Loading...
HomeMy WebLinkAboutResolution - 2020-R0265 - Route Consent Agreement, Hancock Land Application SiteResolution No. 2020-RO265 Item No. 7.19 August 11, 2020 RESOLUTION WHEREAS, the City of Lubbock and its municipally owned electric utility, Lubbock Power & Light ("LP&L"), are currently served with wholesale power delivered through the Southwest Power Pool Regional Transmission Organization ("SPP"); WHEREAS, LP&L filed before the Public Utility Commission of Texas ("PUC") its Application of the City of Lubbock Through Lubbock Power and Light for Authority to Connect a Portion of its System with the Electric Reliability Council of Texas ("ERCOT"), Docket Number 47576 (the "Application"), on or about September 1, 2017; WHEREAS, the portion of LP&L's load subject to the Application is more particularly defined therein and herein as the "Affected Load"; WHEREAS, the Application to integrate the Affected Load into ERCOT was granted by the PUC, as evidenced by its Order dated March 15, 2018, in PUC Docket No. 47576, styled Application for the City ofLubbock through Lubbock Power and Light forAuthority to Connect a Portion of its System with the Electric Reliability Council of Texas (the "Order"); WHEREAS, as a part of Order, the PUC ordered LP&L and Sharyland Utilities ("Sharyland"), as end point owners of the subject transmission infrastructure ("Infrastructure") required to be constructed to integrate the Affected Load into ERCOT, to agree to the split of ownership of such Infrastructure; WHEREAS, such agreement was accomplished through the Participation Agreement (the "PA"), entered into by and between LP&L and Sharyland; WHEREAS, subsequent to entering into the PA, Sharyland was acquired by merger and acquisition by Oncor Electric Delivery Company LLC ("Oncor"); WHEREAS, as a part of the merger and acquisition, Oncor succeeded to all benefits and obligations of Sharyland under the PA; WHEREAS, in PUC Docket No. 48909, the PUC approved a 345 kV transmission line route, known in the PUC docket as the Wadsworth -New Oliver -Farmland 345 kV electric transmission line route ("Wadsworth to Farmland 345kV Route"), which crosses two properties owned by the City of Lubbock; WHEREAS, one of the properties crossed by the Wadsworth to Farmland 345kV Route is the City of Lubbock's Hancock Land Application Site, located in League 3, Wilson County School Land Survey, Abstract No. 112, Lynn County, Texas, and being a part of a tract of land described as Tract 3 in League 3 of Exhibit "A" in a General Warranty Deed to the City of Lubbock, a Texas home rule municipal corporation, recorded in Volume 327, Page 264, of the official public records of Lynn County, Texas ("Hancock Land Application Site"); WHEREAS, the City of Lubbock and Oncor Electric Delivery Company LLC desire to modify the route across the Hancock Land Application Site as described and depicted in the Route Consent Agreement and attachment thereto; NOW, THEREFORE: BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the City Manager of the City of Lubbock is hereby authorized and directed to execute for and on behalf of the City of Lubbock, that certain Route Consent Agreement, by and between the City of Lubbock and Oncor Electric Delivery Company LLC, a Delaware limited liability company, and related documents regarding City of Lubbock's Hancock Land Application Site, located in League 3, Wilson County School Land Survey, Abstract No. 112, Lynn County, Texas, and being a part of a tract of land described as Tract 3 in League 3 of Exhibit "A" in a General Warranty Deed to the City of Lubbock, a Texas home rule municipal corporation, recorded in Volume 327, Page 264, of the official public records of Lynn County, Texas. Said Route Consent Agreement is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council on August 11, 2020 DANIEL M. POPE, MAYOR ►:r W 101.119 Reb a Garza, City Secre APPROVED AS TO CONTENT: c David McCalla, Director of Electric Utilities APPROVED AS TO FORM: J6 It SM6 LP&L General Counsel Wadsworth -New Oliver -Farmland 345 kV CCN 34 ROUTE CONSENT AGREEMENT The undersigned landowner, the City of Lubbock ("Landowner"), executes this agreement to evidence Landowner's consent and agreement to a modification to the Wadsworth New Oliver - Farmland 345 kV electric transmission line route approved by the Public Utility Commission of Texas {"PUCT") in PUCT Docket No. 48909, on the land designated as CCN tract number 34, as shown in the map attached hereto as Exhibit A and incorporated herein for all purposes. Landowner owns the surface of CCN 34. Landowner hereby demonstrates a preference for, and consents to, a route modification through CCN 34 along the general path shown in Exhibit A. The dark blue line in Exhibit represents the PUCT-approved route on Landowner's property, and the turquoise line represents the agreed -upon route modification. Landowner hereby acknowledges and agrees that Oncor is permitted to further investigate the requested route modification and conduct surveys Oncor deems reasonably necessary for this purpose, including land, archeological, wildlife, storm water, vegetation, geotechnical and similar surveys, so long as any such investigation is done in coordination with and approved by the City Manager of the City of Lubbock, or his designee. Landowner agrees that Oncor, with approval of the City Manager of the City of Lubbock, may substitute the general depiction of the requested route modification on Landowner's tract shown in Exhibit A with definitive survey documents more precisely delineating the requested modification in metes and bounds with legal descriptions. This agreement does not grant easement or construction rights. Landowner and Oncor will agree upon the specific terms of the easement for the area roughly depicted in Exhibit A, and any price thereof, in a separate document. [signature page follows] ROUTE CONSENT AGREEMENT -- PAGE 1 of 2 Wadsworth -New Oliver -Farmland 345 kV CCN 34 AGREED: City of Lubbock is • August 11, 2020 Date .MM ' � M Title: Cily Manager APP VED A TO CONTENT: M David McCalla, birector of Electric Utilities APPROVED AS TO FORM: Je n m th, LP&L General Counsel ONCOR E TRIC DE Y COMPANY LLC - : _ 7 T.9 Zozv Date Name: lr� ct Title: r I-j eIAI rl�t ROUTE CONSENT AGREEMENT — PAGE 2 OF 2 I