RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock is hereby authorized and directed to
execute for and on behalf of the City of Lubbock,Amendment No. 1 to that certain
Professional Services Contract for consultant services related to reviewing,evaluating,
designing and implementing water and wastewater cost of service,rates, and financial
models,by and between the City of Lubbock and NewGen Strategies and Solutions,LLC,
and related documents.Said Contract is attached hereto and incorporated in this
Resolution as if fully set forth herein and shall be included in the minutes of the City
Council.
Passed by the City Council on May 25 _,2017.
DANIEL M.POPE,MAYOR
ATTEST:
>£&&L&
Rebecp Garza,City Secretary
APPROVED AS TO CONTENT:
Aubrey A.Speay;P.E.,Director4)f Water Utilities
APPROVED AS TO FORM:
RES.Amend 1-Prof Serv Contract-NewGen Strategies and Solutions,LLC
(4-28-17)
Resolution No. 2017-RO184
AMENDMENT No. 1
to
PROFESSIONAL SERVICES CONTRACT
This Amendment No. 1 to Professional Services Contract ("First Amendment"), is
entered into this 25th day of May 2017, by and between the CITY of Lubbock, a Texas home
rule municipal corporation (the "CITY"), and NewGen Strategies and Solutions, LLC (the
"CONSULTANT") a corporation authorized to conduct business in Texas.
WITNESSETH
WHEREAS, the CITY and CONSULTANT entered into a certain Professional Services
I
Contract, dated January 28, 2016, Resolution No. 2016-R0032 ("the Original Contract"),
I
wherein the CITY contracted with CONSULTANT to perform activities related to reviewing,
evaluating, designing and implementing water and wastewater cost of service, rates, and
financial models;
WHEREAS, the CITY and CONSULTANT now desire to amend the Contract to, among
other things, substitute the scope of services, that contemplates related, but originally
unanticipated, work provided in the Original Agreement, as amended.
NOW, THEREFORE, for good and valuable consideration, the receipt and sufficiency of
which is hereby acknowledged, the City and CONSULTANT agree as follows:
1. ARTICLE I of the Original Agreement, as amended, is deleted in its entirety, and is
replaced with the following:
The term of this Contract commences on the Effective Date and continues without
interruption until February 1, 2018. If the CONSULTANT determines that additional
time is required to complete the Services, the Director of Water Utilities may, but is not
obligated to, in his discretion, execute an agreement to grant up to an additional six (6)
Amendment No.1 to Professional Services Contract
City of Lubbock and NewGen Strategies & Solutions, LLC Page 1
months of time so long as the amount of the consideration does not increase. An
amendment to this Agreement resulting in an increase in the amount of the consideration
must be approved by the CITY acting through its governing body.
2. ARTICLE II of the Original Agreement, as amended, is deleted in its entirety and
replaced with the following:
A. CONSULTANT shall conduct all activities and within such timeframes as set
forth on Exhibit "A", attached hereto (the "Services").
B. CONSULTANT shall receive as consideration to be paid for the performance
of the Services set forth in Exhibit "B", for a lump sum price of one hundred forty-five
thousand dollars ($145,000).
3. "Exhibit A, Scope of Services", "Water & Wastewater Cost of Service & Rate Structure
Evaluation," of the Original Agreement is hereby deleted in its entirety and replaced by
the new "Exhibit A, Scope of Services," attached to and made a part of this First
Amendment, and constitutes the scope of work to be completed.
4. The attached new Exhibit B of this First Amendment, "Payments of Fees," is substituted
for all fees and compensation items, contained in Exhibit "B" to the Original Agreement.
5. Except as amended hereby, the terms and conditions of the Original Agreement shall
remain valid and subsisting as originally provided.
IN WITNESS WEREOF, the parties have executed this First Amendment by their duly
authorized representatives as of the date first written above.
