Loading...
HomeMy WebLinkAboutResolution - 2017-R0039 - H.D. Weaver Ditching Service - 02/09/2017Resolution No. 2017-R0039 Item No. 5.12 February 9, 2017 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for and on behalf of the City of Lubbock, Contract No. 13175 for Water & Sanitary Sewer Tap Installation and Construction Services, by and between the City of Lubbock and H.D. Weaver Ditching Service, Inc., of Lubbock, Texas and related documents. Said Contract is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council on February 9, 2017 DANIEL M. POP AYOR ATTEST: i Rebe ca Garza, City ecra VED AS TO CONTENT: Wood7FranVn, P.E., Director of Public Works APPROVED AS TO FORM: IC�L,C t���Cc - K lli Leisure, Assistant City Attorney ccdocs RES.Contract-13175H.D.WeaverDitchingServices 1.17.17 Resolution No. 2017-R0039 Contract 13175 City of Lubbock, TX Water & Sanitary Sewer Tap Installation and Construction Services Service Agreement This Service Agreement (this "Agreement") is entered into as of the 91h day of February, 2017 ("Effective Date") by and between H.D. Weaver Ditching Service, Inc., (the Contractor), and the City of Lubbock (the "City"). RECITALS WHEREAS, the City has issued a Request for Proposals 17 -13175 -TF, Water & Sanitary Sewer Tap Installation and Construction Services. WHEREAS, the proposal submitted by the Contractor has been selected as the proposal which best meets the needs of the City for this service; and WHEREAS, Contractor desires to perform as an independent contractor to provide Water & Sanitary Sewer Tap Installation and Construction Services, upon terms and conditions maintained in this Agreement; and NOW THEREFORE, for and in consideration of the mutual promises contained herein, the City and Contractor agree as follows: City and Contractor acknowledge the Agreement consists of the following exhibits that are attached hereto and incorporated herein by reference, listed in their order of priority in the event of inconsistent or contradictory provisions: 1. This Agreement 2. Exhibit A — Specifications 3. Exhibit B — Proposal Pricing Sheet 4. Exhibit C — Insurance 5. Exhibit D — Primary and Secondary Designations Scope of Work Contractor shall provide the services that are specified in Exhibit A. The contractor shall execute services as the named primary and secondary provider as specified in Exhibit D. The Contractor shall comply with all the applicable requirements set forth in Exhibits B, and C, attached hereto. Article 1 Services 1.1 The contract shall be for a term of one year, with the option of three, one year extensions, said date of term beginning upon formal approval. All stated annual quantities are approximations of usage during the time period to be covered by pricing established by this bid. Actual usage may be more or less. Order quantities will be determined by actual need. The City of Lubbock does not guarantee any specific amount of compensation, volume, minimum, or maximum amount of services under this solicitation and resulting contract. 1.2 The Contractor shall not assign any interest in this Agreement and shall not transfer any interest in the Agreement, whatsoever, without prior consent of the City. 1.3 All funds for payment by the City under this Agreement are subject to the availability of an annual appropriation for this purpose by the City. In the event of non -appropriation of funds by the City Council of the City of Lubbock for the goods or services provided under the Agreement, the City will terminate the Agreement, without termination charge or other liability, on the last day of the then -current fiscal year or when the appropriation made for the then -current year for the goods or services covered by this Agreement is spent, whichever event occurs first. If at any time funds are not appropriated for the continuance of this Agreement, cancellation shall be accepted by the contractor on 30 days prior written notice, but failure to give such notice shall be of no effect and the City shall not be obligated under this Agreement beyond the date of termination. Article 2 Miscellaneous. 2.1 This Agreement is made in the State of Texas and shall for all purposes be construed in accordance with the laws of said State, without reference to choice of law provisions. 2.2 This Agreement is performable in, and venue of any action related or pertaining to this Agreement shall lie in, Lubbock, Texas. 2.3 This Agreement and its Exhibits contains the entire agreement between the City and Contractor and supersedes any and all previous agreements, written or oral, between the parties relating to the subject matter hereof. No amendment or modification of the terms of this Agreement shall be binding upon the parties unless reduced to writing and signed by both parties. 2.4 This Agreement may be executed in counterparts, each of which shall be deemed an original. 2.5 In the event any provision of this Agreement is held illegal or invalid, the remaining provisions of this Agreement shall not be affected thereby. 2.6 The waiver of a breach of any provision of this Agreement by any parties or the failure of any parties otherwise to insist upon strict performance of any provision hereof shall not constitute a waiver of any subsequent breach or of any subsequent failure to perform. 2.7 This Agreemept shall be binding upon and inure to the benefit of the parties and their respective heirs, representatives and successors and may be assigned by Contractor or the City to any successor only on the written approval of the other party. 2.8 All claims, disputes, and other matters in question between the Parties arising out of or relating to this Agreement or the breach thereof, shall be formally discussed and negotiated between the Parties for resolution. In the event that the Parties are unable to resolve the claims, disputes, or other matters in question within 30 days of written notification from the aggrieved Party to the other Party, the aggrieved Party shall be free to pursue all remedies available at law or in equity. 2.9 At any time during the term of the contract, or thereafter, the City, or a duly authorized audit representative of the City or the State of Texas, at its expense and at reasonable times, reserves the right to audit Contractor's records and books relevant to all services provided to the City under this Contract. In the event such an audit by the City reveals any errors or overpayments by the City, Contractor shall refund the City the full amount of such overpayments within 30 days of such audit findings, or the City, at its option, reserves the right to deduct such amounts owing the City from any payments due Contractor. 