Loading...
HomeMy WebLinkAboutResolution - 2005-R0519 - Amendment To Contract - Hugo Reed And Associates Inc.- Engineering Services - 11/07/2005Resolution No. 2005-RO519 November 7, 2005 Item 6.6 .Y0�1iJI1L[f IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor Pro Tem of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock, an Amendment No. 3 to the Contract between the City of Lubbock and Hugo Reed and Associates, Inc. for engineering services. Said Amendment No. 3 is attached hereto and incorporated in this Resolution as if fully set forth herein and shall be included in the minutes of the Council. assed by the City Council this TTEST: Garza, City Secretary 'ROVED AS TO CONTENT: Engineer APPROVED AS TO FORM: Linda Chamales, Senior Attorney (Office Practice ;s/Amend #3 -Hugo Reed.res 21, 2005 7th day of November , 2005. 'C� /0� TOM MARTIN, MAYOR PRO TEM CONTRACT NO. 6528 AMENDMENT NO.3 to CONTRACT FOR ENGINEERING SERVICES for DESIGN and BID: GLENNA GOODACRE BOULEVARD PROTECT in OVERTON PARK, LUBBOCK THE STATE OF TEXAS § THE COUNTY OF LUBBOCK § THIS AMENDMENT NO. 3 to THE CONTRACT FOR ENGINEERING SERVICES for DESIGN and BID: GLENNA GOODACRE BOULEVARD PROJECT in OVERTON PARK, LUBBOCK, said contract dated December 8, 2003 together with Amendment No. 1 dated August 24, 2004 and Amendment No. 2 dated November 4, 2004, is made by and between the City of Lubbock, Texas, hereinafter called the OWNER, and Hugo Reed and Associates, Inc., hereinafter called HRA. NOW, THEREFORE, in consideration of the mutual covenants and agreements herein contained, the OWNER and HRA do mutually agree as follows. ARTICLE 1. CONTRACT PERIOD The effective date of the original contract was December 8, 2003. This AMENDMENT NO.3 will extend the Contract Period to include the additional design phase services and those construction phase services as generally outlined herein. Unless subsequent Amendments to this Contract are executed, the Contract Period will extend to December 30, 2006, unless the additional services authorized by this amendment are completed in their entirety before said date. ARTICLE 2. SCOPE OF SERVICES This AMENDMENT NO.3 is being made at the request of the OWNER for the purpose of amending the Original Scope of Services to include those general professional services detailed in Attachment A hereto, "Additional Project Scope and Services." ARTICLE 3. COMPENSATION The general tasking proposed to perform the additional services authorized by this AMENDMENT NO.3 is described in Attachment A. The "Basis for Payment" for services performed under this Amendment is indicated in Attachment B hereto. This AMENDMENT NO. 3 will result in a net increase of $ 406,306 to the maximum amount payable under this contract. ARTICLE 4. OTHER This Amendment will affect a change to the hourly billing rates applicable to work performed under this Amendment going forward, as indicated in Attachment A, Table C, "Personnel Service Rates for Amendment No. 3 to Agreement for Engineering Services," Page 9. No changes to the original contract are requested or granted as a result of this Amendment, other than those detailed in these Amendment No. 3 to Contract for Engineering Services for Design and Bid: Glenna Goodacre Boulevard Project Page 3 Articles I through 4, above. All other provisions of the original contract will remain in full force and effect. This Amendment shall become a part of and be incorporated into the original contract upon its full execution by both OWNER and HRA. ARTICLE 5. SIGNATORY WARRANTY The undersigned signatory for Hugo Reed and Associates, Inc. hereby represents and warrants that he is an officer of the organization for which he has executed this contract and that he has full and complete authority to enter into this contract on behalf of his firm. The undersigned signatory for the OWNER hereby represents and warrants that he/she has full and complete authority to enter into this contract on behalf of this organization. IN WITNESS WHEREOF, the parties hereto have caused this AMENDMENT NO. 3 to the original contract to be executed, but this AMENDMENT NO.3 to the original contract shall not be valid until signed by a duly authorized representative of each party. HUGO REED AND ASSOCIATES, INC. Stevan M. Coleman, P.E. E.V.P. Operations CITY OF LUBBOCK, TEXAS Tom Martin Mayor Pro Tempore APPROVE S TO CO ENT: arty Hertel, P . City Engineer Attest: Rebe a Garza City Secretary APPROVED AS TO FORM: o n M. Knigh f Assistant City Attorney Amendment No. 3 to Contract for Engineering Services for Design and Bid: Glenna Goodacre Boulevard Project Page 2 Mailing Addresses: For the purpose of this agreement, the following addresses shall be used to mail all required notices, reports, claims and correspondence: For: Hugo Reed and Associates, Inc. For: City of Lubbock 1601 Avenue N 1625 1P Street Lubbock, TX 79401 Lubbock, Texas 79401 Attn: Mr. Bernard J. Gradel, Jr., President Attn: Mr. Larry Hertel, P. E. Amendment No. 3 to Contract for Engineering Services for Design and Bid: Glenna Goodacre Boulevard Project Page 3 ATTACHMENT A to AMENDMENT No. 3 to AGREEMENT for ENGINEERING SERVICES, ADDITIONAL PROJECT SCOPE and SERVICES OWNER: City of Lubbock, Texas PROJECT: Amendment No. 3 to Agreement for Engineering Services for Design and Bid: Glenna Goodacre Boulevard Project in Overton Park, Lubbock The scope of services for this Amendment is as follows: BASIC SERVICES A. PHASE 1 DESIGN SERVICES — "WAL-MART STREETS" AND CONDEMNATION R -O -W PARCEL SURVEYS 1. The Amendment No. 3 Phase I Basic Design Services are outlined in detail in Exhibit A-1, Worksheet A3 -1B, according to the tasking and man-hours indicated therein. Following is a summary of the major categories for the Phase 1 Basic Design Services to be performed: a. Municipal Paving and Drainage Construction Documents Avenue T, full width curb -to -curb, from tie-in at Marsha Sharp Freeway at south end of radius to south end of radius at intersection with 7th Street; 7th Street, full width curb -to -curb, from intersection with Avenue T to east end of radius of intersection with Avenue R; Avenue R, full width curb -to -curb, from tie-in at Marsha Sharp Freeway at south end of radius to south end of radius at intersection with 7th Street; Storm sewer inlets and piping from intersection of Avenue T and (th Street south to 7th Street and east to tie-in with existing storm sewer west of intersection with Avenue R; R -O -W parcels, both sides of GGB from Avenue Q to Avenue S; Coordination with utilities companies. b. Amenities Construction Documents Parkway amenities for the "Wal-Mart project" are being provided via separate design and construction contracts. Amendment No. 3 to Contract for Engineering Services for Design and Bid: Glenna Goodacrc Boulevard Project Page 4 2. The design deliverables will include one design package of plans, specifications, and estimates each for the Documents specified in Items I.A.I.a. above. 