Loading...
HomeMy WebLinkAboutResolution - 2007-R0541 - Expect To Reimburse Self For Costs Of Capital Project - 11/20/2007Resolution No. 2007-RO541 November 20, 2007 Item No. 5.6 RESOLUTION EXPRESSING INTENT TO FINANCE EXPENDITURES TO BE INCURRED WHEREAS, the City of Lubbock, Texas (the "Issuer") is a political subdivision of the State of Texas authorized to finance its activities by issuing obligations the interest on which is excludable from gross income for federal income tax purposes ("tax-exempt obligations") pursuant to Section 103 of the Intemal Revenue Code of 1386, as amended (the "Code"); WHEREAS, the Issuer will make, or has made not more than 60 days prior to the date hereof, payments with respect to the acquisition, construction, reconstruction or renovation of the property listed on Exhibit A attached hereto; WHEREAS, the Issuer has concluded that it does not currently desire to issue tax-exempt obligations to finance the costs associated with the property listed on Exhibit A attached hereto; WHEREAS, the Issuer desires to reimburse itself for the costs associated with the property listed on Exhibit A attached hereto from the proceeds of tax-exempt obligations to be issued subsequent to the date hereof; and WHEREAS, the Issuer reasonably expects to issue tax-exempt obligations to reimburse itself for the costs associated with the property listed on Exhibit A attached hereto. NOW, THEREFORE, be it resolved that: Section 1. The Issuer reasonably expects to reimburse itself for all costs that have been or will be paid subsequent to the date that is 60 days prior to the date hereof and that are to be paid in connection with the acquisition, construction, reconstruction or renovation of the property listed on Exhibit A attached hereto from the proceeds of tax-exempt obligations to be issued subsequent to the date hereof. Section 2. The Issuer reasonably expects that the maximum principal amount of tax-exempt obligations issued to reimburse the Issuer for the costs associated with the property listed on Exhibit A attached hereto will not exceed $187,266,814. 1332294v.1 LUB200/1 ADOPTED THIS 20th day of November , 2007, by the City Council of the City of Lubbock, Texas. CITY OF LUBBOCK, TEXAS c Mayor, City of L bbock, Texas ATTEST: wzity Secr ary, City of Lubbock, Texas l GGv,RzA -2- 1332294v.1 LLTB200/1 EXHIBIT A Resolution No. 2007-RO541 Cost Estimate HOTEL Visitors Information Center $ 1,650,000 GATEWAY STREETS Erskine Street: Frankford to Salem 16,073,200 Slide Rd: Loop 289 to Erskine 3,962,500 Slide Rd: from 4t'' Street north to Loop 289 2,398,000 4t' Street: W of Loop 289 to E of Loop 289 3,216,000 Slide Rd: Marshall to Clovis Road 1,107,000 Loop 289: SW of Erskine to NE of Quaker 8,060,000 Loop 289: SW of 4t' to SW of Erskine 13,408,000 STREETS 34"' & University Intersection Reconstruction 295,000 Traffic Signals 100,000 N&E Lubbock Residential Street Infrastructure 325,000 Street Maintenance Program 8,800,000 ADMINISTRATIVE FACILITIES City Hall Fire Code Compliance 300,000 CULTURAL AND ARTS Buddy Holly Center Re -roof 255,000 Municipal Auditorium Renovations 5,000,000 FIRE New Fire Station #17 150,000 LFD — Maintenance Shop Extension 79,000 F94TI, WW Landwer House Re -roof 121,000 Parks Greenhouse 75,000 Park Pavilions 200,000 Park Playground Replacement 2.75,000 TIF Water, sewer, electric, drainage, park and street improvements and extensions, 6,287,747 including utility relocations, sidewalks, amenities, street lighting and landscaping, all located within the City's North Overton Tax Increment Financing District A-1 1332294v.1 LUB200/1 COO Estimate SOLID WASTE Cell Development $ 3,735,000 Leachate Evaporation Pond 260,000 Leachate Storage Tanks 356,667 STORM WATER South Lubbock Storm Sewer Project 8,250,000 WASTEWATER SYSTEM 500,000 Lift Station rehabilitation 260,000 Sewer Line Replacements 320,000 Installation of Sewer Lines Ahead of Street Paving 365,000 Sewer Tap Replacements 600,000 Wastewater Collection Vehicle Storage Facility 78,000 Land Application Optimization 500,000 Sewer System Master Plan 800,000 Effluent Discharge Line Evaluation 300,00 Water Reclamation Plant Replacements 525,000 Sewer Lines Ahead of Marsha Sharp Freeway 2,000,000 Southeast Water Reclamation Plant Improvements 66,000,000 WATER Supplemental Water Supply for Lake Alan Henry 500,000 Major Water Line Replacement (34th Street) 6,000,000 Downtown Water System Improvements 6,000,000 Parks Conversion to Ground Water 3,000,000 Water Line Replacement 320,000 Water Lines Ahead of Street Paving 1,100,000 Water Meter Replacements 3,750,000 Lake Alan Henry Pipeline Final Design 5,000,000 Lake Alan Henry Fencing 250,000 Lake Alan Henry Pipeline ROW Acquisition 1,250,000 Eastport Water Renovation 750,000 Regional Water Supply Projects 1,500,000 SW Pump Station 200,000 Water Lines Ahead of Marsha Sharp Freeway 1,500,000 ELECTRIC CKI Cooling Tower Piping 105,000 Overhead Electric Service Distribution 2,250,000 Underground Electric Service Distribution 2,500,000 Distribution Transformers 824,700 Northwest Substation 1,000,000 A-2 1332294v.1 LLTB200/1 Northwest Transmission Line A-3 1332294v.1 LUB200/1 Cost Estimate 1,000,000 $195,286,814