HomeMy WebLinkAboutResolution - 2017-R0157 - Parkhill Smith & Cooper - 04/27/2017Resolution No. 2017-RO157
Item No. 6.21
April 27, 2017
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed
to execute for and on behalf of the City of Lubbock, Amendment No. 4 to that certain
Professional Services Agreement for Construction Phase Services concerning LBB
Terminal Apron Maintenance at the Lubbock Preston Smith International Airport, between
the City of Lubbock and Parkhill, Smith & Cooper, Inc., and related documents, the terms
of said amendment being attached hereto and incorporated in this Resolution as if fully set
forth herein and shall be included in the minutes of the Council.
Passed by the City Council this April 27 , 2017.
DANIEL M. PO E, Mayor
ATTEST:
'V, �' -0 -W'a
e b e ca Garza, C rty Secret y
APPROVED AS TO CONTENT:
(?elly%amApbel10,q0,xecutive Director of Aviation
Res.Agrmt-Amend No. 4 -Prof Servs-Parkhi 11, Smith&Cooper, Ltd
43 F
Resolution No. 2017-R0157
PARKHILLSMITH&COOPER 4222 8501 Street
r. Lubbock, texas 79423
806.473.2200
March 16, 2017
Ms. Kelly Campbell, A.A.E.
Director of Aviation
Lubbock Preston Smith International Airport
Administration Office, 2nd Floor
5401 N. Martin Luther King Jr. Blvd., Unit 389
Lubbock,Texas 79403
Re: Amendment No. 4 to Agreement for Professional Services,
Design Phase Services for LBB Terminal Apron Maintenance
Dear Ms. Campbell:
As requested, we have prepared Amendment No. 4 for preliminary engineering report and design phase
services related to the LBB Terminal Apron Maintenance project. Refer to the detailed fee sheets attached for
an itemization of the scope of services. The contract amendment modifies the scope of professional services
included in our original agreement dated February 27, 2015.
Task 1 PER Lump Sum Fee for Preliminary Engineering Report (PSC)
$ 24,750.00
Task 3FDS Lump Sum Fee for Final Design Services (PSC)
$ 37,585.00
Task 8SSC Hourly Rate Fee for Subconsultant Services for Design (CMT)
$ 8,650.00
TASK SRVY Lump Sum Surveying Services for Final Design (PSC)
$ 5,980,00
TOTAL AMENDMENT NO.4
$ 76,965.00
We propose to modify the agreement between the City of Lubbock and Parkhill, Smith & Cooper, Inc. dated
February 27, 2015 and to provide the approved Task 1, 3, 8 and SRVY services under the provisions of
EXHIBIT B - PAYMENTS TO THE ENGINEER, PARAGRAPH B4.01 (Lump Sum and Hourly Rate Method) of
the contract. Any necessary additional services will be provided according to EXHIBIT B - PAYMENTS TO
THE ENGINEER, PARAGRAPH B4.02. Compensation for Tasks 1, 3, 8 and SRVY services shall not exceed
the total above without Owner's written approval.
If the terms of this amendment are agreeable to you, please sign and return one copy of this amendment to
our office. We will take receipt of this signed letter as our notice to proceed with these services. We look
forward to working with you in completing this project. If you have any questions, please call.
Abilene Albuquerque Amarillo Austin EI Paso Frisco Las Cruces Lubbock Midland team-psc.com
Ms. Kelly Campbell, A.A.E. Page 2 March 16, 2017
Sincerely,
PARKHILL, S OOP R, INC.
By
Mark D. Haberer, E,
PrincipaUProject Manager
IN TRIPLICATE
MDH/amp
Enclosures
C tUsersWark4iDesktoptLBB Terminal Apron Mamtenance%KCampbell contract amendment 4.doc
Accepted by:
CITY OF LUBBOGK
By u
Daniel M. Pope
Mayor
Attest
By
RdPecca Garza
Ci Secretary
Approved as to Content:
Y
Kel ampbell,A.A.E.
Directoviation
to
First Assfstant City Attorney
PARKHILL, SMITH & COOPER, INC.
PROJECT BUDGET SHEET (Billing Rates)
LOCATION CODE:
01
PROJECT NAME:
LBB Terminal Apron Maintenance
JOB NO.:
1
TASK:
1 PER
DATE:
03/16/17
FEE TYPE:
Lump Sum
PREPARED BY:
MDH
PRINCIPAL:
MDH
PROJ. MANAGER:
MDH
MARKUP ON REIMB:
15.00%
MARKUP ON DIRECTS:
15.00%
$24,750
TOTAL FEE:
$24,736
LABOR
$23,547
LABOR
$23,547
DIRECTS
$1,189
SUBTOTAL
$24,736
REIMBURSABLE. CONSULTANTS:
REIMBURSABLE. EXPENSES.
REIMB
DIRECT CONSULTANTS:
DIRECT EXPENSES:
$1,189
TOTAL FEE:
$24,736
LABOR BUDGETS:
DESCRIPTION
LABOR CODE
SS or PL Level
HOURS
RATE
COSTS
Sr Project Manager Civil Struct
X5
PL VI
47
$202.00
$9,494
Prof Eng 11 Civil/Struct
X8
PL IV
51
$149.00
$7,599
Eng III -1 Civil/Struct
Y3
PL 111
38
$107.00
$4,066
RPR IV
R1
PL IV
6
$140.00
$840
Project Assistant (PASS) I
P5
SS III
12
$83.00
$996
Project Assistant (PASS) EL
P6
SS II
6
$92.00
$552
Page 1 of 3
FEE ESTIMATING SHEET PROJECT: I.BBTcrminal Apron Maintenance JOB NO TASK IPPR
SALARY Discipline, Title, Labor Code, Rates
1
2
3
4
5
6
7
Staff Initials (optional) -->
CADD_PASS_
CADD_PASS_
Staff Discipline-->
Civil Struct
Civil Struct
Civil Stmct
RPRs_Techs
Clerical
Clerical
Sr Project
Project
Project
Manager
Prof Eng II
Eng III-I
Assistant
Assistant
Staff Title -->
Civil/Struct
Civil/Struct
Civil/Struct
RPR IV
(PASS) I
(PASS) EL
Support Staff(SS) or Professional Level (PL)—>
PL VI
PL IV
PL III
PL IV
SS Ill
SS it
Labor Code --->
X5
X8
Y3
RI
P5
P6
Billing Rate —>
$202.00
$149.00
$107.00
$140.00
$83.00
$92.00
TASK
Trips
TOTAL
PRELIMINARY ENGINEERING REPORT PHASE
1
2
2
4
Predesign meeting
Coordinate field work with LBB and airlines
1
Records Research
l
2
2
Site evaluation, measure cracks & spalls
2
6
6
6
6
Review data/fridings
2
3
5
Evaluate altematives/fmalize recommendation
2
2
Develop/address design criteria
2
2
2
NEPA Environmental (not included in scope)
Coordinate & review topographic survey
2
2
2
6
Coordinate & review geotechnical
3
2
5
Preliminary Engineering Report
project layout plan(s)
2
8
12
22
narrative
12
16
4
10
42
opinion of cost
2
4
6
12
Review with Sponsor
1
2
2
Revise and resubmit final
2
4
4
2
12
Misc PM (2 months)
6
4
t0
BUDGET SUBTOTALS: HOURS Trips -1
41
471
51
381
61
12
61
1
160
SALARY 1
1
$9,494 1
$7,599 1
$4,066 1
$840 1
$996 1
$552 1
1
$23,547
Page 2 of 3
FEE ESTIMATING SHEET PROJECT:
LBB Terminal Apron Maii JOB NO.