3. Each design package deliverable will consist of one set of reproducible mylar original plans, one hard -copy set of the noted specification sections, a bid form, and a final opinion of probable cost. 4. HRA will provide one hard -copy and one electronic copy of all pertinent design data including plans, specifications, opinion of probable cost, and supporting data, computer models, and other calculations and information utilized in the development of the design package. B. PHASE 2 DESIGN SERVICES — "RESIDENTIAL STREETS" The Amendment No. 3 Phase 2 Basic Design Services are outlined in detail in Exhibit A-1, Worksheet A3 -2B, according to the tasking and man-hours indicated therein. Following is a summary of the major categories for the Phase 2 Basic Design Services to be performed: a. Municipal Paving and Drainage Design and Construction Documents 7th Street, full width curb -to -curb, from Avenue V to Avenue U; 0 Street, full width curb -to -curb, from Avenue V to west end of radius of intersection with Avenue R; 10t4 Street, full width curb -to -curb, from Avenue V to west of Avenue S; Avenue U, full width curb -to -curb, from the north end of radius at the intersection with 7`h Street to the north end of radius at the intersection with Main Street; Avenue T, full width curb -to -curb, from 9th Street to 10th Street; Relocate storm sewer inlets and extend piping from intersection of Avenue R and 9th Street west to approximately the Avenue S intersection, if required for drainage; also, relocate inlets and extend piping from intersection of Avenue S and 10th Street west to clear the future roundabout at that intersection. Coordination with utilities companies. b. Amenities Design and Construction Documents Block by block tree plantings, landscaping and irrigation; Crosswalks and pedestrian crossings; Street signage graphics and finials; Amendment No. 3 to Contract for Engineering Services for Design and Bid: Glenna Goodacre Boulevard Project Page 5 Pedestrian area lighting; Roadway lighting; Coordination with utilities companies; Construction Phase Services and Administration for landscaping and lighting. 2. The design deliverables will include one design package of plans, specifications, and estimates each for the Documents specified in Items I.B. La. and I.B. Lb. above. The packages will be bid separately. I Each design package deliverable will consist of one set of reproducible mylar original plans, one hard -copy set of the noted specification sections, a bid form, and a final opinion of probable cost. 4. HRA will provide one hard -copy and one electronic copy of all pertinent design data including plans, specifications, opinion of probable cost, and supporting data, computer models, and other calculations and information utilized in the development of the design package. C. SUPPLEMENTAL ,SERVICES 1. HRA will provide all surveying services as outlined in Exhibit A-1, Worksheet A3 -S, for the purposes of establishing the necessary control and acquiring the necessary field data for the performance of the Amendment Basic Design Services. These services include the R -O -W parcel surveys necessary for GGB condemnation proceedings at the direction of the City of Lubbock. 2. HRA will provide one hard -copy of all survey notes and records, and one electronic copy of all survey data so formatted. Amendment No. 3 to Contract for Engineering Services for Design and Bid: Glenna Goodacre Boulevard Project Page 6 ATTACHMENT B to AMENDMENT No. 3 to AGREEMENT FOR ENGINEERING SERVICES BASIS for PAYMENT OWNER: City of Lubbock, Texas PROJECT: Amendment No. 3 to Agreement for Engineering Services for Design and Bid: Glenna Goodacre Boulevard Project in Overton Park, Lubbock For Services rendered under this Contract, OWNER agrees to pay HRA as follows: A. GENERAL 1. HRA will be paid according to the personnel classifications and hourly rate schedules shown in Table C, based on actual services performed on the project by classification and hours. Services performed by the subcontractor will be billed at cost. Reimbursable expenses will be paid at cost plus 15% for both HRA and the subcontractor. 2. Monthly payments will be made to HRA based on the uncontested amount of each monthly statement prepared and submitted by HRA. Each monthly statement will be itemized to show the amount of work actually performed by each personnel classification and with associated reimbursable expenses for both HRA and the subcontractor. Statements will be submitted in a format acceptable to OWNER. 3. Anticipated delivery date of the project Amendment Phase 1 design deliverables is on or about November 18, 2005. Anticipated delivery date of deliverables for the roadway portions of 10'h Street from Avenue V to Avenue U is on or about November 18, 2005. Anticipated delivery date of the remainder of the project Amendment Phase 2 roadway design deliverables is on or about January 30, 2006. Delivery of the amenities portions of the design proiect will lag deliveries of the roadway portions and will be bid separately from the roadway portions. The anticipated delivery dates are based on having an executed contract Amendment and N.T.P. no later than November 11 2005. Should the N.T.P. on the Project not be received by the anticipated date, OWNER agrees that it will be necessary to reconsider the anticipated delivery date and, if necessary, to modify same by amendment to this contract if so agreed upon by both the OWNER and HRA.. Amendment No. 3 to Contract for Engineering Services for Design and Bid: Glenna Goodacre