 10'
SALES/MISCELLANEOUS ITEMS:
Qty _Item_..
1 DELIVERY CHARGE
Minimum
12.40
28.70
2.11
41.41
COMMENTS/NOTES:
CONTACT: TAYLOR KENNEDY
CELL#: 915-503-0456
ARE YOU OR YOUR EMPLOYEES IN NEED OF OPERATOR CERTIFICATION TRAINING?
CONTACT UNITED ACADEMY TODAY 844-222-2345 OR WWK.UNITEDACADEMY.UR.COM
TRAINING IS NOT AVAILABLE ON CERTAIN EQUIPMENT IN CANADA.
Invoice Amount: $4,396.20
-. -- ............................. . . ............................
Terms: Doe Upon Ret:etpl
Payment options: Contact W Credit office 704-9164943
REMIT TO: UNITED RENTALS (NORTH AMERICA),INC-
PO BOX 840514
DALLAS TX 7528"514
.Day
week
Month
Amount
18.20
43.50
107.00
319.60
12.40
30.90
77.30
222.80
28.70
66.34
160.32
2,474.80
14.20
36.40
90.90
259.20
.55
1.03
1.55
12.40
2.21
4.16
11.54
66.56
N/C
22.30
56.60
141.00
101.20
41.41
119.48
300.76
404.60
Rental
Subtotal:
3,861.16
Price
Unit of Measure
Extended Amt.
200.000
EACH
2O0.00
Sales/Mist
Subtotal:
200.00
Agreement
Subtotal:
4,061.16
Tax:
335.04
Total:
4,396.20
NOTICE: Tits fnvaiee Is subEeet to dw term, and conditions of the Rental and Service Awooment which ere avaable at ht4aJlwww.uNtadranuis.00ndM 000tW.swvka-terma-US and which
are trx*mwated herein by raferenoa. A COPY OF THE RENTAL AND SERVICE AGREEMENT TERMS ARE AVAILABLE IN PAPER FORM UPON REQUEST.
You Carr Now Am= hnvko Nfsfory and Up&la Puroheae Order Ondw
To SIBe up, cdnlad uncoafre 4warfoa can Page.* 1
0United Rentals
RENTAL RETURN
TRENCH SAFETY
INVOICE
BRARCN 873
4103 FRANKFORD AS==
LOCRBHOTI 79407-3719
7$44702
1 84929867-002
806-318-
_
Customer # : 382816
Invoice Date : 08/27/20
PUMP STATION 7 WATER LINE
Rental out : 08/14/20 20:57 AM
rI 29TH DR & SLIDE RD
Rental In : 08/21/20 05:00 PM
UR Job Loa : 29TH DR & SLIDE RD,
x:29TH DR@SLIDE RD
UR Job # : 2267
.sA LUBBOCK TX 79401
Customer Job ID:
P.O. # :7318-700-OSM
h Office: 303-791-3600 Cell: 915-503-0456
Requested By : TAYLOR KENNEDY
Written By : REYNA MITCHELL
Salesperson :JUSTIN WILSON
GARNEY CONSTRUCTION
Invoice Amount: $622.27
1333 NW VIVION RD
KANSAS CITY MO 64118 - 4 5 54
....... pan "pt ..-..... .
Tama Oue U R
Psymentoptions. Canted oAcredit office 704-91BA843
REMIT TO: UNITED RENTALS (NORTH AMERICA),INC.
PO BOX 840514
DALLAS TX 75284-0514
QtY Equipment
2 944/9930
1 944/9897
Description
ROAD PLATE 6' X 10,
PLATE LIFTING RING STANDARD
Minimum _ Dam_ Meek Month _ Amount
40.82 48.82 123.60 307.97 344.84
8.00 22.00 58.00 30.00
SALES/MISCELLANEOUS ITID43: Rental Subtotal:
QtY Item Price Unit of Measure
1 DELIVERY CHARGE 200.000 EACH
Sales/Mist Subtotal:
COMMENTS/NOTES:
CONTACT: TAYLOR KENNEDY
CELL#: 915-503-0456
ARE YOU OR YOUR EMPLOYEES IN NEED OF OPERATOR CERTIFICATION TRAINING?
CONTACT UNITED ACADEMY TODAY 844-222-2345 OR WWW.UNITEDACADEMY.UR.COM
TRAINING IS NOT AVAILABLE ON CERTAIN EQUIPMENT IN CANADA.
374.84
Extended Amt.
