Loading...
HomeMy WebLinkAboutResolution - 2017-R0087 - HDR Engineering - 02/23/2017Resolution No.2017-R0087 Item No.6.13 February 23,2017 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for and on behalf of the City of Lubbock,a Professional Service Contract for Improvements related to the Strategic Water Supply Plan,by and between the City of Lubbock and HDR Engineering,Inc., and related documents.Said Contract is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council on February 23,2017 . DANIEL M.POPE,MAYOR ATTEST: lLll /^ Rebecca Garza,City Secretary APPROVED AS TO CONTENT: Aubrey A.SpeaiyP.E.,Director of Water Utilities u APPROVED AS TO FORM: RES.PS Contract-HDR Engineering,Inc 1.10.17 Resolution No. 2017-R0087 PROFESSIONAL SERVICES CONTRACT STATE OF TEXAS § COUNTY OF LUBBOCK § This contract (the "Contract" or "Agreement") #13240, effective as of the 23rdday of February, 2017 (the "Effective Date"), is by and between the City of Lubbock, (the "City"), a Texas home rule municipal corporation, and HDR Engineering, Inc. ("ENGINEER"), a Nebraska corporation authorized to conduct business in Texas. WITNESSETH WHEREAS, the City desires to obtain professional engineering services related to planning, evaluating, permitting, designing, and construction of strategic water supplies and management strategies (the "Activities" or "Project"); and WHEREAS, ENGINEER has a professional staff experienced in, and is qualified to provide, professional engineering services related to the Activities, and will provide the services, as defined below, for the price provided herein, said price stipulated by City and ENGINEER to be a fair and reasonable price; and WHEREAS, the City desires to contract with ENGINEER to provide professional engineering services related to the Activities and ENGINEER desires to provide the Services related to same. NOW THEREFORE, for and in consideration of the terms, covenants and conditions set forth in this Contract, the City and ENGINEER hereby agree as follows: ARTICLE I. TERM The term of this Contract commences on the Effective Date and continues without interruption for a term of 365 days, as set forth in Exhibit "A", attached to and made a part of this Agreement for all purposes. If the ENGINEER determines that additional time is required to complete the Services, the Director of Water Utilities may, but is not obligated to, in his discretion, Strategic Water Supply Planning Page 1 of24 execute an agreement to grant up to an additional six (6) months of time so long as the amount of the consideration does not increase. An amendment to this Agreement resulting in an increase in the amount of the consideration must be approved by the City acting through its governing body. ARTICLE II. SERVICES AND COMPENSATION A. ENGINEER shall conduct all activities and within such timeframes as set forth on Exhibit "A", attached hereto (the "Services"). B. ENGINEER shall receive as consideration to be paid for the performance of the Services set forth in Exhibit "B", for a not -to -exceed price of One hundred ninety-five thousand seven hundred dollars ($195,700). ARTICLE III. TERMINATION A. General. City may terminate this Contract, for any reason or convenience, upon thirty (30) days written notice to ENGINEER. In the event this Agreement is so terminated, the City shall only pay ENGINEER for services actually performed by ENGINEER up to the date ENGINEER is deemed to have received notice of termination as provided herein. B. Termination and Remedies. In the event ENGINEER materially breaches any term and/or provision of this Contract and fails to cure within 10 days after notice of same, the City shall be entitled to exercise any right or remedy available to it by this Contract, at law, equity, or otherwise, including without limitation, termination of this Contract and assertion of an action for damages and/or injunctive relief. The exercise of any right or remedy shall not preclude the concurrent or subsequent exercise of any right or remedy and all rights and all remedies shall be cumulative. ARTICLE IV. NON - ARBITRATION The City reserves the right to exercise any right or remedy available to it by law, contract, equity, or otherwise, including without limitation, the right to seek any and all forms of relief in a court of competent jurisdiction. Further, the City shall not be subject to any arbitration process prior to exercising its unrestricted right to seek judicial remedy. The remedies set forth herein are cumulative and not exclusive, and may be exercised concurrently. To the extent of any conflict Strategic Water Supply Planning Page 2 of 24 between this provision and another provision in, or related to, this Contract, this provision shall control. ARTICLE V. REPRESENTATIONS AND WARRANTIES A. Existence. ENGINEER is a corporation duly organized, validly existing, and in good standing under the laws of the State of Texas and is qualified to carry on its business in the State of Texas. B. Corporate Power. ENGINEER has the corporate power to enter into and perform this Contract and all other activities contemplated hereby. C. Authorization. Execution, delivery, and performance of this Contract and the activities contemplated hereby have been duly and validly authorized by all the requisite corporate action on the part of ENGINEER. This Contract constitutes legal, valid, and binding obligations of the ENGINEER and is enforceable in accordance with the terms hereof. D. Engineer. ENGINEER maintains a professional staff and employs, as needed, other qualified specialists experienced in providing the Services, and are familiar with all laws, rules, and regulations, both state and federal, including without limitation, the applicable laws, regarding the Activities contemplated hereby. E. Performance. ENGINEER will and shall conduct all activities contemplated by this Contract in