HomeMy WebLinkAboutResolution - 2005-R0574 - Amendment To Agreement- Pinnacle Mapping Technologies Inc.- Photography Services - 12/15/2005Resolution No. 2005-RO574
December 15, 2005
Item No. 5.14
RESOLUTION
IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
I to execute for and on behalf of the City of Lubbock a Second Amendment to the
lent with Pinnacle Mapping Technologies, Inc. for aerial photograph and digital
lotography services and all related documents. Said Second Amendment is
i hereto and incorporated in this Resolution as if fully set forth herein and shall be
d in the minutes of the Council.
by the City Council this 15th day ofDe
MARC -kfc-DPUGAL, MAYOR
TTEST:
Garza, City Secretary
AS TO CONTENT:
-, ;�
y Abbe,LGIS Specialist
AS TO FORM:
.nda L. Chamales, Senior Attorney
ffice Practice Section
att I Linda I ices — Pinnacle Amendment #2
,tuber 30, 2005
CONTRACT NO.
X796
STATE OF TEXAS §
KNOW ALL MEN BY THESE PRESENTS:
COUNTY OF LUBBOCK §
SECOND AMENDMENT TO PROFESSIONAL SERVICES
AGREEMENT
This Agreement is entered into by the CITY OF LUBBOCK (referred to herein
as "City"), a Home Rule Municipality of Lubbock County, Texas, and PINNACLE
MAPPING TECHNOLOGIES, INC. (referred to herein as "PINNACLE").
WITNESSETH:
WHEREAS, City and PINNACLE executed a Professional Services Agreement
on the 4th day of February, 2005, in which PINNACLE agreed to provide photography,
ground control, photogrammetric and compilation services necessary for the production
of topographic maps and digital orthophotography; and
WHEREAS, City and PINNACLE amended said Agreement in March,
2005 to extend portions of the scope of work to ensure full 1"=100' color digital
orthophotographic coverage of the New Deal, Lubbock East, Lubbock West and
Wolfforth USGS 7.5 minute Quadrangles; and
WHEREAS, City desires to make a second amendment to the Agreement by
adding Contract Addendum A-2 which includes the additional tasks and prices necessary
to develop a new digital elevation model outside the existing areas;
NOW THEREFORE, City and PINNACLE agree as follows:
Second Amendment to Pinnacle Mapping Technologies, Inc.
Contract Addendum A-2, attached hereto and incorporated herein as if fully set
forth, is hereby added to the Professional Service Agreement between the parties dated
February 4, 2005, as previously amended.
Executed this 15th day of December
CITY OF LUBBOCK
OUGAL, MAYOR
ATTEST:
2005.
PINNACLE MAPPING
TECHNOLOGIES, INC.
BY:
BRENDA R. KING, PRES114ENT
Date: 12— 1— UC
ATTEST:
Rebecca Garza, City Secretary Brian J. M field, �fcre?ary
APPROVED AS TO CONTENT:
Rob Al is a ec
Director of Business Development
APPROVED AS TO FORM:
Linda Chamales, Senior
Attorney—Office Practice
LC: cityatt/Linda/Pinnaeie Amendment #2
Second Amendment to Pinnacle Mapping Technologies, Inc.
Page 2
Contract Addendum. A-2
SCOPE OF WORK AND PRICING
City of Lubbock, Texas (including USGS Add-on)
PREVAILING DOCUMENTS
The entire Scope of Work and Pricing document (Exhibit A and Contract Addendum A-1) are
valid and govern the entire scope of work and pricing for the City of Lubbock. This addendum
includes the additional tasks and prices necessary to develop a new DEM outside of the areas that
will be covered by either an existing 1' DTM provided by the City or new P DTM to be
developed by Pinnacle under those scope documents. The DEM will support the extended
orthophoto coverage to ensure full 1"=100' color digital orthophotographic coverage of the New
Deal, Lubbock East, Lubbock West and Woleforth USGS 7.5 -minute Quadrangles. The entire
project area (minus the City's Area E and the Lake Alan Henry Area) will now be approximately
332.05 square miles.
PREVAILING SPECIFICATIONS
The new DEM will be developed to meet or exceed National Map Accuracy Standards for
1"=100' mapping. This standard states that 90 percent of all photographic details on the
orthophotography shall be accurate to within at least 1130 in. of true position, as determined by
test surveys, and none of the photographic details shall be displaced by more than 1115 in. from
true coordinate position.
Since the orthophoto process rectifies images at the ground elevation of a DEM scan, accuracy
standards must exclude objects above and below the scan elevation, such as tops of buildings,
poles, trees, and other like objects." For this project, 1130 of an inch at publication scale equates
to +I-3.3' for the l "=100' maps.
PROJECT AND PRODUCTION SCOPE
Accomplishing this Scope of Work will require the following tasks:
TOPOGRAPHIC MAPPING
PINNACLE will produce new DEM (Digital Elevation Model) data with a grid
spacing of 100' for the 1"=100' maps. DEM surface model for the additional area
will be delivered in ASCII -XYZ format.
DELIVERABLES
PINNACLE will provide the following list of deliverables for this project:
• DEM in ASCII -XYZ format.
SCHEDULE
Please refer to Exhibit B (Project Schedule). In our proposed schedule, we have prepared for
eventualities and questions that may arise during the Pilot Phase of Production. We will not
compromise the quality, accuracy, or precision of the data to meet an unrealistic schedule and
will not move forward in production until everyone is on the same page after the Pilot Phase.
CUSTOMER SUPPLIED DATA
• Additional information deemed helpful or necessary as decided upon by the City's
technical staff
Pinnacle Mapping Technologies, Inc. Scope of Work Page i of 2
PINNACLE is not responsible for inaccuracies in data provided by the City or the United States
Government. PINNACLE reserves the right to seek additional compensation if such items are
found to be deficient and result in additional work by PINNACLE. This condition may also
result in schedule revisions. Either party will notify the other immediately upon the discovery of
any defect. At such time, both parties will evaluate its impact on the project and time schedule.
PINNACLE reserve the right to seek costs to correct the defect before any action is taken.
WARRANTY
No warranty of data produced by a previous vendor, non -related third -party, or data provided by
the client will be implied. All work produced by PINNACLE is warranted for a period of six -
months after final acceptance of the completed project.
REviEW AND ACCEPTANCE
The City shall complete checks of all deliverable products within 30 days of delivery. After
initial checking, work increments will be categorized by the City as follows:
ACCEPTED: Products that meet specifications and contain no apparent errors, or so few errors
as to be acceptable, will formally be indicated as accepted.
RECEIVED/EDITED: The product has a number of errors that do not permit acceptance. For
the product to be accepted, PINNACLE must correct or address all issues noted by the City.
REJECTED: The number and character of errors detected by the City are such that the product
is formally returned to PINNACLE without a complete edit. The City will formally notify
PINNACLE of the rejected status of the product. PINNACLE must edit and correct the mapping
for resubmittal to the City. If the City determines that there are an excessive number of rejected
products, the City may require the Contractor to suspend production until the problems are
resolved. Payment may be withheld until all problems are resolved.
PRICING
c -c-
New DEM Development $ 6,740.00
TOTAL
6,740.00
PINNACLE understands this pricing is contingent upon receipt of third -party funds by the City of
Lubbock. Should the City not receive the funds, this scope of work will become null and void.
TERMS
PINNACLE is authorized to begin the project upon execution of this contract. The prices remain
valid through the duration of the project schedule outlined in Exhibit E. Should delays in
contract signing or execution occur, pricing shall remain valid until December 1, 2005.
Pinnacle Mapping Technologies, Inc. Scope of Work Page 2 of 2