Loading...
HomeMy WebLinkAboutResolution - 2017-R0146 - Amendment 1 With Demattei Wong Architecture, Inc. - 04/27/2017Resolution No.2017-R0146 Item No.6.6.1 April 27,2017 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for and on behalf of the City of Lubbock,Amendment No. 1 to that certain Professional Services Contract for consultant services for the development of a consolidated rental car facility at Lubbock Preston Smith International Airport by and between the City of Lubbock and Demattei Wong Architecture,Inc., and related documents.Said Contract is attached hereto and incorporated in this Resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council on April 27 2017. DANIEL M.POPE,MAYOR ATTEST: •£&Z^L £r- Rebepca Garza,City APPROVED AS TO CONTENT: Kelly Campbell,Director of Aviation APPROVED AS TO FORM: RES.Amend 1-Prof Serv Contract-Demattei Wong Architecture,Inc. (4-11-17) Resolution No. 2017-RO 146 STATE OF TEXAS COUNTY OF LUBBOCK AMENDMENT 1 TO PROFESSIONAL SERVICES AGREEMENT This Amendment 1 to Professional Services Agreement is entered into this 27th day of April, 2017 between the City of Lubbock, a Texas municipal corporation (hereinafter called "the City") and Demattei Wong Architecture, Inc. (the "Consultant".) WHEREAS, the Consultant and the City have previously entered into a certain Professional Services Agreement dated January 29, 2015, Resolution No. 2015-R0036 (hereinafter called "the Agreement"); and WHEREAS, the City and the Consultant hereby desire to further amend said agreement. NOW THEREFORE, the City and the Consultant hereby agree to amend the Agreement as follows: 1) That "Attachment A" of the Agreement is hereby substituted and replaced with "Attachment A1.2017" that is that is attached hereto. 2) This amendment to the Agreement shall be effective upon execution. The remainder of the Agreement shall remain in full force and affect except as changed herein. IN WITNESS WHEREOF, the parties have executed this Agreement by their duly authorized representatives as of the date first written above. CITY OF LUBBOCK: U�- Daniel M. Pope, MAYOR Rqec Garza, City ecretary APPROVED AS TO CONTENT: KellftCpb— ell, Executive Director of Aviation APPROVED AS TO FORM: Amy L. s, pu Attorney CONSULTANT: Demattei Wong Architecture, Inc. ATTACHMENT A1.2017 1W Demattei Wong architecture 15 March, 2017 Ms. Kelly Campbell Executive Director of Aviation City of Lubbock Lubbock Preston Smith International Airport 5401 N. Martin Luther King Blvd., Unit 389 Lubbock, Texas 79403 Re: Lubbock Preston Smith International Airport Consolidated Rental Car Facility Fee Proposal for Task 1 Concept Design — Task 7 Post -Construction Services Dear Ms. Campbell, Demattei Wong Architecture (DWA) is pleased to present the following fee proposal for the new Consolidated Rental Car Facility (ConRAC) for the City of Lubbock at Lubbock Preston Smith International Airport. This fee proposal is for Task 1-Concept Design, Task 2-Schematic Design, Task 3-Design Development, Task 4-Construction Documents, Task 5-Advertising/Bidding, Task 6-Construction Administration and Task 7-Post Construction. Project Description The City of Lubbock intends to construct a new partial ConRAC on the existing airport property. The site is defined by the existing Airport short term surface parking for the new ready/return lot, the existing rental car ready/return and service center sites for the new consolidated quick turn- around facility and surface staging and storage spaces. Project Requirements The project shall accommodate and include the following facility components: 1. Ready/Return Facility (R/R) — The Ready/Return Facility includes Ready and Return car areas. 2. Quick Turn Around Facility (QTA) — The QTA includes fueling, car wash facilities, employee amenities, administrative support areas, and vehicle staging/storage and stacking spaces, and light vehicle maintenance facilities. 3. Public Parking (PP) — Reconfiguration of short-term and long-term surface parking areas in front of the terminal. 4. Airport Employee Parking (AEP) — Relocation of existing airport employee parking lot to a temporary and new location. Scope of Services The scope of services includes Task 1-concept Design, Task 2-Schematic Design, Task 3-Design Development, Task 4-Construction Documents, Task 5-Advertising/Bidding, Task 6-Construction Administration and Task 7-Post Construction. Details on the scope of services are as follows: 1350 MANUFACTURING STREET SUITE 210 DALLAS, TEXAS 75207 214.370.0044 FAX 214.370,0077 TASK 1— Concept Design The Concept Design Task will complement and enhance the Program and Planning tasks in the initial contract, by further defining and developing the site and the functional operations of the ConRAC. This task establishes the functional relationships between the principal ConRAC components, defining the overall site circulation of all modes of vehicular movements and addressing any future expansion areas. DWA will utilize the unique Interactive Design Process (IDP) for the ConRAC project. The IDP is the method through which all design directions and decisions will be made. The process encourages equal interaction from all parties involved in the process through a structured setting to allow design input from all participants. It represents a series of charettes or participatory work sessions which occur over a specific period of time. Participants in the IDP include the airport staff, the Rental Car Agencies, and the design team. The IDP for concept design consists of planned meetings with specific objectives. DWA will develop the selected concept based on all challenges and issues which the stakeholders identified. DWA shall study and develop options for maximum site utilization. DWA shall further analyze site grading and drainage, traffic circulation, ingress/egress options, site layout options, interior roadways and quick turnaround facility layouts and their effects on site design. DWA shall generate building alternatives by studying massing and orientation through the use of drawings, sections, and stacking diagrams. 