Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Resolution - 5146 - Agreement - Firto-Lay Inc - Idustrial Tac Abatement, 3203 Ave B - 03/28/1996
RESOLUTION NO. 5146 March 28, 1996 Item #12 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK- THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock an Agreement and all related documents by and between the City of Lubbock and Frito-Lay, Inc., for industrial tax abatement, which Agreement is attached hereto and shall be spread upon the minutes of the Council and as spread upon the minutes of this Council shall constitute and be a part of this Resolution as if fully copied herein in detail. Passed by the City Council this 28th day of\ march �� , 1996. ATTEST: Betty M. Jahn on, City Secretary APPROVED AS TO CONTENT: L Jpel Beesinger, Int rim D` ctor of Business Development APPROVED AS TO FORM: .i' Donald G. Vandiver, First Assistant City Attorney DGV:v1 ccdmsfa-frita]ay.res Feb. 6, 1996 AGREEMENT STATE OF TEXAS § COUNTY OF LUBBOCK § RESOLUTION NO.5146 March 28, 1996 Item 412 This Agreement made this 28th day of March , 1996, by and between the City of Lubbock, Texas, a home rule municipality of the State of Texas (hereinafter called "City") and Frito-Lay, Inc. (hereinafter called "Company"); WITNESSETH: WHEREAS, City did receive from Company on the 22nd day of December, 1995, an application for tax abatement for the modernization and expansion of the existing manufacturing facility located at 3203 Avenue B, which is further described as Tracts A, D, and E, Burlington Industrial Addition to the City of Lubbock, Lubbock County, Texas; and WHEREAS, upon review of the above application it was determined that the facilities will be located in the South Enterprise Zone designated by the City in Ordinance No. 9591 covering the above described property; and WHEREAS, the Guidelines and Criteria Governing Tax Abatement for all Taxiing Units Contained within Lubbock County was heretofore adopted by Resolution No. 4973 of the City Council of the City of Lubbock; and WHEREAS, the City did comply with all the requirements set forth in V.T.C.A., Tax Code, Section 312.201; and WHEREAS, the City did comply with all of the criteria and guidelines as set forth in the Guidelines and Criteria Governing Tax Abatement for all Taxing Units Contained within Lubbock County, said guidelines having been adopted by Resolution No. 4973 of the City on September 28, 1995, and WHEREAS, the City did thereafter pass Ordinance No. 9591 creating an enter- prise zone for commercial and industrial tax abatement, said zone including Tracts A, D, and E, Burlington Industrial Addition to the City of Lubbock, Lubbock County; and WHEREAS, V.A.T.C., Tax Code, Sec. 312.2011 provides that designation as an enterprise zone constitutes designation as a reinvestment zone without further action; and WHEREAS, the application received by City from Company is an application for the modernization and expansion of an existing facility; and WHEREAS, V.A.T.C., Tax Code, Sec. 312.002 specifically states that such a pur- pose is to be included in the guidelines for tax abatement and to be eligible for such treat - meat; and WHEREAS, Section IV of the Guidelines and Criteria Governing Tax Abatement for all Taxing Units Contained within Lubbock County adopted by the City Council by Resolution No. 4973 does recognize modernization and expansion of existing facilities as being eligible for tax abatement status; and WHEREAS, Section IV (9)(d) provides for variance of the Guidelines and Criteria Governing Tax Abatement for All