Amendment No. 1 to Professional Services Contract
City of Lubbock and NewGen Strategies & Solutions, LLC Page 2
CITY OF L: K
Daniel M. Pope, Mayor
ATTEST:
Reb ca Garza, City Secret y
APPROVED AS TO CONTENT:
�2 � at L" C
Aubrey A. Spe E., Direct r of Water Utilities
APPROVED AS TO FORM:
Arn,
NewGen Strategies & Solutions, LLC
Chris Ekrut, Director
Amendment No. 1 to Professional Services Contract
City of Lubbock and NewGen Strategies & Solutions, LLC Page 3
EXHIBIT A
SCOPE OF SERVICES
WATER & WASTEWATER COST OF SERVICE & RATE STRUCTURE EVALUATION
CITY OF LUBBOCK, TEXAS
PROJECT OVERVIEW
For this project, the consultant will collect, analyze, and evaluate data associated with the Water and
Wastewater Funds. This data will include past, present, and projected revenue requirements. In addition,
cost of services including debt service coverage data will be evaluated. Appropriate financial models will
be developed to evaluate various rate structure scenarios to confirm the adequacy of the current rate
structure. Based on the information analyzed and evaluated, recommendations regarding the effectiveness
of the current water and wastewater rate structures will be developed. Final recommendations will be
presented to City Staff and the Water Advisory Commission.
TASK I — FIVE-YEAR FINANCIAL PLAN & REVENUE REQUIREMENT
IDENTIFICATION
Task 1 of the proposed scope of services will establish the overall revenue needs of the water and
wastewater utility. The goal of this Task will be to establish a financial plan for Fiscal Year (FY) FY 2017
through FY 2021, utilizing a Test Year of FY 2016. The financial plan for the utility will incorporate the
capital needs of the utility, reflective of the City's planned funding method (i.e., debt, cash, reserves, grants,
etc.). It will also seek to define the revenue needed to meet the City's defined financial metrics including
required debt service coverage. Task I will be executed via the subtasks outlined below:
1.1 Development of Initial Data Request
The Project Team will develop an initial data request that will be needed to adequately begin the review
and evaluation of the City's water and wastewater rates. This data will include, but is not limited to,
operating, financial, contractual, management, policy, and ordinance data. The purpose of the initial data
request is to gather the necessary data to conduct the Study and to ensure the Team has a good understanding
of the City's current operating conditions. The Project Team will issue the initial data request within five
(5) days after receiving notice to proceed on the project.
1.2 Initial Data and Information Assessment
Once the City has submitted the initially requested data, the data will be reviewed for discussion during the
project kick-off meeting. Throughout the course of the project, data received by the Project Team will be
sampled and tested for accuracy. The sampling and testing of data is imperative in regards to the billing
data used to set rates. It is also essential that the billing data be as accurate as possible in the development
of proper cost allocations and reliable revenue projections. The Project Team will work closely with the
City's billing staff and software provider to extract the appropriate billing data. In addition, as necessary,
the Project Team will conduct informal interviews with City staff during our review of the historical data
to ensure that the Project Team understands the information provided.
Water & Wastewater Rate Structure Evaluation City of Lubbock
costs may be influenced by the City's wastewater permits and current industrial strength wastewater
program.
It should be noted that these are the Project Team's proposed classification methods. Discussions will be
held with City staff to determine the appropriate classification methods to utilize in recognition of the City's
goals and objectives and available system and billing data.
2.3 Allocation of Revenue Requirements
One of the most important considerations in the setting of fair and equitable rates for utility service is the
establishment of the appropriate grouping of customers (i.e., customer classes for cost distribution after
costs are classified). Generally, a customer class should only include those customers who: (a) are in a
similar location in relation to the utility; (b) use the same or similar service from the utility; and (c) receive
similar service from the utility and place similar demands upon the utility. The Project Team will analyze
the usage patterns of the presently defined customer classes in the above context and evaluate whether a
new classification of customers should be recommended.
Costs within each utility will be allocated to the selected customer classes based on each customer class'
level of service provided by the City. It is vital that the factors that form the basis of costs incurred by the
City to provide continuous and adequate service to its customers be appropriately identified.
