Loading...
HomeMy WebLinkAboutResolution - 2007-R0465 - Amendment To Agreement - Parkhill, Smith, & Cooper Inc.- LPSIA Engineering - 10/11/2007Resolution No. 2007-RO465 October 11, 2007 Item No. 5.16 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock an Amendment No. 11 to the agreement between the City of Lubbock and Parkhill, Smith & Cooper for engineering services for air field drainage and bird mitigation for Lubbock Preston Smith International Airport, and all related documents. Said Amendment is attached hereto and incorporated in this Resolution as if fully set forth herein and shall be included in the minutes of the Council. Passed by the City Council this 11th day of October , 2007. DAVID A. MILLER, MAYOR ATTEST: Rebecca Garza, City Secretary VED AS TO Loomis, Assistant City Manager ortation and Public Works APPROVED AS TO FORM: Linda L. Chamales, Senior Attorney Office Practice Section LC: L/ATrY/Linda/RES-PSC AMENDMENT No.1 1 Drainage & Bird Mitigation October 1, 2007 ■M■MM soon am: ■■■ Oman ■■i■ ■! ■EUM11■■■■00!63 E■iolEEM■ar■■■■■■ MEraan■!a■uu■■■ ■2Mi1111000H■ HH: EI 11 * �1 , ■ ,E En 11 1 `E■ MEMO Mw 14 `■ 098-:11 ■w iru 4 ■ a ■w uo. .ir .0 ■MM■■EM■■■■MMM■■M■ Mr. James W. Loomis, A.A.E. Assistant City Manager Lubbock Preston Smith International Airport Route 3 Box 389 Lubbock, Texas 79403 Resolution No. 2007—RO465 August 28, 2007 Re: Amendment No. l I to Agreement for A/E Services for Airport Improvement Projects: ■ LBB Airfield Drainage and Bird Mitigation Improvements Project Dear Mr. Loomis: We have met with your staff and have developed a scope for the referenced project that includes installing pump stations at the playa lake near the FedEx ramp and another near the ATCT with discharge piping terminating into the playa east of the ARFF pit. During the scoping phase of this project we have gone back and forth with the size of these pump stations and associated pipelines and feel that in order to install pump stations at two locations instead of one that the systems must be downsized which means that it could double the "pump down time" from three to six weeks. At this phase of the project these are of course best guesses. You will notice on the enclosed Engineers Opinion of Probable Cost (EOPC) that we have shown 90,000 cubic yards of detention basin excavation "by others" in order to free up additional budget dollars for the construction of the two pump stations and associated piping. Several times in the last year PSC has been contacted by contractors bidding TxDOT projects looking for places to borrow material for the Marsha Sharp Freeway projects. There is a chance that a contractor bidding a future TxDOT project may wish to contract with the airport for excavation of this material. Since this option will involve building a temporary perimeter road and temporarily relocated perimeter fence in the vicinity of the playa near the ATCT the airport should not plan for any additional compensation for the excavated material as is typically done in these instances. Our design will include identifying the potential limits of excavation of this future detention basin. Therefore, if this opportunity were to present itself the airport