TASK: I PER
DIRECTS
DIRECT CONSULTANT COSTS
SUBTOTAL
611 Structural Consultant
612 Mech/Elec Consultant
613 Environ/Civil Consultant
614 Architectural Consultant
615 Testing Consultant (Geotech, CMT, TAB, etc.)
616 Surveying Consultant
618 Other Consultant - Kitchen / Food Consultant
618 Other Consultant - Acoustical Consultant
618 Other Consultant - AV/ IT Consultant
618 Other Consultant
TOTAL DIRECT CONSULTANTS
DIRECT EXPENSES
621 Travel
Motel Days @
Men rni Man -day
Air Travel Air Fare a
Men (u) Man
Parking Days @
/Day =
Car Rental Days @
/Day =
Mileage 25 Miles @
$0.560
@ 4 Trips =
$56.00
SUBTOTAL
$5G
622 Reproductions
Blackline Prints
34" x 22"
Slits n
$2.50 /Slit @ Sets =
36" x 24"
Slits a
$2.75 /Sht @ Sets =
42" x 30
Shts @
$3.25 /Sht @ Sets =
Other
sf@
$0.55 /sf a Sets =
Mounting Foam Board
Boards @
$10.00 /ea @
Printing:
Set Up Fee
Originals @
$0.15 /Sht @ Submittals
=
8-1/2" x 11" B&W 300
Originals a
$0.09 /Slit @ 8 Sets =
$216.00
8-1/2" x I V Color 100
Originals @
$0.55 /Slit @ 8 Sets =
$440.00
11" x 17" B&W 25
Originals @
$0.18 /Slit @ 8 Sets =
$36.00
11" x 17" Color 25
Originals @
$1.05 /Slit @ 8 Sets =
$210.00
Binding Cost 8
Sets @
$2.00 /Set =
$16.00
Laminating
Slits @
$2.00 /Sht =
Scan to file
Burn to CD/DVD
CD/DVD a
$13.50 /each =
Scan Specs
Originals @
$0.15 /Sht =
Scan Drawings
Originals @
$1.50 /Slit =
SUBTOTAL
$918
623 Models/Renderings/Photos
Shots @ /Shot
624 Telephone 10 Calls a
$5.00 /Call
$50
625 Meals Days @
Men @ /Man -day
626 Field Supplies
628 Postage 5 Mailings@
$2.00 /Mailing (Standard)
$10
628 Postage Mailings a
/Mailing (Overnight)
630 Misc Reimbursable Exp
632 Temporary Personnel
636 Field Equip Rental
639 TDLR Review Inspection Fees
643 NM Gross Receipt Tax
TOTAL DIRECT EXPENSES $1,034
Page 3of3
PARKHILL, SMITH & COOPER, INC.
PROJECT BUDGET SHEET (Billing Rates)
LOCATION CODE:
O1
PROJECT NAME:
LBB Terminal Apron Maintenance
JOB NO.:
1
TASK:
3FDS
DATE:
03/16/17
FEE TYPE:
Lump Sum
PREPARED BY:
MDH
PRINCIPAL:
MDH
PROJ. MANAGER:
MDH
MARKUP ON REIMB:
15.00%
MARKUP ON DIRECTS:
15.00%
$37,585
TOTAL FEE:
$37,585
LABOR
$37,140
LABOR.
$37,140
DIRECTS
$445
SUBTOTAL
$37,585
REIMBURSABLE. CONSULTANTS:
REIMBURSABLE. EXPENSES:
REIMB
DIRECT CONSULTANTS:
DIRECT EXPENSES:
$445
TOTAL FEE:
$37,585
LABOR BUDGETS:
DESCRIPTION
LABOR CODE
SS or PL Level
HOURS
RATE
COSTS
Sr Project Manager Civil/Struct
X5
PL VI
54
$202.00
$10,807
Prof Eng II Civil/Struct
X8
PL IV
73
$149.00
$10,877
Eng III-1 Civil/Struct
Y3
PL 111
112
$107.00
$11,984
RPR IV
RI
PL IV
4
$140.00
$560
Project Assistant (PASS) I
P5
SS ill
24
$83.00
$1,992
Project Assistant (PASS) EL
P6
SS II
10
$92.00
$920
Page 1 of 3
FEE ESTIMATING SHEET PROJECT: LBB Terminal Apron Maintenance JOB NO.: TASK3FD5
SALARY Discipline, Title, Labor Code, Rates
I 2 3 4
5 6 7
Staff Initials (optional) -->
FP
ENG
ENG
ENG
ENG TECH
CADD OPT
CLERICAL
CADD_PASS_
CADD_PASS—
Staff Discipline —>
Civil Struct
Civil Struct
Civil_Struct
Civil Struct
_
RPRs Teclns
Clerical
Clerical
Sr Project
Project
Project
Manager
Prof Eng 11
Eng III -1
Assistant
Assistant
Staff Title --->
Civil Struct
Civil'Struct
CiviUStruct
RPR IV
(PASS) 1
(PASS) EL
PL VI
PL IV
PL III
PL IV
SS III
SS II
Support Staff(SS) or Professional Level (PL)-
Labor Code —s
X5
X8
Y3
R1
P5
P6
Billing Rate —>
$202.00
$149.00
$107.00
$140.00
$83.00
$92.00
TASK
Trips
TOTAL
FINAL D 1 N
Final drawings
cover sheet (1 sheet)
0.5
1
4
summary of quantities, location map and sheet
index (I sheet)
0.5
1
2
4
project airport layout plan, project general notes (1
sheet)
1
1
2
4
- stormwater pollution prevention plan (SWPPP) (I
sheet)
0.5
1
2
4
- stormwater pollution prevention plan (site plan) (1
sheet)
05
l
2
- construction phasing, safety plan and details (3
sheets)
3
6
12
21
demolition plan (I sheet)
0.5
1
2
4
project grading and drainage plan (1 sheet)
1
3
6
10
crack seal plan (l sheet)
1
1
3
5
spall repair plan( I sheet)
1
1
3
4
joint seal plan (1 sheet)
1
1
3
5
edge drain p&p's (4 sheets)
4
8
16
.'8
shoulder crack seal/emulsion plan (I sheet)
1
1
2
4
marking layout plan (4 sheets)
1
4
4
miscellaneous paving and marking details (1 sheet)
1
4
6
miscellaneous drainage details (I sheet)
1
4
6
1,
Final specifications - FAA Standards
6
16
8
30
Final opinion of costs
1
3
6
1
Review with Sponsor
1
2
2
4
Revisions
2
2
4
8
Prepare Construction Management Program
2
2
12
6
Prepare Construction Safety & Phasing Plan
2
2
16
6
Miscellaneous meetings and conferences
1
1
1
FAA Form 7460-1 for CSPP
2
4
FAA Form 7460-1 for final improvements
1
2
2
SQ Review and Constructability Review
8
4
Misc. Project Management (2 months)
8
4
8
BUDGET SUBTOTALS: HOURS; Trips-
1
54
731
1121
4
14
10
2'
$10,807
$10,877 1
$11,984 1
$560 1
$1,992 1
$920 1
$37,140
SALARY 1
Page 2 of 3
FEE ESTIMATING SHEET PROJECT:
LBB Terminal Apron Mah JOB NO.
