Loading...
HomeMy WebLinkAboutResolution - 2007-R0081 - Adopt Master Plan For LPSIA - Barnarddunkelberg Co./ Parkhill Smith & Cooper - 02/22/2007Resolution No. 2007—R0081 February 22, 2007 Item No. 6.5 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the City Council of the City of Lubbock hereby approves and adopts the Master Plan for Lubbock Preston Smith International Airport {LBB} prepared by Barnard Dunkelberg and Company / Parkhill Smith and Cooper, Inc. ct al, as the official airport development guide. Said Master Plan is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council this 22nd day of February , 2007. i04— DAVID A. MILLER, MAYOR ATTEST: Garza, City Secretary VED AS TO CO NT: ZZ zi� Loomis, Assistant City Manager sortation and Public Works APPROVED AS TO FORM: Linda L. Chamales, Senior Attorney Office Practice Section Sh/cityatt/Linda&ccdocs/Res-Airport Master Plan January 25, 2007 MASTED PLAN Resolution No. 2007-R0081 Executive Summary MASTER PLAN Lubbock Preston Smith International Airport As a critical component of the national and regional transportation infrastructure, Lubbock Preston Smith International Airport (LBB) is a center for commercial passenger activity, air cargo activity, and general aviation operations. The City of Lubbock, Texas is the anchor of the West Texas economy, with Midland 120 miles to the south and Amarillo 119 miles to the north, Lubbock serves a 26 -county trade area in excess of 500, 000 residents. Being a city of just over 200, 000 residents, Lubbock lives like a much larger community and commercial center. Lubbock supports banking, government, commerce & retail, medical, and recreation for the entire central West Texas region. Moreover, Lubbock is home to Texas Tech University, Lubbock Christian University, satellite campuses for South Plains College and Wayland Baptist University, two semi pro sports teams, award-winning wineries, and a diversified local economy. Supporting this regional economy is LBB — an airport that sees more annual enplanements and bases a greater number of aircraft than any other West Texas airport, with the exception of its neighbor El Paso, 340 miles to the southwest. Planning for the Airports development must be careful and measured, while also progressive enough to ensure its long-term growth and viability. Since the last master planning study of airportfacilities was completed in 1992, aviation issues on a local, regional, and national level have changed dramatically. The re-evaluation of these issues in the current Master flan requires a thorough understanding of existing LUBBOCK PRESTON SMITH INTERNATIONAL AIRPORT MASTE=P PLAN aviation needs, and the vision to anticipate, future aviation needs in a dynamic environment. The Master Plan addresses a variety of concerns with the formulation of a long-range physical development plan for the Airport; the primary goal is the continued improvement of the Airport in a manner that accommodates potential demand efficiently, is financially attainable, and that is appropriate in consideration of its surroundings. The Master Plan is being developed under the direction of the City of Lubbock Department of Aviation, with financial assistance from the Federal Aviation Administration (FAA). Like any long-term development plan, the Airport's Master Plan should reserve room for potential facilities. However, those potential future facilities for which a site has been reserved are only constructed when actual demand occurs. Thus, the Airport Master Plan is not a decision document on whether or not an improvement will be built; it is a planning tool that indicates how the land at the Airport might best be used in consideration of anticipated future demand. The master planning process made use of a Study Advisory Committee to provide input concerning Airport development issues. The process has involved four Study Committee Meetings, a public information meeting, and numerous discussions with Airport management and City of Lubbock officials. The purpose of the committee and staff meetings and discussions has been to gather input and establish a concept for future development at the Airport from a broad range of interested parties. In addition, the development of the Airport Master Plan has been coordinated with the FAA. In May 2006, a Study Committee