2.10 The City reserves the right to exercise any right or remedy to it by law, contract, equity, or otherwise, including without limitation, the right to seek any and all forms of relief in a court of competent jurisdiction. Further, the City shall not be subject to any arbitration process prior to exercising its unrestricted right to seek judicial remedy. The remedies set forth herein are cumulative and not exclusive, and may be exercised concurrently. To the extent of any conflict between this provision and another provision in, or related to, this do. 2.11 The contractor shall not assign or sublet the contract, or any portion of the contract, without written consent from the Director of Purchasing and Contract Management. Should consent be given, the Contractor shall insure the Subcontractor or shall provide proof of insurance from the Subcontractor that complies with all contract Insurance requirements document, this provision shall control. IN WITNESS WHEREOF, this Agreement is executed as of the Effective Date. CITY OF LUBBOCK, TX: CONTRACTOR: Daniel M. Pope, Mayor A TEST: Reb cca Garza, City Sec to APPROVED AS TO CON ENT: Michael G. Keenum, P.E., City Engineer APPROVED AS TO FORM: l 4- Kelli L isure, Assistant City Attorney SSEA-A Title EXHIBIT A City of Lubbock, TX RFP 17 -13175 -TF Water & Sanitary Sewer Tap Installation and Construction Services Specifications INTRODUCTION AND OVERVIEW The City of Lubbock Public Works Water Engineering is seeking a contract(s) for installation of various water and sanitary sewer components. Major contract items are: installation of sewer and water taps, installation of water lines and valves, installation of fire hydrants, installation of sanitary sewer lines and manholes, boring and casing installation, and rental of various pieces of construction equipment with operators. Construction materials are to be provided by the City of Lubbock and installed by the successful offeror. PART1 GENERAL 1.1 WORK INCLUDED A. Contractor to provide water and sanitary sewer utility installation services as specified, including: 1. Sanitary sewer service (taps) connections. 2. Water service connections (taps). 3. Potable water main construction. 4. Sanitary sewer main construction. 5. Boring services. 6. Hydro excavation services. 7. Equipment and operator rental services. 8. Testing services and equipment for water and sanitary sewer construction. 9. Compaction or 1 '/2 sack controlled low strength material (flowable fill) 10. Contractor is responsible for all traffic control devices. Traffic control shall meet or exceed the TMUTCD for all work on City of Lubbock streets and roads. All TXDOT streets or roads must also meet or exceed standards unique to TxDOT permit requirements. 11. SCBA equipment for confined space entry 12. Contractor is responsible for providing a testing lab for density tests to 95% of standard proctor. The testing will be subsidiary to the items of this contract. B. Materials will be provided by the City of Lubbock to the Contractor's designated receiving area. Water tap material. 2. Sanitary sewer tap material. 3. Potable water main pipe, valves, fittings, fire hydrants and accessories. 4. Sanitary sewer main pipe, manholes and manhole covers and accessories. 5. Steel casing, casing spacers and end seals, if used. 6. Paving repair materials and services for paving cuts in streets and alleys. 7. Gravel embedment. 8. Testing supervision for water and sewer construction projects 9. Water will be provided (if readily available) C. Material Ownership All materials will be delivered to the Contractor's designated receiving area by City of Lubbock forces. Once the Contractor takes possession of the materials provided by the City of Lubbock, the materials then become the responsibility of the Contractor. Any materials requiring replacement due to damage, theft, or any reason will be the responsibility of the Contractor to replace. If additional materials are needed the contractor must request these items from the City of Lubbock. All additional materials will be delivered to the Contractor's designated area by City of Lubbock forces. D. Unit Prices Work will be paid for on the basis of the unit prices submitted in the documents. 2. Unit bid prices are to include all equipment, labor and ancillary components necessary for a complete and functional installation. 3. Invoicing to the City of Lubbock must be itemized, based on the unit price list. 1.2 QUALITY ASSURANCE A. Regulatory Requirements. 1. All work will conform to the most recent version of the City of Lubbock Water Utilities Design Standards for Water and Sewer Construction. 2. Contractor is required to provide proper notification to the State of Texas One Call network and comply with State regulatory notification requirements in addition to the City of Lubbock While Line Ordinance. 3. All work shall conform to the most recent version of applicable standards of the Occupational Health and Safety Administration (OSHA). 4. Contractor performing work shall be Confined Space Certified as regulated by the Occupational Health and Safety Administration (OSHA). 5. Traffic control measures shall conform to the most recent version of the Texas Manual on Uniform Traffic Control Devices. 6. All work shall conform to the most recent version of applicable requirements of the Texas Commission of Environmental Quality (TCEQ). 7. All work shall be in compliance with other local, state and federal regulations as appropriate. 8. All work within public rights of ways will require a completed permit with the City of Lubbock call Claude Kniesley 806-775-3157. 9. All work within TxDOT (Texas Department of Transportation) rights of ways will have a completed permit before any work can begin. The contractor must keep this permit at the job site while construction is ongoing. In addition the contractor must notify TxDOT 48 hours in advance of construction activities call Linda Parker 806-748-4407 1.3 SEQUENCING AND SCHEDULING A. Installation Time Water and sewer taps shall be completed within 21 calendar days from the date the order is received by the Contractor and all work refusals must be declared within 5 business days of receipt of order. If the order is not refused within 5 business days the contractor will be required to perform the work with no price adjustment being given for any extenuating circumstances. a. Certain water and sanitary sewer taps will be required to be installed with in 24 hours after the order is issued should there be a health, safety and public welfare concern established. b. The Chief Water Utilities Engineer will determine the establishment of a health, safety and welfare concern. C. Any Taps exceeding the 21 calendar day time limit, through no fault of the City, will be assessed a 100 dollar per day Liquidated Damage. d. Repeated performance failures will receive written warnings, which may result in termination of contract. 2. Water and sanitary sewer main construction will begin within a minimum of 14 calendar days of issuance of a notice to proceed. 3. Normal installation will require 48 hours waiting period before work may begin to comply with the State notification requirements. 4. A $100 mobilization credit will be applied to Contractor's invoices for instances that involve verified remobilization caused by developers and landowners who fail to prepare for the installation of taps at the job site. The verification and or approval of a mobilization credit is at the total discretion of the City of Lubbock on a case by case basis. The contractor must provide sufficient information as to the need for remobilization. 5. All taps are to be installed within 21 days of the tap application date. City shall supply electronically a list of any installations that the City proposes to install in-house to avoid duplication and expense by either City or Contractor, which includes emergency installations; emergencies as set forth in Texas Utilities Code, title 5, Chapter 251. Contractor shall complete installation and electronically input the necessary information on the individual tap cards within the City's system, thereby notifying the City of the completion date and all pertinent documentation of the specific tap including depth and location. City retains capability of immediately accessing this information and answering to the satisfaction of the inquiring customer. All reports, summaries or documentation related to that specific address are thereby retained and controlled by the City. Contractor shall immediately via electronically generated correspondence, make City aware of circumstances beyond his control of any specific installation problem, prohibiting the Contractor's ability to meet the deadline for specified compliance. 