Loading...
HomeMy WebLinkAboutResolution - 2000-R0326 - Contract-Thompson, Ventulett, Stainback, &Associates-Master Plan Design Services - 09/13/2000Resolution No. 2000—RO326 September 13, 2000 Item No. 42 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock, by and between the City of Lubbock and Thompson, Ventulett, Stainback, & Associates, Inc., a contract to perform master plan design services, and related documents. Said contract is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council this 13th day of September 2000. n WINDY S T ON, MAYOR .APPROVED AS TO CONTENT: Vickie Key Civic Centers Manager APPROVED AS TO FORM: ,y/'--_ / William de Haas Competition and Contracts Manager/Attorney CcdocsWaster plan design services.Res Septernber 13, 2000 Resolution No. 2000—R0326 Planning. Architecture. Interior Design. Thompson, Ventulett, Stainback & Associates, Inc. 2700 Promenade Two, 1230 Peachtree Street N.E. Atlanta, Georgia 30309-3591 t 404 888 6600 f 404 888 6700 August 31, 2000 Mr. Victor Kilman, Purchasing Manager CITY OF LUBBOCK 1625 13th Street, Room 1,04 Lubbock, Texas 79401 Regarding: CITY OF LUBBOCK CONVENTION CENTER, PERFORMING ARTS THEATER, AND --B SPORTS ARENA Lubbock, Texas Project No. DKKA-003 / File No. 2.2 Subject: PROPOSAL FOR MASTERPLAN DESIGN SERVICES Dear Mr. Kilman: Thompson, Ventulett, Stainback, & Associates, Inc. (TVS) in association with BGR Architects -Engineers is pleased to have been selected to perforin Masterplan design services for the City of Lubbock. As requested by the City, we have expanded our proposal in this letter to include a more detailed understanding of scope and schedule and have proposed an outline of compensation for professional services and related expenses. The following proposal is based on our understanding of the project and includes the provisons stated in the Request for Proposal L00-1dated June 23, 2000, the subsequent addendum #1, dated July 18, 2000 and our proposal dated July 26, 2000. SCHEDULE TVS / BGR will provide master planning services within a six-week schedule starting with a Notice to Proceed following the September 13 City Council meeting and concluding prior to November 1. We anticipate two working sessions with city staff and two presentations of the completed study. Schedule priority will be given to cost expectations for the convention center expansion. MASTER PLANNING Project scope will include programming, construction cost and master planning services for the Auditorium, Coliseum and Civic Center. Master planning will be limited to those facilities that can be located on current city owned property at the Civic Center Site and adjacent property across 6"' Street. Design for these facilities will, likewise, be limited to the development of a proposed site plan and conceptual floor plans. Elevation and massing development can be provided as an additional service if desired by the City. COMPENSATION These professional services for master planning will be provided for a lump sum fee of $40,000.00. This sum anticipates the equivalent of a full time TVS architect and a part time representative from BGR for the full duration of the masterplanning phase ($30,000). In addition, a principal of both PROPOSAL FOR MASTERPLAN DESIGN SERVICES Page 2 of 2 Project No. DKKA-003 / File No. 2.2 August 28 2000 organizations will attend owner presentations and workshops ($5,000), and consultation will be provided by our theatrical, cost and acoustical consultants ($5,000). Reimbursable expenses, in addition to the compensation outlined above, will be invoiced at a multiple of 1.1 times expenses incurred by the architect in the interest of the project. Reimbursable expenses include long distance communications, reproduction, delivery and costs related to out of town travel. Per Diem rates for lodging and meals will follow GSA guidelines of $132 per person plus taxes. Travel will be tourist class unless unavailable. TVS / BGR are pleased to have the opportunity to serve the City for this significant planning effort. If this proposal meets your approval, please sign the two originals and return one for our files. Please call me, if you should have any questions. Sincerely, Thompson, Ventulett, Stainback & Associates, Inc. 777/ Michael H. Ezell, ALA Senior Principal cc: Roger Neuenschwander / Mike Briggs / BGR C OF LUBBOCK WINDY SITT YOR ST: KaythijeParnell, City Secretary APPROVED AS TO CONTENT: � da�'— qc�=� - cki Key, Civic tern Manager APPROVED AS TO FORM: William de Haas Competition and Contract Manager