Taxing Units Contained Within Lubbock County by the affirmative vote of three-fourths of the governing body of an affected jurisdiction; and WHEREAS, the Company does not meet the specific standards of Section IV (9)(c)(1) in that the Company began hiring new employees from the commencement of the project; and WHEREAS, the City Council does hereby find that all of the Guidelines and Criteria Governing Tax Abatement for all Taxing Units Contained within Lubbock County, as adopted by Resolution No. 4973, have otherwise been met by Company; and WHEREAS, the City Council finds that variance of the requirements of Section IV (9)(c)(1) and entering into this Agreement to abate taxes on the property described in Exhibit "A" will contribute to the retention of existing jobs and the creation of new jobs AGREEMENT -- FRITO LAY, INC. PAGE 2 within the affected jurisdiction, and enhance economic development within the designated Enterprise Zone; WHEREAS, variance of the requirement that eligible job creation be limited to the term established in the Tax Abatement Agreement to include new jobs created since the commencement of the project is hereby granted; NOW THEREFORE, for and in consideration of the premises and of the mutual terms, covenants and conditions herein contained the City and Company do hereby agree as follows: SECTION 1. Term, This Agreement shall remain in force and effect for a period of ten (10) years from the date of its execution and shall expire and be of no further force and effect after said date. SECTION 2. Base Year. The base year applicable to real property, which is the subject of this Agreement, shall be 1996, and the assessed value of the real property shall be the assessed value applicable to such property for said year. SECTION 3. Base Year Taxes. The taxes upon the real property shall be paid in accordance with the assessed value of such property for the base year. Base year taxes upon the real property are thus not abated. SECTION 4. Abatement of Increase in Base Year Tax, In accordance with V.A.T.C., Tax Code, Section 312.204 real property taxes applicable to the real property subject to this Agreement shall be abated only to the extent said value for any given year within the term of this Agreement exceeds the base year taxes hereinabove set forth. SECTION 5. Property Ineligible for Tax Abatement. The property described and set forth in Section IV(5) of the Guidelines and Criteria Governing Tax Abatement for all Taxing Units Contained within Lubbock County and heretofore adopted by the City Council by Resolution No. 4973 is incorporated by reference herein as if fully set out in this Agreement and fully describes the property ineligible for tax abatement. AGREEMENT -- FRITO LAY, INC. PAGE 3 SECTION 6. Exemption from Tax. The City covenants and agrees to exempt from taxation, in accordance with Section 4 above, the following properties: (a) All proposed new improvements to be placed by Company upon Tracts A, D, and E, Burlington Industrial Addition to the City of Lubbock, Lubbock County, which proposed improvements are set forth in a plat of the above tract of land, attached hereto as Exhibit "A" and made a part hereof. (b) All eligible new tangible personal property placed in or upon the property set forth in Exhibit "A". (c) It is further understood that all items affixed to the new improvements placed upon the real property identified in Exhibit "A" including machinery and equipment shall be considered part of the real property improvement and taxes thereon shall be abated in accordance with the