Loading...
HomeMy WebLinkAboutResolution - 2007-R0429 - Supplemental Agreement - TTU - Traffic Signal Maintenance - 09/13/2007Resolution No. 2007-RO429 September 13, 2007 Item No. 5.14 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the City Council of the City of Lubbock hereby authorizes and directs the Mayor of the City of Lubbock to execute a Supplemental Agreement 2 by and between the City of Lubbock and Texas Tech University for installation and maintenance of traffic signals on the Texas Tech University campus, which Supplemental Agreement and any associated documents, are attached hereto and made a part of this Resolution for all intents and purposes. Passed by the City Council this 13th day of September , 2007. DAVID A. MILLER, MAYOR ATTEST: Rebecca Garza, City Secretary APPROVED AS TO CONTEN Je . Hart, Jr., City Traffic neer APPROVED AS O FORM: ttoneyDon Vandiver, of r our DDresaechSignalSupAgr2-07 Res August 30, 2007 Resolution No. 2007-R0429 SUPPLEMENTAL AGREEMENT 2 FOR THE CITY OF LUBBOCK, TEXAS, TO PROVIDE ASSISTANCE TO TEXAS TECH UNIVERSITY IN THE INSTALLATION OF TRAFFIC SIGNALS ON THE TEXAS TECH UNIVERSITY CAMPUS As provided for in Article 2 and Article 4, Paragraph C of the AGREEMENT FOR THE INSTALLATION AND REIMBURSEMENT FOR THE OPERATION AND MAINTENANCE OF TRAFFIC SIGNALS ON THE TEXAS TECH UNIVERSITY CAMPUS IN LUBBOCK, TEXAS as originally approved by the Lubbock City Council on November 4, 2004 under Resolution No. 2004-RO553 (TECH Contract # 05-0417); the City of Lubbock, Texas (City) , agrees to assist Texas Tech University (TECH) in the installation of traffic signals on the TECH campus at Lubbock, Texas as follows: 1. New Traffic Signal at Parkway and 5"' Street. Compensation for the City's contribution to the project shall be as follows: A. The maximum amount under this agreement without modification for the construction listed in Attachment. A is $43,281.98. A cost estimate of the work authorized under this agreement is marked "Attachment A," attached hereto and made a part of this agreement. B. The State will reimburse the City the cost of furnishing and installing the traffic signal equipment according to the location and manner of construction as shown and described in the plans and specifications. C. The State will reimburse the City for properly supported costs incurred under the terms and conditions of this agreement. Reimbursement will be made by the State to the City for labor, equipment use, materials, supplies, travel expenses, and warehouse or material handling charges provided the City has paid from City funds their obligations covering items of costs previously billed. D. The City shall comply with the cost principles established in OMB Circular A-87, "Cost Principles for State and Local Governments." The TECH contact for this agreement will be the Managing Director, Department of Grounds Maintenance. Exhibit 1 of the original agreement is hereby modified to add a sixth Type 1 signalized intersection: Texas Tech Parkway & 5ci' Street. CITY OF LUBBOCK TEXAS TECH UNIVERSITY CB Mr. David A. Miller r. Michae aires Mayor DATE: September 13, 2007 ATTEST: 4QReb=ccaGarza City Secretary Approved As To Conte t: Wryl D. Hart Jr., P. . City Traffic Engineer Approved As To orm: , �Don�Vandiver Attorney of Counsel Associate Vice President for Operations Resolution No. 2007-RO429 Attachment A TTU Parkwav & 5th Equipment Q . Cost per Unit Total Cabinet Pole mount 1 $5,450.00 $5,450.00 Controller 170 1 $950.00 $950.00 VIVDS video detection- 2 detection directions, VV'B, SBLT 1 $8,950.00 $8,950.00 Processor Cameras Hardware Cable Radio Set-up 2 $2,500.00 $5,000.00 2 $900.00 $1,600.00 9 $800.00 $800.00 450 $3.00 1 $1,728.20 $050.00 $1,728.20 Radio Antenna Superflex Cable Superflex Cable Ends Polyphaser Radio Cables Radio Power Su 30' Arm & Shaft from surplus) ! $900,00 $900 ! $986.00 $186 90 1 $3.28 $295 4 $75.00 $60 ! $96.00 $16 f $35.00 $35 ! $236.00 3 $322.50 $236 $967.50 3 -Section Signal Head Plastic heads, LEDs 5 -Section Signal Head Plastic heads, LEDs O ticom (Emergency Pre -Ern tion- 3 directions 6 3 1 $445.00 $645.00 $5,185.80 $2,670.00 $1,935.00 $5,18580 Opticom 721 receiver Opticom Cable 752 O ticom Phase Selector Turn -in Foundation with Adapter Plate for controller base 3 $425.00 $1,275 540 $1.27 $686 2 $1,612.50 1 $600.00 $3,225 $600 Labor- Timing Labor- Field Crew 60 200 $30.00 $40.00 $1,800.00 $8,000.00 Miscellaneous 15% 1 $5,645.48 1 $5,645.48 Total Cost Estimate 1 $43,281.98 The City will install and wire the cabinet, program and install the controller, program the video detection, install video detection's cabinet components, set-up the radio communications, install radio's cabinet components, program for Emergency pre-emption in controller and install Opticom's cabinet components. Article 2. Construction Responsibilities Providing for the City's contribution to the Project