Boulevard Project Page 7 B. BASIC AND SUPPLEMENTAL SERVICES, AND REIMBURSABLES, THIS AMENDMENT NO.3 1. The maximum compensation to be billed OWNER by HRA on behalf of HRA and all sub -consultants for performance of this AMENDMENT NO.3 Basic and Supplemental Services and Reimbursables is as follows: Basic Supplemental Basic Basic Services Surveying Services Reimbursable Expenses Hugo Reed and $ 188,472 $ 29,520 $ 12,580 Associates, Inc. Parkhill, Smith and 170,116 N.A. $ 5,618 Cooper, Inc. AMENDMENT NO. 3 TOTAL BASIC AND $ 406,306 SUPPLEMENTAL SERVICES NOT TO EXCEED: C. BASIC AND SUPPLEMENTAL SERVICES, AND REIMBURSABLES, TOTAL OF ORIGINAL CONTRACT PLUS ALL AMENDMENTS The maximum compensation to be billed OWNER by HRA on behalf of HRA and all sub -consultants for performance of the Original Contract and all Amendments to -date, including this AMENDMENT NO. 3, is as follows: Original Contract, December 8, 2003 $ 277,089 Amendment No. 1, August 26, 2004 $ 165,915 Amendment No. 2, November 4, 2004 $ 7,500 This Amendment No. 3 $ 406,306 Total Not To Exceed Contract $ 856,810 Amendment No. 3 to Contract for Engineering Services for Design and Bid: Glenna Goodacre Boulevard Project Page 8 TABLE C PERSONNEL SERVICE RATES for AMENDMENT No. 3 to AGREEMENT FOR ENGINEERING SERVICES OWNER: City of Lubbock, Texas PROJECT: Amendment No. 3 to Agreement for Engineering Services for Design and Bid: Glenna Goodacre Boulevard Project in Overton Park, Lubbock COMPENSATION RATES Hourly fees listed herein will apply for the term of this contract. D. PERSONNEL SERVICES Category of Personnel /HR Hugo Reed & Associates. Inc. Principal -in -Charge or Officer 126.00 Project Manager 121.00 Senior Professional Engineer 110.00 Professional Engineer 99.00 Engineer -in -Training 84.00 Engineering Technician/Designer 74.00 Senior Registered Professional Surveyor 110.00 Surveying Party Chief 66.00 CADD Technician 66.00 Clerical 50.00 Parkhill. Smith & Cooper. Inc. Principal -in -Charge or Officer 118.00 Project Manager 88.00 Licensed Architect 88.00 Landscape Architect 71-00 Senior Professional Engineer 118.00 Professional Engineer 96.00 Engineer -in -Training 76.00 Engineering Technician/Designer 65-00 CADD Technician 58.00 Clerical 53.00 Amendment No. 3 to Contract for Engineering Services for Design and Bid: Glenna Goodacre Boulevard Project Page 9 EXHIBIT A-1 AMENDMENT No. 3, TASKING and MAN-HOURS for BASIC SERVICES, BASIC SUPPLEMENTAL SURVEYING SERVICES, and BASIC REIMBURSABLES, including SUBCONTRACTOR Amendment No. 3 to Contract for Engineering Services for Design and Bid: Glenna Goodacre Boulevard Project Page 10 AMENDMENT No. 3 to CITY OF LUBBOCK, TEXAS Glenna Goodacre Boulevard Project and Associated Work 17 -Oct -05 BASIC SERVICES and SUPPLEMENTAL SERVICES CONTRACT PROPOSAL SUMMARY AMENDMENT No. 3 BASIC SERVICES COMPENSATION $ 356,588 MRA Subtotal (Engineering Services) $ 188,472 PSC Subtotal (Architectural and Engineering Services) $ 170,116 AMENDMENT No. 3 SUPPLEMENTAL SERVICES COMPENSATION, SURVEYING SERVICES $ 29,520 AMENDMENT No, 3 BASIC SERVICES REIMBURSABLE EXPENSES, TOTAL, With 1.15 Multiplier $ 18,198 HRA Subtotal (Basic Services Reimbursables, No Multipiier) $ 16,940 PSC Subtotal (Basic Services Reimbursables, No Multiplier) $ 4,685 AMENDMENT No. 3 BASIC SERVICES, SUPPLEMENTAL SERVICES, AND REIMPURSABLES, TOTAL COMPENSATION $ 405,305 Papa SUM -1 TASKING for AMENDMENT NO. 3 to AGREEMENT for ENGINEERING SERVICES GLENNA GOODACRE BOULEVARD PROJECT and Associated Work 17 -Oct -05 CONSTRUCTION ADMINISTRATION for Landscape, Architectural and Electrical Amenities, for the Original Project Area and the Additional Area Encompassed by Amendment No. 2, described as follows: APPLICABLE PROJECT AREA: Median on Glenna Goodacre (GGB) from University Ave to Ave V, GGB, Ave V & Ave W around Dinerstein I, Ave W, GGS and Ave X around Dinerstein II, roundabout at Mac Davis Lane and Ave X, and Ave V and Mac Davis Lane around Dinerstein III Amendment No. 3, Worksheet A3 -CA Firm Classification Prin. or Proj. Sr. Prof. Architect Land. Prof. E.I.T. Engr. CARD Clerical Line Line S 708 $ 765 Officer Mgr. Engr. 24 Arch. Engr. Tech. Tech. Hrs. Extension HRA hates $126.00 $121.00 $110.00 1.3 Respond to contractor questions/review submittals $99.00 $84.00 $74.00 $66.00 $50.00 by by PSC Tasking $118.00 $88.00 $118.00 $88.00 $71.00 $96,00 576,00 $65.00 1 $58.00 $53.00 Firm Firm re cie a- 1-rtnrcr971lrrlAA1 AnMrrJJQTDAr#nAt pna r AAtn.crdFF AQr141T1=rT11PA1 dNf] 11r 1H1T1 rr AMFNIT1Fi HRA PSC 1,1 Pre -Construction mtg 3 3 3 3 3 6 9 S 708 $ 765 HRA PSC 1.2 Weekly site visits -Assume 12 months construction period 24 18 156 36 0 234 $ - $ 18,228 HRA PSC 1.3 Respond to contractor questions/review submittals 16 36 180 90 12 0 334 $ - $ 26,692 HRA PSC 1,4 Review Contractor Pay Applications 4 4 24 8 0 40 S - S 3,176 HRA PSC 1.5 Contractor Coordination Mtgs - monthly, develop minutes and distribute after each meeting 8 48 12 12 0 1 80 $ - $ 5,900 HRA PSC 1.6 Punch list 4 2 6 24 16 2 50 $ 220 $ 4,120 HRA PSC 1.7 Project close-out 1 4 4 16 8 4 1 36 $ 126 $ 2,840 HRA PSC 1.8 Project management 1 1 40 24 1 64 $ 126 1 $ 6,832 HRA TASK 1 SUBTOTAL PSC TASK 1 SUBTOTAL TASK 1 SUBTOTAL PROJECT CUMULATIVE TOTAL HRA Hours by Personnel Classification PSC Hours by Personnel Classification 5 5 fl 0 0 0 0 10 40 87 0 68 451 173 0 0 16 12 847 Page A3 -CA -1 Zl) 1"Idu $ 68,553 $ 69,733 $ 69,733 TASKING for AMENDMENT NO. 3, PHASE 1, to AGREEMENT for ENGINEERING SERVICES GLENNA GOODACRE BOULEVARD PROJECT and Associated Work 17 -Oct -05 "WAL-MART STREETS": Avenue T from Marsha Sharp Freeway to South End of Radius of 7th Street, 7th Street from Avenue T to East End of Radius of Avenue R, Avenue R from Marsha Sharp Freeway to South End of Radius of 7th Street Amendment No. 3, Phase 1, BASIC SERVICES Worksheet A3 -1B - WAL-MART STREETS Firm Classification Prin. or Proj. Sr. Prof. Architect Land. Prof. E.I.T. Engr. CADD Clerical Line Line 1 Officer Mgr. Engr. $ 254 Arch. Engr. Tech. Tech. 1 Hrs. by Extension by HRA Rates $126.00 $121.00 $110.00 $99.00 $84.00 $74.00 $66.00 $50.00 PSC Tasking $118.00 $88.00 $118.00 $88.00 57100 596.00 $76.00 $65,00 558.00 $53.00 Firm Firm TASK 1: RECON, DATA ACQUISITION, EVALUATION HRA PSC 1 1.1 Site visit, note