This identification requires a thorough understanding of the influencing conditions controlling the design
and/or actual operation of a system. These conditions include normal and peak weather conditions as well
as average and peak service demands. Members of the Project Team are versed in appropriately identifying
these costs and are recognized experts before the State's rate regulatory agencies. The factors for the
allocation of costs to the customer classes will be dependent on the billing and system information available
from the City. The final selection of customer classes and allocation methodologies will be discussed with
the City.
2.4 Task 2 Overview Report
At the completion of Task 2, the Project Team will prepare a summary report of the work completed. This
will include a discussion of the Cost of Service process inclusive of the allocation methodologies utilized
and any assumptions made by the Project Team. The report will include a comparison of the cost of service
by customer class as compared to the level of revenue currently generated by class under existing rates.
This will provide the City with an estimation of the overall revenue adjustments necessary to bring a
customer class in -line with its calculated cost of service. In addition, the report will also include an analysis
of the stability of the City's revenue stream. Specifically, the Project Team will compare the utility's
existing debt service obligations with the level of revenue generated under minimum charges. Additionally,
we will also compare the level of fixed charge revenue generated against the allocated excess capacity and
customer related costs, as well as the revenue generated under the volumetric rate with the average day
allocated costs. This will provide an estimation of the adequacy of the City's base water and wastewater
charges, which will further be evaluated as part of Task 3.
On completion, the draft report will be provided to City staff for review and comment, which will be
discussed with City staff via teleconference. After receipt, staff comments will be incorporated into the
final overview report.
The Project Team is keenly aware of the sensitive nature of a cost of service analysis. Many times, the
analysis will produce a result which is not politically appealing and can be cause of significant stakeholder
outcry. While the Project Team anticipates presenting the results of Task 2 to the Water Advisory
Commission and has priced such a presentation into the enclosed price proposal, the Project Team will
Water & Wastewater Rate Structure Evaluation City of Lubbock
work directly with City staff to outline an appropriate strategy for this presentation to ensure minimal
stakeholder impact.
Task 2 Deliverables:
Task 2 Overview Report and teleconference with City staff
Task 2 Work Session with Water Advisory Commission'
TASK 3 — RATE STRUCTURE EVALUATION
On completion of the cost of service analysis, the Project Team will begin an in-depth review of the City's
current water and wastewater rate structures. At present, the Project Team understands the City utilizes a
customer's average winter consumption (AWC) to determine the first block charge under an inclining block
water rate structure. Further, the City's base charges have been decreased steadily over the years, leading
to concerns about the stability of the overall revenue stream. During Task III, the Project Team will evaluate
the overall effectiveness of the current rate structures and will provide recommendations for amendment.
The following outlines the key subtasks as part of Task III.
3.1 Evaluation of Current Rate Design
Based on the City's initial request for qualifications, the Project Team understands the primary pricing
goals and objectives of the City at this time include revenue stability, affordability, and water conservation.
These pricing objectives are particularly important given the reduction the City has experienced in per
capita consumption, coupled with the downward adjustments made to the base (minimum) rates charged
by the utility. The reduction seen through water conservation and overall efficiencies in water use can have
a negative impact on revenue stability. Sufficient monies must be collected in minimum charges to offset
declines in consumption, but the level of minimum charges must be carefully balanced with customer
affordability, particularly for low and/or fixed income customers who are typically more heavily impacted
by the level of minimum charges.
At the outset of Task 3, the Project Team will perform an evaluation of the current rate structure's ability
to achieve these goals and objectives. We will also develop a listing of strengths and weaknesses of the
current rate structure, as well as potential structural changes which may better achieve these goals and
objectives.
On completion of the evaluation, the Project Team will prepare a memorandum of our analysis and provide
to City staff for review. After receiving and incorporating staff s comments, we propose to include this
memorandum as part of the presentation to the Water Advisory Commission performed at the end of Task
II. Through dialogue with the Water Advisory Commission, we propose to develop a formal rate and fee
design plan which will be used to guide our completion of Task 3. In developing the rate and fee design
plan, the Project Team will also discuss with the Water Advisory Commission any limitations and/or
guidelines when incorporating the cost of services results developed in Task 2 into the alternative rate
design. For example, if it is not politically feasible to move immediately to cost of service based rates for
a particular class of customers, we will seek to set bounds on the overall changes seen by a customer class
and/or identified group of customers.