200.00
200.00
Agreement Subtotal: 574.84
Tax. 47.43
Total: 622.27
NOTICE: This Invoice Is subject to the tams Snd coedittat►s of the Rental and Sodas AWMnd"L whkh are avaNAO at https.11www.wdlednntah oaMeg*mntd-ienke•tama4lS and which
No Incerperated herein by wterence. A COPY OF THE REWAL AND SERVICE AGREEMENT TERMS ARE AVAILABLE IN PAPER FORM UPON REQUEST
You Can Now A— hftvko NOmy and UpOla PFnabm Ordna Oarna
To Sint Up, car"M UMCerurptStlpporfpuvCam Page.
I
Q [United Rentals
TRENCH SAFETY
BRANCH 873
4103 FRAHRlORD APBHDB
ABBOM PX 70407-3719
006-318-4792
IIBiIIIdIIiiIiiiiiII11Rllllllilll
m PUMP STATION 7 WATER LINE
29TH DR & SLIDE RD
x:29TH DR@SLIDE RD
LUBBOCK TX 79401
h Office: 303-791--3600 Cell: 915-503-0456
GARNEY CONSTRUCTION
1333 NW VIVION RD
KANSAS CITY MO 64118-4554
RENTAL ITEMS:
OLY Eguipmeat
4 942/8270
4 942/8276
4 940/9828
4 940/9619
4 940/9868
16 940/9821
84 940/9830
4 944/9914
2 944/9924
1 10867568
1 250/1175
4 942/8277
4 940/9828
4 940/9868
16 940/9818
Description
END MEMBER 4'
END MEMBER 8'
2' EXTENSION LEGS PACKAGE FOR BOXES
STACKING PIN FOR ALUMINUM BOX
LIFTING LUGS FOR BUILD A BOX (EACH)
MODULAR SHIELD PANEL 24" X 12'
CONNECTOR PIN LITE SHIELD
ROAD PLATE 4' X 8'
ROAD PLATE 5' X 10,
BLOWER AXIAL 22" ELECTRIC
Make: ALLEGRO Model: 9543
Serial: 43-05301
DUCT HOSE 12" X 25,
END MEMBER 10'
2' EXTENSION LEGS PACKAGE FOR BOXES
LIFTING LUGS FOR BUILD A BOX (EACH)
MODULAR SHIELD PANEL 24" X 8'
SALES/MISCELLANEOUS ITEMS:
OCY item
1 DELIVERY CHARGE
1 PICKUP CHARGE
COMMENTS/NOTES:
CONTACT: TAYLOR KENNEDY
CELL#: 915-503-0456
DELIVER TO JOBSITE AND ASSEMBLE, WILL
HAVE TO PICK UP AS WELL AT JOBSITE ONCE
THEY DISSASSEMBLE
RENTAL RETURN
INVOICE
184997615-001
Customer #
:
382816
Invoice Date
1
08/27/20
Rental Out
t
08/15/20 08:00 AM
Rental In
:
00 21/20 05:00 PM
UR Job LOc
:
29TH DR & SLIDE RD,
UR Job #
:
2267
Customer Job
XD:
P.O. #
:
7318-700-OSM
Requested By : TAYLOR KENNEDY
Reserved By : JUSTIN WILSON
Salesperson : JUSTIN WILSON
Invoice Amount: $4,747.75
.... ..............
., I)le Upon Receipt
Payment Options: Contest Our Credit office 704.9163843
REMIT TO: UNITED RENTALS (NORTH AMERICA),INC..
PO BOX 840514
DALLAS TX 75284-0514
Minimum D ,J
Week
Month
8.08
19.20
48.50
12.40 12.40
30.90
77.30
2.11 2.11
4.16
11.54
3.05
7.07
20.20
.55
1.03
1.55
34.00
84.50
210.00
41.41
96.00
12.20
2.11
28.70
46.00
137.00
369.00
41.41
119.48
300.76
99.00
214.00
279.00
21.20
18.20
2.11
.55
26.70
76.80
123.60
16.64
28.28
4.12
1,352.00
N/C
548.00
238.96
214.00
27.30
67.70
27.30
43.50
107.00
174.00
4.16
11.54
16.64
1.03
1.55
4.12
66.34
160.32
1,061.44
Rental
Subtotal:
3,885.90
Price Unit of Measure
Extended Amt.
250.000 EACH
250.00
250.000 EACH
250.00
Sales/Misc
Subtotal:
500.00
Agreement
Subtotal:
4,385.90
Tax:
361.BS
Total:
4,747.75
CONTINURDI
NOTICE: This Invoke Is uk)eet to the terms end conditions Of Ow Rental and Service Agreement. which are available 11 hMn!ltwww.unllsdnnuis.comnsgwmntW,owvko-termsdlS end which
ere huorpaeted herein by ralerence. A COPY OF THE RENTAL AND SERVICE AGREEMENT TERMS ARE AVAILABLE IN PAPER FORM UPON REQUEST.
