HomeMy WebLinkAboutResolution - 6111 - CO To Bid - DE Rice Construction Co. Inc.- West TX Regional Disposal Facility - 11/19/1998Resolution No. 6111
Item No. 20
November 19, 1998
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed
to execute for and on behalf of the City of Lubbock a Change Order No 5, to Bid No.
97300 (D. E. Rice Construction Co., Inc.) with associated documents for and on behalf of
the City of Lubbock for the West Texas Region Disposal Facility Phase 1 Facility
Development. Said Agreement is attached hereto and incorporated in this Resolution as if
fully set forth herein and shall be included in the minutes of the Council.
Passed by the City Council this 19th day of November 1998.
l
Y
SITTON MAYOR
APPROVED AS TO CONTENT:
4��F'44.-A-3 - -.1
Jeryl, Jr. andfi Special Pro' s gineer
�4O-V--ED AS TO FORM:
crVccd=\ChangeOrder#5Bid97300.Res.doc
November 9, 1998
s
4
Resolution No. 6111
CHANGE ORDER Item No. 20
November 19, 1998
No. S
PROJECT: West Texas Region Disposal Facility DATE OF ISSUANCE: 11/6/98
Phase 1 Facility Development
OWNER: City of Lubbock, Texas OWNER'S PROJECT NO. Bid #97300
CONTRACTOR: D.E. Rice Construction Co., Inc. ENGINEER: Parkhill, Smith & Cooper, Inc., Lubbock
CONTRACT FOR: Municipal Solid Waste ENGINEER'S PROJECT NO. 01-1907-97
Disposal Facility
You are directed to make the following changes in the Contract Documents.
Description:
1. Delete Relocation of Existing Truck Scale from Existing Landrdl and one (1) new truck scale as
described in Bid Alternate "C".
2. Install two (2) New Truck Scales as described in Bid Alternate "D".
Attachments: (List documents supporting change): Tabulation for Change Order No. S
Letter from D.E. Rice dated November 3, 1998
Page 16 of original bid documents
CHANGE IN CONTRACT PRICE
Original Contract Price
$ 5,264,398.66
CHANGE IN CONTRACT TIME:
Original Contract Time
240 calendar days
days or date
Previous Change Orders No. 1 to No. 4
$ 1,039,073.14
Net change from previous Change Orders
63
days or date
Contract Price prior to this Change Order
$ 6,303,471.80
Contract Time prior to this Change Order
303 calendar days
days or date
Net Increase (deer*ase) of this Change Order
$ 64,773.00
Net Increase (decrease) of this Change Order
-0-
days or date
Contract Price with all approved Change Orders
$ 6,368,244.80
Contract Time with all approved Change Orders
303 calendar days
days or date
Page 1
RECOMMENDED: APPRO APPROVED:
r
by: P W - by. % by: Adve,C ??
Engineer Q Windy Sitton, Major' Contractor
/j�
Date: ' " y (�• !fJ . �7 Date: NnvemhPr IC), 199R Date:___
ATTES —
by: If
Ka arnell, City Secretary
APPROV AS TO CONTENT:
by:
Jeryl , Jr.
Landfu Special Pojects
Engineer
APPR ED AS TO FO
by:
Municipal Contracts Attorney
EJCDC No. 1910.8-B (1983 Edition)
Prepared by the Engineers' Joint Contract Documents Committee and endorsed by The Associated General Contractors of America.
RqxbW SBS
Page 2
West Texas Region Disposal Facility
Phase I Facility Development
City of Lubbock Bid No. 97300
Change Order No. 5
B. 2,154,870 EXCAVATION
C.Y. Provide per Item 1 above at the unit price per cubic
yard: ffA F K..: 11t& n Ab it
ffattt-1 44ve1 ��cirG�, ,l.�s 6I.AI Dollars
d
and _� Cents ($ $
The total amount for Alternate Item B consists of:
MATERIALS: $ /a_ -T0 6. o Q
LABOR: S .4 994 180. 4e0
C. 1 TRUCK SCALES
L.S. Provide, relocate and install the truck scales including
all foundation work, load cells, wiring, salvage and
reinstallation of existing scales equipment, all labor,
equipment and superintendence necessary as shown
on the plans and required by the specifications
assuming up to a nine month delay in the relocation of
the existing scale at the unit price per lump sum:
/ L&!2�V?Z--F4-a0we,t l�.L�C,�- eel)oilars S,13e, /, d11 )
and .4 D Cents ($"05-/. 0D )
The total amount for Item 40 consists of.
MATERIALS. $ /V. 8y S• 0 0
LABOR: $ �� 2 ��, 60
D. 1 TRUCK SCALES
L.S. Provide and install two, new truck scales including all
foundation work, load cells, wiring, all labor,
equipment and superintendence necessary as shown
on the plans and required by the specifications at the
unit price per lump sum:AQ2: /— Seya'1 t6,'9&rr' z
hwe! & moa ✓ Dollars
and /10 Cents ($ *5?7 i!�Zll &V ) $� DD
The total amount for Item 40 consists of:
MATERIALS: $ t9Z X3/5.00
LABOR: $_?fig XW
West Texas RDF 1/20/98
16-
A D. E. RICE CONSTRUCTION CO , ` NC PHONE NO. : 806 274 3262 Nov. 03 1998 12: 39PM P2
■ 3300 S. CEDAR P.O. BOX 3344
=CE BORGER, TEXAS 79007 BORGER, TEXAS 79008
806 - 274-7187
November 3, 1998
The City of Lubbock
Attn: Mr. Jere Hart, Jr., P.J.
P.O. Box 2000
Lubbock, TX 79457
RE: West Texas Region Disposal Facility — Phase I — Truck Scales.
Dear Jere:
FAX: 806 - 274-3262
It is our understanding that the submittals for the new truck scales have been approved as
of this date. We have authorized our subcontractor, Rusty's Weigh Scales and Service,
Inc., to begin fabricating / constructing one new set of scales. We anticipate the concrete
work required for the scales to begin within two weeks. •
As noted in my FAX to you on 9/28/98, it is our understanding that the City may want to
install two new sets of scales instead of just the one set as originally bid and contracted.
If this is the case, we need to know as soon as possible so that we can have the second set
of scales fabricated.
As discussed previously, we are willing to provide and install two, new truck scales, as
originally bid under Alternate D, for $87,824.00, even though this amount is $1,916.00
less than our actual cost of the scales from Rusty's Weigh (price to us for two new scales
is $89,740,00). Additional concrete, grating and I-beam installation is also required and
is not included in the cost from Rusty's Weigh.
We will await direction from you on this issue. Thank you.
Sincerely,
Mike Williams
Business Manager