1.4 WARRANTY A. Contractor shall provide a standard one year construction warranty on all work performed under this contract. This includes, but not limited to, backfill requirements, pavement and alleys repairs under this contract. B. The Contractor will be notified of deficiencies which occurred within the one-year warranty period. Contractor is responsible for performing any repairs necessary for work found defective at no added cost to the City of Lubbock, even for repairs accomplished outside of the warranty period. C. The time for this warranty begins at the time of acceptance of the work associated with each job order. The work will be considered accepted when the City of Lubbock makes payment for the work. 1.5 EXPERIENCE A. Contractor will have a minimum of five (5) years experience in Municipal water and sanitary sewer construction of a similar nature to the scope of work herein specified and must list five (5) major projects constructed within the past five (5) years that illustrate Contractor's experience with projects similar to the project herein specified. B. Contractor will have experience working in alleys or other congested environments and good public interaction as determined by reference checks and as determined by the Director of Water Utilities. C. In order to comply with state regulations the contractor must have at a minimum 1 staff member licensed by the TCEQ (Texas Commission of Environmental Quality) with a class A, B, C or D water operators license on site during any construction activities. If the license holder is a class D on site a staff member with a class C or greater license must be available by phone at all times during installation activities, PART 2 SERVICES 2.1 Sanitary Sewer Service Connections A. Contractor will be required to white line the site for utility locates, and request locates, prior to any work being performed. B. Contractor is required to extend the service pipe to the property line, which typically varies from 5 to 20 feet. Connection of the tap to the service line shall be the responsibility of the customer. C. Backfill in accordance with the most recent Public Works Engineering Minimum Design and Construction Standards of the City of Lubbock. At a minimum mechanical compaction shall meet 95% Modified Proctor Density (with moisture content of +/-2% of optimum) in paved areas and 90% Modified Proctor Density (with moisture content of +/-2% of optimum) in unpaved areas." Backfill shall be accomplished in 6-8" lifts in unpaved areas. Density testing of compacted areas must be performed at least once per installation and for every 50'of pipe length and every 2 feet of lift. D. Contractor shall use 1 % sack controlled low strength material (flowable fill) with pea gravel in areas paved or proposed to be paved. All flowable fill shall be T - Capped in accordance with the City of Lubbock Ordinance. The contractor is responsible for haul off of excess material when flowable fill is used. E. Use of flowable fill as a contractor's means and methods will not result in additional charges to the City. All use of flowable fill for utility backfill shall comply with the most recent release of the City's Design Standards. Use of item for additional flowable fill by cubic yard must have billed quantities approved by the City inspector prior to payment. F. Sewer tap shall be left at a 5 foot depth and tightly plugged at property line, unless otherwise instructed in the work order. G. Clean up construction area after completion of work returning the area to as near as possible to pre -construction conditions. H. Involves the excavation to the sanitary sewer main and installation of the requested size service saddle to the sewer main. The sewer main will vary in diameter from 6 inches to 12 inches. I. The Contractor must demonstrate the necessity for special provisions due to rock excavation. Upon City approval, allowance shall be made for the application of 50,OOO1b excavator unit pricing. 2.2 Water Service Connections A. Contractor will be required to white line the site for utility locates, and request locates, prior to any work being performed. B. Contractor is to extend the service line to the property line, which typically varies from 5 to 20 feet. C. Backfill in accordance with the most recent Public Works Engineering Minimum Design and Construction Standards of the City of Lubbock. At a minimum mechanical compaction shall meet 95% Modified Proctor Density (with moisture content of +/-2% of optimum) in paved areas and 90% Modified Proctor Density (with moisture content of +/-2% of optimum) in unpaved areas." Backfill shall be accomplished in 6-8" lifts in unpaved areas. Density testing of compacted areas must be performed at least once per installation and for every 50'of pipe length and every 2 feet of lift. D. Contractor shall use 1 '/z sack controlled low strength material (flowable fill) with pea gravel in areas paved or proposed to be paved. All flowable fill shall be T - Capped in accordance with the City of Lubbock Ordinance. The contractor is responsible for haul off of excess material when flowable fill is used. E. Use of flowable fill as a contractor's means and methods will not result in additional charges to the City. All use of flowable fill for utility backfill shall comply with the most recent release of the City's Design Standards. Use of item for additional flowable fill by cubic yard must have billed quantities approved by the City inspector prior to payment. 0 F. Install meter box and valve box to proposed grade as per City specifications. G. Clean up construction area after completion of work returning the area to as near a possible to pre -construction conditions. H. Requires excavation to the water main and installation of the requested size water tap on the water main. The water main diameter will vary from 4 to 16 inches. I. The Contractor has a right to refuse work within 5 business days by written request. Authorization to refuse work shall be given by the Chief Water Utilities Engineer only. 2.3 Potable Water Main Construction A. Contractor will excavate and install water mains, fittings, valves and accessories as required for a complete installation. B. Contractor will comply with the most recent version of the City Of Lubbock Water Utilities excavation standards. Typical burial depth is 5 feet to the top of pipe or encasement. C. Backfill in accordance with the most recent Public Works Engineering Minimum Design and Construction Standards of the City of Lubbock. At a minimum mechanical compaction shall meet 95% Modified Proctor Density (with moisture content of +/-2% of optimum) in paved areas and 90% Modified Proctor Density (with moisture content of +/-2% of optimum) in unpaved areas." Backfill shall be accomplished in 6-8" lifts in unpaved areas. Density testing of compacted areas must be performed at least once per installation and for every 50'of pipe length and every 2 feet of lift. D. Contractor has the