meeting was held to review the Conceptual Development Plan for the Airport, including passenger terminal building improvements, environmental considerations, and implementation issues (i.e., project timing and costs). Issues and concerns expressed in this meeting, along with subsequent discussions with Airport management led to a refined long-term development plan for the Airport, along with the production of the Master Plan's Draft Final Report. LUBBOCK ------------------------ PRESTON SMITH INTERNATIONAL AIRPORT MASTER PLAN The recommended development plan for LBB is similar to many others, in that it is based on a simple principle: make the best use-' very limited resource. That limited resource is the airport property itself. Although additional property could be added to the Airport in the future, the overall resource remains finite. The development mandate is to utilize existing Airport property in the most efficient manner possible to support anticipated aviation and non-aviations demands and, in turn, provide financial support for operation and capital improvement needs. The proposed long-term development plan for the Airport is described in the following paragraphs and is graphically depicted in the following figure entitled CONCEPTUAL AIRPORT DEVELOPMENT PLAN. Development Considerations and Assumptions The aircraft types projected to use LBB during the next 20 years are, for the most part, the same types that presently use the Airport. The wide variety of aircraft types include narrow body air carrier aircraft (e.g., the Boeing 737 and 727), commuter regional jet aircraft (e.g., Canadair CRJ-50, CRJ-70, Embrear ERJ-135, and ERJ-145), all sizes of business -use aircraft, small single engine prop -aircraft used for flight training purposes, and all sizes of military aircraft (e.g., T-37, T-38, C-17, C-5, and KC -135). The number of annual aircraft operations (landings and takeoffs) at the Airport is forecasted to increase by 23% from approximately 85,000 in 2004 to just over 105,000 by the end of the 20 -year planning period. Also of significance is the fact that commercial passenger activity at LBB is forecasted to increase by almost 50% over the next two decades, from just over 541,000 enplaned passengers in calendar year 2004 to over 804,000 in 2024. LUBBOCK, _ PRESTON SMITH INTERNATIONAL AIRPORT MASTiEP PLAN Several basic assumptions were established in the Master Plan that are intended to direct the development of the Airport in the future. These assumptions are: Assumption One. The Airport will be developed and operated in a manner that is consistent with local ordinances and codes, federal and state statutes, federal grant assurances, and FAA and Transportation Security Administration (TSA) rules and regulations. Assumption Two. The role of the Airport will remain unchanged. It is a regional commercial passenger service facility, which supports general aviation activity (including corporate aircraft and individual owners), air cargo activity, and military aviation. Assumption Three. The size and type of aircraft that utilize the Airport and the resulting dimensional standards used as the basis for the layout of Airport facilities are as follows: Runways 17RI35L and 08126. It has been determined that the design aircraft fleet for these runways includes commercial passenger service aircraft up to the size of the Boeing 757. This indicates the runways will continue to be designed using FAA standards associated with Airport Reference Code (ARC) D -1V criteria. Runway 17LJ35R. Historically, the use of Runway 17L/35R has been associated with small general aviation aircraft, from single engine to smaller twin -engine aircraft. Previous planning studies identified B -I1 as the appropriate ARC. However, based on existing pavement strength and the aircraft types capable of operating on a runway length of 2,891 feet, it appears that B -I (small aircraft only) is the appropriate ARC. Assumption Four. In order to improve the reliability and safety of the Airport, the runway system will be developed with instrument approach guidance capabilities and adequate runway lengths to accommodate the forecasted aircraft operations as efficiently as possible under all weather conditions. LUBBOCK PRESTON SMITH INTERNATIONAL AIRPORT MASTER PLAN Assumption Five. Because landsidc