HomeMy WebLinkAboutResolution - 2007-R0034 - Change Order To Contract - Duininck Brothers Inc.- Cost Reduction In Renovations - 01/25/2007Resolution No. 2007-80034
January 25, 2007
Item No. 5.24
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the City Council of the City of Lubbock hereby authorizes and directs the
Mayor of the City of Lubbock to execute a Change Order No. 1 to Contract #06 -008 -BM
entered into by and between the City of Lubbock and Duininck Brothers, Inc., for a cost
reduction in the Airport Terminal Parking Lot Renovations at Preston Smith International.
Airport, which Change Order No. 1 and any associated documents, are attached hereto
and made a part of this Resolution for all intents and purposes.
Passed by the City Council this 25th day of January , 2007.
ATTEST:
DAVID A�rLER, MAYOR
—Q
Rebecca Garza, City Secretary
AS TO CONTENT:
IV�_.
Loomis
int City Manager/Transportation and Public Works
APPROVED AS O FORM:
Don Vandiver, Attorney of Counsel
DDres/DuininckBrosCO 1 Res
January 4, 2007
Resolution No. 2007—R0034
CITY OF LUBBOCK
CHANGE ORDER
Change Order #:
1
Contractor:
Duininck Brothers, Inc.
Date:
12121/2006
BID/ITB #:
06 -008 -BM
Contract #:
6672
Project Name:
Airport Terminal Parking Lot Renovations
Change Order within the scope of the contract means a Change Order that DOES NOT ALTER THE NATURE OF THE THING
TO BE CONSTRUCTED AND THAT IS AN INTEGRAL PART OF THE PROJECT OBJECTIVE. After performance of a
construction contract begins, Change Orders may be approved if necessary to 1) make changes in plans or specifications; or 2)
decrease or increase the quantity of work to be performed or materials, equipment, or supplies to be furnished. This DOES NOT
mean that a department can redefine the project. All work that alters the nature of the thing to be constructed or that is not an
integral part of the project objective must be let out for SLublic bid by the Purchasing Department. Description of change
(alteration, deviation, addition, or deletion) caused by conditions encountered during construction not covered by the
specifications and drawings of the project (attach additional pages ifnecessary):
Change order #1 includes final constructed quantity adjustments for all bid items, credit for liquidated damages
accumulated during each phase, and other additional items as detailed on the attached summary sheet. Time
allowed to complete the additional items included in Change Order #1 is 120 days from the day the Change
Order is executed and the Contractor is given notice to proceed. Change Order #1 also includes release of
retainage on all items that have been satisfactorily complete prior to the final payment. Retainage equal to the
value of outstanding work ($2,000 for establishment of grass) will be retained until an acceptable stand of grass
is achieved. The percent retained on all remaining progress payments will be .14% of the Total Value of
Work Performed to Date Less Liquidated Damages. Liquidated damages on all additional work included in
Change Order #I will be assessed at a rate of $776/day for each day beyond the allotted 120 days.
Change Orders must either be negotiated in the best interest of the City of Lubbock or put out for public bid by the Purchasing
Department. Where the Change Order is negotiated, the Change Order must be fully documented and itemized as to costs,
including material quantities, material costs, taxes, insurance, employee benefits, other related costs, profit and overhead. Where
certain unit prices are contained in the initial contract, no deviations are allowed in computing negotiated change order costs.
ITEMIZED COSTS MUST BE FULLY DOCUMENTED AND ATTACHED TO THIS FORINT.
ITEM DESCRIPTION AMOUNT
A. ORIGINAL CONTRACT VALUE: $6,462,589.00
B. AMOUNT OF THIS CHANGE ORDER: Council approval required tfover 325,000 ($38,554.40)
C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A):
I I I ,, a, m -
D. AMOUNT OF PREVIOUS CHANGE ORDERS: $0.00
E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D): $38,554.40
F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): 25% Maximum
G. NEW CONTRACT AMOUNT (A+E): $6,424.034.60
It is mutually agreed that the above dollar amount and the time extension, as applicable, as set forth in this Change Order constitutes
full compensation to the Contractor for all costs, expenses and damages to the Contractor, whether direct, consequential or otherwise,
in anyway incident to, or arising out of or resulting directly or indirectly; from the work performed or modified by the Contractor
under this Change Order.
PUR-045 (Rev 02/06)
PUR-045 (Rev 02106)
Resolution No. 2007-R0034
City of Lubbock Bid No. 06 -008 -BM
LUBBOCK PRESTON SMITH INTERNATIONAL AIRPORT
Airport Terminal Parking Lot Renovations
SUMMARY OF ITEMS INCLUDED IN CHANGE ORDER # Z)f
Item
Descriplxen of Item
ORIGINAL BID lNFCRMA1TCN
CONSTRUCTED
QUANTITIES
NET
DIFFERENCE
No.
unlit
Unit
nee
Amount
Qua
Amovtl
Q -6t,
Amai9.