option use 1 '/2 sack controlled low strength material (flowable fill) with pea gravel in areas paved or proposed to be paved. All flowable fill shall be T- Capped in accordance with the City of Lubbock Ordinance. Use of optional flowable fill for mains construction is at the contractors cost. The contractor is responsible for haul off of excess material when flowable fill is used. E. Use of flowable fill as a contractor's means and methods will not result in additional charges to the City. All use of flowable fill for utility backfill shall comply with the most recent release of the City's Design Standards. Use of item for additional flowable fill by cubic yard must have billed quantities approved by the City inspector prior to payment. F. Contractor is responsible for all costs associated mobilization, demobilization, removal and disposal of excess excavation material and construction debris, and pavement cuts, and all other work necessary for a complete and functional installation no additional compensation other than the associated pay items above will be given. G. The Contractor must demonstrate the necessity for special provisions due to rock excavation. Upon City approval, allowance shall be made for the application of 50,0001b excavator unit pricing. 2.4 Sanitary Sewer Main Construction A. Contractor will excavate and install sanitary sewer mains, manholes and accessories as required for a complete installation. B. Contractor will comply with the most recent version of the City Of Lubbock Water Utilities excavation standards. Bury, depth will vary, but minimum cover shall be 4 feet. C. Backfill in accordance with the most recent Public Works Engineering Minimum Design and Construction Standards of the City of Lubbock. At a minimum mechanical compaction shall meet 95% Modified Proctor Density (with moisture content of +/-2% of optimum) in paved areas and 90% Modified Proctor Density (with moisture content of +/-2% of optimum) in unpaved areas." Backfill shall be accomplished in 6-8" lifts in unpaved areas. Density testing of compacted areas must be performed at least once per installation and for every 50'of pipe length and every 2 feet of lift. D. Contractor has the option use 1 %2 sack controlled low strength material (flowable fill) with pea gravel in areas paved or proposed to be paved. All flowable fill shall be T- Capped in accordance with the City of Lubbock Ordinance. Use of optional flowable fill for mains construction is at the contractors cost. The contractor is responsible for haul off of excess material when flowable fill is used. E. Use of flowable fill as a contractor's means and methods will not result in additional charges to the City. All use of flowable fill for utility backfill shall comply with the most recent release of the City's Design Standards. Use of item for additional flowable fill by cubic yard must have billed quantities approved by the City inspector prior to payment. F. Contractor is responsible for all costs associated with mobilization, demobilization, removal and disposal of excess excavation material and construction debris, and pavement cuts, and all other work necessary for a complete and functional installation. G. The Contractor has a right to refuse work within 5 business days by written request. Authorization to refuse work shall be given by the Chief Water Utilities Engineer only. H. The Contractor must demonstrate the necessity for special provisions due to rock excavation. Upon City approval, allowance shall be made for the application of 50,OOO1b excavator unit pricing. 2.5 Boring Services A. Contractor will provide all equipment and labor necessary to bore, install steel casing, install pipe in casing, and install pipe spacers as needed. B. Casing may be in joints 40 feet in length or shorter. Contractor shall provide labor, materials and equipment necessary to weld casing segments together. C. Contractor shall be responsible for all costs associated with mobilization, demobilization, removal, disposal of excess excavation material and construction debris, pavement cuts and repairs, and all other work necessary for a complete and functional installation. D. Contractor shall comply with the most recent version of the City Of Lubbock Water Utilities excavation standards. Any changes that are made while unit price contract is in effect shall be addressed on a case-by-case basis. E. Backfill in accordance with the most recent Public Works Engineering Minimum Design and Construction Standards of the City of Lubbock. At a minimum mechanical compaction shall meet 95% Modified Proctor Density (with moisture content of +/-2% of optimum) in paved areas and 90% Modified Proctor Density (with moisture content of +/-2% of optimum) in unpaved areas." Backfill shall be accomplished in 6-8" lifts in unpaved areas. Density testing of compacted areas must be performed at least once per installation and for every 50'of pipe length and every 2 feet of lift. F. Contractor shall use 1 '/z sack controlled low strength material (flowable fill) with pea gravel in all paved areas or areas proposed to be paved. The contractor is responsible for haul off of excess material is used. G. Use of flowable fill as a contractor's means and methods will not result in additional charges to the City. All use of flowable fill for utility backfill shall comply with the most recent release of the City's Design Standards. Use of item for additional flowable fill by cubic yard must have billed quantities approved by the City inspector prior to payment. H. Payment for boring service will be based on length of casing installed or beginning and ending stations as staked by the Owner when not encased. I. Boring operations do not supplement work of City crews. No refusal of work will be allowed with requests to bore. 2.6 HYDRO EXCAVATION A. Contractor shall have a maximum of 5 days to respond to each work request. Delays in response will affect performance reports and yearly contract renewal. Weather and other factors causing delays will be evaluated on a case-by-case basis. B. Hydro excavator shall be Super Products Mud Dog 1200, or equal, and proven capable of at least: a. 2500 psi water pressure b. 1000 gallons on -board water supply c. 25" Hg vacuum pressure and 5000 cfm air capacity d. 12 cubic yards on -board spoils volume C. Contractor shall provide all equipment and labor necessary to complete the work assigned including necessary tools, equipment. D. Contractor shall provide their own supply of water, unless the City makes water available and prior arrangements have been approved. The City will not guarantee water supply for excavation prior to, during, or after the job. E. The City shall white line proposed area to be potholed, but Contractor shall be responsible for requesting locates as well as verifying and protecting underground utilities. F. Contractor may only dispose of spoils on site with permission City project manager or inspector. G. Unit prices for labor & equipment associated with hydro excavation will be paid for on an hourly basis for work accomplished on site only. All other charges will be paid, once per job, to the mobilization line item. 2.7 Electronic Communication A. Contractor shall be capable of communicating with the City of Lubbock through email and have access to the Internet. B. Contractor is required to have the capability to receive and respond to tap orders through the City of Lubbock's electronic tap