You Can Now Accow lnvoke Nslory &W Update Pumha a Orden On ghe
7o slyn Up. oowaa URCenhe/St pparOra.cam Page: 1
0United Rentals•
TRENCH SAFETY
BRANCN E73
4103 FRARRTORD AVXXUZ
LUBBOCK TI 79407-3719
806-318-4702
m PUMP STATION 7 WATER LINE
A 29TH DR & SLIDE RD
x:29TH DR@SLIDE RD
LUBBOCK TX 79401
h Office: 303-791-3600 Cell: 915-503-0456
GARNEY CONSTRUCTION
1333 NW VIVION RD
KANSAS CITY MO 64118-4554
ARE YOU OR YOUR EMPLOYEES IN NEED OP OPERATOR CERTIFICATION TRA]
CONTACT UNITED ACADEMY TODAY 844-222-2345 OR WWW.UNITEDACADEMY.0
TRAINING IS NOT AVAILABLE ON CERTAIN EQUIPMENT IN CANADA.
RENTAL RETURN
INVOICE
184997615-001
Customer #
: 382816
Invoice Date
1 08/27/20
Rental Out
1 08/15/20 08:00 AM
Rental In
: 08/21/20 05:00 PM
UR Job Loa
: 29TH DR & SLIDE RD,
UR Job #
: 2267
Customer Job
ID:
P.O. #
: 7318-700-05M
Requested By
: TAYLOR KENNEDY
Reserved By
: JUSTIN WILSON
Salesperson
: JUSTIN WILSON
Invoice Amount: $4,747.75
Team Due Upon Receipt
Payment options Contact our eWit office 704.916-4643
REMIT TO: UNITED RENTALS (NORTH AMERICA),INC_
PO BOX 840514
DALLAS TX 75284-0514
Paae: 2
Rangeline Pipeline Services
1150 Blue Mound Road West Suite 301
Haslet, TX 76052
(682) 250-2153
www rangeline corn
[INVOICE
rra�voeitrHE0
cw.nmwri,nnxe rnnn
BILL TO
SHIP TO SHIP DATE 08/24/2020
INVOICE
1959
Garney Companies, Inc_
Garney Companies, Inc. SNIP VIA Rangeline Driver
DATE
08/24/2020
1333 NW Vivion Road
5100 28th Drive TRACKING# NIA
TERMS
Net 30
Kansas City, Missouri 64118
Lubbock, TX 79407
DUE DATE
09/23/2020
I' : _.
PURCHASE ORDER JOB NO
C303
7318-701-15S 20214
DATE
OTY ACTIVITY
RATE
AMOUNT
08/15/2020
1 LABOR:LS-SUB
163,121.00
163,121.00
42" C303 Single Line Slop in place for 7 Days
Epoxy Coated wl SS Hardware
08/15/2020
1 LABOR:LS-SUB
50,965.00
50,965.00
20" C303 Single Line Stop in place for 7 days
Epoxy Coated wl SS Hardware
08/24/2020
2 LABORIS-SUB
18,462.00
36,924.00
24" Line Stop Fitting wl Blow Down Saddle
Epoxy Coated wl SS Hardware
08/24/2020
1 MISCELLANEOUS:RPLS
0.00
0.00
Tech Name: NS, CH, CL
Rangeline Job Number: 20214
Job Name: Pump Station 7
Jobsike Address: 5100 28th Drive Lubbock, TX 79407
Jobsike Contact: Taylor Kennedy 806-662-7052
08/24/2020
4 MATERIALS:WLD-MAT
0.00
0,01)
RESTOCKING FEE
24" CI D Flange x CPE Adapter
------------------------
BALANCE DUE
$251,010.00
Page 1 of 1
Garney Construction
Change Order 7318-02
Attachment D -Schedule Impact
Q
O
O
O
p�1
in
Q
m 10
v
to
W M
AD_A_r9
d N
co��
m
j
N
S `
�
lmm
Lm
7
• Z
3
3
•
3
:3
c
�
v
O
d
'
A
fp
A
A
V
a
v ~
_
O
O
O
(J n
F-► 3
- - -
0
0
O
0
m
0
00 M 0
O Q 3
D
r+
_
�' c
O
N
V
M
m
N
O C
CD
N
0
19
-0
W
•Y
�1
CD
rn
/"F
Q
W
o
m_
a
0
Q
tzi�
N
D
�
N�
_
W
r
V
A
o
a
a
m
_
O
7
z
o
N
•-
61
D
a
_
0
9�
W;o�
o
N
0
N
go
-
Q
-
N
�
3
r
Cl)
m
V
c
cr
0
\\
M
b
-�
v
CD
V
y
N
O•'
N
7
�1
0