would know the exact limits of excavation around the new pump station in the vicinity of the ATCT. The purpose of this 90,000 CY of excavation is to consolidate the flood plane that is present around the ATCT and the area shown as the future ARFF location on the current master plan. If the option mentioned earlier involving the TxDOT projects does not materialize the excavation would most Iikely need to occur in a future All? or PFC project or the flood plane will need to be left "as is" in this area. A rough site plan depicting the limits of the proposed project is included as an attachment. Our understanding of the scope items and a fee proposal for Task I (design), Task 2 (construction phase services) and Task 3 (surveying and testing) are detailed in the Project Budget Sheets which are attached to this amendment. LBB Airfield Drainaize and Bird Mitigation Improvements Proiect: Task 1 - Fee for Professional Services (Study and Report, Preliminary Design, Final Design and Bidding/Negotiation, lump sum). Task 2 - Construction Phase Services (which includes RPR and construction related Engineering Services, lump sum). Task 3 - Surveying and Testing Services, (reimbursable expense). TOTAL Parkhill, Smith & Cooper, Inc. Engineers ■ Architects ■ Planners 4222 85th Street, Lubbock, Texas 79423 (806) 473-2200 FAX (806) 473-3500 Lubbock EI Paso Midland Amarillo $ 172,400.00 :• 111 111 'tll fl Odessa Mr. James W. Loomis, A.A.E. Page 2 August 28, 2007 We propose to modify the agreement between the City of Lubbock and Parkhill, Smith & Cooper, Inc. dated January 13, 2005, and to provide the task I and task 2 services on a lump sum basis under the provisions of the contract, EX[-BBIT B - PAYMENTS TO THE ENGINEER, LUMP SUM METHOD, Paragraph B4.0I.A.1. We propose to provide the task 3 services as a reimbursable expense as outlined under the provisions of EXHIBIT B - PAYMENTS TO THE ENGINEER, LUMP SUM METHOD, Paragraph B4.02.A.2, reimbursable expenses. Compensation for Design Phase - Task 1, Construction Phase - Task 2 services and Task 3, Surveying and Testing Services shall not exceed $300,700.00 without Owner's approval. If the terms of this amendment are agreeable to you, please sign and return one copy of this letter to our office. We will take receipt of this signed letter as our notice to proceed with these services. We look forward to working with you in completing this project. If you have any questions please give me a call. Sincerely, PARKHILL, SMITH & COOPER, INC. By-- <�Johp T. Hamilton, PE F-Hn Principal JTH/pas Enclosures IN TRIPLICATE X:g99SM15.981C VILUYF LIA1Airfield Drainage\Cantrxt & Fu6Cwuw-i amerdnentl I. DOC Accepted by: CITY OF LUBBOCK B� ,r— y David Mi ler Mayor Attest: By CP-a--Q�� 3-�� ebecca Garza City Secretary Appro d as to Content: � d� r - 4Jam0� James W. Loomis, A.A.E. Director of Aviation Approved as to Form: Linda L. Chamales, Senior Attorney Office Practice Section CONTROL MONUMENTS ODOM'ATES AND ECEVATON4 RELATIVE 10 NATIONAL GEODETIC SURVEY PRIMARY AIRPORT CONTROL STATION EBB 63". HORIZONTAL' NAD 83 U.S. SURVEY FEET VERTICAL WAID 86 US SURVEY TEE7 STATE PLANE COORpNATES: TEXAS NORM CENTRAL ZONE 4202 COMBINED SCALE FACTOR: 0.999772388 CONVERGENa -N'48'477' MOIBA4EMTS ARE 3)' 011ORZE DISCS IN CONCRETE PSNCC CMI NORTHING EASONG I LLEVADON LOCATION 1 7,301.00 57 959,829.12 3256.00 RADIUS OF BACK OF CURB ON IERIMNAL ROAD ENTRANCE d PARKNG GARAGE EXIT 228'+/- EAST S 2 OF PARKING GARAGE. 