provisions of subparagraph (a) above set forth. SECTION 7. Economic Oualification, It is hereby found by the City that Com- pany will expend funds in excess of the funds necessary to qualify for tax abatement by expanding an existing facility and further that the Company will create new jobs in excess of the percentage required for tax abatement, all as set forth in Section IV(9)(c) of the Guidelines and Criteria for Tax Abatement adopted by the City through Resolution No. 4973, SECTION 8. Value of Improvements. Company intends to expend approximately six hundred thousand ($600,000) dollars in building related structural improvements and two million six hundred thousand ($2,600,000) in equipment to be located within the enterprise zone created by Ordinance No. 9591. SECTION 9. Creation of New Jobs. Company agrees between the commencement of this project and within twelve (12) months from the date of execution of this Agreement that it will create ten (10) full-time equivalent new jobs within the Company plant located within Tract A, D, and E, Burlington Industrial Addition to the AGREEMENT -- FRITO LAY, INC. PAGE 4 City of Lubbock, Lubbock County and use its best efforts to maintain a minimum of two hundred twenty-nine (229) jobs during the term of this Agreement. SECTION 10. City Access to Property. Company covenants and agrees that City shall have access to the property, which is the subject matter of this Agreement, during normal business hours and that municipal employees shall be able to inspect the property to insure that the improvements are being made in accordance with the terms and condi- tions of Company's application for tax abatement and this Agreement. SECTION 11. Portion of Tax Abated. City agrees, during the term of this Agreement, to abate 100 percent of taxes on eligible property. SECTION 12. Commencement Date. This Agreement shall commence upon the date of its execution, which date is hereinafter set forth, and shall expire ten (10) years after such date. SECTION 13. Tyne of Improvements. The Company proposes to modernize and expand an existing manufacturing facility as described in Exhibit "A". The Company further states that the proposed improvements to the property above mentioned shall commence on the 1 st day of January, 1996, and shall be completed within approximately six (6) months from said date. The Company may request an extension of the above date from City in the event circumstances beyond the control of Company necessitates additional time for completion of such improvements and such consent shall not unreasonably be withheld. SECTION 14. Drawings of Improvements. Company shall furnish City with one set of as built plans and drawings of the improvements to be made pursuant to the terms of this Agreement. SECTION 15. Limitation on Use. Company agrees to limit the use of the prop- erty set forth in Exhibit "A" to commercial and/or industrial uses as those terms are defined in the zoning ordinances of the City of Lubbock and to limit the uses of the prop - AGREEMENT -- FRITO LAY, INC. PAGE 5 erty to uses consistent with the general purpose of encouraging development of the enter- prise zone during the term of this agreement. SECTION 16. Recapture. The Company agrees to be bound by and comply with all the terms and provisions for recapture of abated taxes in the event of default by Com- pany as set forth in Guidelines and Criteria for Tax Abatement adopted by Resolution No. 4973 of the City Council of the City of Lubbock. SECTION 17. Certification. The Company agrees to certify annually to