Loading...
HomeMy WebLinkAboutResolution - 2007-R0173 - Contract- Southwestern Environmental Equipment Technicians Inc- Double Disk Pump - 04/26/2007Resolution No. 2007-RO173 April 26, 2007 Item No. 5.19 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LU3BOCK: THAT the City Council of the City of Lubbock hereby authorizes and directs the Mayor of the City of Lubbock to execute a Contract (#7655) by and between the City of Lubbock and Southwestern Environmental Equipment Technicians, Inc., of Dallas, Texas, for purchase and installation of a 6" double disc pump, which Contract and any associated documents, are attached hereto and made a part of this Resolution for all intents and purposes. Passed by the City Council this 26th day of April , 2007. DAVID A. MILLER, MAYOR ATTEST: Reb ca Garza, City Secretary APPROVED CONTENT: Thomas Adams Deputy City Manager/Water Utilities APPROVED AS, FORM: bon Vandiver, Attorney of Counse Dares/S W Envi ronrnental07ConRes April 17, 2007 CONTRACT FOR Resolution No. 2007—RO173 6" Double Disc Pump Purchase and Installation CONTRACT # 7655 STATE OF TEXAS § COUNTY OF LUBBOCK § This Agreement entered into this 26th day of April, 2007, by and between the CITY of Lubbock ("City"), and Southwestern Environmental Equipment Technicians, Inc. ("Contractor"). WHEREAS, the City is in need of a 6" double disc pump with variable speed drive to transfer thickened sludge into the digester. The pump will be used 24 hours a day by the operational staff at the South East Water Reclamation Plant (SEWRP). WHEREAS, Contractor has the materials, experience and skill required to provide said service as described above; and NOW THEREFORE, it is agreed between the parties that: I. SCOPE OF WORD. A. Contractor agrees to provide the 6" double disc pump and installation as described in "ATTACHMENT A," which is attached hereto and incorporated herein as if fully set forth. B. City Responsibilities. City agrees to pay said amounts as described in "ATTACHMENT A", not to exceed 34, 950. The amount payable shall be invoiced to the City of Lubbock and shall be payable by the City within thirty (30) days after receipt of same. H. TIME OF PERFORMANCE Contractor will order equipment upon execution of this agreement. Installation services shall be completed 30 days after all equipment is onsite. The project shall be completed by June 29, 2007, unless otherwise agreed between the parties. 111. GENERAL CONDITIONS A. General Compliance Contractor shall complete the installation of the 6' double disc pump as specified under "Attachment A ." Contractor shall comply with the two (2) year warranty on material and workmanship as specified in "Attachment A". B. Insurance South Western Environmental Equipment Technicians Contractor will provide and maintain in force for the full term of this contract, the insurance described in "Attachment B", which is attached hereto and incorporated as if fully set forth herein. C. Hold Harmless Contractor hereby assumes full responsibility for the risk of bodily injury, death or property damages resulting from its performance of this Agreement and releases for itself, its employees and agents, the City of Lubbock, its officers, agents, employees or representatives from any and all injury, loss, liability, damage or costs relating to any claim arising from performance of this Agreement. Contractor shall hold harmless, defend and indemnify the City from any and all claims, actions, suits, charges and judgments whatsoever that arise out of Contractor 's performance or nonperformance of this Agreement. D. Governing Law This Agreement shall for all purposes be construed and enforced under and in accordance with the laws of the State of Texas E. Amendments City or Contractor may amend this Agreement at any time provided that such amendments make specific reference to this Agreement and are only effective when executed in writing and signed by both parties. F. Entire Agreement South Western Environmental Equipment Technicians This Agreement constitutes the entire agreement between the parties with respect to the subject matter. EXECUTED in the year and day referenced first above mentioned. CITY OF LUBBOCK, TEXAS (OWNER): MAYOR ATTEST: City S retary APPROVED S CO ENT: i Owner's epresentativc PROVED AS �. Assistant Ci A ey South Westem Environmentai Equipment Technicians CONTRACTOR: �F1'iJ+}�i�'+ENT % IGC'+fi/VI C:I/}MS By: - PRINTED NAME:— lelS TITLE: COMPLETE ADDRESS: Company. Sw,�T Address 7:a -,y 44 ct v.