system. C. Contractor is required to demonstrate this capability at the time of submission. D. Documentation of water and sewer tap locations as installed shall be provide by contractor in entry of work completed. PART 3 EXECUTION 3.1 Examination A. Contractor is responsible for inspecting each construction site to determine the conditions are suitable for the planned activity. B. Unsuitable conditions shall be brought to the attention of the Owner prior to the commencement of any work. 3.2 Preparation A. Contractor is responsible for verifying and protecting surrounding utilities and areas. B. Contractor is responsible for compliance with the Texas Excavation Safety System and the most current City of Lubbock Ordinance associated with white line notification. C. Any repair to damaged areas or utilities shall be at the Contractor's expense D. Contractor is responsible for proper notification of other utilities before commencing work. E. Contractor is responsible for providing all traffic control setup, devices, barricades, preparation and submission of a traffic control plan to the governing agency as necessary at the expense of the contractor. F. All work shall include installation and maintenance of all BMP's (Best Management Practices) as necessary to comply with the City of Lubbock storm water ordinance and TCEQ (Texas Commission of Environmental Quality) construction general permits. This work is subsidiary to the various items of the contract. 3.3 Installation A. Contractor shall install components in accordance with the latest requirements of the City of Lubbock Design Standards. B. Contractor shall disinfect water mains and components in accordance with the latest version of the City Of Lubbock Design Standards and the requirements of the Texas Council on Environmental Quality. Contractor is responsible for providing the disinfectant chemicals at no additional expense to the City of Lubbock. C. Backfill in accordance with the most recent Public Works Engineering Minimum Design and Construction Standards of the City of Lubbock. At a minimum mechanical compaction shall meet 95% Modified Proctor Density (with moisture content of +/-2% of optimum) in paved areas and 90% Modified Proctor Density (with moisture content of +/-2% of optimum) in unpaved areas." Backfill shall be accomplished in 6-8" lifts in unpaved areas. Density testing of compacted areas must be performed at least once per installation and for every 50'of pipe length and every 2 feet of lift. D. Contractor shell use 1 % sack controlled low strength material (flowable fill) with pea gravel in all paved areas or areas proposed to be paved. The contractor is responsible for haul off of excess material is used. E. Use of flowable fill as a contractor's means and methods will not result in additional charges to the City. All use of flowable fill for utility backfill shall comply with the most recent release of the City's Design Standards. Use of item for additional flowable fill by cubic yard must have billed quantities approved by the City inspector prior to payment. 3.4 Field Quality Control A. Test installed components in accordance with the latest version of the City Of Lubbock Design Standards and the Texas Council on Environmental Quality. B. City of Lubbock personnel will inspect all aspects of construction for safety and compliance at the Engineers own discretion. C. Water main construction must be disinfected and pressure tested in accordance with the most recent version of the City Of Lubbock Design Standards. D. Sanitary sewer mains must be mandrel tested in accordance with the most recent version of the City Of Lubbock Design Standards. E. Sanitary sewer manholes must be vacuum tested in accordance with the most recent version of the City Of Lubbock Design Standard. F. Sanitary sewer line mains must be pressure tested in accordance with the most recent version of the city of Lubbock Water Utilities Design Standards. G. Density testing will be performed for every 2 feet of lift and 50'of pipe length. At a minimum at least one test will be performed per installation. All density testing is at the contractor's expense. EXHIBIT B City of Lubbock, TX Proposal Pricing Sheet RFP 17 -13175 -TF Water & Sanitary Sewer Tap Installation and Construction Services -(To be -campleted-and returned with Proposal) Primary - Group A REVISED DESCRIPTION QTY • U/M uNrr COST• EXTENDED COST VICE CONNECTIONS t hereinA 1. e Connections 0' to 4' Deep. A 75 EA 500.00 cified herein 37500.00 A2 ervice Connections 5' to 8' Deep. As 100 EA525.00 cified herein 52500.00 A3. ervice Connections 8' to 12' Deep. 100 EA $550.00 As specified herein 55000.00 A4. ervice Connections 12' to 15' Deep. 75 EA $575.00 $43125.00 s specified herein A5. ervice Connections 15' to 18' Deep. 10 EA 1300.00 13000.00 s snnecified herein A6. ervice Connections 18' to 20' Deep. 2 EA $1660.00 1660.00 s cified herein WATER SERVICE CONNECTIONS As specified herein A7 a Inch Water Meter Tap. As specified herein 800 EA0.00 320000.00 A8 Two inch Tap for One and one -hal 20 EA $575.00 $11500.00 Inch Water Meter. As specified herein A9. Two Inch Water Meter Tap. As specified herein 50 EA550.00 27500.00 A10. our inch Tap for Three Inch Water 25T EA 420.00 10500.00 Meter. As specified herein RAFFIC CONTROL As s ified herein ost per job for complete setup of Al 1. XDOT approved and permitted (Cost plus maximum of 10% markup with City approved submittal of cost arricades as specified herein. summary from barricades and signage sub -contractor) ost per job for complete setup o Al2. arricade for City thoroughfare (T -I (Cost plus maximum of 10% markup with City approved submittal of cost T-2) as specified herein. summary from barricades and signage sub -contractor) ost per job for complete setup o A 13. arricades for other City street 25 EA $300.00 7500.00 losures as specified herein. HPALT AND CONCRETE CUT AND REMOVAL As specified herein re Foot of Asphalt Cut an A14.oved for pipeline installation. As 2,000 SF 15.00 30000.00 ified herein [quare Foot of Concrete Cut and A15.oved for pipeline installation. As 600 SF r15.00 9000.00 ified herein Offeror's Initials: _I& t- City of Lubbock, TX Proposal Pricing Sheet RFP 17 -13175 -TF Water & Sanitary Sewer Tap Installation and Construction Services (To be completed and returned with Proposal) REVISED rrEM DESCRIPTION QTY • U/M UNrr COST* EXTENDED COST ost for ditch in Rock to be verified y City of Lubbock Inspector prior to A16. ommencement of work (per hour 40 HR $50.00 S2000.00 ncountered). As specified herein LOWABLE FILL Asspecified herein 1.5 Cubic Yards Flowable Fill for A17. Water Taps in Paved Alleys. As 500 EA $270.00 $135000.00 specified herein. Cubic Yards Flowable Fill for A18. Sewer Taps in Paved Alleys. As 200 EA $350.00 cified herein. 70000.00 dd Flowable Fill Per Cubic Yard for A19. tri& Other Areas. As specifi 50 CY 180.00 9000.00 erein. TOTAL FOR GROUP A, ITEMS Al THROUGH A19 836445.00 Primary Group B-2 --LLAN90 5 POTABLE WATER MAIN CONSTRUCTION As specified herein B 1. 4"Class 150 Water Pipe. As specified 1,000 FT 14.00 erein 14000.00 B2 " Class 150 Water Pipe. As specified 5,000 FT $18.00 $90000.00 erein B3. "Class 150 Water Pipe. As specified 5,000 FT $20.00 $100000.00 erein B4. 10" Class 150 Water Pipe. As 1,000 FT $20.00 $20000.00 specified herein B5. 12" Class 1510 Water Pipe. As 1,000 FT $22.00 $22000.00 specified herein B6. 