development areas are always a premium at any airport, Airport development will strive to make the most efficient use of the available area for aviation - related activities, including general aviation facilities, passenger terminal facilities, air cargo activity, and other aviation uses. Assumption Six. A priority of the Airport will be the continued focus on the relationship of the Airport to off -airport land uses, and the compatible and complimentary development of each. To the maximum extent possible, future Airport facilities will be designed and developed that ensure the compatibility of the operation of the Airport with the surrounding environs. Development Recommendations Following an examination of several alternatives, combined with input from the Study Advisory Committee, the public, City, and Airport management, a recommended development plan was identified. The recommended plan is illustrated graphically in the preceding figure and has the following major features: Airside Facilities The runway system at LBB is well configured to accommodate the forecasted number of peak period aircraft operations (i.e., capacity) and is for the most part adequate for takeoffs to all regularly used destinations without significant weight penalties (runway length). Runway 1711135L. Maintain this runway virtually as it is now. Improvements to the taxiway system serving this runway include an extension of Taxiway L to the Runway 17R threshold and a high-speed exit taxiway to Taxiway M. The relocation of the perimeter road outside the Runway Object Free Area in the area north of the Runway 17R approach end rectifies deficient design standards associated with this runway. Runway 08128. The ability to extend Runway 08126 2,275 feet to the cast, and relocate the Runway 08 threshold correspondingly by 1,775 feet will be protected and planned for future implementation. The FAA has identified the intersection of Runways 17R/35L and 08/26 as a "hot spot" for runway incursions. By removing the intersection, safety is improved and pilot --LUBBOCK, ------- _ ----------------- - PRESTON SMITH INTERNATIONAL AIRPOPT MASTER PLAN confusion is minimized. Primary taxiway improvements are the recommended 2,275 -foot extension of Taxiway J in conjunction with the runway extension to the east and the reconstruction of Taxiway R at the relocated Runway 08 threshold. Runway 17L/35R. No improvements are recommended for this runway, as it will continue to serve general aviation aircraft weighing less than 12,500 pounds. Other Airside Development Recommendations. Following is a review of other airside development recommendations for LBB. These include:. 1. Provide two high-speed exit taxiways from Runway 08/26 to Taxiway J. 2. Plan for a parallel taxiway north of Runway 08/26. 3. Plan and program CAT I ILS precision approach procedures to Runways 08 and 35L. 4. Provide Medium Intensity Approach Lighting System with Runway Alignment Indicator Lights (MALSR) to Runways 08 and 35L in conjunction with the implementation of the CAT I ILS precision approach procedures. Landside Development Concepts With the framework of the Airport's ultimate airside development identified in a preliminary manner, the placement of landside facilities was analyzed. In general, landside facilities consist of the passenger terminal area, aircraft parking aprons, air cargo development areas, support facility development, hangar development areas, and airport access. Passenger Terminal Facilities The proper functioning of passenger terminal facilities is a high priority in any planning study for a commercial passenger service airport. The majority of the passenger terminal building is well suited for meeting the future projected needs of air travel into and out of LBB. However, several areas of concern have been addressed. These include: security inspection space; checked baggage screening; transition from secure circulation to non -secure circulation; provision of non - secure food, beverage, and retail spaces; and handicapped accessibility issues. _______ LUBBOCK,­ ----------------------- -- ------------------------ PRESTON SMITH INTERNATIONAL. AIRPORT MASTER PLAN Short-term improvements recommended for the passenger terminal building in the Master Plan include: 1. Enlarge the existing security inspection station and queuing area, and provide a second security inspection station and queuing area at the south end of the terminal building. 