accordance with the standard of care, skill and diligence normally provided by a professional person in performance of similar professional engineering services in Texas, and comply with all applicable laws, rules, and regulations, both state and federal, relating to professional engineering services, as contemplated hereby. F. Use of Copyrighted Material. ENGINEER warrants that any materials provided by ENGINEER for use by City pursuant to this Contract shall not contain any proprietary material owned by any other party that is protected under the Copyright Act or any other law, statute, rule, order, regulation, ordinance or contractual obligation relating to the use or reproduction of materials. ENGINEER shall be solely responsible for ensuring that any materials provided by ENGINEER pursuant to this Contract satisfy this requirement and ENGINEER agrees to indemnify Strategic Water Supply Planning Page 3 of 24 and hold City harmless from all liability or loss caused to City or to which City is exposed on account of ENGINEER's failure to perform this duty. ARTICLE VI. SCOPE OF SERVICES ENGINEER, shall accomplish the following: Professional Engineering Services related to the Project, as defined and provided in Exhibit "A," "Scope of Services". ARTICLE VII. INDEPENDENT CONTRACTOR STATUS ENGINEER and City agree that ENGINEER shall perform the duties under this Contract as an independent contractor and shall be considered as independent contractor under this Agreement and/or in its activities hereunder for all purposes. ENGINEER has the sole discretion to determine the manner in which the services are to be performed. During the performance of the Services under this Agreement, Engineer and Engineer's employees and/or subconsultants, will not be considered, for any purpose, employees or agents of the City within the meaning or the application of any federal, state or local law or regulation, including without limitation, laws, rules or regulations regarding or related to unemployment insurance, old age benefits, workers compensation, labor, personal injury or taxes of any kind. ARTICLE VIII. INSURANCE Engineer shall procure and carry, at its sole cost and expense through the life of this Agreement, except as otherwise provided herein, insurance protection as hereinafter specified, in form and substance satisfactory to City, carried with an insurance company authorized to transact business in the state of Texas, covering all aspects and risks of loss of all operations in connection with this Agreement, including without limitation, the indemnity obligations set forth herein. Engineer shall obtain and maintain in full force and effect during the term of this Agreement, and shall cause each approved subcontractor or subconsultant of Engineer to obtain and maintain in full force and effect during the term of this Agreement, commercial general liability, professional liability and automobile liability coverage for non -owned and hired vehicles with insurance carriers admitted to do business in the state of Texas. The insurance companies must carry a Best's Rating Strategic Water Supply Planning Page 4 of 24 of A-VII or better. All policies will be written on per occurrence basis except Professional Liability, subject to the following minimum limits of liability: Commercial General Liability: Per Occurrence Single Limit: General Aggregate Limit: Professional Liability: Per Claim: Automobile Liability: Combined Single Limit for any auto: $1,000,000 $2,000,000 $1,000,000 $1,000,000 Per Occurrence Engineer shall further cause any approved subcontractor or subconsultant to procure and carry, during the term of this Agreement, Professional Liability coverage, as specified above for Engineer, protecting City against direct losses caused by the professional negligence of the approved subcontractor or subconsultant. The City shall be listed as a primary and noncontributory additional insured with respect to the Automobile Liability and Commercial General Liability and shall be granted a waiver of subrogation under those policies. Engineer shall provide a Certificate of Insurance to the City as evidence of coverage. The certificate shall provide 30 days notice of cancellation. A copy of the additional insured endorsement and waiver of subrogation attached to the policy will be included in the Certificate. Engineer shall elect to obtain worker's compensation coverage pursuant to Section 406.002 of the Texas Labor Code. Further, Engineer shall maintain said coverage throughout the term of this Agreement and shall comply with all provisions of Title 5 of the Texas Labor Code to ensure that the Engineer maintains said coverage. The Engineer may maintain Occupational Accident and Disability Insurance in lieu of Worker's Compensation. In either event, the policy must be endorsed to include a waiver of subrogation in favor of the City. If at any time during the life of the Agreement or any extension hereof, Engineer fails to maintain the required insurance in full force and effect, Engineer shall be in breach hereof and all work under the Agreement shall be discontinued immediately. Strategic Water Supply Planning Page 5 of 24 Notwithstanding anything contained herein to the contrary, the professional liability policy shall be maintained at Engineer's sole cost and expense. The retroactive date shall be no later than the commencement of the performance of this Contract and the discovery period (possibly through tail coverage) shall be no less than ten (10) years after the completion of work specified in the Contract. The provisions of this Article VIII shall survive the termination or expiration of this Agreement. ARTICLE IX. EMPLOYMENT OF AGENTS/RETAINING OF CONSULTANTS ENGINEER may employ or retain consultants, contractors, or third parties (any of which are referred to herein as "Subconsultant"), to perform certain duties