16" Class 150 Water Pipe. As 500 FT $22.00 $11000.00 specified herein " Gate Valve and Box. As specified B7 10 EA $240.00 $2400.00 erein B8 " Gate Valve and Box. As specified 30 EA $260.00 $7800.00 erein B9 " Gate Valve and Box. As specified 30 EA 280.00 8400.00 erein Offeror's Initials: City of'Lubbock, TX Proposal Pricing Sheet RFP 17 -13175 -TF Water & Sanitary Sewer Tap Installation and Construction Services (To be completed and returned with Proposal) REVISED ITEM DESCRIPTION QTY • U/M UNrr COST" EXTENDED COST 10" Gate Valve and Box. As specified BIO. herein 10 EA300.00 3000.00 12" Gate Valve and Box. As specified Bl 1. herein 10 EA320.00 3200.00 B12. 16" Gate Valve and Box. As specified 5 EA320.00 herein 1600.00 B13. " x 4" Main Line Tap. As specified 50 EA800.00 herein 40000.00 B14. " x 6" Main Line Tap. As specified 50 EA $600.00 $30000.00 herein " x 4" Main Line Tap. As specified B 15 50 EA $820.00 $41000.00 herein B 16. " x 6" Main Line Tap. As specified 50 EA $840.00 $42000.00 herein B17. 8" x 8" Main Line Tap. As specified 50 EA $600.00 $30000.00 erein B18. 10" x 4" Main Line Tap. As specified 10 EA900.00 herein 9000.00 10" x 6" Main Line Tap. As specified B19. herein 10 EA920.00 9200.00 10" x 8" Main Line Tap. As specified B20. herein 10 EA940.00 9400.00 B21. 10" x 10" Main Line Tap. As 10 EA $960.00 $9600.00 specified herein 12" x 4" Main Line Tap. As specified B22 herein 25 EA960.00 24000.00 12" x 6" Main Line Tap. As specified B23 25 EA980.00 24500.00 herein 12" x 8" Main Line Tap. As specified B24. 25 EA1000.00 25000.00 herein 12" x 10" Main Line Tap. As B25. specified herein 25 EA1040.00 26000.00 12" x 12" Main Line Tap. As B26. specified herein 25 EA800.00 20000.00 16" x 4" Main Line Tap. As specified B27 5 EA1100.00 5500.00 herein 16" x 6" Main Line Tap. As specified B28 5 EA1140.00 5700.00 herein 16" x 8" Main Line Tap. As specified B29. 5 EA1160.00 5800.00 herein 16" x 10" Main Line Tap. As B30. specified herein 5 EA1180.00 5900.00 16" x 12" Main Line Tap. As B31. specified herein 5 EA $1200.00 $6000.00 Offeror's Initials: City of Lubbock, TX Proposal Pricing Sheet RFP 17 -13175 -TF Water & Sanitary Sewer Tap Installation and Construction Services (To be completed and retumed with Proposal) REVISED rrEM DESCRIPTION QTY • U/M UNITCOST* EXTENDED COST B32. ' Bury Fire Hydrant Set for new installation. 50 EA750.00 37500.00 Asspecified herein B33. Additional Fire Hydrant Bury Depth. 100 FT50.00 5000.00 As specified herein B34, ire Hydrant Adjustment. As 20 EA $50.00 S1000.00 ecified herein B35. " Ductile Iron Fitting (including ells 30 EA40.00 1200.00 tees, bends, etc.. Ass cified herein B36. " Ductile Iron Fitting (including ells, 30 EA60.00 tees, bends, etc.. Asspecified herein 1800.00 B37. " Ductile Iron Fitting (including ells, 30 EA80.00 2400.00 tees, bends, etc.. Ass specified herein 10" Ductile Iron Fitting (including B38. ells, tees, bends, etc.). As specified 20 EA $100.00 $2000.00 herein 12" Ductile Iron Fitting (including B39. lls, tees, bends, etc.). As specified 30 EA $120.00 S3600.00 erein 16" Ductile Iron Fitting (including B40. Its, tees, bends, etc.). As specified 20 EA 160.00 $3200.00 erein Additional Water Main Depth in B41. excess of 5 feet of cover (per linear 500 FT 3.00 $1500.00 foot). As specified herein ANITARY SEWER MAIN CONSTRUCTION As specified herein) B42. " PVC Sanitary Sewer Pipe 0' to 4' 200 FT16.00 Deep. s specified herein 3200.00 B43. " PVC Sanitary Sewer Pipe 4' to 6' 200 FT17.00 3400.00 Deep.Asspecified herein B44 " PVC Sanitary Sewer Pipe 6' to 8' 300 FT 18.00 5400.00 ee . Asspecified herein B 5. 4 f' PVC Sanitary Sewer Pipe 8' to 10' 300 FT 19.00 ee . Asspecified herein 5700.00 B46. " PVC Sanitary Sewer Pipe 10' to 300 FT 20.00 12' Deep. Ass specified herein 6000.00 B47. " PVC Sanitary Sewer Pipe 12' 200 FT 21.00 $4200.00 14' Deep. As specified herein B48. " PVC Sanitary Sewer Pipe 0' to 4' 100 FT17.00 1700.00 Deep. Asspecified herein B49. " PVC Sanitary Sewer Pipe 4' to 6' 100 FT18.00 1800.00 Deep.Asspecified herein B50 " PVC Sanitary Sewer Pipe 6' to 8' 100 FT19.00 1900.00 ee . Ass ified herein Offeror's Initials: Pr City of Lubbock, TX Proposal Pricing Sheet RFP 17 -13175 -TF Water & Sanitary Sewer Tap Installation and Construction Services (To be completed and returned with Proposal) REVISED ITEM DESCRIPTION QTY • U/M UNIT COST* EXTENDED COST B51. 8" PVC Sanitary Sewer Pipe 8' to 10' 100 FT20.00 Deep. Asspecified herein 2000.00 $52. 8" PVC Sanitary Sewer Pipe 10' t 100 FT 21.00 12' Deep. Ass specified herein 2100.00 B53. " PVC Sanitary Sewer Pipe 12' to 100 FT22.00 14' Deep. Ass specified herein 2200.00 B54. " PVC Sanitary Sewer Pipe 14' to 100 FT $23.00 $2300.00 16' Deep. As specified herein B55. " PVC Sanitary Sewer Pipe 16' to 100 FT24.00 18' Deep. Ass specified herein 2400.00 8" PVC Sanitary Sewer Pipe 18' to B56. 0' Deep. Ass specified herein 100 FT 25.00 2500.00 B57 10" PVC Sanitary Sewer Pipe 0' to 4' 100 FT $18.00 $1800.00 Deep. s s cified herein 10" PVC Sanitary Sewer Pipe 4' to 6' B58. Deep. Ass specified herein 100 FT19.00 1900.00 B59. 10" PVC Sanitary Sewer Pipe 6' to 8' 100 FT $20.00 $2000.00 Deep. As specified herein B60. 10" PVC Sanitary Sewer Pipe 8' to 100 FT $21.00 $2100.00 10' Deep. Ass ecified herein B61. 10" PVC Sanitary Sewer Pipe 10' to 100 FT 22.00 2200.00 12' Deep. Asspecified herein B62. l0" PVC Sanitary Sewer Pipe 12' to 100 FT 23.00 2300.00 14' Deep. Asspecified herein B63. 10" PVC Sanitary Sewer Pipe 14' to 100 FT 24.00 2400.00 16' Deep. As specified herein B64. 10" PVC Sanitary Sewer Pipe 16' to 100 FT 25.00 2500.00 18' Deep. Asspecified herein 10" PVC Sanitary Sewer Pipe 18' to B65. 20' Deep. Asspecified herein 100 FT 26.00 2600.00 B66. 12" PVC Sanitary Sewer Pipe 0' to 4' 100 FT19.00 Deep. Ass specified herein 1900.00 12" PVC Sanitary Sewer Pipe 4' to 6' B67. Deep. As specified herein 100 FT $20.00 2000.00 B68. 12" PVC Sanitary Sewer Pipe 6' to 8' 100 FT 21.00 Deep. Asspecified herein 2100.00 B69. 12" PVC Sanitary Sewer Pipe 8' t 100 FT 22.00 10' Deep. Ass specified herein 2200.00 B70. 12" PVC Sanitary Sewer Pipe 10' t 100 FT 23.00 2300.00 12' Deep. Ass specified herein B71. 12" PVC Sanitary Sewer Pipe 12' to 100 FT 24.00 2400.00 14' Deep. As specified herein B72. 12" PVC Sanitary Sewer Pipe 14' to 100 FT 25.00 2500.00 16' Deep. Asspecified herein Offeror's Initials: AV City of Lubbock, TX Proposal Pricing Sheet RFP 17 -13175 -TF Water & Sanitary Sewer Tap Installation and Construction Services (To be completed and returned with Proposal) REVISED ITEM DESCRIPTION QTY " U/M UNIT COST* EXTENDED COST B73. 12" PVC Sanitary Sewer Pipe 16' to 100 FT 26.00 18' Deep. Ass specified herein 2600.00 1374 12" PVC Sanitary Sewer Pipe 18' to 100 FT27.00 0 Deep. Asspecified herein 700.00 B75. Standard Manhole 4' or less. As 100 EA750.00 specified herein 75000.00 ost for Additional Vertical Feet 1376. 3tandard Manhole. As specified 50 FT 100.00 $5000.00 erein op Manhole 4' or less. As specified50 B77 erein EA 1000.00 50000.00 1378 ost for Additional Vertical Feet 100 FT 150.00 o Manhole. Asspecified herein 15000.00 ost to Tie to an Existing Manhole. 1379 s ified herein 100 EA 500.00 50000.00 B80. " x 4" Wye with Plug. As specified10 EA 100.00 1000.00 erein " x 4" Wye with Plug. As specified 1381 10 EA $125.00 $1260.00 herein 1382 10" x 4" Wye with Plug. As specified 10 EA150.00 1500.00 erein 12" x 4" Wye with Plug. As specified B83. 