field conditions 1 1 s 1 1 4 3 $ 386 $ 254 HRA PSC 1.2 Coordinate with surveyors for field survey data needed for design 1 2 2 5 0 S 514 $ HRA PSC 1.3 Review field survey data, establish approximate project demo and tie-in limits 2 I 4 4 10 a S 820 $ - HRA PSC 1.4 Develop project base maps, distribute for utilities mark-ups; distribute to PSC for plan development (RESERVED - See Task 3) 0 0 S $ HRA PSC 1.5 Receive, review, incorporate utilities mark-ups; meet, with stakeholders regarding utilities locations and schedule issues (RESERVED - See Task 3) 0 0 S $ HRA PSC 1.6 Assemble known prior drainage analysis work 1 1 2 0 $ 236 $ HRA PSC 1.7 Define R -O -W parcels needed; define potential off - site drainage easements needed, if any 2 6 8 0 $ 724 HRA PSC 1.8 Review field survey data and HRA information on drainage, grades, curb cuts, location of curb, ROW (DELETED for Amendment No. 3, Phase I) 0 0 $ $ HRA PSC 1.9 Coordinate base maps provided by HRA and establish project CADD standards (DELETED for Amendment No. 3, Phase 1) 0 0 $ $ HR, PSC 1.10 Coordinate with PSC on street design, mist, planimetric and alignment details, etc. 1 1 1 4 1 1 2 1 2 1 7 5 $ 698 $ 413 HRA TASK 1 SUBTOTAL- $ 3,378 PSC TASK 1 SUBTOTAL $ 667 TASK 1 SUBTOTAL $ 4,045 PROJECT CUMULATIVE TOTAL $ 4,045 Page A3-1 B-1 17 -Oct -05 "WAL-MART STREETS": Avenue T from Marsha Sharp Freeway to South End of Radius of 7th Street, 7th Street from Avenue T to East End of Radius of Avenue R, Avenue R from Marsha Sharp Freeway to South End of Radius of 7th Street Amendment No. 3, Phase 1, BASIC SERVICES Worksheet A3-1 B - WAL-MART STREETS Firm Classification Prin. or Proj. Sr. Prof. Architect Land. Prof. E.I.T. Engr. CADD Clerical Line Line $ 998 $ 206 Officer Mgr. Engr. Arch, Engr. Tech. Tech. Hrs. Extension HRA Rates $126.00 $121.00 $110.00 2.3 Confirm and refine any necessary revisions to planimetrics and x -sections for all project streets as a result of required on -street accessible parking $99.00 $84.00 $74.00 $66.00 $50.00 by by PSC Tasking $118,00 $8800 $118.00 $88.00 $71.00 $96.00 $76.00 S65.00 $58.00 $53.00 Firm Firm TASK 2. SCHEMATIC DESIGN. DESIGN DEVELOPMENT AND CONSTRUCTION DOCUMENTS FOR STREETS, DRAINAGE AND ON -STREET ACCESSIBLE PARKING HRA PSC 2.1 Confirm street planimetrics and x -sections for all project streets 1 4 1 2 4 11 2 $ 998 $ 206 HRA PSC 2.2 Confirm on -street accessible parking requirements for project streets as a result of Parking Study findings 1 2 1 4 2 $ 412 $ 206 HRA PSC 2.3 Confirm and refine any necessary revisions to planimetrics and x -sections for all project streets as a result of required on -street accessible parking 1 2 1 2 4 8 2 $ 652 $ 159 HRA PSC 2.4 Refine street planimetrics to accommodate physical tie-ins at project limits; confirm demo limtis and tie-in limits; evaluate truck -turning requirements on Avenues R and T at Marsha Sharp Freeway 1 1 8 8 8 25 0 $ 2,206 $ - HRA PSC 2.5 Develop street grading designs and refine drainage analyses 2 32 40 4 78 0 S 7,396 $ - HRA PSC 2.6 Check and refine street grading designs based on drainage hydraulics and tie-in constraints; revise all as - necessary 1 8 12 4 25 0 $ 2,278 $ - HRA PSC 2.7 Analyze storm sewers to accommodate local drainage requirements 1 4 5 0 $ 566 $ HRA PSC 2.8 Develop and complete plans/profiles for storm sewers necessary for this project 1 8 4 16 29 0 S 2,398 $ - HRA PSC 2.9 Develop and prepare demo plan sheets 4 12 1 32 48 0 $ 3,560 $ - HRA PSG 2.10 Develop and prepare street plan/profile sheets 8 12 80 100 0 $ 7,168 $ - Page A3-1 B-2 17 -act -o5 "WAL-MART STREETS": Avenue T from Marsha Sharp Freeway to South End of Radius of 7th Street, 7th Street from Avenue T to East End of Radius of Avenue R, Avenue R from Marsha Sharp Freeway to South End of Radius of 7th Street Amendment No. 3, Phase 1, BASIC SERVICES Worksheet A3 -1B - WAL-MART STREETS Firm Classification Prin. or Officer Proj. Mgr. Sr. Prof. Engr. Architect Land. Arch. Prof. Engr. E.I.T. Engr. Tech. CADD Tech. Clerical Line Hrs. Line Extension HRA PSC Rates Tasking $126.00 $118.00 $121.00 $88.00 $110.00 $118.00 $88.00 571.00 $99.00 $9600 $84.00 $76.00 $74.00 $65.00 $66.00 $58.00 $50.00 $53.00 by Firm by Firm HRA PSC 2.11 Develop and prepare construction plans and details for concrete paving elements 4 8 16 28 fl S 2,168 HRA PSC 2.12 Develop and prepare miscellaneous construction detail sheets, general notes, cover sheet 2 8 16 40 66 0 $ 5,116 $ - HRA PSC 2.13 Develop and prepare advance construction warning layouts and traffic control plan 12 16 40 68 0 S 5,304 $ HRA PSC 2.14 Develop and prepare notes and details for traffic control plan 4 8 16 28 0 S 2,168 $ - HRA PSC 2.15 Develop and prepare permanent striping plan and details; coordinate with City of Lubbock Traffic Engineering (permanent traffic signage assumed by others and not a part of this construction contract) DELETED for Amendment No. 3, Phase 1) 0 0 $ $ HRA PSC 2.16 Develop and prepare drainage area map and storm routing map 2 4 12 16 34 0 S 2,756 $ - HRA PSC 2.17 Develop and prepare SWP3 4 12 12 28 0 $ 2,240 $ HRA PSC 2.18 Develop and prepare specifications as necessary for SWP3, storm sewers, supplementary paving specifications, mist. 1 16 16 8 41 0 $ 3_,630 $ - HRA RSC 2.19 Develop and prepare quantity take -offs and Opinion of Probable Cost 2 16 24 24 4 70 0 $ 5,812 $ HRA PSC 2.20 Project management through pre -construction meeting, 5 months 24 2 8 32 2 $ 3.904 $ 236 HRA TASK 2 SUBTOTAL PSC TASK 2 SUBTOTAL TASK 2 SUBTOTAL PROJECT CUMULATIVE TOTAL Page A3 -1B-3 S 60,732 $ 807 $ 61,539 $ 65,584 17 -Oct -05 "WAL-MART STREETS": Avenue T from Marsha Sharp Freeway to South End of Radius of 7th Street, 7th Street from Avenue T to East End of Radius of Avenue R, Avenue R from Marsha Sharp Freeway to South End of Radius of 7th Street Amendment No. 3, Phase 1, BASIC SERVICES Worksheet A3 -1B • WAL-MART STREETS Firm Classification Prin. or Proj. Sr. Prof. Architect Land. Prof. E.I.T. Engr. CAPD Clerical Line Line $ - HRA PSC Officer Mgr. Engr. 16 Arch. Engr. Tech. Tech. 24 Hrs. Extension HRA Rates $126.00 $121.00 $110.00 4 $99.00 $84.00 $74.00 $66.00 $50.00 by by FSC Tasking $118.00 588.00 5118.00 388.00 571.00 596.00 $76.00 565.00 558.00 $53.00 Firm Firm TASK 3: UTILITIES