Loading...
HomeMy WebLinkAboutResolution - 2007-R0368 - CO To Contract - Utility Contractors Of America Inc.- South Lubbock Drainage - 08/09/2007Resolution No. 2007-RO368 August 9, 2007 Item No. 5.19 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for and on behalf of the City of Lubbock a Contract Change Order No.3 to Contract ITB #001 -04 -VK with Utility Contractors of America, Inc., of Wolfforth, TX, for south Lubbock drainage improvements, a copy of which Contract Change Order No. 3 and any associated documents are attached hereto and which shall be spread upon the minutes of this Council and as spread upon the minutes of this Council shall constitute and be a part hereof as if fully copied herein in detail. Passed by the City Council this 9th day of August , 2007• DAVID A. MILLER, MAYOR ATTEST: City Secretary AS TO C Hertel,�P.E., City Engineer APPROVED AS=FORM: onald G. Vandiver, Attorney of Counsel DIfres/UCAdra inageCon07ChgOrdRes July 27, 2007 CITY OF LUBBOCK CHANGE ORDER Change Order #: i 3 1 Contractor: E Utility Contractors of America, Inc. Date: I July 26, 2006 1 BID/ITB #: 1 001-04/VK Contract #: I 5451 (Project I Project Name: South Lubbock Drainage Improvements Number 29390141) (Package #1) Change Order within the scope of the contract means a Change Order that DOES NOT ALTER THE NATURE OF THE THING TO BE CONSTRUCTED AND THAT IS AN INTEGRAL PART OF THE PROJECT OBJECTIVE. After performance of a construction contract begins, Change Orders may be approved if necessary to 1) make changes in plans or specifications; or 2) decrease or increase the quantity of work to be performed or materials, equipment, or supplies to be furnished. This DOES NOT mean that a department can redefine the project. All work that alters the nature of the thing to be constructed or that is not an integral part of the proiect objective must be let out for public bid by the Purchasing Department. Description of change (alteration, deviation, addition, or deletion) caused by conditions encountered during construction not covered by the specifications and drawings of the pro,jeet (at(ach additional pages if necessary): =attached sheets. Change Orders must either be negotiated in the best interest of the City of Lubbock or put out for public bid by the Purchasing Department. Where the Change Order is negotiated, the Change Order must be fully documented and itemized as to costs, including material quantities, material costs, taxes, insurance, employee benefits, other related costs, profit and overhead. Where certain unit prices are contained in the initial contract, no deviations are allowed in computing negotiated change order costs. ITEMIZED COSTS MUST BE FULLY DOCUMENTED AND ATTACHED TO THIS FORM. ITEM DESCRIPTION AMOUNT A. ORIGINAL CONTRACT VALUE: $25,699,455.50 B. AMOUNT OF THIS CHANGE ORDER: Cmaicil approval required if'over ti75,000 S 2,956,242.00. C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A): 11.50% D. AMOUNT OF PREVIOUS CHANGE ORDERS: $2,048,361.00 E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D): $5,004,603.00 F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): 5-lWaximi'm 19.47% G. NEW CONTRACT AMOUNT (A+E): $30,704,058.50 It is mutually agreed that the above dollar amount and the time extension, as applicable, as set forth in this Change Order constitutes full compensation to the Contractor for all costs, expenses and damages to the Contractor, whether direct, consequential or otherwise, in anyway incident to, or arising out of or resulting directly or indirectly; from the work performed or modified by the Contractor under this Change Order. This Change Order is not valid without the following signatures (please sign in order and return 3 originals with Contract Cover Sheet to P"rehashm aAid Contract Matta tent De artment : �I / ,p r A_ % all ,7/[,.4-'f (1) CONTRACTOR Oate (2) PROJ ECT ARCHITECT/ENGINEER Date Apptnv s to Co ent: Approv - to Form: _ (3)OWN E SREPRESENTAT E Date (4� ATTO NE Date (5) CAPITAL ROJECTS MANAGER Date PURCH G AND ANAGER ate Change Orders over 45,000 require a Contract Cover Sheet and rhe following signatures. c LUB �if. g Q9/07 A sT: 8/09107 (7) MAYOR Date($) CITY SECRET4Y Date Council Date: August 9, 2007 Agenda Item #: 5.19 Resolution #: 2007-80368 PUR-045 (Rev 02106) Change Order No. 3 City of