10 EA $175.00 $1750.00 herein " Service Extension to Property Lin 1384. with Plug in excess of 15 feet. As 100 EA $150.00 $15000.00 .specified herein 1385. " Plug. As specified herein 10 EA 25.00 $250.00 B86 " Plug. As specified herein 10 EA 25.00 250.00 B87. 10" Plug. As specified herein 10 EA 25.00 250.00 1250.00 1388 12" Plug. As specified herein 10 EA 25.00 ORE FOR AND INSTALL CASING AND PIPE Secondary Group 131 As specified herein ore on grade and Install 12" Steel B89. asing and install PVC pipe with 100 FT $120.00 $12000.00 pacers. As specified herein ore on grade and Install 14" Steel 1390. asing and install PVC pipe with 100 FT $140.00 $14000.00 pacers. As specified herein ore on grade and Install 16" Steel B91. asing and install PVC pipe with 100 FT $160.00 $16000.00 pacers. As specified herein Offeror's Initials: City of Lubbock, TX Proposal Pricing Sheet RFP 17 -13175 -TF Water & Sanitary Sewer Tap Installation and Construction Services (To be completed and returned with Proposal) REVISED rrEM DESCRIPTION QTY • U/M UNrr COST* EXTENDED COST Bore on grade and Install 18" Steel B92. Casing and install PVC pipe with 100 FT $180.00 $18000.00 -spacers. As specified herein Bore on grade and Install 20" Steel B93. asing and install PVC pipe with100 FT 200.00 20000.00 pacers. Asspecified herein ore on grade and Install 24" Steel B94. acing and install PVC pipe with 100 FT 240.00 24000.00 acers. As s cified herein B95. Bore on grade and Install 6 Inch 100 FT $60.00 $6000.00 VC pipe. As specified herein B96, Bore on grade and Install 8 Inch 100 FT $80.00 $8000.00 VC pipe. As specified herein B97. Bore on grade and Install 10 Inch 100 FT $100.00 $10000.00 VC pipe. As specified herein B98 Bore on grade and Install 12 Inch 100 FT $100.00 $10000.00 VC pipe. As specified herein B99. Pore on grade and Install 16 Inch 100 FT 10000.00 VC pipe. As specified herein r100.00 r ISCELLANEOUS EQUIPMENT AND OPERATOR As specified herein Primary Group B2 esh Compressed air Supply for B100.fined Space Entry SCBA work24 HR 60.00 1440.00 ate r hour). Asspecified herein laiscellaneous ckhoe & Operator for B 101. Excavation John 24 HR $60.00 1440.00 Deere 310 Extendahoe, or Equal (rat per hour). As specified herein Backhoe & Operator for, B102. Miscellaneous Excavation John 3 DY400.00 Deere 310 Extendahoe, or Equal (rate1200.00 per day). As specified herein Backhoe & Operator for Miscellaneous Excavation John 8103. Deere 310 Extendahoe, or Equal (rate1500.00 1 WK1500.00 per week). As specified herein 0,000 L.B. Excavator & Operator for B104. Miscellaneous Excavation (rate per 8 HR 80.00 640.00 hour). As specified herein Offeror's Initials: -Ae City of Lubbock, TX Proposal Pricing Sheet RFP 17 -13175 -TF Water & Sanitary Sewer Tap Installation and Construction Services (To be completed and retumed with Proposal) REVISED rrEM DESCRIPTION QTY • U/M UNrr COST• EXTENDED COST 0,000 L.B. Excavator & Operator for B105. Miscellaneous Excavation (rate per 1 DY S500.00 S 500.00 day). As specified herein 0,000 L.B. Excavator & Operator for, B 106. Miscellaneous Excavation (rate per 1 WK $2000.00 2000.00 week). Asspecified herein Miscellaneous Man-hours Labor: B107. Approved by Owner in Writing Prior 10 HR 50.00 S o the Commencement of Work. As 500.00 ecified herein SHPALT AND CONCRETE CUT AND REMOVAL As specified herein quare Foot of Asphalt Cut an B 108. emoved for pipeline installation. As 2,000 SF $15.00 30000.00 cified herein quare Foot of Concrete Cut and B 109. emoved for pipeline installation. As 600 SF $15.00 9000.00 cified herein st for ditch in Rock to be verified City of Lubbock Inspector prior t 13110. mmencement of work (per hour' [oncountered). 40 HR 50.00 2000.00 As specified herein TRAFFIC CONTROL As specified herein ost per job for complete setup of (Cost plus 10% with City approved submittal of cost BI 11. XDOT approved and permitted arricades as specified herein. summary from barricades and signage sub -contractor) ost per job for complete setup o (Cost plus 10% with City approved submittal of cost B112. arricade for City thoroughfare (T-1 summary from barricades and signage sub -contractor) T-2 asspecified herein. ost per job for complete setup o B113. arricades for other City street 25 EA $300.00 7500.00 losures as specified herein. TOTAL FOR GROUP B, ITEMS Bl THROUGH B113. 1220720.00 W_t4m Al - HYDRO EXCAVATOR (meeting specifications of Section 2.6 B.) Secondary Group C C1. Per Mobilization and demobilization of hydro -excavator 6 EA $1000.00 $ 6000.00 and crew to include water loading, waste deposition, and travel time. one mobilization per job) C2. Hydro -excavator and crew (on site) 50 HR $ 250.00 $ 12500.00 Offeror's Initials: �c City of Lubbock, TX Proposal Pricing Sheet RFP 17 -13175 -TF Water & Sanitary Sewer Tap Installation and Construction Services (To be completed and returned with Proposal) REVISED ITEM I DESCRIPTION QTY • U/M I UNIT COST' I EXTENDED COST HYDRO EXCAVATION TRAILER (all equipment NOT meeting specifications of Section 2.6 B.) C3. Mobilization and demobilization of hydro -excavation trailer and crew to include water loading, waste deposition, and travel time. one mobilization per job) 12 600.00 7200.00 C4. Hydro -excavation trailer and crew (on site) 100 HR $ 200.00 $ 20000.00 TRAFFIC CONTROL (As specified herein) C5. Cost per job for complete setup of TXDOT approved and permitted barricades as specified herein. (Cost plus 10% with City approved submittal of cost summary from barricades and signage sub -contractor) C6. Cost per job for complete setup of barricade for City thoroughfare T-1 & T-2 asspecified herein. (Cost plus 10% with City approved submittal of cost summary from barricades and signage sub -contractor C7. Cost per job for complete setup of barricades for other City street closures as specified herein. 25 EA VOO.00 $ 5000.00 TOTAL FOR GROUP C, ITEMS Cl THROUGH C7. - $ 50700.00 OVERALL TOTAL FOR GROUPS A, B, & C S 2107865.00 * All quantities listed are estimated for weighting bid prices and not a guarantee of actual work amount. Offeror's Initials: kry EXHIBIT C City of Lubbock, TX RFP 17 -13175 -TF Water & Sanitary Sewer Tap Installation and Construction Services Insurance Requirements SECTION A. Prior to the approval of this contract by the City, the Contractor shall furnish a completed Insurance Certificate to the City, which shall be completed by an agent authorized to bind the named underwriter(s) to the coverages, limits, and termination provisions shown thereon, and which shall furnish and contain all required information referenced or indicated thereon. THE CITY SHALL HAVE NO DUTY TO PAY OR PERFORM UNDER THIS CONTRACT UNTIL SUCH CERTIFICATE SHALL HAVE BEEN DELIVERED TO THE CITY. INSURANCE COVERAGE REQUIRED SECTION B. The City reserves the right to review the insurance requirements of this section during the effective period of the contract and to require adjustment of insurance coverages and their limits when deemed necessary and prudent by the City based upon changes in statutory law, court decisions, or the claims history of the industry as well as the Contractor. SECTION C. The Contractor shall obtain and maintain in frill force and effect for the duration of this contract, and any extension hereof, at Contractor's sole expense, insurance coverage written by companies approved by the State of Texas and acceptable to the City, in the following type(s) and amount(s): INSURANCE (Copies of Endorsements will be Required) TYPE OF INSURANCE GENERAL LIABILITY ® Commercial General Liability ❑ ❑ Claims Made ® W/Heavy Equipment ® To Include Products of Complete