2. Provide an in-line checked baggage screening system shared by all the airlines. 3. Provide additional non -secure services in the middle portion of the terminal building. 4. Improve non -secure circulation patterns and increase size of the ticket lobby areas through reconstruction of the existing sloped entry ramps and landscaped areas in front of the terminal building. 5. Reduce size of the existing food service kitchen area and relocate the rental car agency spaces. b. Provide new entry vestibules that replace the slope entry ramps. All of the passenger terminal building considerations discussed above are illustrated graphically in the following illustrations. LUBBOCK 8 PRESTON SMITH INTERNATIONAL AIRPORT MASTER PLAN To the north and east of the existing terminal building, ample space is readily available that is capable of accommodating additional concourses or expansion of the terminal facilities with relatively little disruption to the existing terminal functions. Requiring that all air freight must transit to and from the air cargo area and the terminal apron via the perimeter road allows removal of the access road located beneath the passenger terminal building, which is a security concern. Adequate terminal apron exists for meeting the projected needs of the air carrier aircraft for maneuvering and parking. Additionally, adequate space exists within the vicinity to accommodate the long-term expansion and/or reconstruction needs of other terminal area functions such as consolidated rental car facilities, additional automobile parking structures, and other support facilities. Air Cargo Facilities The existing air cargo development area will be maintained in its present location. Development space is available and will be reserved to both the north and south of the existing facilities. If extraordinary growth occurs in the air cargo market at LBB, or if demand for a regional sorting facility transpires, then sufficient space is available east of Taxiway M and north of Runway 08/26 for development into a major air cargo facility. General Aviation Facilities General aviation facilities encompass all activities that are not specifically related to commercial passenger service, air cargo, or military operations. General aviation typically includes private aviation activity related to pleasure flying, flight training, business transportation and aircraft storage; commercial aviation activity related to Fixed Base Operators, aircraft maintenance, aircraft fueling, aircraft charter/rental, and aircraft storage; corporate aviation related to employee transportation and aircraft storage; and industrial activity related to aircraft manufacturing and refurbishment. Thus, general aviation is a very diverse aviation category composed of various aircraft types, sizes, technology/sophistication, landside access needs, and airside access needs. It is anticipated that general aviation facilities will continue to be developed in the areas west of Runway 17R/35L (within the Westport District) and east of Runway 17L/35R (within the _____ LUBBOCK, PRESTON SMITH INTERNATIONAL AIRPORT MASTER PLAN Eastport District). Both areas provide ample space to accommodate a wide variety of aircraft types and aviation functions, and are supplied with the necessary airport infrastructure to support growth. If greater than anticipated demand occurs and the designated development spaces are insufficient to meet the demand, then the area east of Runway 17R/35L and north of Runway 08/26 (within the Northport District) is available for general aviation development. Support Facilities Support facilities are those services and functions that are necessary for an airport to operate properly, but are not part of the runway/taxiway system and are not related to the passenger terminal buildings, air cargo facilities, aircraft storage facilities, or aircraft maintenance. LBB support facilities consist of the Air Traffic Control Tower (ATCT), fuel storage areas, the Aircraft Rescue and Fire Fighting (ARFF) facility, and the airport maintenance facility. All existing support facilities are properly sited, capable of expansion, and function well at their present locations, with the