Loading...
HomeMy WebLinkAboutResolution - 2017-R0128 - S.J. Louis Construction - 04/13/2017Resolution No.2017-R0128 Item No.6.13 April 13,2017 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for and on behalf of the City of Lubbock,ChangeOrderNo. 1to that certainContractNo.12810 by and between the City of Lubbock and S.J.Louis Construction of Texas,Ltd. for the NWWRP Phase 1A Outfall Pipeline, and related documents. Said Change Order No. 1 is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council on April 13,2017 . ATTEST: jAgjL^L^ Rebecca Garza, City Secretary APPROVED AS TO^ONTENT /L.Wood fianklin,P.E.,Director of Public Works APPROVED AS TO FORM: Kelli Leisure,Assistant City Attorney RES.ChgOrd#lContractl2810-NWWRPPhaselA 03.20.17 DANIEL M.POPE,MAYOR City of Lubbock Purchasing and Contract Management Change Order 12810 Contract No: Contractor: S.J. Louis Construction of Texas, Ltd. Change Order No. 001 Contract Title: NWWRP Phase 1A Outfall Pipeline BID/RFP No. 16-12810-TF Project Number: 92221.8242.30000 1. "Change Order" means a written order to a Contractor executed by the Owner in accordance with the contract authorizing an addition to, deletion from, or adjustment or revision of the requirements of the contract documents, or an adjustment to the compensation payable to Contractor, or to the time for performance of the contract and completion of the Project, or a combination thereof, which does not alter the nature of the thing to be constructed and is an integral part of the project objective. Adjustments to "Estimated Quantities" to a line item in a Unit Price contract do not require a Change Order. All work that alters the nature of the thing to be constructed or that is not an integral part of the project objective must be let out for public bid. Description of change (alteration, deviation, addition, or deletion) caused by conditions encountered during construction not covered by the specifications and drawings of the project (attach additional pages ifnecessary): CMR 001 -Delete 955 LF of 36-inch Hobas (0-20' depth), 955 LF of trench safety and MH#1 (No time). PCM 001- Add of 1 LS Stainless Steel Ring on Outfall Structure (No time); PCM 002 - Add 20 LF of 54-inch Cased Bore at CRMWA Easement (2 days); PCM 003 Add 4 EA, Cut & Plug 36" Abandoned Well Field Lines (2 Days); PCM 004 - Add of 1 LS, 8-foot Height Chain Link Double Gates (No time) 2. Where the Change Order is negotiated, the Change Order must be fully documented and itemized as to costs, including material quantities, material costs, taxes, insurance, employee benefits, other related costs, profit and overhead. Where certain unit prices are contained in the initial contract, no deviations are allowed in computing negotiated change order costs. ITEMIZED COSTS MUST BE FULLY DOCUMENTED AND ATTACHED TO THIS FORM. ITEM DESCRIPTION AMOUNT A. ORIGINAL CONTRACT VALUE: $ $8,375,658.00 B. AMOUNT OF THIS CHANGE ORDER: Council approval required if over $25, 000 $-289,389.55 COST CENTER: ACCOUNT: C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A): -3.5 % D. AMOUNT OF PREVIOUS CHANGE ORDERS: $ 0.00 E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D): $-289,389.55 F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): 25% increase -3.5 % or decrease G. NEW CONTRACT AMOUNT (A+E): $ 8,086,268.45 3. It is mutually agreed that the above dollar amount and the time extension, as applicable, as set forth in this Change Order constitutes full compensation to the Contractor for all costs, expenses and damages to the Contractor, whether direct, consequential or otherwise, in anyway incident to, or arising out of or resulting directly or indirectly; from the work performed or modified by the Contractor under this Change Order. This Change Order is not valid without the following signatures (please sign in order and return 3 originals with Contract Cover Sheet to Purchasing and Contract Management Department): ,,a„� a ro 0 /42 // � Freese &Nichols 2/16/17 1) CONTRACTOR Date (2) PROJECT ARCHITECTBNGINEER Date ie Content: p to Pbrm: � ao-17 PRESENTA ate (4 CITY ATTORNEY Date Is ? z 1 (5) CAPITAL PROJECTS MANAGER Date (6) Pt S G AND CONTRAC ANAGER Date CITY O Change Orders over $25,000 require a Contract Cover Sheet and the followin s IJBBOCi: 4/13/17 7 4/13/1 7 (7) MAYOR Date (8) C_nj SECRETARY I N Date Council Date: April 13, 2017 Agenda Item #: 613 Resolution #:"—�017-RO 128 PUR-45 (Rev 12/2012) City of Lubbock Purchasing and Contract Management Change Order PUR45 (Rev 12/2012) MM FREESE - .