+ b - -City, State Zip_ a�i X ;7s Yd ATTEST: Allh Corporate Secretary Resolution No. 2007-RO173 "ATTACHMENT A" South Western Environmental Equipment Technicians 7904 La Cosa Drive Dallas, TX 75248 (972) 233-1602 • Fax (972) 866-6852 Email: cjcortez@sbcglobal.net QUOTATION # 827TX6 To: City of Lubbock Date: March 8, 2007 S.E. WRP Terms: Net 30 Attn: Michael Green Delivery: 3 to 4 weeks Phone: 806-775-3233 F.O.B.: Factory: FFA Email: mgreen@mylubbock.us Prices: Good for 60 days TY Description Amount Supply and Install (1) New Double Disc Pump and New VFD Application: Thickened Sludge Transfer from GBT, 225 GPM a* 60 ft. TDH I 6 -inch Double Disc Pump, Model # 6DDSX76, Side Motor Mount Build (Per Drawing # PVD769) With 15 HP, 1200 RPM Baldor Premium Efficient, Severe Duty, Inverter Ready Electric Motor To include the following: - Suction & Discharge Pulsation Dampeners - 304 Stainless Steel Pump Foundation - Belt & Pulley System to achieve 300 RPM Pump Speed - 304 Stainless Steel Belt & Pulley Cover - 304 Stainless Steel Drive Guard - Model PVP420PS, Pressure Gauge Switch Assembly - Red Epoxy Paint on Exterior of pump - Two (2) year warranty on Material & Workmanship - Start-up Services to include operation & maintenance training - Freight to Jobsite - Mechanical and Electric Installation to consist of - Removal of all necessary piping and fittings - Install New Double Disc Pump - Install all necessary piping, fittings and valves from suction to discharge point with new bolt assemblies and gaskets - Anchor & grout pump to floor - Install pipe supports where necessary - Install Pressure Gauge Switch Assembly - Owner responsible for demo of existing pump, concrete pump pad, and disposal of all existing equipment not used. I -lot Electrical Installation and New Variable Frequency Drive for New Double Disc Pump Above to include: - Provide and Install One (1) New 15 HP Altivar 71, Variable Frequency Drive, Model # ATV71 HD I 5N4,460/60/3 - Replace Breaker at MCC and Install New Wire from MCC to Existing Pump Control Panel - Upgrade Breakers, Fuses, Overload and Wire at Existing Pump Control Panel - Program New VFD for Application Using All Control Functions Previously Used - Install New Wire for New VFD and Existing Pump Control Panel to New 15 Hp Pump Motor Making any Necessary Changes in Conduit to Accommodate New Motor and New Pressure Switch Assembly Start-up Services to Include Operation & Maintenance Training Total Price $34,950.00 ft Resolution No. 2007—RO173 " ATTACHMENT B" Insurance The contractor shall obtain and maintain in full force and effect during the term of the contract, commercial general liability coverage with insurance carriers admitted to do business in the State of Texas. The insurance companies must carry a Best's Rating of B or better. The policies will be written on an occurrence basis, subject to the following minimum limits of liability: Worker's Compensation - The Contractor shall elect to obtain worker's compensation coverage pursuant to Section 406.002 of the Texas Labor Code. Further, Contractor shall maintain said coverage throughout the term of this Contract and shall comply with all provisions of Title 5 of the Texas Labor Code to ensure that the Contractor maintains said coverage. Any termination of worker's compensation insurance coverage by contractor or any cancellation or non -renewal of worker's compensation insurance coverage for the Contractor shall be a material breach of this Contract. The contractor may maintain Occupational Accident and Disability Insurance in lieu of Workers' Compensation. In either event, the policy must be endorsed to include a wavier of subrogation in favor of the CITY OF LUBBOCK. The Contractor shall also provide to the CITY OF LUBBOCK proof of Employers' Liability in an amount no less than $500,000. Commercial General (public) Liability insurance, per occurrence, in an amount not less than $1,000,000, with a heavy equipment endorsement. Product — Comp/Op AGG Personal & Adv. Injury Contractual Liability Automotive Liability insurance, per occurrence, in an amount not less than $300,000 combined single limit including coverage for the following: Any Auto The City of Lubbock, its agents, elected and appointed officials, and employees are to be listed as a additional insured under the policies. The contractor will provide a Certificate of Insurance to the City as evidence of coverage. A copy of the primary additional insured endorsement attached to the policy will be included with the certificate. Contractor's insurance policies through policy endorsement must include wording, which states that the policy shall be primary and non- contributing with respect to any insurance carried by the City of Lubbock. The certificate of insurance described below must reflect that the above working is included in evidenced policies. If at any time during the life of the contract or any extension, the contractor fails to maintain the required insurance in full force and effect; all work under the contract shall be discontinued immediately. Any failure to maintain the required insurance may be sufficient cause for the City to terminate the contract. Upon award of the Contract to the successful Offeror, the firm shall submit an insurance certificates naming the City of Lubbock as a Primary Additional Insured on General Liability and Automobile Liability and provide a Waiver of Subrogation in favor of the City of Lubbock South Western Environmental Equipment Technicians