exception of the ARFF facility. The existing ARFF facility challenges the ability for emergency personnel to provide appropriate response times to the north end of Runway 17R/35L. Therefore, reserving space to relocate this facility to a more centralized location near the existing ATCT is recommended. Development Program In overview, the Development Program for LBB calls for the retention of the basic layout of facilities as they presently exist, with programmed improvements to maximize efficient and safe aircraft operational activity. As described above, major airside improvements are related to the relocation and extension of Runway 08126 to the east and extensions to Taxiways L and J. Other major improvements are related to passenger terminal building improvements, rehabilitation of many of the airfield pavement components, and aviation use facility development areas. General improvements recommended during the 20 -year planning period include: ■ Terminal Building Improvements ■ Improve Airport Signage (Underway) LUBBOCK, ------------- --- 12 ----- -------------------------------------------------------------- PRE- 5TOIN SMITH INTL-PNATIONAL AIRPORT MASTER PLAN ■ Airfield Pavement Rehabilitation ■ Rehabilitation and Extension of Runway 08/26 and Taxiway J ■ Relocation of Runway 08 Threshold ■ Provide CAT I ILS Precision Instrument Approaches to Runways 08 ad 35L ■ Land Acquisition ■ Drainage and Bird Mitigation Improvements ■ Extend Taxiway L ■ Expand Air Cargo Facilities ■ Improve Airfield Lighting Summary The long-term development program for LBB is a comprehensive proposal It is intended to establish a strategy for funding airport improvements and maximizing the potential for receiving federal matching funds, while also establishing a financially prudent plan for funding at the local level. This programming effort is a critical component of the Master Plan for the FAA and the sponsor (the City of Lubbock). From the FAA's perspective, the Capital Improvement Program (CIP) component of the Master Plan provides a detailed listing ofprojects and costs that are critical for their use in establishing priorities and budgeting expenditures at the Airport when compared with the needs of other airports. From the sponsor's perspective, the CIP allows budgeting) financial decisions to be made with a comprehensive understanding of financial implications. The overall concept is to maximize the opportunities to receive federal matching funds, within the context of, and in recognition of, the amount of local funds that are available for capital needs. Ifaviation demands continue to indicate that improvements are needed, and if the proposed improvements prove to be environmentally acceptable, the capital improvement financial implications discussed in the Master Plan are likely to be acceptable for both the FAA and the City. However, it must be recognized that this is only a programming analysis and not a commitment on the part of the Sponsor or the FAA. If the cost of an improvement project is not financially feasible, it will not be implemented. LUBBOCK:------------------------------------------------ ------------------------------------ 13 PRESTON SMITH INTERNATIONAL AIRPORT Implementation Pian Introduction This chapter provides a program *or deyelL=�ment and assists in establishing economic viability at Lubbock Preston Smith Intern0ional Airport by presenting the cost estimates associated with the 20 -year pre.lects iderc'Ved in the Development Plan. The improvements necessary to accommodate the forecast aviation demand efficiently have been placed in into three phases: phase one is the initial time frame (0-5 years), phase two is the medium time frame (6-10 years), and phase three is the long-term time frame (11- 20 years). The proposed improvements are illustrated graphically by time period in the figure entitled PHASING PLANpresented at the end of this chapter. Project List and Cost Estimates A list of capital improvement projects has been assembled from the facility requirements documentation previously presented. The project list has been coordinated with the Airport Layout Plan drawing set and the Capital Improvement Program that is continuously updated by airport management and the Federal Aviation Administration. Cost estimates for the individual projects based on