2 7301,60704 958.457.87 3756,45 NORTH SIDE OF MUNAL ROAD AT ENTRANCE i � L TD ROAD UNDER AIRPORT. 3 7.301,444.01 957,76254 3767.02 N MEDIAN ON SOUTHEAST SFE OF TERMINAL a r ROAD 145'+/- FEET NORTHEAST OF SOUTHEAST CORNER OF TERMINAL BURDING. 4 7,300,868.42 9157,696.52 3253.81 SOUTH MEDIAN OF SOUTH TERMINAL ROAD AT CM Ifs N. 73@9964.35 r_ ENT OF ROAD L11UER AIRPORT 5 7,300.964.87 956,036.70 3257315 54'+/- NORIHMEST OF THE SOUINNEST CORNER OF BOOTH 3 6 7,301,778.58 954-57tMO 3241.49 SDUTHW SI` OF OLD WERWNAL R%LDW 37'+/ - LOCATK7N F3" ----' ie NORTHEAST OF INTERCOM FOR GATE IN FENCE 7 7.302,185.38 954,403,21 3242.64 0.7'+/- VEST OF BACK OF CURB ON PARKING L07 MATERIAL t�1 / IIEST OF BLD TERMINAL BUILDING 168'+/- NORTH AREA r l OF THE NORTH RADRIS PONT ON BACK OF CURB. 8 7,302,41003 954,582.96 3243,26 0.8'+/- NORM OF BACK OF CURB ON THE R(RTHWESI LORMER OF THE PARKING L0T NORTNNESI OF THE OLD MIMINAL BLOND. 9 7,308.SB2.M 954,312.54 3267.05 APPR418uA1ELY 240' NORTH OF THE DHL E= 95431234 N= 7303766.25 PARKING AREA AND 86.1' EAST OF THE EAST BACK OF EL- 326705 E. 954234.85 CURB OF THE WESTERN ACCESS ROAD NEAR THE EL= 3259.41 CENTERLINE OF THE ROAD TD 1-27. 13 7,3A3,768.25 954.234.86 3250.41 3.9' REST OF HEST CURB d GUTTER OF WESIPORT ACCESS ROAD AND 15.4' NORTH OF STREET LENT BASE NEAR PROJECTED CENIERLIE OF EAST -WEST RUNWAY. 14 7,949,999.50 954.029.54 3276. APPROXIMATELY 43' SOUTH OF THE CENTERLINE OF NEUKA STREET AND 54' EAST OF TME CENTERLINE OF NORTH BOUND 1-27 ACCESS ROAD. 74.4' NORTH NORTHWEST OF SEWER MANHOLE AND 33' NORTHEAST OF POWER POLE 15 7,309,964.35 955.087.31 3276.49 11"1NMAIELY 1106 EAST OF THE CENTERLINE OF THE NORTHBWW 1-27 ACCESS ROAD AND 56' SOUTH OF THE CENTERLINE OF KELA(A STREET. 3' WEST OF AIRCRAFT OPERATING, AREA FENCE LINE AND 904' SOUTHEAST OF POVER POLE WIDH ELECTRIC DROP. MALSR(EXISTING) EXISTING RVR CM 114- 11=730"",50 14-N=7309999.50 E= 954029.50 EL= 3276.66 Resolution No. 2007-RO465 RESERVOIR C.R.w.W.A RESERVOIR CONTRACTOR'S TEMPORARY FENCE ENTRANCE F CONTRACTOR CATE DESIRES CHAPARRAL JET CENTER `- - CCNMACTOR'S CONSTRUCTION STAGING AREA � DO -E TRUE r BOO' 400' 0 600' 1600' I �I SCALE 1N FEET - �! U&SR(iEX MING) �a. r f • N= 7303523.56 `: • - E= 963701.25 EEE- 3255.04 I k'- Q. .ti7- ...T -! IE ��li ■ � CONTROL IOwER FLOOR 'I EE I' ffiL1.519- 39,'N2� � CM 114- 11=730"",50 14-N=7309999.50 E= 954029.50 EL= 3276.66 Resolution No. 2007-RO465 RESERVOIR C.R.w.W.A RESERVOIR CONTRACTOR'S TEMPORARY FENCE ENTRANCE F CONTRACTOR CATE DESIRES CHAPARRAL JET CENTER `- - CCNMACTOR'S CONSTRUCTION STAGING AREA � DO -E TRUE r BOO' 400' 0 600' 1600' I �I SCALE 1N FEET - �! U&SR(iEX MING) �a. r f • N= 7303523.56 `: • - E= 963701.25 EEE- 3255.04 I k'- Q. .ti7- ...T -! IE ��li ■ � CONTROL IOwER FLOOR 'I EE EL. -3347,00 C �! r •I tea,+ L i N 11 E S 2 I III i � L I I I a r 1 � S CM Ifs N. 73@9964.35 r_ EL= 3276.49 APPROX. LOCATK7N F3" ----' ie ` BORROW IF I It1 y MATERIAL t�1 / AREA r