of ENGINEER, as set forth on Exhibit "A", attached hereto, under this Contract, provided that City approves the retaining of Subconsultants. The City hereby approves the retention of the "HDR Team" as described in Exhibit "A," attached hereto. ENGINEER is at all times responsible to City to perform the Services as provided in this Agreement and ENGINEER is in no event relieved of any obligation under this Contract upon retainage of any approved Subconsultant. Any agent and/or Subconsultant retained and/or employed by ENGINEER shall be required by ENGINEER to carry, for the protection and benefit of the City and ENGINEER and naming said third parties as additional insureds, insurance as described above in this Contract. ENGINEER represents that such services are either under applicable value thresholds or are otherwise exempt from notice and/or bid requirements under Texas Law. ARTICLE X. CONFIDENTIALITY ENGINEER shall retain all information received from or concerning the City and the City's business in confidence and shall not reveal such information to third parties without prior written consent of the City, unless otherwise required by law. It is hereby agreed that the following information is not considered to be confidential under this Agreement: a) Information already in the public domain; b) Information disclosed to ENGINEER by a third party who is not under a confidentiality obligation; Strategic Water Supply Planning Page 6 of 24 c) Information developed by or in the custody of ENGINEER related to work with clients before entering into this Agreement; and d) Information developed by ENGINEER through its work with other clients ARTICLE XI. INDEMNITY ENGINEER SHALL INDEMNIFY AND SAVE HARMLESS THE CITY OF LUBBOCK AND ITS ELECTED OFFICIALS, OFFICERS, AGENTS, AND EMPLOYEES FROM ALL SUITS, ACTIONS, LOSSES, DAMAGES, CLAIMS, OR LIABILITY OF ANY KIND, CHARACTER, TYPE, OR DESCRIPTION, INCLUDING WITHOUT LIMITING THE GENERALITY OF THE FOREGOING, ALL EXPENSES OF LITIGATION, COURT COSTS, AND REASONABLE ATTORNEY'S FEES, FOR INJURY OR DEATH TO ANY PERSON, OR INJURY TO ANY PROPERTY, RECEIVED OR SUSTAINED BY ANY PERSON OR PERSONS OR PROPERTY, TO THE EXTENT ARISING OUT OF, RELATED TO OR OCCASIONED BY, THE NEGLIGENT ACTS OF ENGINEER, ITS AGENTS, EMPLOYEES, AND/OR SUBCONSULTANTS, RELATED TO THE PERFORMANCE, OPERATIONS OR OMISSIONS UNDER THIS CONTRACT AND/OR THE USE OR OCCUPATION OF CITY OWNED PROPERTY. THE INDEMNITY OBLIGATION PROVIDED HEREIN SHALL SURVIVE THE EXPIRATION OR TERMINATION OF THIS AGREEMENT. ARTICLE XII. COMPLIANCE WITH APPLICABLE LAWS ENGINEER shall comply with all applicable federal, state and local laws, statutes, ordinances, rules and regulations relating, in any way, manner or form, to the activities under this Contract, and any amendments thereto. ARTICLE XIII. NOTICE A. General. Whenever notice from ENGINEER to City or City to ENGINEER is required or permitted by this Contract and no other method of notice is provided, such notice shall be given by (1) actual delivery of the written notice to the other party by hand (in which case such notice shall be effective upon delivery); (2) facsimile (in which case such notice shall be effective upon delivery); or (3) by depositing the written notice in the United States mail, properly addressed to the Strategic Water Supply Planning Page 7 of 24 other party at the address provided in this article, registered or certified mail, return receipt requested, in which case such notice shall be effective on the third business day after such notice is so deposited. are: B. ENGINEER's Address. ENGINEER's address and numbers for the purposes of notice HDR Engineering, Inc. Attn: David D. Dunn, P.E. 4401 West Gate Blvd., Suite 400 Austin, Texas 78745 Telephone: (512) 912-5136 Facsimile: (512) 912-5158 C. City's Address. The City's address and numbers for the purposes of notice are: City of Lubbock Attn: Aubrey A. Spear, P.E. P. O. Box 2000 1625 13th Street Lubbock, Texas 79457 Telephone: (806) 775-2585 Facsimile: (806) 775-3027 D. Change of Address. Either party may change its address or numbers for purposes of notice by giving written notice to the other party as provided herein, referring specifically to this Contract, and setting forth such new address or numbers. The address or numbers shall become effective on the 15th day after such notice is effective. ARTICLE XIV. CITY -PROVIDED DATA City shall furnish ENGINEER non -confidential studies, reports and other available data in the possession of the City pertinent to ENGINEER's Services, so long as City is entitled to rely on such studies, reports and other data for the performance of ENGINEER's Services under this Strategic Water Supply Planning Page 8 of 24 Contract (the "Provided Data"). ENGINEER shall be entitled to use and rely, so long as such reliance is reasonable, upon all such Provided Data. ARTICLE XV. MISCELLANEOUS A. Captions. The captions for the articles and sections in this Contract are inserted in this Contract strictly for the parties' convenience in identifying the provisions to this Contract and shall not be given any effect in construing this Contract. B. Audit. ENGINEER shall provide access to its books and records for time -based and reimbursable expenses to the City. The City may audit, at its expense and during normal business hours, ENGINEER's books and records with respect to this Contract between ENGINEER and City. C. Records. ENGINEER shall maintain records that are necessary to substantiate the services provided by ENGINEER. D. Assignability. Neither party may assign this Contract without the prior written approval of the other party. E. Successor and Assigns. This Contract binds and inures to the benefit of the City and ENGINEER, their permitted successors and assigns. F. Construction and Venue. THIS CONTRACT SHALL BE GOVERNED BY AND CONSTRUED IN ACCORDANCE WITH THE LAWS OF THE