Loading...
HomeMy WebLinkAboutResolution - 2007-R0305 - CO To Contract - West Texas Paving Inc.- Mac Davis Lane & Ave V Paving& Drainage - 07/12/2007Resolution No. 2007-80305 July 12, 2007 Item No. 5.27 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock, Change Order #3 to ITB # 05 -148 -BM for Mac Davis Lane and Avenue V Extension Paving and Drainage Improvements Contract with West Texas Paving, Inc. Change Order is attached hereto and incorporated in this Resolution as if fully set forth herein and shall be included in the minutes of the Council. Passed by the City Council this 12th day of July , 2007• DAVID A. MILLER, MAYOR ATTEST: Rebecca Garza, City Secretary APPROVED AS TO CONTENT: J es oomis ssi ant City Manager for Transportation and Public Works APPROVED AS TO FORM: Chad Weaver, Assistant City Attorney vwxcdocs/Res-Chorder3-MacDavis Lane &Ave V June 29, 2007 CITY OF LUBBOCK CHANGE ORDER Change Order 4: 3 Contractor:: West Texas Paving, Inc. Date: I June 28,2007 BID/ITB #: 05 -148 -BM Contract #: 6574 Project Name: I Mac Davis Lane and Avenue V Extension Paving and Drainage Improvements Change Order within the scope of the contract means a Change Order that DOES NOT ALTER THE NATURE OF THE THING TO BE CONSTRUCTED AND THAT IS AN INTEGRAL PART OF THE PROJECT OBJECTIVE. After performance of a construction contract begins, Change Orders may be approved if necessary to 1) make changes in plans or specifications; or 2) decrease or increase the quantity of work to be performed or materials, equipment, or supplies to be furnished. This DOES NOT mean that a department can redefine the project. All work that alters the nature of the thing to be constructed or that is not an integral part of the ro'ect objective must be let out for public bid by the Purchasing Department. Description of change (alteration, deviation, addition, or deletion) caused by conditions encountered during construction not covered by the specifications and drawings of the project (attach additional pages if necessary): Changed intersection at 7`h street and Avenue U to concrete due to drainage and maintenance issues, unforeseen concrete slab removal due to utilities encased in concrete along Mac Davis Lane, Avenue T, 7th street, Avenue V and Avenue U, and replace the sidewalk removed at Ramirez Element�rv. Change Orders must either be negotiated in the best interest of the City of Lubbock or put out for public bid by the Purchasing Department. Where the Change Order is negotiated, the Change Order must be fully documented and itemized as to costs, including material quantities, material costs, taxes, insurance, employee benefits, other related costs, profit and overhead. Where certain unit prices are contained in the initial contract, no deviations are allowed in computing negotiated change order costs. ITEMIZED COSTS MUST BE FULLY DOCUMENTED AND ATTACHED TO THIS .FORM. ITEM DESCRIPTION AMOUNT A. ORIGINAL CONTRACT VALUE: $609569 B. AMOUNT OF THIS CHANGE ORDER: Council appnnal required if Ewer 525,000 $90174.93 C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A): 14.8 % D. AMOUNT OF PREVIOUS CHANGE ORDERS: $-85501 E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D): $4673.93 F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): 25%Maxinannr .6 % G. NEW CONTRACT AMOUNT (A+E): $614243 It is mutually agreed that the above dollar amount and the time extension, as applicable, as set forth in this Change Order constitutes full compensation to the Contractor for all costs, expenses and damages to the Contractor, whether direct, consequential or otherwise, in anyway incident to, or arising out of or resulting directly or indirectly: from the work performed or modified by the Contractor under this