current dollars have been prepared for the improvements that have been identified as necessary during the 20 -year planning period. Facility costs have been formulated using unit prices extended by the size of the particular facility and tempered with specific considerations related to the City of Lubbock, the Airport, and the development site. This data is then reviewed and analyzed for specific factors that may influence costs, such as airport operational constraints, project schedule, utility locations, future projections of material and labor costs, and other special project requirements. That being said, these estimates are intended to be used for planning purposes only and should not be construed as detailed construction cost estimates, which can only be compiled following the preparation of detailed design documentation. Lubbock Preston Smith International Airport Master Plan/Working Paper FourlMay 2006 H.1 Implementation Schedule The following illustration, entitled PHASING PLAN, along with the project/cost estimate list (Tables H1, H2, and H3) provides the suggested phasing for improvement projects throughout the 20 -year planning period. The projects listed in phase one (i.e., the first five years) are in priority order by year. During the second and third phases (i.e. years 6- 20), the projects are listed in priority order without year designators. With the best information available today, the tables provide information related to what projects will be needed, when those projects are likely to be constructed, and how the improvements are likely to be funded. It is anticipated that the project timetable will change as local and federal priorities evolve. These are suggested schedules and variance from them may be necessary, especially during the latter phases. Special attention has been given to the first five years because the projects outlined in this time period include many critical improvements. The demand for certain facilities, especially in the latter time frame, and the economic feasibility of their development are to be the prime factors influencing the timing of individual project construction. Care must be taken to provide for adequate lead-time for detailed planning and construction of facilities in order to meet aviation demands. It is also important to minimize the disruptive scheduling where a portion of the facility may become inoperative due to construction and to prevent extra costs resulting from improper project scheduling. Capital Improvement Program The projects, phasing, and costs presented in this Master Plan are the best projections that can be made at the time of formulation. The purpose is to provide a reasonable projection of capital needs, which can then be used in financial programming to test for financial feasibility. To assist in the preparation of the Airport's Capital Improvement Program (CIP) that the Airport keeps on file and updates annually with the FAA, the first phase of the projects list and cost estimates have been organized in a format similar to that used by the FAA. However, as soon as it is published, the long-term project list presented here starts to'be out of date and, therefore, it will always differ to some degree with the Airport's 5 -year CIP on file with the FAA. Lubbock Preston Smith International Airport Master Plan/Working Paper Four/May 2006 H.2 Table H1 PHASE ONE (0-5 YEARS) DEVELOPMENT PLAIN PROJECT COSTS Lubbock Preston Smith International Ai7port Master Plan Total Recommended Financing Method Project Description Note Cost Local' AIP PFC Year 1 (FFY 2006) A.1 East Side Phase II GA Ramp Improvements - Design $390,850 $371,308 $19,543 A.2 Replace Airport Signage $30,000 YEAR 1 TOTAL $420,850 Year 2 (FFY 2007) A.3 East Side Phase lI GA Ramp Improvements - Construction 52,464,150 $2,340,943 $123,208 A.4 Terminal Building Improvements, ADA Compliance, and Carpet Replacement $4,770,000 $2,607,750 $2,162,250 A.5 Roadway and Signage Improvements $2,125,000 $2,125,000 A.6 Upgrade Flight Information Displays $225,000 $225,000 A.7 Airfield Pavement Analysis $91,000 $91,000 A.8 Purchase ARFF Vehicle $700,000 $700,000 A.9 Runway 08/26 Extension Environmental Assessment $500,000 $500,000 YEAR. 2 TOTAL $10,875,150 $4,948,693 $5,926,458 Year 3 (FFY 2008) A.10 Bridge 72 -Inch Water Line, Rehabilitate and Extend