HomeMy WebLinkAboutResolution - 2007-R0368 - CO To Contract - Utility Contractors Of America Inc.- South Lubbock Drainage - 08/09/2007Resolution No. 2007-RO368
August 9, 2007
Item No. 5.19
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock is hereby authorized and directed to
execute for and on behalf of the City of Lubbock a Contract Change Order No.3 to
Contract ITB #001 -04 -VK with Utility Contractors of America, Inc., of Wolfforth, TX,
for south Lubbock drainage improvements, a copy of which Contract Change Order No. 3
and any associated documents are attached hereto and which shall be spread upon the
minutes of this Council and as spread upon the minutes of this Council shall constitute
and be a part hereof as if fully copied herein in detail.
Passed by the City Council this 9th day of August , 2007•
DAVID A. MILLER, MAYOR
ATTEST:
City Secretary
AS TO C
Hertel,�P.E., City Engineer
APPROVED AS=FORM:
onald G. Vandiver, Attorney of Counsel
DIfres/UCAdra inageCon07ChgOrdRes
July 27, 2007
CITY OF LUBBOCK
CHANGE ORDER
Change Order #: i 3 1 Contractor: E Utility Contractors of America, Inc.
Date: I July 26, 2006 1 BID/ITB #: 1 001-04/VK
Contract #: I
5451 (Project I Project Name: South Lubbock Drainage Improvements
Number 29390141) (Package #1)
Change Order within the scope of the contract means a Change Order that DOES NOT ALTER THE NATURE OF THE THING
TO BE CONSTRUCTED AND THAT IS AN INTEGRAL PART OF THE PROJECT OBJECTIVE. After performance of a
construction contract begins, Change Orders may be approved if necessary to 1) make changes in plans or specifications; or 2)
decrease or increase the quantity of work to be performed or materials, equipment, or supplies to be furnished. This DOES NOT
mean that a department can redefine the project. All work that alters the nature of the thing to be constructed or that is not an
integral part of the proiect objective must be let out for public bid by the Purchasing Department. Description of change
(alteration, deviation, addition, or deletion) caused by conditions encountered during construction not covered by the
specifications and drawings of the pro,jeet (at(ach additional pages if necessary):
=attached sheets.
Change Orders must either be negotiated in the best interest of the City of Lubbock or put out for public bid by the Purchasing
Department. Where the Change Order is negotiated, the Change Order must be fully documented and itemized as to costs,
including material quantities, material costs, taxes, insurance, employee benefits, other related costs, profit and overhead. Where
certain unit prices are contained in the initial contract, no deviations are allowed in computing negotiated change order costs.
ITEMIZED COSTS MUST BE FULLY DOCUMENTED AND ATTACHED TO THIS FORM.
ITEM
DESCRIPTION
AMOUNT
A.
ORIGINAL CONTRACT VALUE:
$25,699,455.50
B.
AMOUNT OF THIS CHANGE ORDER: Cmaicil approval required if'over ti75,000
S 2,956,242.00.
C.
PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A):
11.50%
D.
AMOUNT OF PREVIOUS CHANGE ORDERS:
$2,048,361.00
E.
TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D):
$5,004,603.00
F.
PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): 5-lWaximi'm
19.47%
G.
NEW CONTRACT AMOUNT (A+E):
$30,704,058.50
It is mutually agreed that the above dollar amount and the time extension, as applicable, as set forth in this Change Order constitutes
full compensation to the Contractor for all costs, expenses and damages to the Contractor, whether direct, consequential or otherwise,
in anyway incident to, or arising out of or resulting directly or indirectly; from the work performed or modified by the Contractor
under this Change Order.
This Change Order is not valid without the following signatures (please sign in order and return 3 originals with Contract Cover Sheet to
P"rehashm aAid Contract Matta tent De artment : �I / ,p
r A_ % all ,7/[,.4-'f
(1) CONTRACTOR Oate (2) PROJ ECT ARCHITECT/ENGINEER Date
Apptnv s to Co ent:
Approv - to Form:
_
(3)OWN E SREPRESENTAT E Date
(4� ATTO NE
Date
(5) CAPITAL ROJECTS MANAGER Date
PURCH G AND
ANAGER ate
Change Orders over 45,000 require a Contract Cover Sheet and rhe following signatures.
c LUB �if. g Q9/07 A sT: 8/09107
(7) MAYOR Date($) CITY SECRET4Y Date
Council Date: August 9, 2007 Agenda Item #: 5.19 Resolution #: 2007-80368
PUR-045 (Rev 02106)
Change Order No. 3
City of Lubbock, Texas
South Lubbock Drainage Improvements
(Package #1)
Contract No. 5451 (Project No. 293-90141)
July 26, 2007
Change Order No. 3 involves the following items:
This change order would add all of the remaining inlet structures for the remainder of the
overall project. These structures are located at Playa Lakes 28 (Jan Jennings Park), 86
(Earl Crow Park), 89 (Charles Guy Park), 92 (Phil Hoel Park) and 132 (north of 114`x'
Street and west of Frankford). In addition to the structures, the associated pipelines,
manholes, seeding or sodding and traffic control are included to complete the
construction in the park areas. The future pipe connections will therefore have minimal
disruption to the park areas.