' In an effort to perform the Study in the most cost effective manner, the Task 2 work session will include a
discussion of the memorandum proposed to be developed as part of Task 3.1
Water & Wastewater Rate Structure Evaluation City of Lubbock
3.2 Development of Alternative Rate Design
Based on the rate and fee design plan developed in Task 3.1, the Project Team will develop alternative rate
designs for the City's consideration. Please note that the proposed pricing included herein anticipates up
to two (2) alternative water rate designs and up to two (2) alternative wastewater rate designs. Additional
rate designs requested to be analyzed and/or developed will be provided at a to be negotiated price.
3.3 Determination of Realizable Revenue with Alternative Rate Structures
The Project Team will analyze and compare the revenues forecasted to be generated under alternative rate
structures to the forecasted cost of service to determine the adequacy of the alternative rate structures to
meet the City's financial goals, including bond coverage requirements and operating and capital reserves.
In the revenue determination, adjustments will be made to the historical billing data to reflect normalized
weather conditions and usage. Additionally, when projecting revenue under the alternative rates, the Project
Team will incorporate the estimated impact of elasticity of demand within the revenue projections.
Elasticity of demand is the economic concept that recognizes the relationship between the quantity
demanded of a good and a change in the price of that good. Failure to recognize this relationship,
particularly with regards to water sales, can result in an inaccurate estimate of revenue on a going forward
basis. The Project Team will presume industry standard, long-term elasticity standards within its
calculations. Finally, the monthly impact on customer bills under the alternative rate structures will also
be examined along with the impact to the City's revenue stability.
3.4 Rate Comparison Review
The Project Team will compare the City's current and proposed water and wastewater utility rates and
resulting monthly bills to utility rates of municipal utilities of similar size, demographics, geographic
location, and/or operational characteristics so as to provide an estimation of the City's comparable and
competitive position.
3.5 Task 3 Overview Report
At the completion of Task 3, the Project Team will develop a report summarizing the current rate structure
evaluation, the rate and fee design plan, and the recommended alternative rate structures for consideration.
On completion, the draft report will be provided to City staff for review and comment, which will be
discussed with City staff via teleconference. After receipt, staff comments will be incorporated into the
final overview report, with a presentation of the report to the Water Advisory Commission.
Task 3 Deliverables:
Memorandum discussing Current Rate Design Evaluation
Memorandum outlining the City's Rate and Fee Design Plan
Task 3 Overview Report and teleconference with City staff
Task 3 Work Session with Water Advisory Commission
TASK 4 — ADMINISTRATIVE RECORD OF PROJECT
A clear administrative record, or report, of a Water and Wastewater Rate Study has become a key element
in supporting and defending the rate action of a municipality. Recently, a City in California saw its rates
challenged by customers and ultimately overturned. One element of the judicial ruling against the City's
6
Water & Wastewater Rate Structure Evaluation City of Lubbock
rates was the fact that the rates adopted were not based on a written report — referred to in the judgement as
an Administrative Record. While cities in Texas enjoy original rate jurisdiction, a clearly written,
comprehensive administrative record of a project is highly recommended to support rate action taken by
the City.
To fully obtain customer buy -in and ensure compliance with legal precedent, a clear record of the
assumptions and methodologies employed as part of the analysis must be developed, along with a record
of the key decision points and outcomes which occurred throughout the conduct of the analysis. To ensure
the proper development of an appropriate administrative record, the Project Team will develop a final report
for the project which will include each of the overview reports and presentations developed from the prior
tasks. The final draft report will include an Executive Summary, as well as the inclusion of all necessary
tables, charts, and worksheets needed to fully understand and comprehend the study.
Once completed, the final draft report will be provided to City staff for review and comment. Upon receipt
of City staff edits and comments, the report will be finalized with electronic and hard copies provided to
the City for full dissemination to the City Council and the public, as deemed appropriate. The Project Team
will also present the findings and recommendations of the Study to the City Council in a workshop setting.
The Project Team will participate in up to two on -site meetings with the City Council.