- MICHOL� l tiHlVl�t IJKUtK (4.43) PROJECT: Northwest Water Reecllamation Plant Outfall Pipeline OWNER: City of Lubbock, Texas OWNER PROJ # 92221.9242.30000 CONTRACTOR: SJ Louis Construction of Texas, Ltd. CONTRACTOR # ENGINEER: Alan Plummer Associates, Inc. ENG. PROD. # FNI Proj. # LUB16204 ANGE ORDER NO. 1 CHANGE ORDER DATE: 2/16/2017 Intake following additions/deletions or modifications to work described in the Contract Documents: CMR 001 PCM 001 PCM 002 PCM 003 PCM 004 8 9 10 Description of Change Deduct of 955 LF, 36" CCFRPM (0 - 20 ft. depth), No time Deduct of 1 EA, 6-foot Fiberglass Manholes, No time Deduct of 955 LF, Trench Safety, No time Add of 1 LS Stainless Steel Ring on Outfall Structure, No cost/time Add of 20 LF of 54-inch Cased Bore at CRMWA Easement, 2 Days Add of 4 EA, Cut & Plug 36" Abandoned Well Field Lines, 2 Days Add of 1 LS, 8-foot Height Chain Link Double Gates, No time Cost -$355,260.00 -$14,650.00 -$9.55 $0.00 $69,920.00 $2,008.00 $ 8, 602.00 TOTAL COST OF THIS CHANGE ORDER: -$289,389.55 The compensation agreed to upon in this change order is full, complete and final payment for all costs the Contractor may incur as a result afar related to this change whether said costs are known, unknown, foreseen or unforeseen at this time, including without limitation, any cost for delay, extended overhead, ripple or impact cost, or any other affect on changed or unchanged work as a result of this Change Order. Contract Cost and/or Time Impacts: Original Contract Amount $8,375,658.00 Previously Approved Change Order Amount $0.00 Adjusted Contract Amount $8,375,658.00 Proposed Change Order Amount (this change order) -$289,389.55 Revised Contract Amount $8,086,268.45 Previous Contract Time 270 Previous Substantial Completion Date 12-May-17 Previous Final Completion Date 11-Jun-17 Net Change in Contract Time 4 Revised Contract Time 274 Revised Substantial Completion Date 16-May-17 Revised Final Completion Date 15-Jul-17 Recommended by: FREESE ANDNIICCHOLS, INC..�� By 2/16/2017 Date Approved by: (Contractor) 7 Date Approved by: (Owner) By Date CERTIFICATE OF INTERESTED PARTIES FORM 1295 1of1 Complete Nos. 1- 4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos. 1, 2, 3, 5, and 6 if there are no interested parties. CERTIFICATION OF FILING Certificate Number: 1 Name of business entity filing form, and the city, state and country of the business entity's place of business. 2017-189486 S.J. Louis Construction of Texas Ltd. Conroe, TX United States Date Filed: 04/07/2017 2 Name of governmental entity or state agency that is a party to the contract for which the form is being filed. City of Lubbock Date Acknowledged: 04/10/2017 u.' 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract, and provide a description of the services, goods, or other property to be provided under the contract. RFP 16-12810 Change Order #1 NWRP Outfall Line 4 Name of Interested Party City, State, Country (place of business) Nature of interest (check applicable) Controlling FIntermediary Menebroker, Lucas Conroe, TX United States X 5 Check only if there is NO Interested Party. ❑ 6 AFFIDAVIT I swear, or affirm, under penalty of perjury, that the above disclosure is true and correct. Signature of authorized agent of contracting business entity AFFIX NOTARY STAMP / SEAL ABOVE Sworn to and subscribed before me, by the said this the day of 20 , to certify which, witness my hand and seal of office. Signature of officer administering oath Printed name of officer administering oath Title of officer administering oath Forms proviaea oy I exas Ethics commission www.ethics.state.tx.us Version V1.0.883 CERTIFICATE OF INTERESTED PARTIES FORM Z295 1of1 Complete Nos. 1- 4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos. 1, 2, 3, 5, and 6 if there are no interested parties. CERTIFICATION OF FILING Certificate Number: 1 Name of business entity filing form, and the city, state and country of the business entity's place of business. S.J. Louis Construction of Texas Ltd. 2017-189486 Conroe, TX United States Date Filed: 04/07/2017 2 Name of governmental entity or state agency that is a party to the contract for which the form is being filed. City of Lubbock Date Acknowledged: 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract, and provide a description of the services, goods, or other to be property provided under the contract. RFP 16-12810 Change Order #1 NWRP Outfall Line 4 Nature of interest Name of Interested Party City, State, Country (place of business) (check applicable) Controlling Intermediary Menebroker, Lucas Conroe, TX United States TX 5 Check only if there is NO Interested Party. ❑ 6 AFFIDAVIT I swear, or affirm, under penalty of perjury, that the above disclosure is true and correct. 'i , ram SAMUEL MONTOYA Notary 10 s 12040080 0 �^ My Commission Ex fires Expires v _ Q.,,FartF►4 July 19, 2020 nature of authorized agent of contracting business entity AFFIX NOTARY STAMP / SEAL ABOVE 1 Sworn to and subscribed before me, by the said LUe"k 5 L. KEOe-B,?WER this the /d day of Aix/ L._ 20 % 7 to certify which, witness my hand and seal of office. 1, / ta7cC�L h`lar.�vya /11OTARZ nature of officer administering oath Printed name of officer administering oath Title of officer administering oath Pnrmc nrnvirinri by T—, =:+t,;, - r- --- . --I,--- wVVw.Cuncs.siaie.ix.uS Version V1.0.883