STATE OF TEXAS. THIS CONTRACT IS PERFORMABLE IN LUBBOCK COUNTY, TEXAS. THE PARTIES HERETO HEREBY IRREVOCABLY CONSENT TO THE SOLE AND EXCLUSIVE JURISDICTION AND VENUE OF THE COURTS OF COMPETENT JURISDICTION OF THE STATE OF TEXAS, COUNTY OF LUBBOCK, FOR THE PURPOSES OF ALL LEGAL PROCEEDINGS ARISING OUT OF OR RELATING TO THIS CONTRACT OR THE ACTIONS THAT ARE CONTEMPLATED HEREBY. Strategic Water Supply Planning Page 9 of 24 G. Severability. If any provision of this Contract is ever held to be invalid or ineffective by any court of competent jurisdiction with respect to any person or circumstances, the remainder of this Contract and the application of such provision to persons and/or circumstances other than those with respect to which it is held invalid or ineffective shall not be affected thereby. H. Amendment. No amendment, modification, or alteration of the terms of this Contract shall be binding unless such amendment, modification, or alteration is in writing, dated subsequent to this Contract, and duly authorized and executed by ENGINEER and City. I. Entire Agreement. This Contract, including Exhibits "A" and `B," attached hereto, contains the entire agreement between the City and ENGINEER, and there are no other written or oral promises, conditions, warranties, or representations relating to or affecting the matters contemplated herein. J. No Joint Enterprise. Nothing contained herein shall be construed to imply a joint venture, joint enterprise, partnership or principal — agent relationship between ENGINEER and the City. K. Documents Owned by City. Any and all documents, drawings and specifications prepared by ENGINEER as part of the Services hereunder, with the exception of those standard details and specifications regularly used by the ENGINEER in its normal course of business, shall become the property of the City when ENGINEER has been compensated as set forth in Article II, above. The ENGINEER shall make copies of any and all work products for its files. Any reuse or modification of such Documents for purposes other than those intended by ENGINEER herein shall be at City's sole risk and without liability to the ENGINEER. L. Notice of Waiver. A waiver by either City or ENGINEER of a breach of this Agreement must be in writing and duly authorized to be effective. In the event either party shall execute and deliver such waiver, such waiver shall not affect the waiving party's rights with respect to any other or subsequent breach. M. Third Party Activities. Nothing in this Agreement shall be construed to provide any rights or benefits whatsoever to any party other than City and ENGINEER. Strategic Water Supply Planning Page 10 of 24 N. Non- Appropriation. All funds for payment by the City under this Contract are subject to the availability of an annual appropriation for this purpose by the City. In the event of non - appropriation of funds by the City Council of the City of Lubbock for the services provided under this Contract, the City will terminate this Contract, without termination charge or other liability, on the last day of the then -current fiscal year or when the appropriation made for the then -current year for the goods or services covered by this Contract is spent, whichever event occurs first (the "Non - Appropriation Date"). If at any time funds are not appropriated for the continuance of this Contract, cancellation shall be accepted by the ENGINEER on thirty (30) days prior written notice, but failure to give such notice shall be of no effect and the City shall not be obligated under this Contract beyond the Non -Appropriation Date. EXECUTED as of the Effective Date hereof. ATTEST: Reb cca Garza, City Secret ry APPROVED AS TO CONTEN Aubrey A. Speer, P.E., Director of Water Utilities APPROVED AS TO FORM: CITY OF LUBBOCK 4n=,A� Daniel M. Pope, Mayor HDR Engineering, Inc. e ly J. Oa jiil ce President Strategic Water Supply Planning Page 11 of 24 EXHIBIT A 2018 STRATEGIC WATER SUPPLY PLAN SCOPE OF SERVICES Background The City of Lubbock (the "City") prepared a 100-year Strategic Water Supply Plan ("SWSP" or the "Plan") in 2013, and intends to update the Plan every five years. The Plan provides a framework for evaluation and implementation of water supply sources at appropriate times and in a cost efficient manner. Since development of the 2013 SWSP, the City has continued to update and refine evaluations of water supply strategies and has pursued the necessary permitting and coordination with the regional and state water planning process to facilitate the City's initiatives. This scope of services will develop the 2018 SWSP, incorporating new information that has been developed since the 2013 SWSP was completed. Scope of Services HDR will perform the following tasks for the City, generally organized to follow the chapter -by - chapter outline of the 2013 SWSP. The City intends for this update to be accomplished in a collaborative fashion between City staff and HDR. Task 1. Update Introduction The City will be responsible for updating Chapter I Introduction and will provide draft text and figures to HDR to incorporate into the document. HDR will provide editorial review to the text and figures, and will format and incorporate the information provided by the City into the final Plan. Task 2. Water Demand Proiections HDR will update water demand projections based on information updated since the 2013 SWSP. Task 2.1. Population Projections HDR will acquire the annual population estimates (2011 — 2016) for the City and its customers from the U.S. Census Bureau and will acquire the population projections for the City and its customers from the 2016 Llano Estacado (Region O) Regional Water Plan. If the population projections for the 2021 Region O Plan are available, those will be obtained as well. Strategic Water Supply Planning Page 12 of 24 Using those data and historical census data, HDR