Task 4 Deliverables:
Electronic and Hard Copies of Draft Report
Electronic and Hard Copies of the Final Report, reflective of City Staff edits and comments
Presentation to City Council (Up to two meetings)
TASK 5 — FINANCIAL FORECASTING & RATE MODEL
DEVELOPMENT
The development of a financial forecasting and rate model for City use will occur throughout the course of
the project. Once the project has been finalized, the Project Team will work to form this model into a "user-
friendly" program for use by City staff.
NewGen prides itself in developing user-friendly models which are specific to, and reflect the unique
operational characteristics of, each client. While our Project Team utilizes standard best practices in
developing rate models, each model we develop is unique and does not reflect a "canned" or "off -the -shelf
product. Given the unique nature of each of our clients, we believe it is important that the product produced
as part of a rate study also be unique and reflective of our client's overall goals and objectives.
The model provided to the City will be built so as to be compatible with Microsoft Excel 2010 or newer
versions. Within the model itself, the user guide will be built-in so as to ensure that a user has immediate
and constant access to instructions on the model's function. All assumptions will be presented in blue font
and all calculations/results presented in black font so the user is aware of fields that can be amended.
Additionally, both a fully protected version and an unlocked version of the model will be provided to ensure
staff has a tool that can be deployed to all classes of user, from novice to advanced.
The City's model will allow staff to run "what -if' scenarios including, but not limited to, changes in
operating, capital and wholesale costs, customer and volume growth or decline, debt service structure,
source costs, inflation, capital project financing, and funding sources. The model will allow the user to
assess the impact various scenarios will have on an existing typical monthly bill for each class of customer.
The model will also generate financial statistics such as debt coverage ratios and average dollar and
Water & Wastewater Rate Structure Evaluation City of Lubbock
percentage change for each customer class. A visual dashboard will also be included within the model to
assist City staff in communicating key financial and performance metrics, as defined by City staff, with the
City's key decision -makers.
To ensure the model is fully useable by staff, the Project Team will conduct a hands-on training session
with key model stakeholders when the model is delivered and will discuss every worksheet within the model
and fully demonstrate its functionality.
Task S Deliverables:
Electronic copy of Financial Forecasting and Rate Model
On -site, hands-on training session with City staff
TASK 6 — RATE IMPLEMENTATION SERVICES
Given the complexities associated with the City's planned billing system conversation, coupled with the
proposed new rate design, the Project Team agrees to assist the City in providing needed services related
to the implementation of the alternative rate design structure. Such services will include updating rate
calculations as necessary to reflect the fiscal year in which initial application is to occur, modifying
completed work products and financial models as necessary to reflect final agreed upon implementation
dates and timelines, and assisting in developing and presenting materials explaining planned
implementation steps to the Water Advisory Commission and/or City Council.
Task 6 Deliverables:
Updated rate calculations as necessary reflective of planned implementation
Modifications to Financial Forecasting and Rate Model reflective of planned implementation
One (1) additional meeting with City Council or Water Advisory Commission, as may be needed,
to assist in rate implementation
PROPOSED ADDITIONAL SERVICES
The scope of services outlined above reflects the activities the Project Team believes are necessary to meet
the goals and objectives outlined by the City. However, we recognize that additional services may be
desired by the City to increase stakeholder communication and buy -in throughout the process, or to expand
the analysis beyond simply water and sewer rate revenues. Such services may include, but may not be
limited to, those outlined in detail below.
Please note that the not -to -exceed project fee proposal included herein does not include any of these
additional services at this time.
Additional Service 1 — Cost of Service and Rate Design 101 Workshop
Depending on the involvement of City leaders and decision -makers, the Project Team has found it useful
in past studies to conduct a Cost of Service and Rate Design 101 workshop. Such a workshop would
introduce key stakeholders to the Cost of Service and Rate Design process including key terminology and
methodological processes, and provide them an overview of what to expect from the study. This workshop
can also be used as a means by which to gather policy direction from the Water Advisory Commission
and/or City Council members, or to begin to outline and consider the potential pricing objectives to be
included in Task 3. A 101 workshop can best be described as a foundation upon which the remainder of
the study is built. It serves as a key introduction to the process and can be a useful step to obtaining buy -in
at the outset of the study.