2 SCHEMATIC DESIGN Schematic Design will be based on the selected concept from Task 1. The objective will be to provide design alternatives and prepare presentation materials for each major component of the building development and to fix the scope of the Project by refining the program requirements to allow for preliminary budget confirmation and Owner approval. The concept will be further refined through the development of the following exhibits: • Site Plan — Identifies the customer vehicular access, ingress/egress, traffic flow in and around the site, landscape areas, edge conditions, service access and flow, visitor access and flow, service and fueling areas, etc. • Plans — Shows the relationship of the programmatic space requirements to scale and describes the functional requirements, such as, flow, wayfinding, building support areas, administrative areas, and public areas. • Sections — Identifies the vertical heights of the different components in relation to the existing grades. • Major Building Systems — The major building systems will be identified, analyzed, selected, and coordinated with the architectural drawings. The building systems will be structural engineering, mechanical engineering, electrical engineering, plumbing engineering, specialty engineering, etc. • General Outline Specifications - General outline specifications will be developed highlighting the major building divisions and identifying the general quality of the project. • LEED — Continuation of overall sustainability strategic approach of identifying, analyzing, and implementing project strategies. Schematic Design Deliverables: Drawings including: • Architectural building floor plans • Architectural roof plans • Architectural building sections • Architectural building elevations Narratives including: • Executive summary • Project purpose • Project scope • Facility operational description • Building aesthetics description Outline Specifications 3 DESIGN DEVELOPMENT Upon conclusion of the Schematic Design phase with the City of Lubbock, the DWA design team and consultants will have thoroughly reviewed the Schematic Design documents and have prepared a list of key design/coordination issues, cost issues, and Airport feedback issues. The major tasks arising out of the reviews will be to resolve and incorporate into the Project all agreed upon Schematic Design review comments and to establish a list of priorities and action items for the Design Development Phase. The Design Development documents will refine and further develop the design concepts and space planning established during the Schematic Design Phase. The main objective of the Design Development Phase will be to fix and describe the Architectural, Structural, Mechanical / Electrical / Plumbing systems and building materials and finalize design decisions. • Finalize major design decisions and fix and describe the architectural, structural, mechanical, electrical, plumbing systems, specialty systems, and building materials. • Convey all key aspects of the design and building systems in order that the State's acceptance of the design can be obtained, and in addition, form the basis for a further developed and refined cost estimate. • Serve as the basis for coordination among all team members to begin the Construction Documents Phase which will, in part, commence prior to completion of the Design Development Phase. 4 CONSTRUCTION DOCUMENTS Upon completion of the Design Development Document review period with the City of Lubbock, the DWA design team and consultants will have thoroughly reviewed the Design Development documents and have prepared a list of key design/coordination issues, cost issues, and Airport feedback issues. The major tasks arising out of the reviews will be to resolve and incorporate into the Project all agreed upon Design Development review comments and to establish a list of priorities and action items for the Construction Document Phase. The design team will thoroughly review the Design Development cost estimate for budget compliance, and review and discuss all Design Development review comments. Specific direction on Design Development issues for each building and all disciplines will be critical to move into the Construction Document Phase. The main objective of the Construction Document Phase is to prepare and issue construction document packages setting forth in detail the requirement for the project necessary for permitting, negotiating, contracting and construction. 