TASK: 3FDS
DIRECTS
DIRECT CONSULTANT COSTS
SUBTOTAL
611 Structural Consultant
612 Mech/Elec Consultant
613 Environ/Civil Consultant
614 Architectural Consultant
615 Testing Consultant (Geotech, CMT, TAB, etc.)
616 Surveying Consultant
618 Other Consultant - Kitchen / Food Consultant
618 Other Consultant - Acoustical Consultant
618 Other Consultant - AV/ IT Consultant
618 Other Consultant
TOTAL DIRECT CONSULTANTS
DIRECT EXPENSES
621 Travel
Motel Days @
Men @ Man-day
Air Travel Air Fare @
Men @ Man
Parking Days @
/Day
=
Car Rental Days @
/Day
=
Mileage 25 Miles@
$0.560
@ 1 Trips
= $14.00
SUBTOTAL
$14
622 Reproductions
Blackline Prints
34" x 22"
Shts @
$2.50 /Sht @
Sets =
36" x 24"
Slits a
$2.75 /Sht @
Sets =
42" x 30
Slits @
$3.25 /Sht @
Sets =
Other
sf@
$0.55 /sf a
Sets =
Mounting Foam Board
Boards @
$10.00 /ea @
Printing:
Set Up Fee
Originals a
$0.15 /Sht @
Submittals =
8-1/2" x 11" B&W 100
Originals a
$0.09 /Sht u
1 Sets = $9.00
8-1/2" x I I" Color 100
Originals @
$0.55 /Sht @
1 Sets = $55.00
11" x 17" B&W 15
Originals@
$0.18 /Sht @
20 Sets = $54.00
11" x 17" Color 5
Originals@
$1.05 /Sht @
20 Sets = $105.00
Binding Cost 20
Sets @
$2.00 /Set
= $40.00
Laminating
Slits @
$2.00 /Sht
=
Scan to file
Burn to CD/DVD
CD/DVD n
$13.50 /each
=
Scan Specs
Originals a
$0.15 /Sht
=
Scan Drawings
Originals @
$1.50 /Sht
=
SUBTOTAL
$263
623 Models/Renderings/Photos
Shots a /Shot
624 Telephone 20 Calls n
$5.00
/Call
$100
625 Meals Days @
Men @ /Man-day
626 Field Supplies
628 Postage 5 Mailings a
$2.00 /Mailing (Standard)
$10
628 Postage Mailings @
/Mailing (Overnight)
630 Misc Reimbursable Exp
632 Temporary Personnel
636 Field Equip Rental
639 TDLR Review Inspection Fees
643 NM Gross Receipt Tax
TOTAL DIRECT EXPENSES $387 jj
Page 3 of 3
PARKHILL, SMITH & COOPER, INC.
PROJECT BUDGET SHEET (Billing Rates)
LOCATION CODE:
01
PROJECT NAME:
LBB Terminal Apron Maintenance
JOB NO.:
TASK:
8SSD
DATE:
03/16/17
FEE TYPE:
Hourly Rate
PREPARED BY:
MDH
PRINCIPAL:
MDH
PROJ. MANAGER:
MDH
MARKUP ON REIMB:
15.00%
MARKUP ON DIRECTS:
15.00%
$8,650
TOTAL FEE:
$8,648
LABOR
LABOR
DIRECTS
SUBTOTAL
REIMBURSABLE. CONSULTANTS:
$8,648
REIMBURSABLE. EXPENSES:
REIMB $8.648
DIRECT CONSULTANTS.
DIRECT EXPENSES.
TOTAL FEE: $8,648
LABOR BUDGETS:
DESCRIPTION
LABOR CODE SS or PL Level HOURS
RATE COSTS
Page 1 of 2
FEE ESTIMATING SHEET PROJECT:
LBB Terminal Apron MaiIJOB NO.
