Loading...
HomeMy WebLinkAboutResolution - 4811 - CO #8 To Contract - BRB Contractors Inc-SEWRP Contract 4 - 04/27/1995Resolution No. 4811 April 27, 1995 Item #7 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock Change Order No. 8 for Southeast Water Reclamation Plant Contract 4 by and between the City of Lubbock and BRB Contractors, Inc., attached hereto, which shall be spread upon the minutes of the Council and as spread upon the minutes of this Council shall constitute and be a part of this Resolution as if fully copied herein in detail. Passed by the City Council this ATTEST: Lm;: a (:�" L' Betty M. Johns , City Secretary APPROVED AS TO CONTENT: Ellerbro' , irector of Water Utilities APPROVED AS TO FORM: AOF) C�A L-AjeYt(7-5 ',� ) V'�W 2�7 ld G. Van Iver, First ssistant City Attorney DGV:da ccdocs/CQ8-BRB.res April 13, 1995 Resolution No. 4811 April 27, 1995 Item #7 LUBBOCK. TEXAS . SOUTHEAST WA'T'ER RECLAMATION PLANT IMPROVEMENTS (MNTRACT 4 - WATER RECLAMATION PLANTS 2 & 3. LABORATORY IMPROVEMENTS AND DEMOLITION OF PLANT 1 CHANGE ORDER NO. 8 SCOPE. This Change Order No. B covers the following change to the Contract Documents: Deduct iumP sum for a reduction in the quantity of landscape gravel to be installed. as indicated on the attached drawing. A PVC landscape edger shall be installed at all locations where the landscape gravel terminates adjacent to soil surfaces. Completion of the concrete landscape curb is required in the area of the existing dant 3 headworks. REASONS FOR CHANGE: A lump sum deduct is included for the reduction in the quantity of landscape gravel to be installed under this Contract 4. The areas where the landscape gravel will be eliminated are areas that could be easily mowed and maintained by the City_ In addition, the areas are subject to possible vehicular traffic, future plant expansion, or material storage, which would negate the use and performance of the landscape gravel. Grass could be planted by the City in the areas where landscape gravel is eliminated, following construction activities. Attached to this Change Order is a copy of Black & 'Veatch letter F-23, dated March 09, 1995, and BRE letter dated March 30, 1995, concerning the proposed change. BASIS FOR CHANGE: Reduce the amount of landscape gravel to be installed, and install landscape edgers and curbs, all as outlined in this Change Order, for a lump sum deduct of $51,003.00. f LUBBOCK. TEYAE ) (17-78.440 i w CF-kN ,E ORDER NO. 8 i COB -1 CHANGE TO CONTRACT PRICE.. Original Contract Price Current Contract Price adjusted by Previous Change Orders Contract Price due to this Change Order will be decreased by New Contract Price including this and previous Change Orders To date percent of original Contract Price $10,185,000.00 $10,278,580.98 $ 51,003.00 $10,327,577.98 0.42% CHANGE T4 CONTRACT TIME. The Contract Time for this contract remains unchanged. AGREED to this 27th day of BRB CO TRAORE. INC. BY 1�b �ll1�c-i r7 Title C, - ( LUBBOCK. TEXAS ) ( 17576.440 3 (CHANGE ORDER NO. 8) ATTEST: etty . Johnso , City Secretary APPROVED AS TO CON ENT: Terry Ellerbr Director of Water Utilities APPROVED ASTOFORM: ` [ (\�f', ---- '��&&. Y, _Y�,V1.1L JVD,► "ryrt D6Kald G. Vandiver; `-� First Assistant City Attorney COs -21 r- O p.. BLACK & VEATCH 5728 LBJ Freeway, Suite 300, Dallas, Texas 75240, (214) 770-1500, Fax: (214) 770-1544 Lubbock, Texas Southeast Water Reclamation Plant Contract 4 SRF Project 3104-004 BRB Contractors, Inc. P.O. Box 12107 Lubbock, Texas 79452 Attention: Mr. Ken Dedmon: B&V Project 17578.540 B&V File G-4.02(Sitework) March 09, 1995 Letter No. CP -23 Subject: Reduction of Landscape Gravel at Plants 1, 2, and 3 Please provide a credit proposal to revise the quantity of landscape gravel to be placed at plants 1, 2, and 3 as shown on the attached sheet. A pvc landscape edger shall be installed at all locations where the landscape gravel terminates adjacent to soil surfaces, including the area north of the headworks where landscape gravel was placed under Contract 2. Your cost proposal should be sufficiently detailed to allow a thorough review. If you have any further questions, please contact us. Very truly yours, SLACK & VEATCH ', Steve W. Keeling cc: Mr. Terry Fllerbrook w/att Mr. Henry Day w/att Mr. Bill Carroll w/att File ✓ lie I E3 BUFFALO GRASS ,Q-14,vr- & C, /-V 75WVXs G LAYOUT LAYOUT BR B Contractors, Inc. HEAVY AND UNDERGROUND CONSTRUCTION Phone (913) 232-1245 400 N.W. Curtis Street Fax # (913) 235-8045 wa BLACK & VEATCH 5728 LBJ Freeway, Suite 300 Dallas, Texas 75240 P.O. BOX 8128 TOPEKA, KANSAS 66608-0128 MARCH 30, 1995 Attention: Mr. Sterne W. Keeling Regarding: Southeast Water Reclamation Plant Contract No. 4 - Lubbock, Texas Project No. 2133-553103-9776 Dear Steve: Per you cost proposal request number 23, we offer the following: • Deduct approx. 221,434 50t. ft. of landscape rock = -$53,144 • Add approx. 9,213 out. ft. of buffalo grass = $ 1,013 • Add approx. 400 In. ft. puc landscape edger = $ 505 • Add approx. 155 In. ft, of concrete landscape curb = 620 • TOTAL ALL ITEMS THI5 PROP05AL = 0103 .4 51,003 If there should be any further questions, please do not hesitate to call. Sincerely, BRB CONTRACTORS, INC. Ken Dedmon, Project Manager [contact thru jobsite office @ 806-744-7661 or 744-6838 (fax)] cc: Terry Ellerbrook, City of Lubbock Henry Day, City of Lubbock Bill Carroll, BBV - Dallas Topeka file job file