HomeMy WebLinkAboutResolution - 2020-R0218 - Change Order No. 2 to Contract 14354, Utility Contractors of America, Inc.Resolution No. 2020-RO218 Item No. 7.6 July 14, 2020 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for and on behalf of the City of Lubbock, Change Order No. 2 to that certain Contract No. 14354 by and between the City of Lubbock and Utility Contractors of America, Inc., for Canyon Lakes Sanitary Sewer Interceptor Rehabilitation, and related documents. Said Change Order No. 2 is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council on July 14, 2020 DANIEL M. POPE, MAYOR ATTEST: � A-Aa-�(- Y Re cca Karza, Uty Secretary APPROVED AS TO CONTENT: esica McEachern, Assistant City Manager elli Leisure, Assistant City Attorney ccdocs/RES.Chg0rd#2Contract 14354- Canyon Lakes Sanitary Sewer Interceptor Rehabilitation June 1 I, 2020 Office of Purchasing and Contract Management Change Order Contract No: 14354 Contractor: Utility Contractors of America, Inc. Change Order No: 002-Reconciliatory ConttactTitle: Canyon Lakes Sanitary Sewer Interceptor Rehabilitation —Phasc2 Bid/RFPNo: 19-14354-TF Project No: 92318.9242.30000 "Change Order" means a written order to a Contractor, executed by the Owner, in accordance with the Contract authorizing an addition to, deletion from, or adjustment or rev is ion of the requirements of the Contract documents, or an adjustment to the cam pens ation payable to the Contractor, or to the time for performance of the Contract and completion of the project, or a combination thereof, which does not alter the nature of project and is an integral part ofthe project objective. Adjustments to "Estimated Quantities" to aline time in a Unit Price Contract do not require a Change Order. All work [hat alters the nature of the construction or that is not an integra I Parr of the project objective must be let out for public bid. Description of Change (alteration, deviation, addition, or deletion) caused by conditions encountered during construction not covered by the The Work of the Project involves therehabilita tion of certain sections of the Canyon Lakes Sanitary Sewerand Downtown Sewer Interceptors. Change Order #2 reconciles all bid items to complete the contract. Refer to the attachments. Where the Change Order is negotiated, the Change Order must be fully documented and itemized as to costs, includingmaterial quantities, material costs, taxes, insurance, employee benefits, other related costs, profit and overhead. Where certain unit prices are contained in the initial Contract, no deviations arc allowed in computing negotiated change order cos Is. ITEMIZED COSTS MUST BE FULLY DOCUMENTED AND ATTACHED TO THIS FORM. ITEM DESCRIPTION AMOUNT A. ORIGINALCONTRACTYALUE: $ 5,825,039.00 B. AM OUNT OF THIS CHANGE ORDER: Note: Council approval required if (+/-) S50,000 $-232,507.00 COST CENTER: I ACCOUNT: C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER B/A) -3.99% D. AMOUNT OF PREVIOUS C14ANGE ORDERS: $ 226,879.90 E. TOTAL AMOUNT OF ALL CHANGE ORDERS B+D) $ - 5,627.10 F. PERCENTOFCONTRACT OFALL CHANGE ORDERS (E/A):(25%maximunr) -0.097% G. NEWCONTRACTAMOUNT(A+E): $5,8t9,411.90 It is mutually agreed that the above dollar amount and the time extension, as applicable, asset forth in th is Change Order cons titutes full compensation to the Contractor for all costs, expenses and damages to the Contractor, whether direct, consequential or otherwise, in anyway incident to, or arising out of, or resulting directly or indirectly; from the work performed or modified by the Contractor under this Change Order. Date (2) Protect chitecN ta cf( o Date July 14, 2020 Date Council Date: July 14, 2020 Agcndaltcm#: 7.6 Contract 06/02/2020 Date W-Zb Dale Date Resolution#:__ 2020-RO218 PUR-45 (Rev 08/2018) City of Lubbock Canyon Lakes Sanitary Sewer Interceptor Rehabilitation - Phase 2 Reconciliatory Change Order #2 PAY- QUANTITY UNITS OESCR{PTION OF'ITEM UNIT- PRICE TOTAL ITEM ADDITIONS; No Items $ - $ - - $ - $ TOTAL ADDITIONS ''_ .. $ - SUBTRACTIONS 4A (120) Lb furnish and install 30-inch sanitary sewer pipe (VIU) or PVC.) by $ 420.00 $ (50,400.00) open cut (0-10-feet deep), including excavation and trench safety. Complete 30-inch sanitary sewer point repair by open cut 9A (1) 1:A construction (12-feet long), including removal and replacement $ 18,000.00 $ (18,000.00) of existing pipe (all types) wth FRP or PVC pipe, sediment, debris, and contaminated soils (tip to 10-feet of do tli . Complete 30-inch sanitary sewer point repair by open cut 9B (1.307) 13A construction (12-feet long), including removal and replacement $ 18,000.00 $ (23,526.00) of existing pipe (all types) wth bRP or PVC pipe, sediment, debris, and contaminated soils 10 to 20-feet of depth). 22 (1) IsA Abandon/Remove Existin ► 11,Eanhole $ 6,700.00 $ (6,700.00) 23 (30) CY Furnish and Install Grout Dill of Abandoned SanitarySewer, all ( $ 280.00 $ (8,400.00) depths, pipe materials, and pipe diameters). 26 (650) CY burnish and Install Select Dill Backfill for Aerial Sections and $ 75.00 $ (48,750.00) Other Areas Requiring Dill. 29A (226) l,b Itemoval and Repair or Replacement of existing concrete curb land $ 132.00 $ (29,832.00) gutter. Perform site restoration by hydro -mulch seating of all areas 31 (5,211) Sy disturbed during construction where existing irrigation systems $ 9.00 $ (46.899.00) arc not in place. TOTAL SUBTRACTION$ ...; $ 232,507.00 TOTAL FOR CHANGE'ORDER-NO'. -2 $ 232,507.00 Date Printed: 6/2/2020 Page 1 of 1