the governing body of each taxing unit that the owner is in compliance with the terms of the Agreement. SECTION 18. Compliance. The City may cancel or modify this Agreement if the Company fails to comply with the Agreement. SECTION 19. Notices. Notices required to be given by this Agreement shall be mailed, certified mail return receipt requested, to the following addresses: CITY OF LUBBOCK City Manager P.O. Box 2000 Lubbock, Texas 79457 FRITO-LAY, INC. 3203 Avenue B Lubbock, Texas 79404 AGREEMENT -- FRITO LAY, INC. PAGE 6 SECTION 20. Effective Date. Notwithstanding anything contained herein to the contrary, this Agreement shall not be effective until such time as it has been finally passed and approved. EXECUTED this 28 t FRITO LAY, INC. '1. -4� ice President of Operations ATTEST: Secretary ATTEST: La—' a a4 Betty 161insorY City Secretary PROVED AS TO CONTENT: noel Beesinger Interim Director of Business Development P • • • t1!*+Van ver Assistant City Attorney AGREEMENT -- FRITO LAY, INC. PAGE 7 J -11- v„ EXHIBIT "A" Ame • I. Frito-Lay, Inc. Section III - Facility Description for Frito Lay, Inc. - Lubbock plant a) General description of improvements: arch Recovery Upgrade: Improvements include upgrading the current system to a new high efficiency starch recovery design and constructing a new building to fit it in. LBCSS / Texas Grilled Fritos: Improvements include new equipment and upgrading building structure for new Texas Grill line Frito #1 Fryer Replacement: improvements include new equipment b) Descriptive list of improvements Starch Recovery Upgrade: Building a 2,500 sq ft metal building extension * Installing a 200 gpm Starch Recovery Module Installing a 500 lb/hr ring -type starch dryer LBCSS / Texas Grilled Fritos: * Installing a new corn cooking system (2 kettles and 16 soaking tanks) * Upgrade floor, ceiling, roof, roof penetrations, walls, drains * Install new griller and new conveyors for new line * New weigh belt and seasoning loop Frito #1 Fryer Replacement: Install new fryer to handle a larger capacity due to new line c) List of the kind, number, and location of all proposed improvements Starch Recovery Upgrade: Environmental f Upgrade with new equipment 1 Cost reduction, 1, see attached map LBCSS / Texas Grilled Fritos: New equipment / new line / increased headcount by 10, 1, see attached map Frito #1 Fryer Replacement New equipment, 1, see attached map Location of plant: 3203 Ave. B, Lubbock, TX 79404 �AN-i 1-vo 1Hl�42 Page 2 Facility Description d) Site map rKl iQLh: LUbbUlA rr,% NU, OUDICie i 1s - . u Starch Recovery Upgrade, LBCSS / Texas Grilled Fritos, and Frito #1 Fryer Replacement: • See attached map e) List of all Tangible Personal Property presently existing on Real Property or located in an existing facility Personal Property value = $11,075,100 fl Proposed time schedule Starch Recovery Upgrade, LBCSS 1 Texas Grilled Fritos, and Fdto #1 Fryer Replacement: See attached time schedule g) General description stating whether the proposed improvements are in connection with the modernization of a facility Starch Recovery Upgrade, LBCSS 1 Texas Grilled Fritos, and Frito #1 Fryer Replacement: Al of these projects are involved with modernizing the plant. h) Statement of the additional value to the Real Property or Facility Starch Recovery Upgrade: Capital: $635,000 Expense: $5,000 Total: $640,000 L3CSS 1 Texas Grilled Fritos: Capital: $2,595,000 Expense: $105,000 Total: $2,700,000 Frito #1 Fryer Replacement: Capital: $104,000 Expense: $30,000 Total: $134,000 i) Statement of the assessed value of the Real Property for the Base Year Starch Recovery Upgrade, LBCSS / Texas Grilled Fritos, and Frito #1 Fryer Replacement: Please see attached statement 1) Information concerning the number of new jobs that will be created Starch Recovery Upgrade, LBCSS / Texas Grilled Fritos, and Frito #1 Fryer Replacement: 3 sanitors LBCSS 1 Texas Grilled Fritos and Frito #1 Fryer Replacement: 3 fryer operators, 1 resource, 3 packers Total of 10 new jobs created ceet I'% VC, - t.." B �T,�aS Gr;tit � ��c,ovePy-LIM ,ie- Ma o �;- may,, - ���,ba.