will develop projections of future population for the City and its customers through year 2118. HDR anticipates developing two separate projections — Probable Growth and Accelerated Growth, consistent with those developed for the 2013 SWSP. Based upon recent experience, growth rates for these projections may be different from those used in the 2013 SWSP, and will be decided upon jointly by HDR and the City. Task 2.2. Per Capita Consumption HDR will utilize data provided by the City to estimate per capita consumption for years 2010 — 2016. These data will then be utilized to project per capita consumption through year 2113. In the 2013 SWSP, two projections were developed, Probable and Conservation. Recent City use appears to more closely follow the Conservation consumption pattern, which may have become the "new probable." HDR will coordinate with the City to develop updated Probable and Conservation consumption projections that are consistent with recent experience and long-term City goals. Task 2.3. Annual Water Demand Projections HDR will utilize the information from Tasks 2.1 and 2.2 to develop alternative annual water demand projections. These projections will be consistent with the Probable, Accelerated and Conservation demand projections from the 2013 SWSP, which will be reviewed by HDR and the City and revised as appropriate to be consistent with recent experience and long-term City goals. Task 2.4. Peak Day Water Demands HDR will utilize the Annual Water Demand Projections (as average day), and apply the same peak day demand factors used in the 2013 SWSP to develop projections of peak day water demands. Task 2.5. Update Appendix A HDR will update Appendix A to incorporate the new information developed during Task 2. Task 3. Decommissioned Water Supplies This chapter of the 2013 SWSP requires little or no update. The City will provide the text and figures to HDR for inclusion in the 2018 SWSP. Task 4. Current Water Supplies Much of the information concerning the City's current water supplies is unchanged since the 2013 SWSP. Task 4.1. Supplies The City will update the information in this chapter regarding supplies allocated from CRMWA and supplies from the Bailey County Well Field. HDR will update the information in the chapter regarding the available supply from Lake Alan Henry to account for the updated safe yield supply determined since the 2013 SWSP. Strategic Water Supply Planning Page 13 of 24 Task 4.2. System Capacity The City will provide updated information regarding the capacity of the current system, and HDR will incorporate this updated information into the text of the chapter. Task 4.3. Comparison of Demands and Supplies HDR will utilize the information developed in Tasks 2, 4.1 and 4.2 to update the chapter section comparing current supplies with projected water demands. Task 4.4. Update Appendix B HDR will update Appendix B to reflect the information developed in Tasks 2 and 4. Task 5. Water Conservation Stratep-ies HDR will update Chapter 5 Water Conservation Strategies and Appendix C as necessary to reflect current practices by the City, recent data, and the City's most current Water Conservation Plan and Ordinance. The City will assist by providing necessary data for the Plan update and confirming that specific City strategies are still applicable. Much of this update will be based on information contained in the "City of Lubbock Water Conservation Program Development" technical memorandum recently prepared by Alan Plummer and Associates, Inc. Task 6. Reclaimed Water Strategies Task 6.1. Update Reclaimed Water Availability HDR will update Chapter 6 Reclaimed Water Strategies to reflect information concerning the Northwest Water Reclamation Plant (NWWRP). HDR will review more recent wastewater influent demands and update per capita wastewater usage, as necessary, and update projected reclaimed water availability. The City will provide to HDR wastewater plant inflows not included in the 2013 SWSP for this purpose. The City will also provide to HDR estimates of reclaimed water to be sold for power generation and other purposes in order for HDR to update that information in Chapter 6. HDR will update Appendix D to reflect the new information. Task 6.2. Update Reclaimed Water Strategies HDR will update the following reclaimed water strategies to reflect current information available concerning planned configurations, supplies developed and costs. Costs will be updated to 2017 dollars using the TWDB costing model approach, modified to account for recent pump station costs Lubbock has experienced. Costs utilized in the Direct Potable Reuse study are not always compatible with other cost bases because they reflect several Bureau of Reclamation requirements for specific contingency factors, etc. Other updated information will reflect more Strategic Water Supply Planning Page 14 of 24 detailed evaluations of these strategies that have been completed subsequent to the publication of the 2013 SWSP. • North Fork Diversion at CR 7300 — An updated evaluation was performed in 2015 and additional information concerning treatment options has been made available from the City's ongoing Direct Potable Reuse Study. An updated evaluation will include this new information. • Direct Potable Reuse to NWTP — The evaluation will be updated to reflect the Direct Potable Reuse Study. • Direct Potable Reuse to SWTP — The evaluation will be updated to reflect the Direct Potable Reuse Study. • South Fork Discharge — Costs will be updated to 2017 dollars. • North Fork Diversion to LAH Pump Station — Costs will be updated to 2017 dollars. • Reclaimed Water ASR1 — This evaluation will be updated to reflect analyses completed for the Aquifer Storage and Recovery Evaluation completed in 2015. Additional information will be included to reflect recent legislation regarding regulation of ASR projects enacted