Water & Wastewater Rate Structure Evaluation City of Lubbock
Additional Service 2 — Additional Meetings
As evident above, there are a number of meetings with the Water Advisory Commission and City Council
that have been included within the Standard Services. However, we recognize that additional meetings
may be necessary with either body, or with others within the community. Our Team stands ready to support
the City as necessary and can be available to attend additional meetings as requested.
Additional Service 3 — Stakeholder Engagement Effort
For a study such as this to be as successful as possible, ongoing and open communication between the
Project Team and Stakeholders much occur. This includes, but is not limited to, community with the City
Council, Water Advisory Commission, City staff and, as necessary, communication with the City's
customers.
Our Project Team understands the complexities and challenges that stakeholder involvement can bring to a
Project, and is happy to assist the City in a more extensive stakeholder engagement effort or Citizen
Education Plan. Such a plan could include, but would not be limited to:
Public Presentations and/or Question and Answer Sessions conducted throughout the Community;
Presentations and/or Speaking Engagements with local Homeowner's Associations;
Development of white papers and/or citizen education pamphlets, newsletters, or press releases; and/or,
Development of bill calculation tools for deployment on the City's website.
Additional Service 4 — Miscellaneous Service Fee Evaluation
Based on our understanding of the proposed project, the City is most interested in an analysis of the current
water and wastewater rates. However, the utility may charge other fees for miscellaneous services
including, but not limited to, meter tap fees, disconnect / reconnect fees, and late fees. While the revenue
stream from such fees is generally minor, maintaining these fees as adequate levels is an important part of
utility financial management. The Project Team is well versed in these miscellaneous fee types and can
include an evaluation of their adequacy within the scope of services as requested.
Water & Wastewater Rate Structure Evaluation City of Lubbock
PROPOSED PROJECT SCHEDULE
Based on the Standard Services outlined above, and assuming notice to proceed is received by the Project
Team by February 1, 2016, the Project Team anticipates the starting and completion dates for each Task as
noted in the table below. Please note that the Project Team's ability to meet these deadlines will be
dependent on the timely receipt of accurate data as requested by the Project Team and the availability of
City staff, the Water Advisory Commission and/or the City Council for the meetings indicated herein.
Task
No
Task Descriptioii
�kl
Starting Date
CompletionD.
I
Five Year Financial Plan and Identification
February 1, 2016
April 1, 2016
of Revenue Requirements
2
Cost of Service Analysis
April 4, 2016
May 20, 2016
3
Rate Structure Evaluation
May 23, 2016
July 15, 2016
4
Administrative Record of Project
July 18, 2016
August 31, 2017
5
Financial Forecasting and Rate Model
August 8, 2016
August 26, 2016
Development
6
Rate Implementation Services
May 1, 2017
August 31, 2017
10
Water & Wastewater Rate Structure Evaluation City of Lubbock
EXHIBIT B
PAYMENT OF FEES
WATER & WASTEWATER COST OF SERVICE & RATE STRUCTURE EVALUATION
CITY OF LUBBOCK, TEXAS
The City shall pay Engineer for services set forth in Exhibit A on a lump sum basis by task, as indicated
in the attached schedule below. The Engineer will invoice the City monthly based on estimated percent
complete of each task. The final payment for Task 5 will be paid upon receipt by the City of all
deliverables for this Project.
Task
Description
Task Budget
Task 1
Five Year Financial Plan and Identification of
Revenue Requirements
$ 31,663
Task 2
Cost of Service Analysis
$ 35,246
Task 3
Rate Structure Evaluation
$ 33,970
Task 4
Administrative Record of Project
$ 15,341
Task 5
Financial Forecasting and Rate Model
Development
$ 7,780
Task 6
Rate Implementation Services
$ 21,000
Total Fee
$145,000
Attachment A includes a detailed breakdown of the anticipated hours and costs by task as well as the
anticipated out-of-pocket expenses to be incurred.