�,r; i Jon" 5. 1996 z CanOct NOV DOC .iw► �� r r r r r� rg�, r95 ►g,6 Kar 1�Dr l96 96 J� 96 cr -�- Tons Grill and Fryer Bgripment ordering �quipaent Orderi..................................................:...... Installation OmLssianinq... ............... .................................. Ki......... , ........ , , ........ , ... `r . - Inu Production----i Full Ptoducti qWPmeti,t OrderiKg prem Otderi ' installation cmissionliaq ��.......,...........,........;..... ............. ........ ............. Fail Pmdnctlon ; ; : ; ; K1l Predation----� STAIM Nulp mt Ordering ' H . Building Installation ........................... .. ............ ..............,,........., .........,.,.. Mpip mt Installation ltefi mat of ON SYstse ........................ ................. ,......... ....... ... .................i........;.........:.......;.......;.........:..... ............................................H............................I.......... H ')1.., -gid rRi d eK IuL Y LUbbuA rhA NU. ouui62i l2i r, uo •1 • APs Frito-Uy, Inc. Lubbock, TX STARCH RECOVERY UPGRADE Description: Potato starch is a by-product of potato chip manufacturing that can be sold when recovered from the slice washer process water. Frito-Lay starch recovery systems are currently operated at 21 of Frito-Lay's 22 potato chip production facilities including Lubbock which has one PC21 potato chip line_ The existing starch recovery module was an asset transferred from another plant and is more than 10 years old. Due to its age and low efficiency, the starch recovery system needs to be upgraded to a new high efficiency starch recovery design. This project will significantly reduce wastewater discharge loads (37 percent for TSS and 12 percent for SOD) which will comply with recent requests from the City of Lubbock to make a good faith effort to reduce waste loads, Scope: 0Local contractors to construct a 37' wide by 54" long metal building extension to house the new starch recovery system, provide for dry starch storage, and to provide space for wastewater pretreatment system components is required in the future. Local contractors to install new starch recovery system Ca ital' $635,000 Expense:, $5,000 'rte $640,000 JAN- b -8b rxl a. 4b r 1 i LY LJ:Jd N rriA NU. elaer e l • I. Frito-Lay, Inc. Lubbock, TRK TEXAS GRILLED FRljQS PROQUCT START UP QeScriptignt Texas Grilled is a new product which involves several process changes when compared to Crisp N' Thin the product currently run on that line. There will be several pieces of specialized equipment Installed. The current Crisp N' Thin Is crewed with one (1) Fryer Opr.and one (1) Packer working about 15 to 20 hours weekly, producing .85 MMI LSs. this year. Texas Grilled will put this line at max capacity 6.5 MM LBs, annually with three (3) Fryer Opr. and three (3) Packers all full time employees. Local contractors will assist In the installation of the new specialized processing equipment, plus relocate some existing assets, and make the required facility modifications. Canital $910,000 Fx2ense: $55,000 9 , 00 F.O. BOX 660634 • Dallas, Texas 75266-0634 • (214) 334.7000 0 -do rMl J140 rKtIULhf L=Ukahrn 11u, OUD I I. Frits -Lay, Inc. LUBBOCK, TX LBCSS CORN COOKING UPGRADE DescridtioM Currently, the existing cora cooking system in the Fritos department does not have the required capacity to support the Texas Grilled project, planned in the first quarter of 1996. Also major upgrades are needed due to the age of the existing cook system. The LBCSS system planned for this department will be handle any growth for this product line for several years in the future. ScooeLocal contractors will assist in the installation of the specialized equipment, and make the required facility modifications. Caoftal: 41,150,000 Eximm $ 50,000 Total: 01,200,000 F.O. BOX 660634 - Dallis, Texas 75266-0634 - (214) 334-7000 5- b tmi ;4b MilULHY LU bUU&bC . U ' � 1 • �. Frito-Lay, Inc. Lubbock. Tx RITOS #1 ERYER REPLACEMENT Oe1crioti= The existing Fryer is in needed of replacement due it's age which is In excess of 10 years. As Improved Product Standards are introduced the condition of this asset Is also making it difficult to achieve our product quality requirements. ScocA new fryer will be purchased and relocated as required when installed with the Texas Grilled project. Capital: 4104,000 Expense: 430,000 Total: $134,000 P.O. BOX 660634 • Dallas, Texas 75266-0634 • (214) 334-7000 inii- -ll-db mi 11U, I �,L I I L b1i11/56 12;34 GF_ORW r4CF_LROY i RS50C. -0 918867ta27727097 NO.361 Pt3 R WPOF1'TANT13 NOT A TAX DILL, JSBOCK CENWL APPRAISAL DISTRJCT p LCE REVIEwA L DATA ON THIS r's 1713 24dt STF1EET ;NOMCE BE -CAUSE OF POSSIBLE IMPACT P.Q- box 10542 ON YOUR PROPEIM TAXES. LUSBOCk TEXAS 76408-3342 "w7 OATL 05/1 9/95 (806) 762 -WW EXT. 600 I � PROPERTYCWWN A I�CATQNADpREai L3 3204 AVE A KV 3 00777035 MPERTY ttsCRIPTION: PR OLS6080RG8 E ASSOCIATES FFM t IttVNT(}ii'r D�a_ his TX 7S35t5 �c.►- PAe $1`000452500 LAST YEAR 4 MARKT VALUE LAM 1RAWCET-VAI E 1PR00t1OTIV" VALUE LAND MDUCTNTTY VALUE aVEht61m • IUAWCfai` IMPROVEMENTS - MARXET ONAI. PROPt:.RTY VALUE 10,348.400 POZONAL PROPERrr VAwt: IAL WIWIEST VALUE WDAL INTER59T VALUE MAs mT VALUE 10,, 34 3, 300 TOTAL MARKO VALUE CC( ISD 1362,, 7.4 ,-T F 7 i 1.343 148,896.1! 4 ,, 66„a i �� t35 67r 4 A`3{t� 11 P -T 7 I f 101 4.i1i7.Es:71 L K COUNTY 4 -3 0 248;313.bs -- - 11�ti7S,,i00I 6197 245.611.' V -04y 1111,11W #� AWRAZSAI.. DM"W. Titer IS NOT ATAX NTATEMENT' ESTIMATED PROPERTY TAXES bo m* r _ F” YFAIM S"SYIMAM TAX RATE: T1so titre woW cake the same %W mq&UA #W the unk reed last year from Pro Wad ROW 7*+6 eu. A to _, +uvt nuy NOTadopt a rale that woAd rake VM rt:wnua from dw rafttie properties !)1il.E'S'6 it PUN" native fn msmier 70 a la oonedemg an lr tm a and hoift a pinto hmft for Wxpayem to fwm the lame. HE YMG E5iilXll<TtED TAXES. Thm amounts are the taxes you would pay on M y$ar's proposed vakm I' She gimmin9 4ocEes adopt the ififtled tv rate SftmL 'Trio Taxwt L.&SjWgWre docs not Sol LNe amount of your bat maws. Vogt pr*eror rix burden is droded oY imur k Ka fy e1000d ollklltA ane' air ,nqutnes a n*rnrnp ]tart uam shauld be 6mcW Io tfmre d kd4.' `PLEASt. tF YOU ARE A04 66 OR OLDER and you reeatved the $1 O MO Wi= tax exemption on your home. your 5GHWL AW taxes for ttus year wil not be higher thin whorl you received tt* exemp(kA unless you have Improved your property rby adding memo other brJiklrnps. Pod. etc.) it you fo.