Loading...
HomeMy WebLinkAboutResolution - 2007-R0326 - CO To Contract - West Texas Paving Inc.- Mac Davis, Ave V Paving And Drainage - 07/26/2007Resolution No. 2007—RO326 July 26, 2007 Item No. 5.12 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock Change Order No. 4 for West Texas Paving Contract 46574 Mac Davis Lane and Avenue V Extension Paving and Drainage Improvements and associated documents. Said Change Order is attached hereto and incorporated in this Resolution as if fully set forth herein and shall be included in the minutes of the Council. Passed by the City Council this 26th day of ATTEST: Rebe ca Garza, City Secretary AS.TO CONTENT: Loomis, Assistant City Manager sortation and Public Works APPROVED AS TO FORM: t � Linda L. Chamales, Senior Attorney Office Practice ml/L inda/Resolutions/ChOrderNo4- W estTXPaving_6 574 July 13, 2007 July , 2007. f DAVID A. MILLER, MAYOR CITY OF LUBBOCK CHANGE ORDER Change Order #: 4 Contractor: West'] exas Paving, Inc. Date: July 12, 2007 BID/ITB #: 05 -148 -BM Contract #: I 6574 Project Name: Mac Davis Lane and Avenue V Extension Paving and Drainage Improvements Change Order within the scope of the contract means a Change Order that DOES NOT ALTER THE NATURE OF THE THING TO BE CONSTRUCTED AND THAT IS AN INTEGRAL PART OF THE PROJECT OBJECTIVE. After performance of a construction contract begins. Change Orders may be approved if necessary to 1) make changes in plans or specifications; or 2) decrease or increase the quantity of work to be performed or materials, equipment, or supplies to be furnished. This DOES NOT mean that a department can redefine the project. All work that alters the nature of the thing to be constructed or that is not an integral part of the project objective must be let out for public bid by the Purchasing; Department. Description of change (alteration, deviation, addition, or deletion) caused by conditions encountered during construction not covered by the specifications and drawings of the project (attach additional pages if necessary): The following work for tracts IB -1 thru IB -3: Curb and gutter, concrete removal, and installation of handicap ramps alone the north side of 10`' street, east side of university, and south side of 9'h street. Change Orders must either be negotiated in the best interest of the City ol' Lubbock or put out for public bid by the Purchasing Department. Where the Change Order is negotiated, the Change Order must be fully documented and itemized as to costs, including material quantities, material costs, taxes, insurance, employee benefits, other related costs, profit and overhead. Where certain unit prices are contained in the initial contract, no deviations are allowed in computing negotiated change order costs. ITEMIZED COSTS MUST BE FULLY DOCUMENTED AND ATTACHED TO THIS FORM. ITEM DESCRIPTION AMOUNT A. ORIGINAL CONTRACT VALUE: $609569 B. AMOUNT OF THIS CHANGE ORDER: t bm of opproval regalred ff over s25,oua $102131,68 C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A): 16,75 % D. AMOUNT OF PREVIOUS CHANGE ORDERS: $4673.93 E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D): $106805.61 F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (EIA): 25% Maximum 17.52 % G. NEW CONTRACT AMOUNT (A+E): $716374.61 It is mutually agreed that the above dollar amount and the time extension, as applicable, as set forth in this Change Order constitutes full compensation to the Contractor for all costs, expenses and damages to the Contractor, whether direct, consequential or otherwise, in anyway incident to. or arising out of or resulting directly or indirectly; from the work performed or modified by the Contractor under this Change Order. (I TRACTOIF Date (2) ROJEC ARCIIITECT/ENGINEER Date as t it, &xc, Div- Approved asld Form: -%�%% R PRESENTATIVE Date (4) CITY ATTORNEY Date ,] -7 PROJECTS MANAGER Date (G URC AND CO ANAGER 7a CArange Vraers over 3Z-),uoy require a c.untrarr cover sneer ana nre jottowing signarures: B ►ST: 7126/07 (7) MAYOR Date (8) CaY SECRETARY Date July 26, 2007 A 5.12 2007—RO326 Council Date: Y Benda hent #: Resolution #: PUR-045 (Rev 02106) Curb and Gutter Replacement for Raising Cain Restaurant North side of 10th street between Avenue X and University East side of University between 9th and 10th Street South side of 9th street between Avenue X and University Item unit quantity West Texas Unit Price total price Remove curb and gutter If 1500 $7.20 $10,800.00 Concrete Removal sy 1260 $23.24 $29,287.44 Sawcut and remove concrete paving sy 67.78 $70.42 $4,772.80 Curb and gutter If 1325 $18.00 $23,850.00 Handicap Ramps ea 2 $1,200.00 $2,400.00 Concrete Driveways sy 281.44 $66.49 $18,713.51 Brick Repair If 626 $6.96 $4,356.96 Asphalt Repair sy 139.11 $57.16 $7,950.97 $102,131.68