TASK 8SSD
REIMBURSABLES
REIMBURSABLE CONSULTANT COSTS
SUBTOTAL
511 Structural Consultant
512 Mech/Elec Consultant
513 Environ/Civil Consultant
514 Architectural Consultant
515 Testing Consultant (Geotech, CMT, TAB, etc.)
CMT Engineering
$7,520
516 Surveying Consultant
518 Other Consultant - Kitchen / Food Consultant
518 Other Consultant - Acoustical Consultant
518 Other Consultant - AV/ IT Consultant
518 Other Consultant
TOTAL REIMBURSABLE CONSULTANTS
$7,520
REIMBURSABLE EXPENSES
521 Travel
Motel Days @
Men a /Man -day
=
Air Travel Air Fare @
Men @ /Man
=
Parking Days @
/Day
Car Rental Days @
/Day
Mileage Miles @
$0.560
@ Trips
SUBTOTAL
522 Reproductions
Blackline / Color Plots
34" x 22"
Slits a
$2.50 /Sht @
Sets
36" x 24"
Slits @
$2.75 /Sht @
Sets
42" x 30
Slits @
$3.25 /Sht @
Sets
Other
sf @
$0.55 /sf @
Sets
Mounting Foam Board
Boards @
$10.00 /ea @
Printing:
Set Up Fee
Originals a
$0.15 /Sht a
Submittals
8-1/2" x 11" B&W
Originals @
$0.09 /Sht @
Sets
8-1/2" x I I" Color
Originals @
$0.55 /Sht @
Sets
11" x 17" B&W
Originals @
$0.18 /Sht @
Sets
I I " x 17" Color
Originals @
$1.05 'Shtra
Sets
Binding Cost
Sets @
$2.00 Set
=
Laminating
Slits @
$2.00 ,Slit
=
Scan to file
Bum to CD/DVD
CD/DVD @
$13.50 each
=
Scan Specs
Originals @
$0.15"Slit
=
Scan Drawings
Originals @
$1.50 ;Slit
=
SUBTOTAL
523 Models/Renderings/Photos
Shots @ /Shot
524 Telephone Calls @
/Call
525 Meals Days @
Men @ /Man -day
526 Field Supplies
528 Postage Mailings @
/Mailing (Standard)
528 Postage Mailings @
/Mailing (Overnight)
530 Misc Reimbursable Exp
532 Temporary Personnel
536 Field Equip Rental
539 TDLR Review/ Inspection Fees
543 NM Gross Receipt Tax
TOTAL REIMBURSABLE EXPENSES
Page 2 of 2
CMT
Engineering
12804 CR 2500
Lubbock, Texas 79404
Phone (806) 771-7283
Fax (806) 771-7062
February 21, 2017
Mark Haberer. PE, CM
Principal
Parkhill, Smith & Cooper, Inc.
4222 85th Street
Lubbock, Texas 79423
Subject: Geotechnical Data Report
LBB Terminal Apron Maintenance
Lubbock Preston Smith International Airport
Dear Mr. Haberer:
CMT Engineering, Inc. (CMT) appreciates the opportunity to submit this proposal for
Geotechnical Services. This proposal was requested by you on February 20, 2017.
This proposal is prepared based on a RFP and information provided by you.
The purpose of this study will be to explore subsurface soil conditions at the site to
provide a data report to you for data evaluation.
Our understanding is that the project will consist of isolated panel repair and the
installation of an edge drain along the terminal apron at the Lubbock International
Airport. At the time of this writing an exact project location or plan of borings has not
been provided.
We have assumed the drilling sites will be accessible during field work. CMT will
place the One -Call (DIGTESS) for the location of existing utilities within the site;
however, it is the owner's responsibility to provide the location of all private
underground utilities in the vicinity of the boring locations. CMT cannot accept
responsibility for damaging any utility not located by the owner, DIGTESS and by
others. Should unusual soil and/or rock conditions or undocumented fill be
encountered at the site that indicates broadening the scope of the study, CMT will
contact the owner before proceeding with any additional work. Should the
preliminary site plan change the boring locations may need to be revised.
FIELD EXPLORATION
We have assumed eight (8) borings that will be drilled with a truck mounted drill rig
and support vehicle. Three borings will be located under the proposed edge drain
and will be advanced to a depth of six (6) feet below existing ground surface. The
Proposed LBB Terminal Apron Maintenance
Lubbock, Texas
Page 2
borings located under the isolated panels will be advanced to a depth of ten (10) feet
below existing ground surface. We request that the exact locations of the borings will
be provided by you prior to the field investigation.
The relative density/consistency of the soil will be determined in general accordance
with the use of the Standard Penetration Test (SPT) (ASTM D 1586). Dynamic Cone
Penetration values will be recorded within the top few feet of the isolated panels.
We plan to use a truck -mounted drilling rig to advance the test borings. Non-
cohesive soil samples will be obtained using split -barrel samplers used in conjunction
with the standard penetration test (SPT). Groundwater readings will be obtained as
the boring is advanced and following completion of drilling, as possible.
CMT field personnel or client's representative will stake the boring locations using
hand-held GPS or normal taping procedures. Both methods provide an accuracy of
20 to 50 feet. Locations will be shown on the plan of borings. Precise surveying of
boring locations and elevations is not included in the cost estimate. At the
completion of drilling operations, borings will be backfilled with soil cuttings and
concrete at the surface, if applicable.
LABORATORY TESTING
The engineering properties of the soil and/or rock will be evaluated in the laboratory
using tests performed on selected representative samples. The samples will be
visually examined and classified. Considering the nature of the project, we
recommend the following tests be performed for your study:
Moisture content;
2. Liquid and plastic limit (Plasticity Index -PI);
3. Percent passing a No. 200 sieve;
For the purpose of this proposal we have assumed 2 of each test listed per boring.
GEOTECHNICAL ENGINEERING ANALYSIS AND REPORT
We will provide a plan of borings, boring logs, results of our laboratory testing and
groundwater conditions at the boring locations. No recommendations or discussion
of construction procedures is included in our scope of work.
COST ESTIMATE AND ANTICIPATED SCHEDULE
Based on the scope of work outlined herein, the cost of the Geotechnical Services
will be on a unit price basis of $7,520.00 according to the fees shown on the attached
fee schedule. The cost shown will not be exceeded without prior approval from the
client or the scope of work has changed from its original version. This cost is not
Proposed LBB Terminal Apron Maintenance
Lubbock, Texas
Page 3
applicable after 90 days from the date of this proposal and does not include costs
incurred to access the site if the site is inaccessible for a truck mounted drill rig and
support vehicle.
The fieldwork should take one (1) day to complete with favorable weather conditions.
The laboratory testing and preparation of the logs will take an additional one (1) to
two (2) weeks.
To indicate acceptance of our proposal and the attached "General Terms and
Conditions to Agreement between the Geotechnical Engineer and the Client", please
have a duly authorized person (referred to as "Client") sign in the spaces provided
and return the attached copy to us for our files.
We appreciate the opportunity of submitting this proposal and look forward to working
with you for this project. If you have any questions please feel free to call us.
Sincerely,
CMT Engineering, Inc
TBPE Firm Registration No. 13112
Cole Hutson, P.E.