Runway 08/26, Extend Taxiway J, Demo Runway 26 End, and Reconstruct Taxiway R - Design Only $3,160,180 A.11 Airfield Drainage and Bird Mitigation Improvements $1,940,000 $1,940,000 YEAR 3 TOTAL $5,100,180 $1,940,000 Year 4 (FFY 2009) A.12 Bridge 72 -Inch Water Line Under Runway 08/26 Extension - Construction $5,500,000 YEAR. 4 TOTAL $5,500,000 Year 5 (FFY 2010) A.13 Rehabilitate Runway 17R/35L, Design Only $1,801,700 A.14 Extend Runway 08/26 and Taxiway J - Construction $18,700,000 YEAR 5 TOTAL $20,501,700 Other Potential Phase I Projects A.15 Relocate RTR Antennas 2 A.16 Implement ILS or Precision GPS Approach to Runway 35L, Including Installation of MALSR Sub-Total/Phase I $42,397,880 $0 $5,320,000 $7,886,000 Notes. Cost estimates, based upon 2006 dollars, are intended for preliminary planning purposes only and do not reflect a detailed engineering evaluation. I Current revenues, cash reserves, bonds, etc. '- 100% FAA financing through Facilities and Equipment Division, no costs listed. Lubbock Preston Smith International Airport Master Plan/Working Paper Four/May 2006 H.3 Table H2 PHASE TWO (6-10 YEARS) DEVELOPMENT PLAN PROJECT COSTS Lubbock Preston Smith International Airport Master Plan Project Description Total Recommended Financing Method Note Cost Locals AIP PFC B.1 Rehabilitate Runway 08/26 - Construction $19,500,000 B.2 Demolish Runway 26 End and Reconstruct Taxiway R - Construction $5,600,000 B.3 Rehabilitate Runway 17R/35L - Construction $22,857900 B.4 Phase H Terminal HVAC Improvements $5,694,998 B.5 Terminal Building Remodel, Expansion, and Facility Reroofing $18,725,000 B.6 Relocate Perimeter Road North of the Approach End of Runway 17R, Acquire Approximately 7.1 Acres, and Update Airport Property Map $1,278,900 B.7 Construct High Speed Exit Taxiway G South of Runway 08/26 to Taxiway,J and Terminal Apron $2,028,300 B.8 Acquire Approximately 32 Acres Within the Runway 17R Runway Protection Zone $80,000 B.9 Relocate Rotating Beacon $150,000 B.10 Construct Taxiway L North of Taxiway S to Runway 17R $8,726,700 B.I1 Expand Air Cargo Facilities $3,980,300 B.12 Strengthen Taxiway D $12,126,600 B.13 Replace Existing MITL and Signs With LED And Fluorescent Fixtures $2,230,000 B.14 Reconstruct and/or Rehabilitate All Airside Asphalt Pavement and Perimeter Road $7,160,600 B.15 Demolish Taxiway H and Regrade All Infield Areas $4,036,000 B.16 Update ALP and Reevaluate CIP $125,000 B.17 Replace VASI Serving Runways 08, 26, and 35 With PAPI-4 2 B.18 Install PAPI-4 to Runway 17R 2 B.19 Install Centerline Lights and Touchdown Zone Lighting to Runway 17R/35L $325,000 B.20 Construct New ARFF Facility $4,500,000 Sub-Total/Phase Two $119,125,298 Notes: Cost estimates, based upon 2046 dollars, are intended for preliminary planning purposes only and do not reflect a detailed engineering evaluation, Current revenues, cash reserves, bonds, etc. 2 100% FAA financing through Facilities and Equipment Division, no costs fisted. Lubbock Preston Smith International Airport Master Plan/Working Paper Four/May 2006 H.4 Table H3 PHASE THREE (11-20 YEARS) DEVELOPMENT PLAN PROJECT COSTS Lubbock Preston ,Smith International Airlhart Master Plan Protect Description Total Recommended Financing Method Note Cost Local' AIP PFC C.1 Construct High Speed Exit Taxiway East of Runway 17R/35L to Taxiway M $2,785,300 C.2 Implement ILS or Precision GPS Approach to Runway 08, Including Installation of Mt1L.SR z C.3 Update ALP and Reevaluate CIP $125,000 CA Rehabiliwe All Airside Asphalt Pavement and Perimeter Road $1,790,900 C.5 Rehabilitate Taxiways F, G, K, N, and R $6,134,900 C.6 Rehabilitate Taxiway M $16,822,800 C.7 Rehabilitate Taxiway J $11,098,400 C.8 Rehabilitate Taxiways A, Q, S, and T $2,876,500 C.9 Reconstruct Taxiway B (From Asphalt to Full Strength Concrete $3,060,900 C.10 Reconstruct Concrete Portion of West Ramp $10,351,400 CAI Construct Asphalt Shoulders to Taxiways A and L $2,172,000 CA Replace Jet Bridges in Terminal Building $4,200,000 C.13 Reseal Parking Lot Joints and Replace Damaged Panels $1,350,000 C.14 Seal All Joints and Apply Deck Coating to Upper Level Parking Structure $1,500,000 C.15 Install REILs to Runway 17L/35R 2 C.16 Construct Parking Garage Addition $5,750,000 C.17 Security Gate Improvements $2,400,000 C.18 Update ALP and Reevaluate CIP $125,000 C.19 Light Cargo