COORDINATION HRA PSG 3.1 Develop project base maps, distribute for utilities mark-ups; distribute to PSC for plan development 4 8 12 24 0 $ 1,904 $ - HRA PSC 3.2 Meet with stakeholders regarding utilities locations and schedule issues and receive utilities mark-ups; review, incorporate utilities mark-ups 4 16 16 24 60 0 $ 5,192 $ - HRA PSC 3.3 Follow-up contacts with individual utilities companies during development of plans and construction documents 2 4 4 4 14 0 $ 1,292 $ HRA PSC 3.4 Reserved. fl © $ $ HRA TASK 3 SUBTOTAL PSC TASK 3 SUBTOTAL TASK 3 SUBTOTAL PROJECT CUMULATIVE TOTAL Page A3-1 B-4 8,388 $ 8,388 $ 73,972 17 -Oct -05 "WA'L-MART STREETS": Avenue T from Marsha Sharp Freeway to South End of Radius of 7th Street, 7th Street from Avenue T to East End of Radius of Avenue R, Avenue R from Marsha Sharp Freeway to South End of Radius of 7th Street Amendment No. 3, Phase 1, BASIC SERVICES Worksheet A3.1B • WAL-MART STREETS Firm Classification Prin. or Proj. Sr. Prof. Architect Land. Prof. E.I.T. Engr. CADD Clerical Line Line $ - HRA PSC Officer Mgr. Engr. 4 Arch. Engr. Tech. Tech. 4 Hrs. Extension HRA Rates $126.00 $121.00 $110.00 4 $99.00 $84.00 $74.00 $66.00 $50.00 by by PSC Tasking $118.00 $88,00 $118.00 $88.00 571.00 $96.00 576.00 $65.00 $5800 $5300 Firm Firm TASK 4: DESIGN SUBMITTALS HRA PSC 4.1 QG/QA and preparation of deliverables: preliminary design submittal; plans, specifications, estimates 1 __ 2 4 9 0 $ 778 $ - HRA PSC 4.2 QCIQA and preparation of pre -final design submittal; plans, specifications, estimates, bid form 2 4 4 4 14 0 $ 1,292 $ - HRA PSC 4.3 QC/QA and preparation of final design package submittal; plans, specifications, estimates, bid form 2 4 8 6 1 21 0 $ 1,610 $ HRA PSC 4.4 Submit plans to TDLR for accessibility compliance review; receive review comments, incorporate changes as necessary 1 4 4 4 13 0 _ $ 11166 $ HRA PSC 4.5 Reserved. 1 0 0 $ $ HRA TASK 4 SUBTOTAL PSG TASK 4 SUBTOTAL TASK 4 SUBTOTAL PROJECT CUMULATIVE TOTAL Page A3-1 B-5 $ 5,046 $ 5,046 $ 79,018 17 -Oct -05 "WAL-MART STREETS"; Avenue T from Marsha Sharp Freeway to South End of Radius of 7th Street, 7th Street from Avenue T to East End of Radius of Avenue R, Avenue R from Marsha Sharp Freeway to South End of Radius of 7th Street Amendment No. 3, Phase 1, BASIC SERVICES Worksheet A3-18 - WAL-MART STREETS Firm Classification Prin. or Proj. Sr. Prof. Architect Land. Prof. I E.I.T. Engr. CADD Clerical Line Line HRA 1 submittal review comment meeting Officer Mgr. Engr. 4 Arch. Engr. 2 Tech. Tech. Hrs. Extension HRA Rates $126.00 $121.00 $110.00 $99.00 $84,00 $74.00 $66.00 $50.00 by by PSC Tasking $118.00 $88,00 '$11800 $88.00 $7100 $96.00 S76.00 S6500 $58.00 $53,00 Firm Firm TaIZu r - nAJ=J=Trnrra HRA TASK 5 SUBTOTAL l,bLb PSC TASK 5 SUBTOTAL TASK 5 SUBTOTAL $ 1,626 PROJECT CUMULATIVE TOTAL $ 80,644 TAilf 8 - Rif) ANn PRE CONSTRunne N PmASE HRA PSC 5.1 Project kick-off meeting with COL plus maximum of 4 PSC TASK 6 SUBTOTAL 4 106 TASK 6 SUBTOTAL $ 4 PROJECT CUMULATIVE TOTAL $ 84,438 12 0 $ 1,280 HRA 1 submittal review comment meeting 2 1 2 4 2 4 6 $ 640 $ - PSC HRA PSC 6.3 Attend bid opening 3 0 3 0 5.2 Internal HRA and PSC meetings to coordinate base $ - HRA PSC 6.4 Bid evaluation assistance 1 2 4 4 maps, drainage locations, grades, crosswalks, etc. - 2 $ 1,028 $ - HRA F 6.5 (RESERVED) 1 HRA meetings assumed 1 $ 2 2 5 S 514 PSC 0 5.3 Additional coordination meetings with COL project HRA management; 1 meeting assumed 2 2 4 $ 472 $ PSC 0 HRA TASK 5 SUBTOTAL l,bLb PSC TASK 5 SUBTOTAL TASK 5 SUBTOTAL $ 1,626 PROJECT CUMULATIVE TOTAL $ 80,644 TAilf 8 - Rif) ANn PRE CONSTRunne N PmASE HRA PSC 6.1 Prepare for and attend pre-bid conference; address pre-bid questions 4 PSC TASK 6 SUBTOTAL 4 106 TASK 6 SUBTOTAL $ 4 PROJECT CUMULATIVE TOTAL $ 84,438 12 0 $ 1,280 $ _ _ - HRA PSC 6.2 Prepare bid addendum; 1 addendum 1 4 4 2 2 11 2 $ 1,002 $ 106 HRA PSC 6.3 Attend bid opening 3 3 0 $ 378 $ - HRA PSC 6.4 Bid evaluation assistance 1 2 4 4 10 0 $ 1,028 $ - HRA F 6.5 (RESERVED) 1 0 0 $ $ HRA IASKb 6U15IUTAL 5,00ts PSC TASK 6 SUBTOTAL $ 106 TASK 6 SUBTOTAL $ 3,794 PROJECT CUMULATIVE TOTAL $ 84,438 Page A3-1 B-6 17 -Oct -05 "VITAL -MARY STREETS": Avenue T from Marsha Sharp Freeway to South End of Radius of 7th Street, 7th Street from Avenue T to East End of Radius of Avenue R, Avenue R from Marsha Sharp Freeway to South End of Radius of 7th Street Amendment No. 3, Phase 1, BASIC SERVICES Worksheet A3 -1B - WAL-MART STREETS Firm Classification Prin. or Proj. Sr. Prof. Architect Land. Prof. E.I.T. Engr. CADD Clerical Line Line Officer Mgr. Engr. Arch. Engr. Tech, Tech. Hrs. Extension HRA Rates $126.00 $121.00 $110.00 $99.00 $84.00 $74.00 $66.00 $50.00 by by PSC Tasking $118.00 $88,00 $11800 $88.00 $71,00 $96.00 $76.00 $65.00 558.00 $53.00 Firm Firm HRA PROJECT SUBTOTAL, BASIC SERVICES PSC PROJECT SUBTOTAL, BASIC SERVICES PROJECT CUMULATIVE TOTAL, BASIC SERVICES HRA Hours by Personnel Classification PSC Hours by Personnel Classification 70 224 B 3 0 Page A3-1 B-7 0 279 0 382 15 970 1 4 0 0 2 0 2 18 $ 82,858 $ 1,580 $ 84,438 TASKING for AMENDMENT NO. 3, PHASE 2, to AGREEMENT for ENGINEERING SERVICES GLENNA GOODACRE BOULEVARD PROJECT and Associated Work 17 -Oct -05 "RESIDENTIAL STREETS," Including: 7th Street from Avenue V to Avenue U; 9th Street from Avenue V to Avenue R; 10th Street from Avenue V to west of Avenue S; Avenue U from 7th Street to Main Street; and Avenue T from 9th Street to 10th Street Amendment No. 3, Phase 2, BASIC SERVICES Worksheet A3 -2B - RESIDENTIAL STREETS Firm Classification Prin. or Proj. Officer Mgr. Sr. Prof. Architect Engr. Land. Arch. Prof. Engr. E.I.T. Engr. Tech. CADD Clerical Tech. Line Line Hrs. Extension by by Firm Firm HRA Rates $126.00 $121 AO PSC Tasldn $118.00 $88.00 rip 1197 11 TASK 1: RECON, DATA AGOUIS1TIiON, EVALUA7-1O1U. $110,00 $118.00 $88.00 $71.00 $99.00 $96.00 $84.00 $74.00 $66.00 550.00 $76.00 $65.00 S58.00 553-00 HRA PSC 1.1 Site visit, nolo field conditions 1 1 1 1 1 1 6 1 4 4 $ 386 $ 335 HRA PSC 1.2 Coordinate with surveyors for field survey data needed for design 12 1 1 2 1 5 3 $ 514 $ 217 HRA PSC 1.3 Review field survey data, establish approximate project demo and tie-in limits 1 2 1 4 4 10 2 $ 820 $ 159 HRA PSC 1.4 Develop project base