Lubbock, Texas South Lubbock Drainage Improvements (Package #1) Contract No. 5451 (Project No. 293-90141) July 26, 2007 Change Order No. 3 involves the following items: This change order would add all of the remaining inlet structures for the remainder of the overall project. These structures are located at Playa Lakes 28 (Jan Jennings Park), 86 (Earl Crow Park), 89 (Charles Guy Park), 92 (Phil Hoel Park) and 132 (north of 114`x' Street and west of Frankford). In addition to the structures, the associated pipelines, manholes, seeding or sodding and traffic control are included to complete the construction in the park areas. The future pipe connections will therefore have minimal disruption to the park areas. The existing contract amount for Phase I — Main Trunk Line is $27,747,816.50. The increase in contract price for these items is $2,956,242.00, making a total contract amount of $30,704,058.50. This change order keeps the total percentage of change orders below the 25% maximum allowed. Construction Change Order No. 3 City of Lubbock, Texas South Lubbock Drainage Improvements Package No. 1 Inlets at Lakes 28, 86, 89, 92, AND 132 (Jan Jennings Park, Earl Crow Park, Chas Guy Park, Phil Hoel Park, and Unnamed Lake 132, respectively) Lake 28 = Line L Lake 92 = Line D Lake 86 = Line F Lake 132 = Line A Lake 89 = Line I Item No Quantity Unit Abbreviated Description Unit Price Amount 1 1 LS Mobilzatoin/Demobilzation $200,000.00 $200.000.00 Line A 24 -inch approved type pipe, contractor's option of 1A 280 LF installation method $275.00 $77,000.00 2A 280 LF Trench, Tunnel, Bore, Access Shaft Safety System $6.00 $1,68000 3A 1 EA Lake Inlet for Line A, complete $205,000.00 $205,000.00 4A 8,333 SY Reestablish Vegetation by Seeding $14,00 $116,662.00 Line D 24 -inch approved type pipe, contractor's option of 1D 114 LF installation method $275.00 $31,35000 2D 114 LF Trench, Tunnel, Bore, Access Shaft Safety System $6.00 $684.00 3D 1 EA Type 1 Manhole, complete $20,00000 $20,000.00 4D 1 EA Lake Inlet for Line D, complete $230,000.00 $230,000.00 5D 1 EA Cofferdams, Installed, Removal, and Dewatering $220,000.00 $220,000.00 6D 1 LS Traffic Control, complete in place $1,500.00 $1,500.00 7D 2,445 SY Reestablish Vegetation by Sod $14.00 $34,23000 Line F 24 -inch approved type pipe, contractor's option of 1F 80 LF installation method $275.00 $22,000.00 2F 80 LF Trench, Tunnel, Bore, Access Shaft Safety System $6.00 $480.00 3F 1 EA Lake Inlet for Line F, complete $258,000.00 $258,000.00 4F 1 EA Cofferdams, Installed, Removal, and Dewatering $248,000.00 $248,000.00 5F 1 LS Traffic Control, complete in place $1,500.00 $1,500.00 6F 1,225 SY Reestablish Vegetation by Sod $14.00 $17,150.00 1 OF 2 SLDIP PKG #1 CCO #3 Construction Change Order No, 3 City of Lubbock, Texas South Lubbock Drainage Improvements Package No. 1 Inlets at Lakes 28, 86, 89, 92, AND 132 (Jan Jennings Park, Earl Crow Park, Chas Guy Park, Phil Hoel Park, and Unnamed Lake 132, respectively) Lake 28 = Line L Lake 92 = Line D Lake 86 = Line F Lake 132 = Line A Lake 89 = Line I Item No, Quantity Unit Abbreviated Description Unit Price Amount Mobilzatoin/Demobilzation $206.000 00 $200,000.00 Line I 24 -inch approved type pipe, contractors option of 1 1 416 LF installation method $275.00 $114,400.00 21 416 LF Trench, Tunnel, Bore, Access Shaft Safety System $6.00 $2,496.00 31 2 EA Type 1 manhole, complete $20,000.00 $40,000.00 41 1 EA Lake inlet for Line I, complete $206,000.00 $206,000.00 51 1 EA Cofferdams, Installed, Removal, and Dewatering $172,000.00 $172,000.00 61 1 LS Traffic Control, complete in place $25,00000 $25,000.00 7 1 4,225 SY Reestablish Vegetation by Sod $14.00 $59,150.00 Line L 24 -inch approved type pipe, contractor's option of 1 L 60 LF installation method $27500 $16,500.00 2L 60 LF Trench, Tunnel, Bore, Access Shaft Safety System $6.00 $360.00 3L 1 EA Lake Inlet for Line I, complete $310,000.00 $310,00000 4L 1 EA Cofferdams, Installed, Removal, and Dewatering $255,000.00 $255,000.00 5L 1 LS Traffic Control, complete in place $1,500.00 $1,500.00 61- 4,900 SY Reestablish Vegetation by Sod $14.00 $68,600.00 TOTAL SLDIP PKC #1 CCO #3 $2,95 242.00 Prepared by: �--L 4� Print Name: Z/ D Utility ontractors of America, Inc. 927 Highway 62-82 Wolfforth, Texas 79382 Date: ('y 2 OF 2 SLDIP PKG #1 CCO #3