5 ADVERTISINGBIDDING During the Advertising/Bidding phase, DWA will assist the City, and the Airport with questions and issues arising from the pricing efforts. The following are examples of activities during this phase: • Review bid packages • Assist in bid package distribution • Prepare addenda as required to answer contractor questions or further clarify the contract in responding to all contractor questions during the bidding process • Assist in conducting pre -bid conferences • Assist in price evaluations and in post -bid evaluation meetings 6 CONSTRUCTION ADMINISTRATION . During the project's construction phase, the DWA design team will manage and coordinate construction administration services with the City of Lubbock, Lubbock Preston Smith International Airport, and Construction Manager at Risk. The main objective is to manage the construction administration process, advising the City of the progress of construction. The following activities and events are examples during the project's construction phase: • Pre -construction conference • Attend project team construction meetings • Monitor construction schedule • Monitor submittal process • Monitor RFI's • Monitor as -built drawings • Permitting assistance • Value engineering review • Payment application review • Punch list assistance • Final change order review • Site visits 7 POST CONSTRUCTION The main objective will be to coordinate the transfer of the completed Project to the City of Lubbock's property manager. The following activities and events are examples during the project's post construction phase: • Establish close-out procedures • Compile Revit files on CD-ROM • Complete final accounting, payments and contract close-out • Close out document check list • Submittal of warranties and guarantees Fee Proposal Summary The DWA Team proposes to produce the scope of services for the following lump sum fee by task: 1. Task 1-Concept Design - $112,000 2. Task 2-Schematic Design - $246,400 3. Task 3-Design Development - $336,000 4. Task 4-Construction Documents - $425,600 5. Task 5-Advertising/Bidding - $21,344 6. Task 6-Construction Administration - $277,312 7. Task 7-Post Construction - $21,344 8. The direct, out-of-pocket expenses we incur while accomplishing this project — airfare, hotels, meals, car rentals, printing and plotting, reproductions, courier services, etc. - is not included in the cost of the basic services and will be billed at direct cost per contract limits. Estimated reimbursable costs are $93,600 and will not be exceeded without prior authorization. 9. Total Fee: Architectural/Engineering Services $1,440,000 Reimbursables $93 600 Total Fee $1,533,600 We are grateful for this opportunity and look forward to a successful project. Please feel free to call if you have any questions. Best Regards, M, Wesley Wong Jr., AIA Project Director Demattei Wong Architecture Team CERTIFICATE OF INTERESTED PARTIES FORM 1295 1of1 Complete Nos. 1 - 4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos. 1, 2, 3, 5, and 6 if there are no interested parties. CERTIFICATION OF FILING Certificate Number: 1 Name of business entity filing form, and the city, state and country of the business entity's place of business. 2017-194521 Demattei Wong Architecture, Inc. Dallas, TX United States Date Filed: 04/18/2017 2 Name of governmental entity or state agency that is a party to the contract for which the form is being filed. City of Lubbock Date Acknowledged: 05/02/2017 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract, and provide a description of the services, goods, or other property to be provided under the contract. Amendment 1 to contract 11852 Architectural Services 4 Name of Interested Party City, State, Country (place of business) Nature of interest (check applicable) Controlling Intermediary Demattei, Anthony Dallas, TX United States X Wong, Wesley Dallas, TX United States X 5 Check only if there is NO Interested Party. ❑ 6 AFFIDAVIT I swear, or affirm, under penalty of perjury, that the above disclosure is true and correct. Signature of authorized agent of contracting business entity AFFIX NOTARY STAMP / SEAL ABOVE Sworn to and subscribed before me, by the said this the day of 20 , to certify which, witness my hand and seal of office. Signature of officer administering oath Printed name of officer administering oath Title of officer administering oath corms proviaea oy i exas tinics commission www.etnics.state.tx.us Version V1.0.883 CERTIFICATE OF INTERESTED PARTIES FORM 1295 1of1 Complete Nos. 1- 4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos. 1, 2, 3, 5, and 6 if there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form, and the city, state and country of the business entity's place Certificate Number: of business. 2017-194521 Demattei Wong Architecture, Inc. Dallas, TX United States Date Filed: 2 Name of governmental entity or state agency that is a party to the contract for which the form is 04/18/2017 being filed. Date Acknowledged: City of Lubbock g Provide the identification number used by the governmental entity or state agency to track or identify the contract, and provide a description of the services, goods, or other property to be provided under the contract. Amendment 1 to contract 11852 Architectural Services Nature of interest 4 Name of interested Party City, State, Country (place of business) (check applicable) Controlling I Intermediary Demattei, Anthony Dallas, TX United States X Wong, Wesley Dallas, TX United States X 5 Check only if there is NO Interested Party. 6 AFFIDAVIT I swear, or affirm, under penalty of perjury, that the above disclosure is true and correct. � THOM DANCE z1-pY P4e`�;s Notary Public, State of Toxas =� Expires 05-02-2019 *Z Comm. 0F��' Notary ID 8778405 Signature of arlthorized agent f contracting business entity AFFIX NOTARY STAMP ! SEAL ABOVE t �v � � _, Sworn to and subscribed before me, by the said this the // �(P day of 20_1_Z_, to certify which, witness my hand and seal of office. Signature of officer administering oath Printed name of officer administering oath Title of officer administering oath Forms provided by Texas Ethics Commission www.etrncs.state.tx.us Vef�avrl vl.v.000