maps, distribute to PSC for plan development 1 1 4 2 12 1 24 2 40 6 $ 3,032 $ 464 HRA PSC 1.5 Receive, review, incorporate utilities mark-ups; meet with stakeholders regarding utilities locations and scheduling issues (RESERVED - See Task 9) 0 0 $ - $ - HRA PSC 1.6 Assemble known prior drainage analysis work 1 1 2 0 $ 236 $ - HRA PSC 1.7 Define R -O -W parcels needed, define potential off- site drainage easements needed, if any , locate pad easments for lighting and irrigation 1 2 2 2 2 4 1 6 6 $ 556 $ 318 HRA PSG 1.8 Review field survey data and HRA information on drainage, grades, curb cuts, location of curb, ROW 1 2 1 4 1 2 2 9 $ 176 $ 694 HRA PSC 1.9 Coordinate base maps provided by HRA 1 1 1 1 4 2 6 $ 176 $ 391 HRA PSC 1.10 Coordinate with PSC on street design, mise. planin is and alignment details, etc. 1 1 2 2 4 2 4 5 11 $ 478 $ 810 HRA TASK 1 SUBTOTAL $ 6,374 PSC TASK 1 SUBTOTAL $ 3,388 TASK 1 SUBTOTAL $ 9,762 PROJECT CUMULATIVE TOTAL $ 9,762 Page A3-213-1 17 -Oct -05 "RESIDENTIAL STREETS," Including: 7th Street from Avenue V to Avenue U; 9th Street from Avenue V to Avenue R; 10th Street from Avenue V to west of Avenue S; Avenue U from 7th Street to Main Street; and Avenue T from 9th Street to 10th Street Amendment No. 3, Phase 2, BASIC SERVICES Worksheet A3 -2B - RESIDENTIAL STREETS Firm Classification Prin. or Proj. Sr. Prof. Architect Land. Prof. E.LT. Engr. CADD Clerical Line Line HRA Officer Mgr. Engr. 4 Arch. Engr. Tech. Tech. Hrs. Extension HRA Rates $126.00 $121.00 $110.00 1 $99.00 $84.00 $74.00 $66.00 $50.00 by by PSC Tasking $11800 $88.00 5118.00 $88.00 $71.00 S9600 576.00 S6500 $58.00 553.00 Firm Firm rn cr ...rrur=naa rrr n�crrN nF.VrN nFVFI 4r1PMFNT AW) ('C)NSTRrrrTICDN 1]nr1 JMFNTs FOR STRFFM, DRAINAGF AND ON -SIRE T ACCESSIBLE PARKING Page A3-213-2 2.1 Confirm street planimetrics and x -sections for all HRA project streets 1 4 2 4 11 S 998 5 260 PSC 1 2 3 2.2 Confirm on -street accessible parking requirements HRA for project streets as a result of Parking Study findings 1 2 1 4 S 412 $ 318 PSC 1 1 1 2 1 1 1 4 2.3 Confirm and refine any necessary revisions to planimetrics and x -sections for all project streets as a HRA result of required on -street accessible parking 2 2 4 8 $ 652 $ 189 PSC 1 1 2 2.4 Refine street planimetrics to accommodate physical tie-ins at project limits; confirm demo limtis and tie-in HRA limfts 1 8 8 8 25 $ 2,206 $ 260 PSC 1 2 3 2.5 Develop street grading designs and refine drainage HRA analyses 2 32 40 4 78 $ 7,396 $ - PSC 0 2.6 Check and refine street grading designs based on drainage hydraulics and tie-in constraints; revise all as - HRA necessary 1 8 12 4 25 $ 2,278 S - PSC 0 2.7 Analyze storm sewers to accommodate local HRA drainage requirements 1 4 5 $ 566 $ - PSC 0 2.8 Develop and complete plans/profiles for storm sewers necessary for this project, including extensions of existing storm sewers in 10th Street to west side of future roundabout at Avenue S, and extensions of HRA existing storm sewers in 9th Street to west of Avenue R, 1 12 16 40 69 $ 5,430 $ PSC 0 2.9 Develop and prepare demo plan sheets HRA 4 12 64 80 $ 5,672 $ - PSC 0 2.10 Develop and prepare street plan/profile sheets HRA 24 32 120 176 $ 13,248 $ - PSC 1 0 Page A3-213-2 17 -Oct -05 "RESIDENTIAL STREETS," Including: 7th Street from Avenue V to Avenue U; 9th Street from Avenue V to Avenue R; 10th Street from Avenue V to west of Avenue S; Avenue U from 7th Street to Main Street; and Avenue T from 9th Street to 10th Street Amendment No. 3, Phase 2, BASIC SERVICES Worksheet A3-26 - RESIDENTIAL STREETS Firm Classification Prin. or Proj. Sr. Prof. Architect Land. Prof. E.I.T. Engr. CADD Clerical Line Line Officer Mgr. Engr. Arch. Engr. Tech. Tech. Hrs. Extension HRA Rates $126.00 $121.00 $110,00 $99.00 $84.00 $74.00 $66.00 $50.00 by by PSC Tasking $118.00 $88.00 $118.00 $88.00 $71.00 596.00 $76.00 $65-00 558.00 $53.00 Firm Firm 2,11 Develop and prepare construction plans and details HRA for concrete paving elements 8 8 16 32 $ 2,608 $ - PSC 0 2.12 Develop and prepare miscellaneous construction HRA detail sheets, general notes, cover sheet 2 8 16 40 66 $ 5,116 $ 692 PSC coordinate with HRA 2 4 4 10 2.13 Develop and prepare advance construction warning HRA layouts and traffic control plan 12 16 40 68 $ 5,304 $ PSG 0 2.14 Develop and prepare notes and details for traffic HRA control plan 8 16 24 48 $ 3,808_ $ - PSC 0 2.15 Develop and prepare permanent striping plats and details; coordinate with City of Lubbock Traffic Engineering (permanent traffic signage assumed by HRA others and not a part of this construction contract) 0 $ $ PSC (DELETED for Amendment Na. 3, Phase 2) 0 2.16 Develop and prepare drainage area map and storm HRA routing map 2 4 16 24 46 $ 3,620 $ - PSC 0 2.17 Develop and prepare SWP3 (two construction document packages, roadway component and HRA landscaping component) 2 4 16 16 38 $ 3,082 $ 2,320 PSC 2 4 16 16 38 2 18 Develop and prepare specifications as necessary for SWP3, storm sewers, supplementary paving HRA specifications, mise. 1 16 16 4 37 $ 3,430 $ 330 PSC 1 8 4 13 2.19 Develop and prepare quantity take -offs and HRA Opinion of Probable Cost 2 16 32 24 2 76 $ 6,384 $ 2,436 PSC 0 2.20 Project management through pre -construction EPSC meeting, 3 months 24 24 $ 3,024 $ 1,880 4 16 20 HRA TASK 2 SUBTOTAL PSG TASK 2 SUBTOTAL TASK 2 SUBTOTAL PROJECT CUMULATIVE TOTAL Page A3 -2B-3 $ 75,234 $ 8,685 $ 83,919 $ 93,681 17 -Oct -05 "RESIDENTIAL STREETS," Including: 7th Street from Avenue V to Avenue U; 9th Street from Avenue V to Avenue R; 10th Street from Avenue V to west of Avenue S; Avenue U from 7th Street to Main Street; and Avenue T from 9th Street to 10th Street Amendment No. 3, Phase 2, BASIC SERVICES Worksheet A3-213 - RESIDENTIAL STREETS Firm Classification Prin. or Proj. Sr. Prof. Architect Land. Prof. E.I.T. Engr. CADD ,Clerical 48 Line Line $ 110 $ 7,288 Officer Mgr. Engr. 2 Arch. Engr. 12 Tech. Tech. Hrs. Extension HRA Rates $126.00 $121.00 $110.00 HRA PSC 3.3 Develop, confirm and prepare details and plan sheets for street signage graphics and finials $99.00 $84.00 $74.00 $66.00 I $50.00 by by PSC Tasking $118.00 $8800 $11800 $88,00 $71.00 $96.00 $76.00 $65.00 $5800 $53.00 Firm Firm TACie 0 . nrC/f_`Ad n=11Gf n0MAC'A1T AAin rn)dCTM11r