l FW U LI p', 1 LJ STORAGE r ^' e T733GB582.44 H31Ili E= 95431234 N= 7303766.25 EL- 326705 E. 954234.85 EL= 3259.41 f m 3256.45 N. CM 14 N= 7300868.42 11957696.52 a. 3253.81 CN 13 GENERAL N)TES: I. SIARWY C+DADUCTEO BY SMITH SURVEYING, LUBBOGK, TErAS. BEARINGS ARE RELATIVE TD Ga NORTH, TUAS STATE PLANE CDOROONTE SYSTEM NIMDU RASED ON CM OF LUBBOCK TEWIC COMM NErM DEFINED AT I.M. 2. MARK AND LIGHT COfSTRU:FION AREAS AND VEHrLFS AS REOUIRED IN SKCFUT04 AND AS REWIRED BY TLE FAA 3. THE CONTRACTOR 6 RESPONSIBLE FOR LOCARNG AND PROTECTING ALL UTILITIES AND NFRp51RUCRW DURING CONSTRUCTION. THE LOCATIONS OF ANY UTEDY 'DR FACILITY SHOWN ON THE PIANS HAVE NOT BEEN VMFO BY THE OWNER OR OWNER'S REPRESENTATNE. THE CONTRACTOR SHALT. COORDINATE LOCATION AHO VERFIOVTIDH OF UTIL)DE5 WH THE FOLLOWNG. pG TEST L -800-344-W77 FAA . LOB&7(.9f PRESTDN SMITH INTERNA70WL AIRPORT THE CONTRACTOR SWILL SWUR TO THE ENGINEER IN WRITING ANY PRE-EXSTNC DWAGE TO UTILITIES AND OTHER INFRASTRUCTURE. URLIIIES DAMAGED DURING CONSTWCTIDN WILL 8E REPAIRED AT THE CCNTRACTOLS EIPENSE. 4. THE CONTRACTOR 6 RESPONSIBLE FOR OBTANNG ANY AND ALL KR64TS REDUIREO FOR CONSTRUCTION WHETHER ON THE LOCAL, STATE OR FEDERAL LEVEL. 5. THE OWNER RESUMES THE RICHT TO PERFORM OVER WORK ADJACENT TO OR WTWN THE UNITS OF lAAS PROJECT. D01H DWIRACTORS SH U, COORDINATE AND COOPERATE WITH EACH OTTER 10 ENSURE UNINTERRUPTED PROGRESS WITH EACH PROJECT. NO ADDITIONAL COMPENSATION TALL 8E MADE FOR THE COORDINATION. 6. THE STAGING AREA SHALL BE USED FOR EQUPNENT STAGING, NAARIAL STOCKPILE AND EMPLOYEE PARKING, ALL EQUIPMENT SHALL BE PARKED IN THE STACK AREA AT NICHT OR OTHER TIMES WHEN CONSTRUCTION IS NOT OCCURNG UNLESS DIIERWISE APPROVED BY THE ENGINEER. CONSTRUCTION OF THE STAGING AREA 6 NOT AN OPTIONAL CONSTRUCTION TEEM. THE COST FOR THIS (TEM SNTNLD BE WLUDED WITH MOBIL€ZATION, PROJECT LOCATION ----- UY111 N= 7301048.87 iE- 958829.12 EL- 3258.00 I ARM LUTHER KING CM 15 N= 734D964A7 E= 958036.7D EL= 3257,05 N= 7302410.03 E= 954582.96 SILENT WINGS .� MUSEUM J. EL- 3241.24 L LOW POINT a 1778.50 E _!.-I E � EL= -3241.44-- `'STIt `-II 11 !F I cm 17 N= 73(12065.38 E- 954403.21 EL= 3242.00 I L'9 '�rP CY�TI DY`y 1 PNIM Mnft l Coop0r, WEU. r:imhw -Archf m.Plswws Ldbp*a I=MdwdA ww Od, ': AAAA i HAMILTON • I VAB LW11110Ch PreSA011 Sntilh 1111Er AaIiO ILaI Airp Oft GA RAMP EXPANSION PHASE II WBBOCK PRESTON SMITH INTERNATIONAL AIRPORT WBBOCK, TEXAS KE" PLAN 4 VW IN DOOLIAff S � lfllyO6 111AAEYETr lR1BIIfTAL P !!AM fA IEVEMVAANW,8 7 NS9! PpEukraTf WMN WAHITAL M DATE DPSCWPOON ZMAWOPFV- UMWCK PR0.EGTND: Umm PROJECT AIRPORT LAYOUT PLAN C'.71-103 EE �! r •I tea,+ L I VAB LW11110Ch PreSA011 Sntilh 1111Er AaIiO ILaI Airp Oft GA RAMP EXPANSION PHASE II WBBOCK PRESTON SMITH INTERNATIONAL AIRPORT WBBOCK, TEXAS KE" PLAN 4 VW IN DOOLIAff S � lfllyO6 111AAEYETr lR1BIIfTAL P !!AM fA IEVEMVAANW,8 7 NS9! PpEukraTf WMN WAHITAL M DATE DPSCWPOON ZMAWOPFV- UMWCK PR0.EGTND: Umm PROJECT AIRPORT LAYOUT PLAN C'.71-103 Resolution No. 2007-RO465 OPINION OF PROBABLE COST Lubbock Preston Smith International Airport Lubbock, Texas Airfield Drainage and Bird Hazard Mitigation Improvements 23 -Jul -07 Preston Smith Parkhill, Smith, & Cooper, inc. Lubbock 