Apron $165,000 C.20 Repave Cedar, Bluefield, and Walnut Streets $1,515,000 Sub-Total/Phase Three $74,223,100 GRAND TOTALS $235,746,278 $5,320,000 $7,886,000 Notes: Cost estimates, based upon 2006 dollars, are intended for preliminary planning purposes only and do not reflect a detailed engineering evaluation. Current revenues, cash reserves, bonds, ctc. 10(rlo FAA financing through Facilities and Equipment Division, no costs listed. Lubbock Preston Smith International Airport Master Plan/Working Paper Four/May 2006 H.5 Legend + y: "� _AMTCH LIFE ! , ? (LARGE AIRCRAFT 1--e STORAGE UNITS & I FUTURE PASSENGER TERMINAL/ EXISTING AIRPORT PROPERTY LINE F,LITURE RUNWAY PROTECTION ZONE TERMINAL SUPPORT i 1000' X 1760'X 2500' ___ _J PERIMETER Conceptual Airport II EXISTINGZ ROAD Development Plan FUTURE AIRPORT PROPERTY LINE VISIBILITY NIMUMS NOT • i LOWER THAN 3/4 -MILE 11, q EXISTING RPZ r til 1000'X 1750'X 2500' Rvz EXISTING RUNWAY VISIBILITY ZONE 1 I I VISIBILITY MINIMUMS 1/2 -MILE N 0 300' 6001 1200 - 1000 '' + Ih FUTURE RPZ 6RAPH;f SCALE iN FEET EXISTING RUNWAY PROTECTION ZONE RPZ (RPZ) ! 1 t " t I., 1000% 1750'X 2500' FUTURE RUNWAY zl 1 1 VISIBILITY MINIMUMS 1/2 -MILE 1 PROTECTION ZONE I : t I! I II RUNWAY 08/26 EXTENSION (2,275') AND ® FUTURE AIRFIELD PAVEMENT a� "y II TAXIWAY'J' EXTENSION _ Land Use Legend I GI t'l d. ISI OPEN/UNDEVELOPED PASSENGER TERMINAL AREA (APPROX. 31 ACRES) AIRPORT SUPPORT FACILITIES (APPROX. 54 ACRES) AVIATION DEVELOPMENT AREAS (APPROX. 270 ACRES) AVIATION-RELATED/NON-AVIATION DEVELOPMENT AREAS (APPROX. 616 ACRES) OPEN/UNDEVELOPED AREA I (APPROX. 62 ACRES) 100 -YEAR FLOOD ZONE RELOCATED FUTURE RPZ 1000% 1750'X 2SOO' VISIBILITY MINIMUMS FUTURE PERIMETER ROAD ------- ------�� I r r v i t • I II t + 11 I I II + u I + II MATCH LINE FUTURE PARALLEL TAXIWAY — AIRPORT SUPPORT FACILITIES (ATCT & ARFF)1 FUTURE RUNWAY 6 — 1 a RELOCATED THRESHOLD (1,775') Iff1 Y NON -AVIATION EWA COMMERCIAL/INDUSTRIAL I It EXISTING RUNWAY PROTECTION ZONE �---------- --- - - - ----�I 1000'X175BILITY MINIMUMS 2MILE ------ LARGE AIRCRAFT -~------ 1000' X 1750' X 2600' I GENERAL AVIATION 1/ �f ) • �'� �. „ �6 I I �— FUTURE ACUT ,ANGLED EXIT TAXIWAY. , i I --- - -RUNWA Y I - up it II -FUTURE at FUTURE PROPERTY I PERIMETE r ---------- - --���-_-- -- II FUTURE TAXIWAY 'L' AIR CARGO ACQUISITION ROAD 1 (APPROX. 32 ACRES) - - LMPROVEMENT5 -_ - U. NON -AVIATION INDUSTRIAL/COMMERCIAL AIRPORT SUPPORT FACILITIES o (ARFF, MAINTENANCE, TRAINING) GENERAL AVIATION (SMALL AIRCRAFT STORAGE UNITS) I, & 4_� 11 _— GENERAL AVIATION (T -HANGARS) rr.r�•r�r�r�r� w. r�� lr Cfir +li lu�I,I.GT :fir':_ 71 JI 1 J� 1 ' 1 - y FUTURE �_�•----..---- I 1000'X 1 X 2500' 1 TERMINAL t p BIL INIMUMS 1/2- LE SUPPORT (PARKING) IL ,-TERMINAL SUPPORT (EXISTING & FUTURE RENTAL CAR/ FUTURE PARKING) mwwim�il -void NON -AVIATION 1 I COMMERCIAL/OFFICE 1 (LARGE AIRCRAFT 1--e STORAGE UNITS & I PASSENGER TERMINAL/ I 1 F,LITURE RUNWAY PROTECTION ZONE TERMINAL SUPPORT i 1000' X 1760'X 2500' +' RESERVE VISIBILITY MINIMUMS 1/2 -MILE I L•,------------------ II EXISTINGZ 1000 X l,6l0 X 1700' " I VISIBILITY NIMUMS NOT • i LOWER THAN 3/4 -MILE • I 4 lei I f FUTURE MALSR COMMERCIAL/I DUSTRIAL l " #1 I `� Jy% - -®-- MASTER PLAN ------ LUBBOCK ------ _ PRESTON SMIi H �" INTERNATIONAL AIRPORT 4 I GENERAL AVIATION (LARGE AIRCRAFT 1--e STORAGE UNITS & T•HANGARS) #T�ON. I O FJCNtTRIAL J f` COMMERCIAL/I DUSTRIAL l " #1 I `� Jy% - -®-- MASTER PLAN ------ LUBBOCK ------ _ PRESTON SMIi H �" INTERNATIONAL AIRPORT 4 ��t a6- DEPARTURE LOUNGE 46 2 . ..ref Or, 'bP; ENLARGED MAIN LEVEL FLOOR PLAN — SCHEME 2 — NORTHERN ENO li6`:TI ---------------------------; Parkhill, Smith & Cooper, Inc. • Barnard Ounkelberg & Company Enlarged North End of Main Floor of the Terminal Building Improvements MASTL—P PLAN --------------L U B B O C K I------- PRESTON SMITH INTERNATIONAL AIRPORT Source: Parkhill, Smith & Cooper, tnc„ Terminal Building Alternative, 2005. 9 t > �-qolo� ENLARGED MAIN LEVEL FLOOR PLAN - SCHEME 2 - SOUTHERN END cam/ }) NORTI- --- ----- Parkhill, Smith & Cooper, Inc. • Barnard Dunkelberg & Company Enlarged South End of Main Floor of the Terminal Building Improvements NAASTE=P PLAN ----------------- -------�, L U B B O C K ;. PRESTION SMITH INT&RNATIONAL AIRPORT Source: Parkhill, Smith & Cooper, Inc., Terminal Building Alternative, 2005. 10