Tin Al nn1-11AA6A1TC CTPX:Wr A AAJ=AJ1YJG'.0 (`.d)M0nA1FA1T4Z HRA PSC 3.1 Develop design and prepare details and plan sheets by block for tree plantings, landscaping and irrigation; coordinate with City and developer interests 4 16 1 4 32 48 1 104 $ 110 $ 7,288 HRA PSC 3.2 Develop design and prepare details and section plan sheets for crosswalks and pedestrian crossings 2 16 2 12 32 48 2 110 $ 220 $ 7,756 HRA PSC 3.3 Develop, confirm and prepare details and plan sheets for street signage graphics and finials 2 20 16 40 74 0 152 $ - $ 10,536 HRA PSC 3.4 Develp and prepare specifications - draft and final 4 8 16 8 0 36 $ - $ 2,272 HRA PSC 3.5 QA/QC review, including coordination with HRA on grading and drainage design impacts 2 4 4 1 4 8 12 4 30 $ 440 $ 2,204 HRA PSC 3.6 Develop and prepare quantity take -offs and Opinions of Probable Cost 2 4 1 16 4 24 1 50 $ 110 $ 3,500 HRA PSC 3.7 Develop and submit separate bid package for amenities components 1 4 8 8 0 20 $ - $ 1,384 HRA PSC 3.8 Project management, 3 months 1 16 1 1 1 16 $ 126 $ 1,888 HRA TASK 3 SUBTOTAL PSC TASK 3 SUBTOTAL TASK 3 SUBTOTAL PROJECT CUMULATIVE TOTAL Page A3 -2B-4 `l; 1,Uob $ 36,828 $ 37,834 $ 131,515 17 -Oct -05 "RESIDENTIAL STREETS," Including: 7th Street from Avenue V to Avenue U; 9th Street from Avenue V to Avenue R; 10th Street from Avenue V to west of Avenue S; Avenue U from 7th Street to Main Street; and Avenue T from 9th Street to 10th Street Amendment No. 3, Phase 2, BASIC SERVICES Worksheet A3 -2B - RESIDENTIAL STREETS Firm Classification Prin. or Officer Proj. Mgr. Sr. Prof. Architect Engr. Land. Arch. Prof. Engr. E.I.T. Engr. CADD Tech. Tech. Clerical Line Hrs. $50.00 by $53.00 Firm Line Extension by Firm HRA PSC Rates Tasking $126.00 $118.00 $121.00 588.00 $110.00 $118.00 $88.00 $7100 $99.00 $96.00 $84.00 $74.00 $66.00 576.00 $65.070 $58.00 TASK 4: DESIGN DEVELOPMENT AND CONSTRUCTION DOCUMENTS, PUBLIC LIGHTING COMPONENTS HRA PSC 4.1 Pedestrian area lighting design development, prepare details and plan sheets; coordinate with LPL 2 4 8 12 0 26 $ $ 1,748 HRA PSC 4.2 Roadway lighting design development, prepare details and plan sheets; coordinate with LPL 2 8 12 0 22 $ - $ 1,464 HRA PSC 4.3 Lighting calculations 1 8 0 9 $ - $ 704 HRA PSC 4 4 Voltage drop calculations 1 8 0 9 $ - $ 704 HRA PSC 4.5 Coordination with utilities 1 2 2 8 1 12 $ 110 $ 800 HRA PSC 4.6 Develop specifications 12 8 0 20 $ - $ 1,576 HRA PSC 4.7 Coordination/Review meetings 6 6 6 0 18 $ - $ 1,284 HRA PSC 4.8 Project management 1 4 1 4 $ 126 $ 472 HRA PSC 4.9 Develop Opinions of Cost 2 8 8 16 0S 34 - $ 2,436 HRA TASK 4 SUBTOTAL PSC TASK 4 SUBTOTAL TASK 4 SUBTOTAL PROJECT CUMULATIVE TOTAL Page A3-26-5 $ 236 $ 11,188 $ 11,424 $ 142,939 17 -Oct -05 "RESIDENTIAL STREETS," Including: 7th Street from Avenue V to Avenue U; 9th Street from Avenue V to Avenue R; 10th Street from Avenue V to west of Avenue S; Avenue U from 7th Street to Main Street; and Avenue T from 9th Street to 10th Street Amendment No. 3, Phase 2, BASIC SERVICES Worksheet A3-213 - RESIDENTIAL STREETS Firm Classification Prin. or Proj. Sr. Prof. Architect Land. Prof. E.I.T. Engr. CADD Clerical Line Line $ 552 HRA PSC Officer Mgr. Engr. 4 Arch. Engr. Tech. Tech. 4 4 Hrs. Extension HRA Rates $126.00 $121,00 $110.00 4 4 $99.00 $84.00 $74.00 $66.00 $50.00 by by PSC Tasking 5118.00 588.00 5118.00 $88 00 $71 00 S96 00 S76.00 $65.00 S5800 553.00 Firm Firm TASK 5: DESIGN SUBMITTALS TWO PACKAGES: RQADWAYS, AND AMENITIES HRA PSC 5.1 QC/QA and preparation of deliverables: preliminary design submittal; plans, specifications, estimates 1 1 2 2 2 2 2 2 7 7 $ 646 $ 552 HRA PSC 5.2 QC/QA and preparation of pre -final design submittal; pians, specifications, estimates, bid form 2 1 2 4 4 4 4 4 1 14 12 $ 1,292 $ 863 HRA PSG 5.3 QC/QA and preparation of final design package submittal; plans, specifications, estimates, bid form 2 2 4 4 8 8 6 6 1 1 21 21 $ 1,810 $ 1,557 HRA PSC 5.4 Submit plans to TDLR for accessibility compliance review; receive review comments, incorporate changes as necessary 1 1 2 4 4 4 4 4 4 13 15 $ 1.166 $ 1,162 HRA PSC 5.5 Reserved I 1 0 0 $ - $ HRA TASK 5 SUBTOTAL PSC TASK 5 SUBTOTAL TASK 5 SUBTOTAL PROJECT CUMULATIVE TOTAL Page A3 -2B-6 �b 4,514 $ 4,134 $ 9,048 $ 151,987 17 -Oct -05 "RESIDENTIAL STREETS," Including: 7th Street from Avenue V to Avenue U; 9th Street from Avenue V to Avenue R; 10th Street from Avenue V to west of Avenue S; Avenue U from 7th Street to Main Street; and Avenue T from 9th Street to 10th Street Amendment No. 3, Phase 2, BASIC SERVICES Worksheet A3 -2B - RESIDENTIAL STREETS Firm Classification Prin. or Proj. Sr. Prof. Architect Land. Prof. E.I.T. Engr. GADD Clerical Line Line HRA PSC HRA Officer Mgr. Engr. 2 Arch. Engr. 4 Tech. Tech. 8 Hrs. Extension HRA Rates $126.00 $121.00 $110.00 3 6 $99.00 $84.00 574.00 566.00 $50.00 by by PSC Tasking $118.00 $88.00 $118.00 588.00 571.00 S96.00 576.00 $65.00 $58.00 553.00 Firm Firm TASK 6 - MFFTINGS HRA TASK 6 SUBTOTAL PSG TASK 6 SUBTOTAL TASK 6 SUBTOTAL F!T!T TT1Wdr1"I7trrrrfi►1:111IioIf•'1 � L,b54 $ 3,358 $ 6,012, S 157.999 r is r r : era ae+r, ori==coivsr, iiCtfd HA 6 1 Project kick-off meeting with COL plus maximum of 4 4 4 4 4 12 12 $ 1,280 HRA PSC 7.1 Prepare for and attend pre-bid conference; address pre-bid questions 4 $ 1,020 HRA PSC HRA 1 submittal review comment meeting 2 4 2 4 4 4 2 8 2 2 11 21 6 $ 640 $ 1,520 PSC 3 6 3 6 4 19 $ 501 6.2 Internal HRA and PSC meetings to coordinate base 7.4 Bid evaluation assistance 1 2 2 4 4 4 4 10 10 $ 1,028 maps, drainage locations, grades, crosswalks, etc. - 2 HRA F 7.5 (RESERVED) 1 HRA meetings assumed 3 6 6 15 $ 1,542 $ 1,520 PSC —3 6 6 4 19 6.3 Additional coordination meetings with COL project HRA management; 1 meeting assumed 2 2 4 $ 472 $ 318 PSC 2 2 4 HRA TASK 6 SUBTOTAL PSG TASK 6 SUBTOTAL TASK 6 SUBTOTAL F!T!T TT1Wdr1"I7trrrrfi►1:111IioIf•'1 � L,b54 $ 3,358 $ 6,012, S 157.999 r is r r : era ae+r, ori==coivsr, iiCtfd HA 4 4 4 4 4 12 12 $ 1,280 HRA PSC 7.1 Prepare for and attend pre-bid conference; address pre-bid questions 4 $ 1,020 HRA PSC 7.2 Prepare bid addendum; 1 addendum 1 1 2 4 4 4 4 8 2 2 11 21 $ 1,002 $ 1,532 HRA PSC 7.3 Attend bid opening 3 3 3 3 6 $ 330 $ 501 HRA PSC 7.4 Bid evaluation assistance 1 2 2 4 4 4 4 10 10 $ 