4222 85th Street international Airport Lubbock, Texas 79423 Item Description Unit Quant!Unit Extension No. Price 1 Mobilization/Demobilization LS 1 $140,000 $140,000 Storm water Pump Station and Force Main 2 8 -inch SDR 26 Force Main LF 6,600 $35.00 $231,000 3 12 -inch SDR 26 Force Main LF 1,750 $45.00 $78,750 4 Heavy Polyethylene Warning Tape LF 8,350 $0.25 $2,088 5 C153 Ductile Iron Fittings Ton 1.0 $6,000.00 $6,000 6 2 -inch Combination Air Valve and Structure EA 2.0 $4,500.00 $9,000 7 Outlet Structure LS 1.0 $20,000.00 $20,000 8 Pump Station Structure/Pumps/Ra ils/FloatsNa Ives etc EA 2 $125,000.00 $250,000 9 Pump Station Site Work -Grading (Subgrade Work) EA 2 $15,000.00 $30,000 10 Storm water Inlet Structure EA 2 $15,000.00 $30,000 11 14 -inch SDR 26 Inlet Line LF 775 $47.50 $36,813 12 Electrical EA 2 $40,000.00 $80,000 13 16" Steel Casing in Bore LF 700 $150.00 $105,000 14 20" Steel Casing in Bore LF 775 $225.00 $174,375 Storage Basin Grading and Drainage 15 36 -inch RCP Culverts with Headwalls LF 750 $150,00 $112,500 16 12 -ft Earthen Channel to Discharge Lake (1' depth) CY 1,250 $5.00 $6,250 17 Trapezoidal Channel to Intake Structure of Pump Station CY 15,000 $5.00 $75,000 18 Detention Basin Excavation CY 90,000 By Others 19 Erosion Protection (Seeding) for Earthen Channels Acre 5 $1,500.00 $7,500 Contingency (15%) $245,025 Construction Subtotal $1,639,300 Engineering $172,400 Surveying $26,500 Testing/G eotech $15,400 RPR $86,400 TOTAL OPINION OF PROBABLE COST $1,940,000 X:1199810015.981CIVILWTHILIA\Airfiefd DrainagMEOPCTump Station revised.xls LUBBOCK INTERNATIONAL :AIRPORT 2005 PFC APPLICATION PROJECT INFORMATION PROJECT: Item 6-7, Airfield Drainage and Bird Hazard Mitigation Improvements PROJECT DESCRIPTION: An area located north of Runway 8/26 across from Taxiway G retains storm water runoff in a basin. This basin is capable of holding considerable volume of water. Currently, the only way for storm water to leave this basin is by way of evaporation. This basin attracts wildlife which has become a hazard to aircraft. This project will improve the overall drainage of this area and install a pump station and pipe conveyance systems to allow removal of stored storm water from the basin. Excavation, storm sewer piping, pumping systems and other associated work will be involved in this proj ect. JUSTIFICATION: The storm water basin is located within the airport property and adjacent to Runway 8/26. During periods when the basin contains storm water, the basin will attract wildlife such as birds. Aircraft using runway 8/26 startle these birds and bird strikes in this area of the airport have been an issue. In addition, the entrance road from the County Road to the FAA ATCT is in the flood plane. The 5 year event will put it under water making it impassable during times of minor rainfall events. During times of significant rainfall FAA ATCT personnel are "shuttled" to work by parking along tower road and riding in a FAA owned 4x4 vehicle. The 50 and 100 year events almost completely inundate this access road for a significant amount of time. This project will improve the overall drainage in this area by increasing the storage capacity of this