11
Water & Wastewater Rate Structure Evaluation City of Lubbock
CERTIFICATE OF INTERESTED PARTIES
FORM 1295
1of1
Complete Nos. 1- 4 and 6 if there are interested parties.
OFFICE USE ONLY
Complete Nos. 1, 2, 3, 5, and 6 if there are no interested parties.
CERTIFICATION OF FILING
Certificate Number:
1 Name of business entity filing form, and the city, state and country of the business entity's place
of business.
2017-206695
NewGen Strategies and Solutions, LLC
Richardson, TX United States
Date Filed:
05/12/2017
2 Name of governmental entity or state agency that is a party to the contract for which the form is
being filed.
City of Lubbock, Texas
Date Acknowledged:
05/15/2017 V
3 Provide the identification number used by the governmental entity or state agency to track or identify the contract, and provide a
description of the services, goods, or other property to be provided under the contract.
12538 (Amendment)
Water and Wastewater Cost of Service and Rate Design Study
4
Nature of interest
Name of Interested Party
City, State, Country (place of business)
(check applicable)
Controlling
Intermediary
Georgis, Anthony
Lakewood, CO United States
X
Yanke, David
Austin, TX United States
X
Ekrut, Christopher
Richardson, TX United States
X
Hughes, Nancy
Sammamish, WA United States
X
Lane, Mike
Brentwood, TN United States
X
Mancinelli, Joseph
Lakewood, CO United States
X
5 Check only if there is NO Interested Party. ❑
6 AFFIDAVIT I swear, or affirm, under penalty of perjury, that the above disclosure is true and correct.
Signature of authorized agent of contracting business entity
AFFIX NOTARY STAMP / SEAL ABOVE
Sworn to and subscribed before me, by the said this the
day of
20 , to certify which, witness my hand and seal of office.
Signature of officer administering oath Printed name of officer administering oath Title of officer administering oath
Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.0.883
CERTIFICATE OF INTERESTED PARTIES
FORM 1295
l of l
Complete Nos. 1- a and 6 if there are interested parties.
OFFICE USE ONLY
Complete Nos. 1, 2, 3, 5, and 6 if there are no interested parties.
CERTIFICATION OF FILING
Certificate Number:
1 Name of business entity filing form, and the city, state and country of the business entity's place
of business.
2017-206695
NewGen Strategies and Solutions, LLC
Richardson, TX United States
Date Filed:
05/12/2017
2 Name of governmental entity or state agency that is a party to the contract for which the form is
being filed.
City of Lubbock, Texas
Date Acknowledged:
3 Provide the identification number used by the governmental entity or state agency to track or identify the contract, and provide a
description of the services, goods, or other property to be provided under the contract.
12538 (Amendment)
Water and Wastewater Cost of Service and Rate Design Study
4
Nature of interest
Name of Interested Party
City, State, Country (place of business)
(check applicable)
Controlling
Intermediary
Georgis, Anthony
Lakewood, CO United States
X
Yanke, David
Austin, TX United States
X
Ekrut, Christopher
Richardson, TX United States
X
Hughes, Nancy
Sammamish, WA United States
X
Lane, Mike
Brentwood, TN United States
X
Mancinelli, Joseph
Lakewood, CO United Slates
X
5 Check only if there is NO Interested Party. ❑
6 AFFIDAVIT I swear, or affirm, under penalty of perjury, that the above disclosure is true and correct.
v'a�4, LAUREE KIELY
:Notary Public, State of Texas ;
Comm. Expires 10-12-2020
n,,,,,Notary 10 126674008 1S gnature o aufhori ed agent of contracting usiness entity
AFFIX NOTARY STAMP / SEAL ABOVE
Sworn to and subscribed before me, by the said C� It S� [�Jrt�1y •%Cl this the a day off_,
20 17 , to certify which, witness my hand and seal of office.
Lc�, urx c 12, i .e t y Ajm; �i;irrth,7� Serb+ ens ��/r c� of
Signature of officer administCAng oath Printed name of officer administering oath Title of officer administering oath
corms provlaea ny I exas Ethics commission www.ethics.state.tx.us Version V1.0.883