Sr. Supervising Engineer
o CMT
Engineering
AGREEMENT FOR GEOTECHNICAL ENGINEERING SERVICES
THIS AGREEMENT is by and between PARKHILL, SMITH & COOPER, INC. hereinafter
called CLIENT and CMT ENGINEERING, INC., hereinafter called Geotechnical Engineer,
who agrees as follows:
DECLARATIONS. CLIENT desires to engage Geotechnical Engineer to provide
geotechnical engineering services in connection with CLIENT's project ("THE
PROJECT") described as follows:
Proposed LBB Terminal Apron Maintenance
Lubbock Texas
2. SCOPE OF WORK. CMT ENGINEERING, INC. shall provide Geotechnical
Engineering services for THE PROJECT in accordance with the accompanying Fee
Schedule dated February 21 , 2016. The scope of services (as described in the
proposal) and the "General Terms and Conditions to Agreement between the
Geotechnical Engineer and the Client" (set forth on the following page) are made part
of this Agreement.
EXECUTED THIS day of 12016
CLIENT
(Firm)
0
Title:
CMT ENGINEERING, INC.
By:
Cole Hutson
Title: Sr. Supervising Engineer
Attachment
Page 1 of 2
GENERAL TERMS AND CONDITIONS
TO
AGREEMENT BETWEEN THE GEOTECHNICAL ENGINEER AND THE CLIENT
MISCELLANEOUS INFORMATION
The client and/or his architect and/or his engineer shall provide the
Geotechnical Engineer with all information concerning the site which is the
subject matter of this contract specifically including but not limited to
geotechnical information testing reports, site plan, utility easements and
locations and building locations and other such information which would be of
benefit to the Geotechnical Engineer in preparing and/or completing its work.
The Geotechnical Engineer shall have the right to rely upon the accuracy of
the information provided in performing its service.
RIGHT OF ENTRY
Unless otherwise agreed, the Client will provide for right of entry of the
Geotechnical Engineer and all necessary equipment, in order to complete the
work.
While the Geotechnical Engineer will take all reasonable precautions to
minimize any damage to the property, the Client understands that in the
normal course of work some damage may occur, Geotechnical Engineer are
not responsible for repairing the damage, and their fees do not include the
correction of which is not part of this Agreement.
UTILITIES AND PIPELINES
In the prosecution of the field work, the Geotechnical Engineer will take
all reasonable precautions to avoid damage or injury to subterranean
structures or utilities.
The client agrees to hold the Geotechnical Engineer harmless for any
damages to subterranean and subaqueous structures. pipelines, and utilities
which are not called to Geotechnical Engineer's attention and correctly shown
on the plans furnished which Indemnity Agreement shall specifically protect
the Geotechnical Engineer. even from engineer's own negligence.
SITE SAFETY
Geotechnical Engineer is not responsible for job site safety of others.
However, Geotechnical Engineer will conduct its work in a safe, workman -like
manner, and will observe the work -site safety requirements of the Client that
have been communicated to Geotechnical Engineer in writing.
SAMPLES
Geotechnical Engineer will retain all soil and rock samples for thirty (30)
days upon completion of the final work. Further storage or transfer of
samples can be made at owner expense upon written request.
INVOICES
Geotechnical Engineer will submit invoices to the client monthly and a
final bill upon completion of services. Payment is due upon presentation of
invoice and is past due thirty (30) days from invoice date.
OWNERSHIP OF DOCUMENTS
All reports, boring logs, field notes, laboratory test data, calculations,
estimates, and other documents prepared by the Geotechnical Engineer, as
instruments of service, shall remain the property of the Geotechnical
Engineer. It is specifically understood and agreed that all reports, boring
logs, field data, field notes and laboratory test data, calculations, estimates
and other documents were prepared at a specific time and under a specific
set of criteria for use by the client named herein. Accordingly, such reports
and other information noted shall not be transferred by client to any third
party nor shall any representation by made by client to such a third party
regarding their ability to rely upon any of the reports or other information
noted without the express written consent of the Geotechnical Engineer.
The client agrees that all reports and other work furnished to the client or
his agents, which are not paid for, will be returned upon demand and will not
be used by the client for any purpose whatever.
The Geotechnical Engineer will retain all pertinent records relating to the
services performed for a minimum of two (2) years following submission of
the report, during which period the records will be made available to the client
at all reasonable times.
DISPUTES
In the event that a dispute should arise relating to the performance of the
'qkFEnghmee
CMT
ring
services to be provided under this Agreement, and should that dispute result
in litigation, it is agreed that the prevailing party shall be entitled to recover all
reasonable costs incurred in the defense of the claim, court costs and
attorneys' fees.
STANDARD OF CARE
Service performed by the Geotechnical Engineer under this Agreement
will be conducted in a manner consistent with that level of care and skill
ordinarily exercised by members of the profession currently practicing under
similar conditions. No warranty, express or implied, is made.
Client recognizes that subsurface conditions may vary from those
encountered at the location where borings, surveys, or explorations are made
by the Geotechnical Engineer and that the data, interpretations and
recommendations of the Geotechnical Engineer are based solely on the
information available to him. The Geotechnical Engineer's responsibility shall
be to develop data, interpretations and recommendations in a reasonably
prudent manner exercising the care and skill noted in the preceding
paragraph. The Geotechnical Engineer shall not be responsible for the
interpretation or use by others of the information developed and provided to
the client.
INSURANCE
The Geotechnical Engineer maintains Worker's Compensation Insurance
for its staff and further maintains public liability and property damage
insurance deemed to be adequate. Certificates for all such policies of
insurance shall be provided to Client upon request in writing. Within the limits
and conditions of such insurance, Geotechnical Engineer agrees to indemnify
and save Client harmless from and against any loss, damage, or liability
arising from any negligent acts of Geotechnical Engineer, his agents, staff,
and consultants employed by him, on a comparative basis, except as
specifically noted elsewhere in this Agreement. The Geotechnical Engineer
shall not be responsible for any loss, damage or liability beyond the amounts,
limits, and conditions of such insurance. The Geotechnical Engineer shall not
be responsible for any loss, damage, or liability arising from any acts by client,
his agents, staff, and other consultants employed by him.
BIOLOGICAL POLLUTANTS
Geotechnical Engineer's scope of work does not include the investigation,
detection, or design related to the presence of any Biological Pollutants, which
includes, but is not limited to, mold, fungi, spores, bacteria, and/or viruses,
and the byproducts of any such biological organisms.
TERMINATION OF CONTRACT
This Agreement may be terminated at any time by either party upon ten
(10) days written notice. In the event of termination, Geotechnical Engineer
shall be paid for services performed to the termination notice date plus
reasonable termination expenses.