since publication of the 2013 SWSP. • Other strategies — Other strategies identified in the Direct Potable Reuse Study will be incorporated into this section as appropriate. Task 7. Groundwater Strategies Task 7.1. Update Groundwater Supplies HDR will update Chapter 7, Section 7.1 regarding the City's groundwater supplies to include more recent information regarding the City's groundwater supplies from the CRMWA and from the City -owned Baily County Well Field. HDR will also update Section 7.2 to reflect current issues regarding groundwater regulation in the area. Task 7.2. Update Groundwater Strategies HDR will update the Chapter 7 sections describing the various groundwater strategies available to the City. Costs will be updated to 2017 dollars. Other updated information will reflect more detailed evaluations of the following strategies completed subsequent to the publication of the 2013 SWSP. • Roberts County Well Field Capacity Maintenance — This strategy will be updated to include the CRMWA's most recent plans for well field maintenance. 1 Note that following confirmation by the City, all ASR projects will likely be combined into a new, separate ASR chapter. Strategic Water Supply Planning Page 15 of 24 • Bailey County Well Field Capacity Maintenance — This strategy will be updated to reflect the City's efforts to maintain capacity from the well field since publication of the 2013 SWSP, including reflecting any new regulatory and legal constraints instituted since 2013. • Roberts County Well Field — New Transmission Line to Aqueduct — This strategy will be updated to include CRMWA's most recent plans for the transmission line and costs updated to 2017 dollars. • CRMWA to ASR — This strategy will be updated to reflect analyses completed for the Aquifer Storage and Recovery Evaluation completed in 2015. Additional information will be included to reflect legislation regarding regulation of ASR projects enacted since publication of the 2013 SWSP. • South Lubbock Well Field — Costs for this strategy will be updated to 2017 dollars. • Brackish Well Field —Costs for this strategy will be updated to 2017 dollars. Treatment options will be updated to reflect data obtained from the Dockum Brackish Test Well completed in December 2016. Supply availability and well yields and overall project configuration also will be updated as necessary to reflect data from the test well. Task 8. Surface Water Strategies Task 8.1. Update Developed Water Supplies HDR will update Chapter 8, Section 8.1 regarding the City's developed water supplies, which consist of reclaimed water and playa lake stormwater. HDR will update the amount of playa lake stormwater potentially available to reflect the North Lubbock Drainage Improvement Project. Information regarding TCEQ actions and other related legal or regulatory issues regarding currently pending water right permit applications will be reflected in the update. Task 8.2. Update Surface Water Strategies HDR will update the Chapter 8 sections describing the various surface water strategies being considered by the City. • Lake Alan Henry Phase 2 — This strategy will be updated to reflect 2017 dollars and any additional engineering evaluations completed since publication of the 2013 SWSP. • Jim Bertram Lake 7 — This strategy will be updated to reflect 2017 dollars. Other information to be incorporated include information from the groundwater interactions study completed by HDR in 2014, additional supply made available through the North Lubbock Drainage Improvement Project, refined estimates of supply available from reclaimed water sources, and an alternative transmission and treatment system to the North Water Treatment Plant as identified in the Direct Potable Reuse Study. The potential regulatory impacts of the listing of the Sharpnose and Smalleye Shiners will also be addressed. Strategic Water Supply Planning Page 16 of 24 • Post Reservoir — This strategy will be updated to reflect 2017 dollars. The potential regulatory impacts of the listing of the Sharpnose and Smalleye Shiners will also be addressed. • North Fork Scalping Operation — This strategy will be updated to reflect 2017 dollars. Task 9.Other Strategies Considered In addition to the above -referenced strategies, updated information (as available) will be used to update the following potential strategies that were identified, but not evaluated fully for the 2013 SWSP. These strategies will not be evaluated fully, but will be identified and any updated information added to the existing evaluations in the 2018 SWSP. • Jim Bertram Lake 8 • Linear Well Field — CRMWA Aqueduct • Additional CRMWA Aqueduct • Jim Bertram Lake System Well Field • Other strategies that may have been identified since publication of the 2013 SWSP Task 10. Strategy Scoring and Identification of Water Supply Packages Task 10.1. Evaluate and Update Scoring Methodology HDR will review the scoring methodology and evaluation criteria used in the 2013 SWSP and recommend modifications that will further highlight differences between the various alternatives considered, and reflect the City's current goals. HDR will implement those recommended modifications that are approved by the City. Task 10.2. Evaluate, Score and Rank Strategies Using the updated methodology and criteria, HDR will evaluate and score each of the strategies identified in the preceding tasks. HDR will provide these updated evaluations and scores to the City for review and comment, and will lead a workshop with City staff to obtain City staff input and refinement of the scores assigned initially by HDR. HDR will provide final evaluations and scoring to the City for final approval prior to developing a ranking of the alternatives and combining strategies into water supply packages. Task 10.3. Combine Strategies into Water Supply Packages HDR will combine the various water supply strategies into up to seven (7) alternative water supply packages, each designed to meet the City's future water supply needs through 2118. At least one package will be designed to address water supply needs under a conservation set of demands and another to address water supply needs under an accelerated growth set of demands. The packages will be assembled with strong coordination of City staff so that the various Strategic Water Supply Planning Page 17 of 24 packages accurately reflect the City's vision for its future water supplies. The schedules necessary to implement each package will be reviewed in detail. 