-I ,any rtGm of lnformation an this form is incorrect. or if you disagree with this ytgfs Proposod value fur your property. Contact the appraisal odka Utsme ilaiely. d the problem Cannot be rmlye'd. you have .t right to appeal to the Apprassal R"4w Board (AA8). In order to appeal. you must vie a WFtrrm protest with Lha ARS on or before 06120/93 You can got a protest form from the appraisal diWet omco at 1715 211th Street Lubbock Texas. 11 The Ar:', 14 begin hel*v on 06 / 1419 3 • You wX be roW od of the Cave, rims an0 place )vw hoot" is vam4l led. i In e301. 1 ixing t.nR tistctl. Wo goverrwV be* decbes whg;).w property teres mcresse. The appraisal atfflro detelmUWS only It% value of CZ, .if you object w irtc►aasrr taxes or govemment vontidnp. you shouhl conlact trw taaft umWt goveming body. You shoed contact C ap A a(" and ARD orrty � yaw proposed onwrty ,,slue or eumrxlons. THIS IS NOT A TAX BILL PLEASE 00 NOT PAY FROM THIS NQTICE 41 aoonoa 2r1i21CY w A060CIA766, i110. re"t "m r"Na 1r Tom a --w rw"4w'*104 T7r1 M1s0va1L KAW 4ommob.10k MM 0r r.. rMsoaAY-M Tl�e 20..i�.N N LSM,h 4A*40A1-` "kava 1065 61rOfaclnb�Arrq�ld !00.02061 NMco7JMW 1M#62yrci►iwd14w01*1 it"Flail 700.8 194 1691 Vrl� f�crW 1900 O Meld. TK Ammamt0977705 Jre�Klon Acer T ROW Tawr � 74.M Two IOf4FLnl 1965MR� _ i400 21lfi 100M + fJJMOdLCd.1111'V �-� A.M#dlaa 10i�►t.1� 4�a74bQ t16Rita MA55u91 *Aa 9400 ©.2M7Ma• 0Af01Mo- 01,17aLi0• 10011Vw6A& /baa.a�d 100MMdw 1A.t49�1Oa 1 Aw.04 X04 1l,al. 7� 1.Oi6,tm 11 Ia11AOQ[CITY 6.w4o6ao 90.tb1! Id!: 7.43 p.44b9000 1JNio6D0 if =1 57,6�19F LR#A2'p- i7e.ML7?• !'14 14 ,1 � Ll1MOCKtID 1-6110000 2.29054100 �R 1.09 6A4§ Mises 071,I7aAM Ts MA4ti11ai 1Ai1*.2m 1ion'sas 11176.106 27A70,i00 12".104 Taft* #.461M0 514M9AN 2A"S M 24 An" tfeim)" *Ao OMA APM FAV 6'M/ fs90 21r*rs NdAMM O s 69059w 117.7tL99 1imi m0 mw.1 % x07 0.60 6A09i606O 610y94A0' 4112x 6.&4 22419046700 1064 i414r: OcrdAmmWd 6.1646E ejew � Roo! 4.f100110 0&%B?.lMOF Od}Okit ,6pTa20V0e19F lIVIA TX L11si0ai/1.A1f1 2i19,0M6F 11lIA:07A0la1' 1 A 0wc" Hft7WAV'.IL1C. T111ru.t..isM++o 18 M 0ldrlie, fX AOa2uNt M 1750040D004E 1010 R1u 1016 ToM• 1004 1'nr. fe"" w 1006 /r .wl 1000 f'M� LLM*MKGO1MM Mer rr 0. 5#0000 sr &S8 OA M7000 4.50iL42 �. 41A0 0.!947121• #,767.40` 10,s1A.7w 1OM�VMr _A�_w+rl 105 VAM _ a+rrr� 96 VAM Ar Oi ter. meamemY 0.0440400 7x041, t9 0ti0920000 Oy0 M.ls -6100 00 Or0101ew i 1 AM1i00• liyd k 11141,!60 1 fN � 1.146.700 1 p?00 1JI4L709 1 LU OCK �.#7-60000 1rA71.1s / 4EsulsDa !! Od 377,64Re1 *AD ,._ &4wo19� 36.MaAe . -6 Tw&& 2!16400 l0,i1rRR L441N00 fi 1 0,179 1AM1179 1.6217.'70 � x76 tAl 0$76 t 1�?771 411 Aem:. Kwhy OV f 465 6e.iuc 14•r••W Awr01.4 alam 6700 106# kalm rrw�dMrA4� LSM,h 4A*40A1-` "kava 1065 61rOfaclnb�Arrq�ld !00.02061 NMco7JMW 1M#62yrci►iwd14w01*1 it"Flail 700.8 1625P44 -000�� Am id Vrl� f�crW 100%Yak» /wpw-w L: 66`676 23A70 t 1,141,300 * 1,141,200 I A4a,7a0 1�i7 700 6!.676 3x470 1.647,700 1 &j&jW Ta !!!tc 1�t6.179 1,!25.17! fA7076 1.027AA 1.0!7.6711 1.627,76 p: tO."SAO6 lo'!w" 11.076,106 11)075.1410 11 -675,100 11076,IOD Ti 11AA/ rM H.672y070 1! 701 070 12.702,590 11.711 M 77303)070 L: 17A26.O7 5 AC 17AMA7 &AC 17�12l40TMC G 10MM VIA* W. 57,6�19F PC PP. 14.04 i8f 110.56165 1645 I5F 120AD ISE 1&01r - 121LIM F 1'1 2.29054100 TSo.ia 1x2: 445.629F it94 16M low JrOA/ire1M 11ac+-- rww#-�^ Ta !!!tc !bM Taw _ ^OtO6M090 6i'A06,51 0.107000 MAA" 390 020~7764x' 47.4"-w LU69OCKCCUMV LPJNG KIM" *6000/60 74x079,!7 OAM0000 7"MA0 ! a" 0.06 a,0101M4- 70,140-24- - -- fA002004• Et ' IJU69001(IM 1X)10000 i 709!!1 i0 IA4M wrd F.1. .... 1. 2.29054100 20AlM0= 2A61OM 67-6'#6x6# 0AO 2AN190s' 60�44iA0• 171.166.600 hw++e.1/10a11s1 2_00660 2.MMO0 tfeim)" *Ao 1A491*►a• TMir s 69059w 117.7tL99 1imi m0 mw.1 % x07 0.60 6A09i606O 610y94A0' 4112x 6.&4 6.1646E ejew