In the event of suspension/holdup for more than three (3) months, prior to
completion of all reports contemplated by this Agreement, Geotechnical
Engineer may complete such analyses and records as are necessary to
complete his files and may also complete a report on the services performed
to the date of notice of suspension as per Client's request. The expenses of
suspension may include all direct costs of Geotechnical Engineer in
completing such analyses, records and reports for the proposed project.
Rev. Nov. 2013
CMT ENGINEERING, INC.
Lubbock, Texas
Ph. (806) 771-7283
Attachment
Page 2 of 2
FEE PROPOSAL
GEOTECHNICAL INVESTIGATION
CMT Engineering, Inc
12804 County Road 2500 CMT
Lubbock TX 79404 *Engineering
Office (806) 771-7283
Fax (806) 771-7062
Client: Parkhill, Smith & Cooper, Inc.
Project: LBB Terminal Apron
Location: Lubbock Preston Smith International Airport
Date: Febfruary 21, 2017
Geotechnical Investigation
Fee
Qty
Estimate
Geotech Borings Per Foot
$
14.00
68
$
952.00
Drill Rig Mobilization
$
1,200.00
1
$
1,200.00
Drill Crew Per Diem
$
240.00
1
$
240.00
Patch Bore Holes w/ Concrete ea
$
30.00
5
$
150.00
Laboratory Tests
Soils
Atterber Limits
$
70.00
16
$
1,120.00
Classification of soils inc washed rad
$
75.00
16
$
1,200.00
Moisture content
$
10.00
16
$
160.00
Technician / Engineering
Technician Hourly (Two hour minimum)
$
59.00
12
$
708.00
E.I.T. Hourly
$
85.00
8
$
680.00
Senior Professional Engineer Hourly
$
185.00
6
$
1,110.00
Total
$
7,520.00
PARKHILLSMITH&COOPER 4222 85th Street
1.9 Lubbock, Texas 79423
806-473.2200
GEOTECHNICAL INVESTIGATION REQUEST FOR PROPOSAL
Parkhill, Smith & Cooper, Inc. has been retained for design services by the Lubbock Preston Smith
International Airport to prepare afee for design related to LBB Terminal Apron Maintenance project.
Please provide a proposal to perform Geotechnical Investigation as part of the process. The following
should give guidance on what is expected in the proposal. Our overaching goals are to gather sufficient
data for use in design of an edge drainage system and to also gather sufficient information on the
conditions under panels to be removed. If you believe that some necessary service has been omitted,
please include such recommendations in your proposal. Please contact Mark Haberer, PE
mhaberer@team-psc.com with any questions or concerns. Alternatively, can reach me at (806) 473-
3600.
Report and Deliverables
Please be sure to includetests as necessaryto make recommendations in the final report as detailed below.
Provide a report detailing your findings and the locations of the tests collected. The report should include,
at a minimum, te flowing;
Boring Logs (with contents as indicated below)
All Testing (as indicated below)
DESTRUCTIVE TESTING
Total Number of Borings: 8
Bores are to be placed as staked in the field by the Engineer.
Please include the following in the deliverable boring logs*;
• Bore Location
• Date Performed
• Type of Exploration
• Water Table Observations (Different from
Ground Water Study)
• Sample Identification Numbers
• Classification
• Relative Depth of Materials
• Test results per below
• Material Profile (Surface and
Lower Strata)
*Samples should be taken per ASTM D 421 — Standard Practice for dry Preparation of Soil Samples for
Particle -Size Analysis and Determination of Soil Constants. Boring depth shall be 10' or until the bore is
obstructed by a solid.
Please include the following in the deliverable text data;
Classification/Properties/Reaction Testing:
ASTM D 422 Standard Test Method for Particle -Size Analysis of Soils (all test
holes, all layers)
ASTM D 4318 Standard Test Methods for Liquid Limit, Plastic Limit, and Plasticity Index of Soils
(to be performed on each stratum of material encountered) (all test holes, all layers)
ASTM D 2216 Standard Test Methods for Laboratory Determination of Water (Moisture) Content
of Soil and Rock by Mass (all test holes, all layers)
ASTM D 2487 Unified Soil Classification System (all test holes, all layers)
C:\Users\Mark-H\Desktop\LBB Terminal Apron Maintenance\LBB Terminal Apron Maintenance_Geotech_Investigation.docm
Abilene Albuquerque Amarillo Austin EI Paso Frisco Las Cruces Lubbock Midland team-psc.com
LBBTERMINAL APRON MAINTENANCE Page 2 FEBRUARY 20, 2017
Compaction/Strength Testing:
ADCP values (5 core holes). Provide results for Modulus of Subgrade Reaction (k).
SITE CLEANUP
Core Hole and Test Pit Cleanup
Core holes are to be filled to grade with ready mix concrete by the lab.
All debris and trash must be removed from the area prior to inspection by Operations
Site Access
This project will be located in a secure area of the airport. SIDA badging will be required.
Deadlines
Please provide the requested proposal by noon Tuesday 2/21/2017 so we may keep our own deadlines
as given to us by the Owner. Feel free to contact us with any questions.
PARKHILL, SMITH & COOPER, INC.
PROJECT BUDGET SHEET (Billing Rates)
LOCATION CODE:
01
PROJECT NAME:
LBB Apron Maintenance Survey
JOB NO.:
Pending
1
TASK:
SRVY
DATE:
02/20/17
FEE TYPE:
Lump Sum
PREPARED BY:
SWW
PRINCIPAL:
PROJ. MANAGER:
SWW
MARKUP ON REIMB:
15.00%
$51980.00
MARKUP ON DIRECTS:
15.00%
TOTAL FEE:
$5,980
LABOR
$4.721
LABOR:
$4,721
DIRECTS
$1,259
SUBTOTAL
$5,980
REIMBURSABLE. CONSULTANTS:
REIMBURSABLE. EXPENSES:
REIMB
DIRECT CONSULTANTS:
DIRECT EXPENSES.