10.4. Financial Impact HDR will estimate the financial impacts each package will have, considering the timing and costs of the packages. This analysis will be intended to assist the City in prioritizing the next phases of implementation for specific projects and in developing a capital improvements plan (CIP) for water supply improvements. 10.5 Present Value Analysis HDR will develop a net present value analysis for each package. Assumptions regarding inflation, discount and interest rates will be coordinated with the City before proceeding. 10.6 Water Rate Impacts The City will provide to HDR the financial spreadsheet model of the City's Water Fund that was used to determine near -term rate impacts in the 2013 SWSP. HDR will review assumptions utilized in the model, and will recommend modifications of those assumptions for use in developing the 2018 SWSP. After receiving concurrence from the City regarding the assumptions to be used, HDR will update the financial water rate model and use the updated model to determine the impacts on City water rates of each of the proposed water supply packages from 2018 — 2030. HDR will estimate future average monthly water bills for an "average" customer (7,000 gals/mo). *Task 11. Proiect Report The City will provide to HDR the GIS data used to develop maps in the 2013 SWSP and the spreadsheets and other files used to develop the demand projections and other information contained in the 2013 SWSP. HDR will provide to the City a report outline for the 2018 SWSP for City review and concurrence. HDR will develop and propose a standard report format that will differentiate the 2018 SWSP from the 2013 SWSP. HDR will develop a draft 2018 SWSP report. HDR anticipates developing specific report sections in parallel with the tasks enumerated in Tasks 1 — 10 of the Scope of Services. As individual report sections become available, HDR will provide those to the City for review and comment. HDR will provide draft report sections in Portable Document Format (PDF) file format. Strategic Water Supply Planning Page 18 of 24 The City will distribute draft report sections amongst City staff as appropriate, and will provide to HDR a compiled, coordinated set of comments regarding the draft report or report sections. HDR will accommodate the City's comments into a final report. HDR will provide five (5) hard copies of the draft report and one electronic (PDF) copy. HDR will provide to the City all native documents and graphics used to develop the final report and will provide to the City the GIS databased used to develop the maps contained in the report. •Task 12. Project Administration. OA/OC and Communication HDR will lead a Project kickoff conference call during the two -week period following notice to proceed from the City. During the kickoff call, HDR and the City will: • Review assumptions regarding growth and per capita consumption scenarios to be evaluated, • Confirm the City's conservation goals to be reflected in the 2018 SWSP, • Discuss the City's plans for selling or otherwise utilizing reclaimed effluent, particularly sales anticipated for power generation, • Review and establish milestone dates for completion of portions of this scope of services, • Establish target date to hold workshop to review project scoring criteria, • Review invoicing requirements and timing, • Establish project communication protocols, • Identify data needs from the City and coordinate transfer of information, and • Review HDR's suggested report format. Project administration and quality assurance/quality control (QA/QC) activities will be performed under this task. Coordination with the Llano Estacado Regional Water Planning Group regarding the City's water supply plans is not included in this Scope of Services. Task 13. Present Findings to the LWAC The draft 2018 SWSP will be presented to the Lubbock Water Advisory Commission (LWAC) when requested by the City. A PowerPoint presentation of the findings and conclusions of the work effort will be prepared. This presentation will be reviewed with City staff prior to presentation to the LWAC. This scope of services anticipates that one member of the HDR Team will attend the presentation in Lubbock and be available to answer questions. Deliverables include a PowerPoint presentation and any associated boards and visual aids, including handout packages for the LWAC members. Strategic Water Supply Planning Page 19 of 24 Project Schedule The proposed timeline for completion of the major tasks of the Scope of Services is as follows: Task Description Schedule Task 12 Project kickoff conference call 2 weeks from Notice to Proceed Task 10 Scoring workshop 6 months from Notice to Proceed Task 11 All draft report sections provided to City for review 9 months from Notice to Proceed Task 11 Final report submitted to City 12 months from Notice to Proceed Task 13 Present Findings to the LWAC When requested by the City Strategic Water Supply Planning Page 20 of 24 EXHIBIT B 2018 STRATEGIC WATER SUPPLY PLAN BUDGET CITY and ENGINEER have established a not -to -exceed fee of $195,700 to complete all services under this Contract, as shown below by major task. This amount will not be exceeded without a contract amendment. As estimated fees for each task are estimates