detention basin and concentrating the inundated area and provide a method for removal of storm water from the basin to reduce the potential for attracting wildlife. OBJECTIVE: The airfield drainage improvements will improve the drainage of storm water in the area north of Runway 8/26. It will reduce the potential for attracting wildlife to the storage basin. It will help mitigate potential flooding problems along taxiway M and the access road to the FAA ATCT during times of significant rainfall and will enhance the safety of the airport by reducing the potential for wildlife strikes by aircraft. ESTIMATED PROJECT IMPLEMENTATION DATE: January 2008 ESTIMATED PROJECT COMPLETION DATE: January 2009 TOTAL ESTIMATED PROJECT COST: 12 12/77/05 S1,940,000 TOTAL ESTIMATED PFC AMOUNT: $1,940,000 EXISTING AND/OR ANTICIPATED AIP GRANTS: None 13 12/22/05 PARKHILL, SMITH & COOPER, INC. - LUBBOCK PROJECT BUDGET SHEET LOCATION CODE: 01 PROJECT NAME: LBB Air Drainage JOB NO.: TASK: 1DSN DATE: 08/29;'07 FEE TYPE: Lump Sum PREPARED BY: JTH PRINCIPAL: JTH PROD. MANAGER: JTH OVERHEAD RATE: PROFIT ON LABOR: PROFIT ON REIMB: 15.00% PROFIT ON DIRECTS: 15.04% FEE: $172,400 LABOR: $161,887 OVERHEAD: REIMB. CONSULTANTS: REIMS. EXPENSES: DIRECT CONSULTANTS: DIRECT EXPENSES: $9,141 LABOR BUDGETS: CODE DESCRIPTION HOURS COSTS 01 Firm Principal 171 $21,546 #Nf A #NIA 03 Engineer 471 $45,216 09 Engineering Technician 376 $30,456 07 Engineer -in -Training 561 $40,953 14 CADD Operator 370 $23,310 18 Clerical 7 $406 Page 1 of 3 FEE ESTIMATING SHEET PROJECT: :.I.8.4•r crnmage JOB NO.: TASK: 1PSN SALARY CATEGORY OF PERSONNEL RATE PER HOUR rP ENG ENG TECH FIT CADD OPT CLERICAL TASK 01 #NIA 03 09 07 14 18 Tris $126.00 $96.00 $81.00 $73.00 $63.00 $58.00 TOTAL STUDY AND REPORT PHASE Predesign Conference 1 3 3 6 Site Visits, Gather Data 4 32 32 64 Developlanalyze project scope 1 16 16 32 Coordinate geotechnical investigation 24 8 32 Coordinate survey 8 8 16 PRELIMINARY DESIGN PHASE Refine scope, coord. with Owner 2 16 16 32 Meetings and conferences 4 32 32 64 Analyze Drainage 8 24 16 48 Analyze Grading 32 120 36 16 204 Analyze existing electrical options 18 40 58 Analyze existing infrastructure and options 48 48 96 Hydraulic analysis 18 40 58 Preliminary design documents preliminary drawings (17 sheets) 51 136 85 136 408 outline specifications 24 32 4 60 review w/ Owner 4 4 8 Opinion of costs 4 16 20 FINAL DESIGN PHASE Final drawings 24 50 80 85 136 375 Final specifications 24 32 3 59 Dev and coord phasing plan with Owner 1 4 16 16 36 Assist/consult with govt authorities Not included in project Final opinion of costs 4 8 12 Review with Owner 1 3 3 6 Revisions 12 8 40 16 50 126 Misc meetings and conferences 4 8 8 8 24 FAA Form 7460-1 1 3 4 BIDDING PHASE Assist in advertisement 4 4 Plan distribution - issue/record/deposits 8 8 Conduct Pre -Bid Conference, minutes 1 8 8 16 Miscellaneous addenda 4 8 12 Attend Bid Opening 1 3 3 6 Evaluate bids, bid tabulation, award 8 8 16 Check out Contr, subcontractors, etc. 8 8 16 Review substitute materials/equipment 2 8 10 MISCELLANEOUS ITEMS QCIPM (4 mos. @ 2 hrs./mo.) 8 8 Prepare stmts. (5 Qa 1 hr.) 5 5 Monthly Progress Reports (0.5 hr. each) 3 3 Coordination