$1,259
TOTAL FEE:
$5,980
LABOR BUDGETS:
DESCRIPTION
LABOR CODE
SS or PL Level
HOURS
RATE
COSTS
Prof Eng 11 Civil." Struct
X8
PL IV
4
$149.00
$596
Eng Tech I
U5
SS II
24
$83.00
$1,992
Eng Tech I
U5
SS II
10
$83.00
$830
Eng Tech I
U5
SS lI
$83.00
CADD II
E6
SS II
1
$83.00
$83
Eng III-I Civil/Struct
Y3
PL III
10
$122.00
$1,220
Page 1 of 3
FEE ESTIMATING SHEET PROJECT: IBB Apron hinintenencc Sune% JOB NO Pending TASK' SRVY
SALARY Discipline, Title, Labor Code, Rates
Staff Initials (optional) --- >
Staff Discipline—>
Staff Title -->
Support Staff(SS) or Professional Level (PL) --- >
Labor Code --->
Billing Rate-->
1
2 3 4 5 6 7
SWW
CMW
BRA
NLM
MTF
CS
Civil Struct
RPRs Techs
RPRs Techs
RPRs Techs
ADD_PASS_
erical
Civil Struct
Prof Eng 11
Civil/Struct
Eng Tech I
Eng Tech 1
Eng Tech I
[CADDI1
Eng III -I
Civil/Struct
PL IV
SS II
I SS II
SS II
SS 11
PL 111
X8
U5
U5
U5
E6
Y3
$149.00
$83.00
$83.00
$83.00
$83.00
$122.00
TASK
Trips
TOTAL
Field Work
Office Process/Field Prep
Admin
Survey Report
Additional Field Trip
4
20
4
10
1
10
30
4
11
q
BUDGET SUBTOTALS: HOURS Trips-
SALARY
41
241
10
I
101
49
$596
$1,992
$830
1
$83 1
$1,220 1
$4,721
Page 2 of 3
FEE ESTIMATING SHEET PROJECT:
LBB Apron Maintenance'. JOB NO. Pending
TASK: SRVY
DIRECTS
DIRECT CONSULTANT COSTS
SUBTOTAL
611 Structural Consultant
612 Mech/Elec Consultant
613 Environ/Civil Consultant
614 Architectural Consultant
615 Testing Consultant (Geotech, CMT, TAB, etc.)
616 Surveying Consultant
618 Other Consultant - Kitchen / Food Consultant
618 Other Consultant - Acoustical Consultant
618 Other Consultant - AV/ IT Consultant
618 Other Consultant
TOTAL DIRECT CONSULTANTS
DIRECT EXPENSES
621 Travel
Motel Days @
Men @ Man -day
Air Travel Air Fare @
Men @ Man
Parking Days @
/Day
=
Car Rental Days @
/Day
=
Mileage 40 Miles @
$0.560
@ 2 Trips
= $44.80
SUBTOTAL
$45
622 Reproductions
Blackline Prints
34" x 22"
Shts @
$2.50 /Sht @
Sets =
36" x 24"
Shts a
$2.75 /Sht @
Sets =
42" x 30
Shts a
$3.25 /Sht @
Sets =
Other
sf@
$0.55 /sf a
Sets =
Mounting Foam Board
Boards @
$10.00 /ea @
Printing:
Set Up Fee
Originals a
$0.15 /Sht @
Submittals =
8-1/2" x 11" B&W
Originals a
$0.09 /Sht a
Sets =
8-1/2" x 1 V Color
Originals @
$0.55 /Sht @
Sets =
11" x 17" B&W
Originals @
$0.18 /Sht @
Sets =
I I " x 17" Color
Originals@
$1.05 /Sht @
Sets =
Binding Cost
Sets @
$2.00 /Set
=
Laminating
Shts @
$2.00 /Sht
=
Scan to file
Burn to CD/DVD
CD/DVD n
$13.50 /each
=
Scan Specs
Originals @
$0.15 /Sht
=
Scan Drawings
Originals @
$1.50 /Sht
=
SUBTOTAL
623 Models/Renderings/Photos
Shots @ /Shot
624 Telephone Calls n
/Call
625 Meals Days @
Men @ /Man -day
626 Field Supplies
628 Postage Mailings @
/Mailing (Standard)
628 Postage Mailings @
/Mailing (Overnight)
630 Misc Reimbursable Exp
632 Temporary Personnel
636 Field Equip Rental
$1,050
639 TDLR Review/ Inspection Fees
643 NM Gross Receipt Tax
TOTAL DIRECT EXPENSES $1,09511
Page 3 of 3
PARKHILLSMITH& 4222 85th Street
T-1
Lubbock, Texas 79423
806.473.2200
BOUNDARYITOPOGRAPHIC SURVEY
Parkhill, Smith & Cooper Inc. has been retained for design services by the Lubbock Preston Smith
International Airport to prepare a fee for design related to the Terminal Apron Maintenance project
Please provide a proposal to perform Topographic surveying in relation to this work. The following
should give guidance on what is expected in the proposal. If you feel that some necessary service
has been omitted, please include such recommendations in your proposal. Please contact Mark
Haberer, PE at mhaberer@team-psc.com with any questions or concerns. Alternatively, call (806)
473-3600.
Deliverables Format
Please provide the deliverable data in the following format;
• Coordinates: Texas State Plane, Texas North Central — 4202
• Vertical Datum: North American Vertical Datum 1988 (NAVD88)
• Geodetic (Horizontal) Datum: North American Datum 1983 (NAD83)
• Show benchmark(s) used for survey, but ensure tie to the primary and secondary
airport control monuments.
• Provide elevation data on all flow lines and exposed pipes, conduits, and structures.
including existing sanitary sewer and storm sewer flow lines, culvert and inlet flow
lines, and other identifiable utilities.
• Topographic survey shall extend fifty (50) feet beyond the shoulder paving. Refer to
the drawing attached.
• Provide electronic drawing in AutoCAD compatible with Version 2008 or newer.
• Entity color and line type shall be "by -layer".
• Follow the PSC CAD Standard's Layer Guidelines per PDF and CADD block provided.
• Provide all contours, breaklines, TIN elements, and existing ground shots on elevation.
(Extraneous shots for locating features that are not on the ground surface should be
on elevation but on a separate layer from the ground surface shots.)
• Line work shall be all on elevation "0".
• Points should be blocks with elevation, point number, and descriptor attributes.
• Provide a comma delimited ASCII text file of all points obtained in the following format:
POINT #, NORTHING, EASTING, ELEVATION, DESCRIPTION.
• Provide an AutoCAD color table file (*.ctb) for plotting styles.
• Provide a point codes description list describing abbreviations and symbols used.
• Provide one (1) PDF file of each drawing.
Topographic Survey Deliverables
Topographic surveys shall include the following ground feature criteria as a minimum:
• Provide grid and additional points sufficient to accurately show existing ground surface
and existing site features.
• Topo grid to be obtained at max 50 foot interval for unpaved footprint ( area on
attached drawing) unless topography requires tighter grid to capture grade breaks.
• Topo grid to be obtained at max 25 foot interval on concrete apron and asphalt
shoulder (red area on attached drawing).
• Topo at max 25 foot interval along edge of concrete apron (; area on attached
drawing).