The existing contract amount for Phase I — Main Trunk Line is $27,747,816.50. The
increase in contract price for these items is $2,956,242.00, making a total contract
amount of $30,704,058.50. This change order keeps the total percentage of change
orders below the 25% maximum allowed.
Construction Change Order No. 3
City of Lubbock, Texas
South Lubbock Drainage Improvements Package No. 1
Inlets at Lakes 28, 86, 89, 92, AND 132
(Jan Jennings Park, Earl Crow Park, Chas Guy Park, Phil Hoel Park, and Unnamed Lake 132, respectively)
Lake 28 = Line L Lake 92 = Line D
Lake 86 = Line F Lake 132 = Line A
Lake 89 = Line I
Item No Quantity
Unit
Abbreviated Description
Unit Price
Amount
1 1
LS
Mobilzatoin/Demobilzation
$200,000.00
$200.000.00
Line A
24 -inch approved type pipe, contractor's option of
1A
280
LF
installation method
$275.00
$77,000.00
2A
280
LF
Trench, Tunnel, Bore, Access Shaft Safety System
$6.00
$1,68000
3A
1
EA
Lake Inlet for Line A, complete
$205,000.00
$205,000.00
4A
8,333
SY
Reestablish Vegetation by Seeding
$14,00
$116,662.00
Line D
24 -inch approved type pipe, contractor's option of
1D
114
LF
installation method
$275.00
$31,35000
2D
114
LF
Trench, Tunnel, Bore, Access Shaft Safety System
$6.00
$684.00
3D
1
EA
Type 1 Manhole, complete
$20,00000
$20,000.00
4D
1
EA
Lake Inlet for Line D, complete
$230,000.00
$230,000.00
5D
1
EA
Cofferdams, Installed, Removal, and Dewatering
$220,000.00
$220,000.00
6D
1
LS
Traffic Control, complete in place
$1,500.00
$1,500.00
7D
2,445
SY
Reestablish Vegetation by Sod
$14.00
$34,23000
Line F
24 -inch approved type pipe, contractor's option of
1F
80
LF
installation method
$275.00
$22,000.00
2F
80
LF
Trench, Tunnel, Bore, Access Shaft Safety System
$6.00
$480.00
3F
1
EA
Lake Inlet for Line F, complete
$258,000.00
$258,000.00
4F
1
EA
Cofferdams, Installed, Removal, and Dewatering
$248,000.00
$248,000.00
5F
1
LS
Traffic Control, complete in place
$1,500.00
$1,500.00
6F
1,225
SY
Reestablish Vegetation by Sod
$14.00
$17,150.00
1 OF 2 SLDIP PKG #1 CCO #3
Construction Change Order No, 3
City of Lubbock, Texas
South Lubbock Drainage Improvements Package No. 1
Inlets at Lakes 28, 86, 89, 92, AND 132
(Jan Jennings Park, Earl Crow Park, Chas Guy Park, Phil Hoel Park, and Unnamed Lake 132, respectively)
Lake 28 = Line L Lake 92 = Line D
Lake 86 = Line F Lake 132 = Line A
Lake 89 = Line I
Item No, Quantity
Unit
Abbreviated Description
Unit Price
Amount
Mobilzatoin/Demobilzation
$206.000 00
$200,000.00
Line I
24 -inch approved type pipe, contractors option of
1 1
416
LF
installation method
$275.00
$114,400.00
21
416
LF
Trench, Tunnel, Bore, Access Shaft Safety System
$6.00
$2,496.00
31
2
EA
Type 1 manhole, complete
$20,000.00
$40,000.00
41
1
EA
Lake inlet for Line I, complete
$206,000.00
$206,000.00
51
1
EA
Cofferdams, Installed, Removal, and Dewatering
$172,000.00
$172,000.00
61
1
LS
Traffic Control, complete in place
$25,00000
$25,000.00
7 1
4,225
SY
Reestablish Vegetation by Sod
$14.00
$59,150.00
Line L
24 -inch approved type pipe, contractor's option of
1 L
60
LF
installation method
$27500
$16,500.00
2L
60
LF
Trench, Tunnel, Bore, Access Shaft Safety System
$6.00
$360.00
3L
1
EA
Lake Inlet for Line I, complete
$310,000.00
$310,00000
4L
1
EA
Cofferdams, Installed, Removal, and Dewatering
$255,000.00
$255,000.00
5L
1
LS
Traffic Control, complete in place
$1,500.00
$1,500.00
61-
4,900
SY
Reestablish Vegetation by Sod
$14.00
$68,600.00
TOTAL SLDIP PKC #1 CCO #3
$2,95 242.00
Prepared by: �--L 4�
Print Name: Z/ D
Utility ontractors of America, Inc.
927 Highway 62-82
Wolfforth, Texas 79382
Date: ('y
2 OF 2 SLDIP PKG #1 CCO #3