with Owner 4 4 BUDGET SUBTOTALS: HOURS/ Trips - 20 171 471 376 561 370 7 1956 11 SALARY $21,546 $45,216 $30,456 $40,953 $23,310 $406 $161 887 Page 2 of 3 EE ESTIMATING SHEET PROJECT: IRECTS LBB Air Drainage JOB NO.: TASK: 1 DSN DIRECT CONSULTANT COSTS SUBTOTAL 611 STRUCTURAL CONSULTANTS 612 MECH�ELEC CONSULTANTS _ 613 ENV & CIVIL CONSULTANTS 614 LANDSCAPE CCNSULTANTS 615 TESTING CONSULTANTS _ 616 SURVEYING CONSULTANTS 617 INTERIOR DESIGN CONSULTANTS 618 OTHER CONSULTANTS 75TAL DIRECT CONSULTANT DIRECT EXPENSES 621 TRAVELlLODGING MOTEL DAYS @ AIR TRAVEL AIR FARE PARKING DAYS @ CAR RENTAL DAYS @ MILEAGE 35 MILES MEN @ 1MANDAY = MEN @ !MAN = IDAY - /DAY - $0,485 Q 20 TRIPS SUBTOTAL $339.50 $340 622 REPRODUCTIONS BLUELINE PRINTS SEPIA PRINTS PRINTING: ORIGINAL SET-UP COST COST PER SHEET BINDING COST XEROX 17 SHTS ( $2.55 30 SETS = $1,300-50 SHTS $8.51 @ SETS = 17 ORIGINALS @ $0.15 LORI. - $2.55 30 SETS @ $0.08 ISHT @ 25 SHEETS= $60.00 30 SETS @ $2 00 /SET = $60.00 760 SHTS @ $0.08 ISHT = $60,60 SUBTOTAL $1,484 623 MODELIRENDERING5IPHOTOS Shots /Shot $200 624 TELEPHONE 250 Calls @ $3.00 ICa€1 $750 625 MEALS DAYS @ MEN /MANDAY 626 FIELD SUPPLIES 626 POSTAGE 40 Mailin s $5.00 !Mallin $200 629 PUBLICATIONS & SUBSCRIPTIONS 630 MISC DIRECT EXP 631 FAX 200 Pages @ $1.00 $200 632 TEMPORARY PERSONNEL 633 DRAFTING SUPPLIES 634 OFFICE SUPPLIES 635 CADD 746 HOURS $8.00 /HOUR $5,968 636 FIELD EQUIP RENTAL 646 SOFTWARE TOTAL DIRECT EXPENSES 9,141 Page 3 of 3 PARKHILL, SMITH & COOPER, INC. - LUBBOCK PROJECT BUDGET SHEET LOCATION CODE: 01 PROJECT NAME: LBB Air Drainage JOB NO.: TASK: 2CST DATE: 08/29/07 FEE TYPE: Lunip Sum PREPARED BY: LTH PRINCIPAL: JTH PROJ. MANAGER: JTH OVERHEAD RATE: PROFIT ON LABOR: PROFIT ON REIMB: 15.00°/„ PROFIT ON DIRECTS: 15.00% FEE: $ , 07 LABOR: $80,715 OVERHEAD: REIMB. CONSULTANTS: REIMB. EXPENSES: DIRECT CONSULTANTS: DIRECT EXPENSES: $4,949 LABOR BUDGETS: CODE DESCRIPTION HOURS COSTS 01 Firm Principal 56 $7,056 #NIA #NIA 03 Engineer 116 $11,136 11 Resident Project Representat 664 $53,784 07 Engineer -in -Training 99 $7,227 14 CADD Operator 24 $I,512 18 Clerical Page 1 of 3 FEE ESTIMATING SHEET PROJECT: LBB Air Drainaga JOB NO.: TASK: XST SALARY CATEGORY OF PERSONNEL RATE PER HOUR FP ENG RPR EIT CADD OPT CLERICAL TASK 01 #'NIA 03 11 07 14 18 Tris $126.00 $96.00 $8L00 $73.00 $63.00 $58.00 TOTAL RPR (4-month construction period} Preconstruction Conference 1 4 4 80 Days at 8 Hrs! Day 80 640 640 CONSTRUCTION PHASE Conduct Preconstr Conference, minutes 1 3 8 11 Coord baseline surveys, benchmark 2 2 4 Site visits, notes, progress meetings 16 12 24 24 60 Coord. with RPR, Contractor, Owner 12 8 40 16 64 Routine change orders 4 4 B Review submittals 4 9 13 Pay estimates including final 4 8 12 Certifications, guarantees & warranties 4 4 8 Final inspection and notes/Endings 4 8 8 20 MISCELLANEOUS ITEMS QC/PM (4 mos. @ 2 hrs./mo.) 8 8 Prepare stmts. (5 Q 1 hr.) 5 5 Monthly Progress Reports (0.5 hr. each) 2 2 Coordination with Owner 8 8 CLOSEOUT PHASE Record drawings 8 16 24 48 Warranty insp. 4 4 8 Addnl. compliance insps. 