Abilene Albuquerque Amarillo Austin EI Paso Frisco Las Cruces Lubbock Midland team-psc.com
LBB Terminal Apron Maintenance Project
February 20, 2017
• Topo drainage flowline at interval necessary to capture existing condition (green area
on attached drawing).
• Topo grid to be obtained at max 10 foot interval edge drain discharge area (blue area
on attached drawing). Include detail of pipe flowline and discharge location.
• Provide contours on the finished drawing at 0.1 foot interval.
• Show spot elevations to the nearest 0.01 foot.
• Locate drainage swales, ridges, flow lines and specific drainage features.
• Locate miscellaneous structures including signs, edge lights, utility markers, or any
object that might be encountered on the property.
Utility Survey Deliverables
The Surveyor is to coordinate with DIGTESS, the City of Lubbock, the Lubbock Preston Smith
International Airport, the local FAA SSC Manager and the various utility providers as necessary
to have buried utilities marked. Provide the information of the operating authority (contact person,
email, and phone number). Such utility information shall be shown on the completed survey along
with the following minimum utility criteria:
• Locate Municipal Utilities - water, sewer, storm sewer, fire protection lines, post
indicator valves, culverts, inlets, fire hydrants, meter boxes, valve boxes, cleanouts,
manholes, and catch basins.
• Locate Municipal Franchisee Utilities - electric, natural gas, phone, cable, street
lighting, other communications systems including meters, meter boxes, valve boxes,
poles, and guy wires.
• Locate Non -Franchisee Utilities — Overland fiber optic, crude oil, natural gas, raw water
transmission, oil wells, and oil flow lines.
• Locate Private Utilities — On-site utilities typically extending from property line to
existing building, also private storm sewer and culverts, central plant utilities, buried
tanks, septic fields, water wells, and irrigation system valve boxes.
Other Requirements
Aviation Survey Deliverables should also account for the following:
• Vertical accuracy of any survey elevations on pavement shall be +/-.02'.
• Vertical accuracy of any survey elevations off pavement shall be +/-.04'
• Include an additional 4hrs of crew survey time to capture unforseens.
• Note that the southwest area may have been adequately covered under previous
survey. Utilize existing data where available.
Site Access
This project will be located in a secured area of the airport. SIDA badging will be required.
Deadlines
Please provide the requested proposal by Tuesday 2/21/2017 so we may keep our own deadlines
as given to us by the Owner. Feel free to contact me with any questions.
R
CERTIFICATE OF INTERESTED PARTIES
FORM 1295
1 of 1
Complete Nos. 1- 4 and 6 if there are interested parties.
OFFICE USE ONLY
Complete Nos. 1, 2, 3, 5, and 6 if there are no interested parties.
CERTIFICATION OF FILING
Certificate Number:
1 Name of business entity filing form, and the city, state and country of the business entity's place
of business.
2017-191173
Parkhill, Smith & Cooper, Inc.
Lubbock, TX United States
Date Filed:
04/11/2017
2 Name of governmental entity or state agency that is a party to the contract for which the form is
being filed.
City of Lubbock
Date Acknowledged:
04/20/2017
3 Provide the identification number used by the governmental entity or state agency to track or identify the contract, and provide a
description of the services, goods, or other property to be provided under the contract.
2015-R0061 Amendment 4
LBB Terminal Apron Maintenance
4
Nature of interest
Name of Interested Party
City, State, Country (place of business)
(check applicable)
Controlling
I Intermediary
Rangel, Ruppert S.
Abilene, TX United States
X
Hart, Daniel S.
Midland, TX United States
X
Edwards, Jay M.
Midland, TX United States
X
Hamilton, John T.
Lubbock, TX United States
X
Moss, Mike W.
Lubbock, TX United States
X
Davis, Edwin E.
Lubbock, TX United States
X
Rapier, Joseph R.
Lubbock, TX United States
X
5 Check only if there is NO Interested Parry. ❑
6 AFFIDAVIT I swear, or affirm, under penalty of perjury, that the above disclosure is true and correct.
Signature of authorized agent of contracting business entity
AFFIX NOTARY STAMP / SEAL ABOVE
Sworn to and subscribed before me, by the said this the
day of
20 , to certify which, witness my hand and seal of office.
Signature of officer administering oath Printed name of officer administering oath Title of officer administering oath
Forms orovided by Texas Ethics Commission www.ethics.state.tx.us
Versinn V1 n RRR
CERTIFICATE OF INTERESTED PARTIES
FORM 1295
1 of 1
Complete Nos. 1- 4 and 6 if there are interested parties.
OFFICE USE ONLY
Complete Nos. 1, 2, 3, 5, and 6 if there are no interested parties.
CERTIFICATION OF FILING
Certificate Number:
1 Name of business entity filing form, and the city, state and country of the business entity's place
of business.
2017-191173
Parkhill, Smith & Cooper, Inc.
Lubbock, TX United States
Date Filed:
04/11/2017
2 Name of governmental entity or state agency that is a party to the contract for which the form is
being filed.
City of Lubbock
Date Acknowledged:
3 Provide the identification number used by the governmental entity or state agency to track or identify the contract, and provide a
description of the services, goods, or other property to be provided under the contract.
2015-R0061 Amendment 4
LBB Terminal Apron Maintenance
4
Nature of interest
Name of Interested Party
City, State, Country (place of business)
(check applicable)
Controlling
Intermediary
Rangel, Ruppert S.
Abilene, TX United States
X
Hart, Daniel S.
Midland, TX United States
X
Edwards, Jay M.
Midland, TX United States
X
Hamilton, John T.
Lubbock, TX United States
X
Moss, Mike W.
Lubbock, TX United States
X
Davis, Edwin E.
Lubbock, TX United States
X
Rapier, Joseph R.
Lubbock, TX United States
X
5 Check only if there is NO Interested Party. ❑
6 AFFIDAVIT I swear, or affirm, under penalty of perjury, that the above disclosure is true and correct.
o�ari'Q APRIL M. PIER
T
is a Notary Public. State of Texas 1 _
Comm.
.+ Expires 08 10-2019 ignature of authorized agent of contracting
``O
business entity
Notary ID 13032946-5
AFFIX NOTARYSTAMP-7 SEAL ABOVE
Sworn and subscribed before me, by the said v Yl n bill; r \ this the day of ►'/
20, to hand
certify which, witness my and seal of office.
Signal a of officer administering oath Printed na a of officer administering oath Title of officer administering oath
Forms Drovided by Texas Ethics Commission www_P_thICS_StatP_tx.i1S
ver--;inn v1 _n.RR3