Operation Endorsements PROFESSIONAL LIABILITY AUTOMOTIVE LIABILITY ® Any Auto EXCESS LIABILITY ❑ Umbrella Form GARAGE LIABILITY ❑ Any Auto COMBINED SINGLE LIMIT Other General Aggregate $1,000,000 Occurrence Products-Comp/Op AGG X XCU Personal & Adv. Injury _X_ Contractual Liability _X_ Fire Damage (Any one Fire) Med Exp (Any one Person) General Aggregate Aggregate $1,000,000 Each Occurrence Aggregate Auto Only - Each Accident Each Accident Aggregate ❑ BUILDER'S RISK ❑ 100% of the Total Contract Price ❑ INSTALLATION FLOATER ❑ 100% of the Total Material Costs ❑ POLLUTION ❑ CARGO ® WORKERS COMPENSATION — STATUTORY AMOUNTS OR ® EMPLOYERS' LIABILITY $1,000,000 OTHER: COPIES OF ENDOSEMENTS ARE REQUIRED ® City of Lubbock named as additional insured on a primary and non-contributory basis. ® To include products of completed operations endorsement. ® Waiver of subrogation in favor of the City of Lubbock on all coverages, except .e City of Lubbock shall be named as an additional insured on a primary and non-contributory basis J shall include waivers of subrogation in favor of the City on all coverage's. Copies of the Certificates Insurance and all applicable endorsements are required. ADDITIONAL POLICY ENDORSEMENTS The City shall been, upon request, and without expense, to receive copies of the policies and all endorsements thereto and may make any reasonable request for deletion, revision, or modification of particular policy terns, conditions, limitations, or exclusions (except where policy provisions are established by law or regulation binding upon either of the parties hereto or the underwriter of any of such policies). Upon such request by the City, the Contractor shall exercise reasonable efforts to accomplish such changes in policy coverages, and shall pay the cost thereof. REQUIRED PROVISIONS The Contractor agrees that with respect to the above required insurance, all insurance contracts and certificate(s) of insurance will contain and state, in writing, on the certificate or its attachment, the following required provisions: a. Name the City of Lubbock and its officers, employees, and elected representatives as additional insureds, (as the interest of each insured may appear) as to all applicable coverage; b. Provide for 30 day notice to the City for cancellation, nonrenewal, or material change; c. Provide for notice to the City at the address shown below by registered mail; d. The Contractor agrees to waive subrogation against the City of Lubbock, its officers, employees, and elected representatives for injuries, including death, property damage, or any other loss to the extent same may be covered by the proceeds of insurance; e. Provide that all provisions of this contract concerning liability, duty, and standard of care together with the indemnification provision, shall be underwritten by contractual liability coverage sufficient to include such obligations within applicable policies. NOTICES The Contractor shall notify the City in the event of any change in coverage and shall give such notices not less than 30 days prior the change, which notice must be accompanied by a replacement CERTIFICATE OF INSURANCE. All notices shall be given to the City at the following address: Marta Alvarez, Director of Purchasing and Contract Management City of Lubbock 1625 13" Street, Room 204 Lubbock, Texas 79401 SECTION D. Approval, disapproval, or failure to act by the City regarding any insurance supplied by the Contractor shall not relieve the Contractor of full responsibility or liability for damages and accidents as set forth in the contract documents. Neither shall the bankruptcy, insolvency, or denial of liability by the insurance company exonerate the Contractor from liability City of Lubbock, TX Contract 13175 — H.D. Weaver Ditching Service, Inc. Water & Sanitary Sewer Tap Installation and Construction Services Primary and Secondary Designations Primary Designation The contractor shall be the primary contractor for Group A Taps and Group B Non -Boring Services (1-88,100-113). Secondary Designation The contractor shall be the secondary contractor for Group C Hydro Excavation Trailer (3-4) and Group B Boring Services (89-99). CERTIFICATE OF INTERESTED PARTIES FORM 1295 1 of 1 Complete Nos. 1- 4 and 6 if there are interested parties. Complete Nos. 1, 2, 3, 5, and 6 if there are no interested parties. OFFICE USE ONLY CERTIFICATION OF FILING Certificate Number: 2017-149966 Date Filed: 01/03/2017 Date Acknowledged: 1 Name of business entity filing form, and the city, state and country of the business entity's place of business. HD Weaver Ditching Service, Inc. Lubbock, TX United States 2 Name of governmental entity or state agency that is a party to the contract for which the form is being filed. City of Lubbock 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract, and provide a description of the services, goods, or other property to be provided under the contract. 17 -13175 -TF water and sewer tap installation and construction services 4 Name of Interested Party City, State, Country (place of business) Nature of interest (check applicable) Controlling I Intermediary Jeffreys, Randy Lubbock, TX United States X 5 Check only if there is NO Interested Parry. ❑ 6 AFFIDAVIT I swear, or affirm, under penalty of perjury, that the above disclosure is true and correct. LINDA LIGHTFOOT ®, NOTARY PUBLIC STATE OF TEXAS MY COMM. EXP. 10/9/17 Si azure cLauthw4ed agent of contracting business entity AFFIX NOTARY STAMP / SEAL ABOVE Sworn to and subscribed before me, by the said V th' the day of 20 , to certify which, witness my hand and seal of Ace. Signature of officer administering oath Printed name of officer administering oath Title of officer administering oath Forms provided by Texas Ethics Commission www.ethics.state.tx.us verbwn vi.U.cf I Forms provided by Texas Ethics Commission vwvw.ethics.state.tx.us version V1.U.2I/ CERTIFICATE OF INTERESTED PARTIES FORM 1295 101`1 Complete Nos. 1- 4 and 6 if there are interested parties. Complete Nos. 1, 2, 3, 5, and 6 if there are no interested parties. OFFICE USE ONLY CERTIFICATION OF FILING Certificate Number: 2017-149966 Date Filed: 01/03/2017 Date Acknowledged: 01/19/2017 1 Name of business entity filing form, and the city, state and country of the business entity's place of business. HD Weaver Ditching Service, Inc. Lubbock, TX United States 2 Name of governmental entity or state agency that is a party to the contract for which the form is being filed. City of Lubbock 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract, and provide a description of the services, goods, or other property to be provided under the contract. 17 -13175 -TF water and sewer tap installation and construction services 4 Name of Interested Party City, State, Country (place of business) Nature of interest (check applicable) Controlling I Intermediary Jeffreys, Randy Lubbock, TX United States X 5 Check only if there is NO Interested Party. ❑ 6 AFFIDAVIT I swear, or affirm, under penalty of perjury, that the above disclosure is true and correct. Signature of authorized agent of contracting business entity AFFIX NOTARY STAMP / SEAL ABOVE Sworn to and subscribed before me, by the said this the day of 20 , to certify which, witness my hand and seal of office. Signature of officer administering oath Printed name of officer administering oath Title of officer administering oath Forms provided by Texas Ethics Commission vwvw.ethics.state.tx.us version V1.U.2I/