2 2 4 Final test and QC rpt. 4 20 8 32 BUDGET SUBTOTALS: HOURSI Trips - 110 56 116 664 99 24 95 SALARY $7,056 $11,136 $53,784 $7,227 $1,512 $80,715 Paqe 2 of 3 F EE ESTIMATING SHEET PROJECT: DIRECTS LBB Air Drainage JOB NO.. TASK: 2CST DIRECT CONSULTANT COSTS SUBTOTAL 611 STRUCTURAL CONSULTANTS 612 MECHIELEC CONSULTANTS 613 ENV 8 CIVIL CONSULTANTS 614 LANDSCAPE CONSULTANTS 615 TESTING CONSULTANTS 616 SJRVEYING CONSULTANTS 617 INTERIOR DESIGN CONSULTANTS 618 OTHER CONSULTANTS TOTAL DIRECT CONSULTANTS DIRECT EXPENSES - 821 TRAVEL'LODGING MOTEL DAYS @ AIR TRAVEL AIR FARE @ PARKING DAYS @ CAR RENTAL DAYS @ MILEAGE 55 MILES @ MEN @ /MANDAY = MEN @ MAN = 1DAY - 1DAY = $0.485 @ 110 TRIPS -- $2,934.25 SUBTOTAL $2,934 622 REPRODUCTIONS BLUELINE PRINTS SEPIA PRINTS PRINTING: ORIGINAL SET-UP COST COST PER SHEET BINDING COST XEROX 600 SHTS @ $2.55 ( 5 SETS = SHTS @ $8.51 @ SETS = ORIGINALS @ $0.15 10RI. _ SETS @ $0.08 ISHT @ 225 SHEETS = SETS @ $2.00 (SET = SHTS @ $0.08 (SHT = $48.00 SUBTOTAL $48 623 MODEURENDERINGS/PHOTOS Shots /Shot $200 624 TELEPHONE 250 Calls@ $3.00 !Call $750 625 MEALS DAYS @ MEN WANDAY 626 FIELD SUPPLIES $400 628 POSTAGE 15 Mailings @ $5.00 Wailing $75 629 PUBLICATIONS R SUBSCRIPTIONS 630 MISC DIRECT EXP 631 FAX 350 Pa es $1.00 - $350 632 TEMPORARY PERSONNEL 633 DRAFTING SUPPLIES 634 OFFICE SUPPLIES 635 CADD 24 HOURS @ $8.00 !HOUR $192 536 FIELD EQUIP RENTAL 646 SOFTWARE TOTAL DIRECT EXPENSES 4,949 Page 3 of 3 Resolution No. 2007-80465 PARKHILL, SMITH & COOPER, INC. - LUBBOCK PROJECT BUDGET SHEET LOCATION CODE: (A PROJECT NAME: LBB Air Drainage JOB NO.: TASK: 3S&T DATE: 0829.07 FEE TYPE: um PREPARED BY: JTH PRINCIPAL: JTH PROD. MANAGER: JTH OVERHEAD RATE: PROFIT ON LABOR: PROFIT ON REIMB: 15.00ub PROFIT ON DIRECTS: 15.009'0 FEE: LABOR: OVERHEAD: REIMB. CONSULTANTS: 536,450 REIMB. EXPENSES: DIRECT CONSULTANTS: DIRECT EXPENSES: LABOR BUDGETS: CODE DESCRIPTION HOURS COSTS 01 Firm Principal #N/A #N/A 03 Engineer 09 Engineering Technician 07 Engineer -in -Training 14 CADD Operator 18 Clerical Page I of 2 FEE ESTIMATING SHEET PROJECT: REIMBURSABLES LBB Air Drainage JOB NO.: TASK: 3S&T REIMBURSABLE CONSULTANT COSTS SUBTOTAL 511 STRUCTURAL CONSULTANTS 512 MECH/ELEC CONSULTANTS 513 ENV & CIVIL CONSULTANTS 514 LANDSCAPE CONSULTANTS 515 TESTING CONSULTANTS _ _ _ _ Terra Engineers $13.,925 516 SURVEYING CONSULTANTS Smith Surveying $22,525 517 INTERIOR DESIGN CONSULTANTS 518 OTHER CONSULTANTS TOTAL REIMBURSABLE CONSULTANT 3 ,450 REIMBURSABLE EXPENSES 521 TRAVELJLODGING MOTEL DAYS @ AIR TRAVEL AIR FARE @ PARKING DAYS @ CAR RENTAL DAYS @ MILEAGE MILES MEN Q MEN IOAY IDAY $0.400 /MANDAY = IMAN = = = TRIPS = SUBTOTAL 522 REPRODUCTIONS BLUELINE PRINTS SEPIA PRINTS PRINTING; ORIGINAL SET-UP COST COST PER SHEET BINDING COST XEROX SHTS $2.55 @ 8 SETS = SHTS $8.51 @ SETS = ORIGINALS ® $0,15 /ORI. _ SETS @ $0.08 /SHT @ 250 SHEETS= SETS @ $2.00 /SET - SHTS {d $0.08 ISHT = SUBTOTAL 523 MODEL'RENDERINGS/PHOTOS Shots !Shat 524 TELEPHONE Calls - $2.00 rCall 525 MEALS DAYS MEN IMANDAY 526 FIELD SUPPLIES 528 POSTAGE mailings @ $2.00 Wailing 529 PUBLICATIONS & SUBSCRIPTIONS 530 MISE REIMBURSABLE EXP 531 FAX Pages @ $1.00 532 TEMPORARY PERSONNEL 533 DRAFTING SUPPLIES 534 OFFICE SUPPLIES _ 535 CADD HOURS @ $8-00 iHOUR 536 FIELD EQUIP RENTAL 546 SOFTWARE TOTAL REIMBURSABLE EXPENSE Page 2 of 2