_
a- Bid charmayli
4 Remow asting onnctele cut and gutter
2.503
1F
$ 12.00
$ 30,036.00
2,670.90
$ 32,05(1,80
167.90
$ 2,014.80
13 Suagrade prep (6' 0dckbass)
16 Cement -treated •Recytied' base u .-lch trihress ck
cose6
48,567
4.293
SY
BY
$ 2.25
$ 12.00
S 109,275.75
$ 51,516.00
48,307,44
4.170.20
S 108.691.74
S 50,042.40
-25956
-122.80
$ (584.01)
$ (1,473.60)
17 Cement ted •Recycled• base cause. 8irxh lhckness
42,230
SY
S 13.25
$ 559.547,50
41.022.20
$ 543,544,15
-1207.80
$ (16.,003.35)
18 Rot ma asphaltic concrete path[, Type D. 21nch thy kness
4,593
Ten
$ 90-00
$ 413,37000
4.461.50
$ 401,544.00
-131.40
$ (11„828.00)
20 Seal Coe'
21 7 1R -inch por0and cement concrete paling
46,523
4,245
SY
SY
$ 2.30
$ 81.25
$ 107.002.90
$ 344.906.25
45,192.00
4,197.45
S 163,941.60
$ 341,042.81
-1331.00
-47.55
$ (3,061.30)
$ (3,863.44)
24 TV BADA Ramps
2
Each
S 1.250-00
$ 2.500.00
3.00
S 3,750.00
1.00
$ 1,250.03
25 Tr C ADA Ramps
1
Earle
S 1.750-00
$ 1.75000
2:00
S 3,500.00
1.00
$ 1.756,90
29 44nch striping
65,647
LF
S 0.75
$ 49.235.25
68,861.00
$ 51,660,75
3234.90
52,425.50
31 BoWds
29
Each
$ 601.00
$ 17,400.00
34.60
$ 20,400.00
5.00
$ 3,000.00
33 Pre®st Concrete Barriers
206
LF
$ 95.00
$ 19,570A0
210.00
S 19,950.50
4.90
S 380.00
37 Rehab Ty 9 Sign
15
EA
$ 2,100.00
$ 31,500,00
17.00
S 35,700,00
2.00
$ 4,200.00
40 Rehab Ty 16 Sign
7
EA
$ 1,300.00
$ 9,100.00
8.90
$ 10,400.00
1.00
$ 1,300.00
42 Rehab Ty 18 Sign
5
EA
$ 300.00
$ 1.500.00
8:00
S 1,800..00
1.00
$ 300.00
46 New Ty 17 sign
1
EA
$ 700.00
$ 700.00
2.00
$ 1,400.00
1.00
5 700.00
59 Electrical connectwrl o1 new hllemally kt sign
73 Marblecrete patch (loll boothsl
8
3
EA
SY
$ 950.00
$ 600.00
$ 7,290.00
S 1.800,00
0.00
0.90$
$ -
-
A.00
X3.00
S (7.200.00)
S (1.800.00)
74 Tow Vehicles
125
1 EA
1$ 110.00
1 S 13750,00
190.001
$ _ 20,90600
65.00
S 7.150.00
Total Base Bid
1771 659.85
1,750,316.25
21.341,48
Alternate 2 Changes
Concrete Pavinq
42.230
SY I
X35.00
$1,478,050.00
41,022.20
51,435,7(7 00
.1207.86
1$42.273.00)
TOTAL ALTERNATES
..................................................
11, 1,478,35D,00
1 435777 00
11. 142.273.00)
Liquidated Damages
Phasef e
n
I+egs
5
3'E
5 38U(Nr c
5 sc.000.00
Plisse 16
13
S 13.006 u
, 5 15,000-00
�5
Phase Ic.
a
Days
$ 1.000.00
S
5
5 5.000+�
$ 5,00000
Ph. -
0
Days
$ 1,350.00
S
.,
$ 725 t,
"1°. = 47,25000
r'hase 3 Ithron3h I W1(t+06 -cars were atpwgd to part m k,r5 t vm cr+ t0+11+061
0
Dan
$ 650.00
$
4 5,85000
5,85000
t T.-4
0
Da
f
$
4
107100:00
5 187,100.09
Proposed items
Trues a)awsion (rxh gales 1 arid 2)
0
LS
$ 3.0110.00
S
1
5 3,000.00
1
S 3,1100A0
Wheal stops
0
LS
$ 2,458.00
$
1
S 2,458.00
1
S 2,458.00
Chain Unk Fence Reincyal
0
LF
$ 1650
$
450
S 7.425.00
450
$ 7,425,00
Ptpa Rail
0
LF
$ 25.00
$
1428
5 35,700.00
1428
S 35,700.00
Sl9irwe0 Replacemera
0
LS
S 60.000.00
$
1
5 80,000.00
1
$ 60,000.00
Stucco epi hod"
0
LS
$ 10.000.00
$
1
5 10.000.00
1
$ 10,000.00
Sursktute 1041 baniera for 30.11 bamers (appmAmele)
0
LF
$ 95.00
$
50
$ 4.750.00
50
$ 4,750.00
8 addltlonal kmP delectus
0
EA
$ 800.00
$
8
$ 4,800.00
8
$ 4;800 d0
3 addl(wr+al bollards
0
EA
$ 800.00
5
3
S 1,800.00
3
00
S 1,8.00
Repair damaged pipe rail (2 lvcol ,$)
0
EA
$ 556.00
S
2
5 1.100.00
2
$ 1,100.00
voulI I'd IHDJ rule M S980, 1 111
0
LS
$ 1.127 00
S
1
5 1 127.00
1
1127.00
TotalPro4ms._._.
$
$ 132160.00
172180.00
Total Changes to Original contract
g,�,yp