Change Order. d -a? G 0-) (I) . )NTRAC"COR Date (2) PR JECT fCHH7ECT/ENGINEER Date Approved as to ' ten Approved as to Form: kir (3) OWNER'S REPRESENTATIVE Date (4) CrJY ATTORNEY Date ifavl-m p Zr (5) CAPITAL PROJECTS MANAGER Date (6) PURCHASING A11D CONTRACT MANAGER Date Change Orders rplir Y5,000 require a Contract Cover Sheet and the following signatures: 7/12/07 A 7/12/07 (7) MAYOR Date (8) CITY , ECRETARY Date Council Date: July 12, 2007 Agenda item #: 5 27 Resolution #: 2007—RO305 PUR-045 (Rev 02/06) Change order #3 Mac Davis Lane Changed 7th street and Avenue U intersection to concrete for drainage and to prevent maintenance issue Item Area (yd"2) cost total cost Concrete paving Class C 397 70 27790 Item Area (yd ^2) cost total cost Paving repair 32 16 512 During the project utilities are encased in concrete not flowable fill which requires the contractor to be paid as remove concrete slab 7th street and Avenue U intersection water line 6" thick concrete length width area (ft"2) area(yd^2) cost total cost 102 3.5 357 39.66667 25 991.6667 area(yd"2) cost 16 3 48 5.333333 25 133.3333 14 6.5 91 10.11111 25 252.7778 25 9.5 8 76 8.444444 25 211.1111 7 70 7.777778 1588.889 194.4444 Atmos abandon gas line to be removed 12 7 26" thick concrete 9.333333 25 233.3333 8" of concrete paid as removal so used multiplier of 3.2 7 length width multiplier area (ft"2) area(yd"2) cost total cost 133 2 3.2 851.2 94.57778 25 2364.444 Sidewalk for school at Avenue U 25 194.4444 length width multiplier area (ft^2) area(yd^2) cost total cost 133 10 3.2 4256 472.8889 25 11822.22 intersection total 70 15775.56 Concrete slab removal for driveways covered by dirt 7th street from Avenue U to Avenue V north side length width area (ftA2) area(yd"2) cost total cost 28 8 224 24.88889 25 622.2222 10 7 70 7.777778 25 194.4444 12 7 84 9.333333 25 233.3333 10 7 70 7.777778 25 194.4444 10 7 70 7.777778 25 194.4444 11 7 77 8.555556 25 213.8889 10 7 70 7.777778 25 194.4444 9 7 63 7 25 175 10 7 70 7.777778 25 194.4444 10 7 70 7.777778 25 194.4444 96.44444 2411.111 south side length width area (ft"2) area(ydA2) cost total cost 12 7 84 9.333333 25 233.3333 12 7 84 +9.333333 25 233.3333 10 7 70 7.777778 25 194.4444 9 7 63 7 25 175 9 7 63 7 25 175 9 7 63 7 25 175 9 7 63 7 25 175 10 7 70 7.777778 25 194.4444 9 7 63 7 25 175 14 7 98 10.88889 25 272.2222 80.11111 2002.778 7th drvwy total 176.5556 4413.889 Mac Davis lane driveways Ave X to Ave V south side length width area (ft"2) area(yd"2) cost total cost 12 45 540 60 25 1500 10 16 160 17.77778 25 444.4444 8 10 80 8.888889 25 222.2222 9 10 90 10 25 250 driveway at university fountain 12508 25 3127 area(yd"2) cost Mac Davis total 221.7467 5543.667 Ave R from 7th to GG® 565 62.77778 25 1569.444 length width area (ft"2) area(yd"2) cost total cost 9 6 54 6 25 150 15 9 135 15 25 375 5.777778 25 total Ave R 21 525 Sidewalk on Avenue T for Ramirez elementary 2063.889 Concrete replacement for sidewalk at school length width area (ft"2) area(yd"2) cost total cost 130 6 780 86.66667 25 2166.667 81 7 567 63 25 1575 113 10 1130 149.6667 3741.667 Concrete slabs encountered in the street MDL length width area (ft"2) area(yd"2) cost total cost 1186 3 3558 395.3333 25 98-83.333 Ave V length width area (ft"2) area(yd"2) cost total cost 568 3 1704 189.3333 25 4733.333 Ave T length width area (ft"2) area(yd"2) cost total cost 113 5 565 62.77778 25 1569.444 12 8 96 10.66667 25 266.6667 6 5 30 3.333333 25 83.33333 26 2 52 5.777778 25 144.4444 82.55556 2063.889 Concrete replacement for sidewalk at school Avenue U length width area (ft"2) area(yd"2) cost total cost 113 10 1130 125.5556 46.66667 5859.259 Avenue T 200 46.66667 9333.333 Total for concrete intersection and slab removal 90174.93