only, CITY and ENGINEER agree to allow redistribution of funds between tasks as appropriate to allow flexibility in providing the needed services within the total not -to -exceed fee. Fees will be billed as total salary costs times a multiplier of 2.191 plus direct expenses. Salary costs are defined as direct labor rates plus fringe benefits. ENGINEER agrees to complete these services as delineated above. Should a change in Scope of Services or Time of Performance be necessary, an amendment to this contract shall be negotiated at that time. The following table summarizes the fee estimated to be required to complete the above scope of services. Task Task Description Fee 1, 3, 4 Update Introduction, Decommissioned and Current Water Supplies $6,800 2 Water Demand Projections $8,600 5 Water Conservation Strategies $15,700 6-8 Reclaimed, Groundwater and Surface Water Strategies $58,600 9 Other Strategies $2,300 10 Strategy Scoring and Identification of Supply Packages $37,300 11 Project Report $42,600 12 Project Administration, QA/QC and Communication $19,500 13 LWAC Presentation $4,300 Total Fee $195,700 Strategic Water Supply Planning Page 21 of 24 2018 STRATEGIC WATER SUPPLY PLAN BREAKDOWN OF LABOR HOURS Task Ro. --- Task Descripdon -- _ Env. Scientist Project Manager _ _QAIQC _ - Resources Engineer - Resources En ig near GIS 5 ecialis[ Resources En ineer - Resources En meeteer Resources EIT Accounting _-- __-- Admint Steno Travel O Total Fee 1.1 Introduction Review and incorporate into final report Total Task 1� 2 2 2 ' $0 $1.000 - 2 2 _ _ 2 6 $0 $0 $1,000 Water Demand Projections 2 1 Population Projections 2 8 2 2 $0 52.600 2.2 Per Capita Consumption 2 8 2 $0 $2.300 2.3 Annual Water Demand Projections �i, 2 6 2 $o S1.900 2.4 Peak Water Demands 1 2 $0 $600 2.5 Update Appendix A Total Task 2 1 8 2 4 $0 S1,200 _ 2 24 6 - 2 - 4 - - 46 $0 $0 $8,600 Decommissioned Water Supplies 3.1 Review and incorporate into final report 2 4 s0 $900 Total Task 3 2 4 6 $o $0 $900 Current Water Supplies 4.1 Supplies 2 2 12 2 $0 $3.100 42 System Capacity 2 2 $0 5700 4.3 Compare Demands and Supplies j 2 8 2 2 4.4 Update Appeudix El Total Task 41 1 7 2 2 10 2 4 ' s0 $1, 100 Water Conservation Strategies 12 4 6 43 $0 $0 $4,900 5.1 Adapt Lubbock Conservation Program (APAI report) 6 32 4 a $0 S8.600 5.2 Update Appendix C 4 32 4 $0 $7.100 Total Task 6 1D 64 4 _ _ _ _ 12 ' s0 $0 $D $15. T00 Reclaimed Water Strategies 6.1 Update Reclaimed Water Availability 8 8 2 $0 53,600 6.2 Update Reclaimed Water Strategies 12 24 50 4 5o S13.200 6.3 Update Appendix D 1 24 Total Task 6 21 32 74 6 ' 133 $0 SO $19,1900 Groundwater Strategies 7 1 Update Groundwater Supplies 4 16 2 $0 $3.900 7.2 Update Groundwater Strategies 8 20 24 80 4 Total Task 71 12 36 24 80 6 ' 156 $o $0 $27-6600 Surface Water Strategies 8.1 Developed Water Supplies 8 12 2 $0 54,300 8.2 Surface Water Strategies 4 8 4 24 8 12 6 $0 S11.800 Total Task 6 4 16 4 - 36 8 - 12 - - 8 Be s0 s0 $16,100 Other Strategies Considered 9.1 Update Other Strategies Considered 8 2 $0 52.300 Total Task 91 $ _ _ 2 10 $o $0 $2,300 Strategic Water Supply Planning Page 22 of 24 Thomas, J Dunn ShorJde , C Reed, G I Lemonds, PJ I Gonsalvez, NJ Newell, P I Stein, Z I Sampson, L I Coley, C I Admin Water Water Water Water Water Task Env. Project Resources Resources GIS Resources Resources Resources JACC Admiol Total No. Task Description Scientist Marta er QA7QC En Ineer E (near S Kish En sneer E ineer EIT ountin Steno Total Hou Travel Omer Fee 10 Strategy Storing and Supply Packages 10.1 Update Scoring Matrix 4 4 8 0 $6, 10-2 Score and Rank Strategies 8 4 8 24 $ 10.3 Develop Water Supply Packages P4 4 4 $"0 7.800 10 Financial Impact 4 24 $6,-4 5.400 10-5 Present Value Analysis 4 24 2 2 $6,000 10-6 Water Rate Impacts 4 40 Total Task 10 48 88 14 22 24 196 s0 $0 $37 tt Project Report ,300 11-1 Update GIS information 2 8 $0 $1.o 11.2 Outline 4 2 S $1400 00 11.3 Report Format 4 6 SO $1,600 11.4 Draft Report 40 12 40 16 16 16 so $26,300 11.5 Final Report 24 16 6 16 S260 $11,600 Task 11 74 12 58 30 16 38 228 s0 $250 S42,600 12 ProjeaAdmin, OAIaC & CommunicationTotal 12.1 Ki ko6Carference Call 4 2 2 2 so $2, 300 122 PM Setup 6 6 Slj $2,600 12-3 Onqoinq PM 40 24 S14,600 Total Task 12 50 - 2 2 - 2 2 30 - 86 so $0 319,500 13 LWAC Presentations 13-1 Demands and Supplies so so 132 Scoring and Rankinq of Strategies 50 $0 13.3 Water Supply Packages So $0 13-4 Financial Impacts $0 $0 13-5 Final Overview and Adoption 1' _1 $650 50 54,300 Total lask 13, 12 .1 16 $650 $0 $4,300 Total 4 270 20 178 166 66 74 24 168 30 88 1,108 $250 $195,7G0 Strategic Water Supply Planning Page 23 of 24 2018 STRATEGIC WATER SUPPLY PLAN HOURLY RATE SCHEDULE Rates for January 1, 2017 through December 31, 2017 Specific Rates for Water Resources Engineering Support HDR Engineering, Inc. Job Titles & Classifications Rate Range Principal $ 220.00 $ 300.00 Engineers Sr. Water Resources Engineer / Project Manager $ 150.00 $ 275.00 Water Resources Engineer $ 135.00 $ 230.00 Hydrologist $ 110.00 $ 190.00 Technical / Support Staff GIS Analyst $ 100.00 $ 180.00 GIS Technician II $ 75.00 $ 160.00 Administrative II / Accountant $ 63.00 $ 170.00 Administrative I / Clerical $ 47.25 $ 100.00 Rate Calculation Fees will be billed as total salary costs times a multiplier of 2.191 plus direct expenses. Salary costs are defined as direct labor rates plus fringe benefits. Other reimbursable expenses will be passed through directly to the City of Lubbock with no multiplier and include mileage (standard IRS reimbursable rate), lodging, Per Diem expenses, incidentals, and copier/plotting costs. *Note: The rates are for January 1, 2017 through December 31, 2017. Proposed new rates, in subsequent years, will be negotiated on an annual basis and will include cost -of -living escalation and other factors relevant at that time. Strategic Water Supply Planning Page 24 of 24