1,028 $ 904 HRA F 7.5 (RESERVED) 1 0 0 $ - $ HRA IA6K ( JUkSIUTAL PSG TASK 7 SUBTOTAL TASK 7 SUBTOTAL PROJECT CUMULATIVE TOTAL Page A3-213-7 Z) J,b4U $ 3,957 $ 7,597 $ 165,596 17 -Oct -05 "RESIDENTIAL STREETS," Including: 7th Street from Avenue V to Avenue U; 9th Street from Avenue V to Avenue R; 10th Street from Avenue V to west of Avenue S; Avenue U from 7th Street to Main Street; and Avenue T from 9th Street to 10th Street Amendment No. 3, Phase 2, BASIC SERVICES Worksheet A3-26 - RESIDENTIAL STREETS Firm Classification Prin. or Proj. Sr. Prof. Architect Land. Prof. E.I.T. Engr. CAOD Clerical Line Line $ 765 HRA PSC Officer Mgr. Engr. Arch. Engr. 24 Tech. Tech. Hrs. Extension HRA Rates $126.00 $121.00 $110.00 8 $99.00 $84,00 $74.00 $66.00 $50.00 by by PSC Tasking $118.00 588.00 $118.00 $88.06 $71.00 $96.00 $76.00 S65.00 $58.00 $53.00 Firm Firm TASK A • fYSYUSTRI Ir770AI dnMINICTPATInN FP1R I ,ANr SCGAF11 K;NTINr, IN RFSIr)9MT1AL AREA HRA PSC 8.1 Pre -Construction meeting 3 3 3 3 3 6 9 $ 708 $ 765 HRA PSC 8.2 Weekly site visits - Assume 6 months construction 72 24 0 96 $ - $ 7,416 HRA PSC 8.3 Respond to contractor questions 8 80 36 12 0 136 $ - $ 10,536 HRA PSC 8.4 Review contractor pay applications 18 0 18 $ - $ 11278 MRA PSC 8.5 Contractor coordination meetings 18 6 0 24 $ - $ 1,854 HRA PSC 8.6 Punch list 4 16 8 0 28 $ - $ 2,256 HRA PSC 8.7 Project close-out 1 1 1 4 8 4 4 1 20 $ 126 $ 1,536 HRA PSC 8.8 Project management 1 1 12 1 12 $ 126 1 $ 1,416 HRA TASK 8 SUBTOTAL PSC TASK 8 SUBTOTAL TASK 8 SUBTOTAL PROJECT CUMULATIVE TOTAL Page A3 -2B-8 5 9bu $ 27,057 $ 28,017 $ 193,613 17 -Oct -O5 "RESIDENTIAL STREETS," Including: 7th Street from Avenue V to Avenue U; 9th Street from Avenue V to Avenue R; 10th Street from Avenue V to west of Avenue S; Avenue U from 7th Street to Main Street; and Avenue T from 9th Street to 10th Street Amendment No. 3, Phase 2, BASIC SERVICES Worksheet A3 -2B - RESIDENTIAL STREETS Firm Classification Prin. or Proj. Sr. Prof. Architect Land. Prof. E.I.T. Engr. CADD Clerical Line Line $ - HRA PSC Officer Mgr. Engr. 16 Arch. Engr. Tech. Tech. 16 4 Hrs. Extension HRA Rates $126.00 $121.00 5110.00 2 8 $99.00 $84.00 $74.00 $66.00 $50.00 by by PSC Tasking 5118.00 S88.00 5118.00 $88.00 S71.00 S96.00 $76.00 $65-00 $58.00 $53.00 Firm Firm TASK 9 - UTILITIES COORDINATION HRA PSC 9.1 Develop project base maps, distribute for utilities mark-ups 4 8 12 24 0 $ 11904 $ - HRA PSC 9.2 Meet with stakeholders regarding utilities locations and schedule issues and receive utilities mark-ups; review, incorporate utilities mark-ups 4 1 2 16 4 16 16 4 52 11 $ 4,664 S 810 HRA PSC 9.3 Follow-up contacts with individual utilities companies during development of plans and construction documents 4 1 2 8 4 8 12 32 7 5 2,848 $ 578 HRA PSC 9.4 Reserved. 1 0 0 $ - r $ - HRA TASK 9 SUBTOTAL PSC TASK 9 SUBTOTAL TASK 9 SUBTOTAL HRA PROJECT SUBTOTAL, BASIC SERVICES PSC PROJECT SUBTOTAL, BASIC SERVICES PROJECT CUMULATIVE TOTAL, BASIC SERVICES HRA Hours by Personnel Classification PSC Hours by Personnel Classification 78 271 81 160 26 Page A3-213-9 0 353 0 522 9 1235 40 453 138 40 0 349 32 1319 %414 $ 1,388 $ 10,804 $ 104,434 $ 99,983 $ 204,417 TASKING for AMENDMENT NO. 3, to AGREEMENT for ENGINEERING SERVICES GLENNA GOODACRE BOULEVARD and Associated Work 101172005 Supplemental Services Compensation Worksheet AMENDMENT NO.. 3, SURVEYING SERVICES Worksheet A3 -S Task I Description uuanlity Unit Lind Cost Line Total S-1 Establish project horizontal and vertical control 2 Days @ $ 880 per Day $ 1,760 S-2 Locate/establish existing rights-of-way 2 Days @ $ 880 per Day $ 1,760 S-3 R -O -W parcel surveys 12 Each @ $ 800 Each $ 9,600 9-4 Locate existing surface improvements in project corridor 6 Days @ $ 880 per Day $ 5,280 S-5 Topography: cross-sections in primary project phase streets 5 Days @ $ 880 per Day $ 4,400 S-6 Topography: crass -sections, intersecting streets, alleys, and drainage features 2 Days @ $ 880 per Day $ 1,760 S-7 Research, office calculations, and record-keeping, Party Chief 8 Hours @ $ 66 per Hour $ 528 S-8 Supervision, data processing, review, calculations, and record-keeping; Sr. RPLS 12 Hours @ $ 110 per Hour $ 1,320 S-9 Surveying CAD 32 Hours @ $ 66 per Hour $ 2,112 5-10 GPS or Robotic Survey Equipment 4 Days @ 1 $ 250 per Day $ 1,000 SUPPLEMENTAL SERVICES, SURVEYING, TOTAL Page A3 -S-1 $ 29,520 AMENDMENT NO. 3, to AGREEMENT for PROFESSIONAL SERVICES GLENNA GOODACRE BOULEVARD PROJECT and Associated Work 17' -Oct -Q5 Basic Services Reimbursable Expenses Worksheet AMENDMENT NO. 3, REIMBURSABLE EXPENSES Worksheet A3 -R Firm Reimbursable Expense Description Quantity Unit Unit CostLine Total A9II1A151 001ZACtr fi FVDFlUCFC HRA Fax 200 Pages @ $ 1 per Page $ 200 PSC 200 Pages @ $ 1 per Page S 200 HRA Blueline prints, 24" x 36"; check sets; utilities mark-up sets; COL review sets; mist. 25p Sheets @ $ 2.50 per Sheet $ fi�5 prints for field sheets and consultant; clarification sets PSC 250 Sheets @ $ 2.50 per Sheet $ 625 HRA Printing, 8-1!2x11 sheets 2000 Sheets @ $ 0.05 per Sheet $ 100 PSC 2000 Sheets @ $ 0.05 per Sheet $ 100 HRA Mylar plotter media for final drawing deliverables 1 Roll @ $ 300 per Roll $ 300 PSC 1 Roll @ $ 300 per Roll $ 300 HRA Engineering & Architectural CADD charges 904 Hours @ $ 8 per Hour $ 7,232 PSC 365 Hours @ $ 8 per Hour $ 2,920 HRA Mileage 500 Miles @ $ 0.405 per Mile $ 203 PSC 1000 Miles @ $ 0,49 per Mlle $ 490 HRA Long distance telephone charges, postage 1 Pruject @ $ 100 per Project $ 100 PSC 1 Project @ $ 250 per Project $ 250 HRA Reproduction for Bid Sets = To be done by the City of Lubbock N.A, Sheets @ N_A. per Sheet PSC N.A. Sheets @ N.A. per Sheet HRA 'TDLR Review Fee, Review Filing Fee, Inspection Fee, and Inspection Filing Fee 2 Fee Set @ $ 1,090 per Fee Se $ 2,180 PSC Not in PSC portion N.A. Fee @ N.A. per Fee HRA Basic Services Reimbursable Expenses, Subtotal PSC Basic Services Reimbursable Expenses, Subtotal Basic Services Reimbursable Expenses, Total, w/o Muitiplier BASIC SERVICES REIMBURSABLE EXPENSES, TOTAL, With 1.15 Multiplier $ 10,940 $ 4,885 $ 15,825 $ 18,198 Estimate only, based on estimated construction value and one review. Any additional fees shall be reimbursed to the consultant at actual costs incurred. Page RA