HomeMy WebLinkAboutResolution - 2007-R0014 - Change Order To Contract - Duininck Brothers Inc. - LSPIA, Taxiway Lima - 01/12/2007Resolution No. 2007-R0014 January 12, 2007 Item No. 5.25 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the City Council of the City of Lubbock hereby authorizes and directs the Mayor of the City of Lubbock to execute a Change Order No. 1 to Contract #05 -061 -BM entered into by and between the City of Lubbock and Duininck Brothers, Inc., for a cost reduction in the Taxiway Lima project at Preston Smith International Airport, which Change Order No. 1 and any associated documents, are attached hereto and made a part of this Resolution for all intents and purposes. Passed by the City Council this 12th day of Januar , 2007. DAVID A. MIL ER, MAY ATTEST: ROecca Gatza, City Secretary VED AS TO C,01�TENT: Loomis int City Manager/Transportation and Public Works APPROVED AS TO FORM: G n Vandiver, Attorney of ounsel DDres/DuininckBrosC01 Res December 20, 2006 CITY OF LUBBOCK CHANGE ORDER Change Order #: 1 Contractor: Duininck Brothers, Inc. Date: 11/21/2006 B[D/[TB #: 05 -061 -BM Contract #: 15982 1 Project Name: I Construction/Extension of Taxiway L Change Order within the scope of the contract means a Change Order that DOES NOT ALTER THE NATURE OF THE THING TO BE CONSTRUCTED AND THAT IS AN INTEGRAL PART OF THE PROJECT OBJECTIVE. After performance of a construction contract begins, Change Orders may be approved if necessary to 1) make changes in plans or specifications; or 2) decrease or increase the quantity of work to be performed or materials, equipment, or supplies to be furnished. This DOES NOT mean that a department can redefine the project. All work that alters the nature of the thing to be constructed or that is not an integral part of the project objective must be let out for Rublic bid by the Purchasing De2artment. Description of change (alteration, deviation, addition, or deletion) caused by conditions encountered during construction not covered by the specifications and drawings of the project (attach additional pages ifnecessary): Change order #1 includes final constructed quantity adjustments for all bid items, credit for removing the lighted X's, the SBC line relocate, additional concrete riprap, additional wire fabric, relocation of the FAA comm. line, sealing between HMAC and concrete pavement and resealing a joint on Twy V. Refer to the attachment for a detailed summary of each item. Change Orders must either be negotiated in the best interest of the City of Lubbock or put out for public bid by the Purchasing Department. Where the Change Order is negotiated, the Change Order must be fully documented and itemized as to costs, including material quantities, material costs, taxes, insurance, employee benefits, other related costs, profit and overhead. Where certain unit prices are contained in the initial contract, no deviations are allowed in computing negotiated change order costs. ITEMIZED COSTS MUST BE FULLY DOCUMENTED AND ATTACHED TO THIS FORM. ITEM DESCRIPTION AMOUNT A. ORIGINAL CONTRACT VALUE: 510,056,506.40 B. AMOUNT OF THIS CHANGE ORDER: Council approval required ifover &25,000 ($37,306.66) j C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A): 37°fo_ D. AMOUNT OF PREVIOUS CHANGE ORDERS: $0.00 E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D): ($37,306.66) F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): 25% Maximum G. NEW CONTRACT AMOUNT (A+E): $10,019,199.74 It is mutually agreed that the above dollar amount and the time extension, as applicable, as set forth in this Change Order constitutes full compensation to the Contractor for all costs, expenses and damages to the Contractor, whether direct, consequential or otherwise, in anyway incident to, or arising out of or resulting directly or indirectly; from the work performed or modified by the Contractor under this Change Order. tiA �7-off. i'FWV/°4''"'" _Zl�zlvs (l)TRACTOR Dae (2) PROJECT ARCHITECTIENGINEER Date Appro ed as to Cont t: Approved as to Form: \ J f 12_171o�' '�/ A/;�4.�' ��a (3) OWNE EP E T Tlvl Date (4O Date / ALL PROJECTS MANAGER Date(6)%RHASING AND CO RACT MANAGER Date A L OJ Change Orders over $25,000 require a Contract Cover Sheet and the following signatures. Luca 1/12/O7A TTST:alali1/12/07 (7) MAYOR Date TiY SECRETA.JY Date Council Date: January 12, 2007 Agenda ]tem #: 5.25 Resolution #: 2007—ROO14 PUR-045 (Rev 07106) Resolution No. 2007-R0014 City of Lubbock Bid No. OS -061 -BM FAA A.I.P. Project No. 3.48-0138-027-2004 LUBBOCK PRESTON SMITH INTERNATIONAL AIRPORT CONSTRUCTION/EXPANSION OF TAXIWAY LIMA SUMMARY OF ITEMS INCLUDED IN CHANGE ORDER #1 Item Descnpeon of Item ORIGINAL DID QUANTI RES ACTUAL CONSTRUCTED QUANT1T1E NET DIFFERENCE Qus Unit Unit Price Amount Quanti -Unm Unit Price Amount 2uan11 Amount No. BID ITEM ADJUSTMENTS 2 Item P-150, Remove and Dispose of 14"P-501, Pavement Section 5.443 LS $12.30 $66,948.90 0.00 LS $x2.30 $0.0' (5.443.001 1$66.948.901 3 Item P-150, Remove and Dispose of 12" 8501, 7" P-301 and 6'9-155 Pavement Section 19.370 BY $13.30 5257,621.00 28.47620 SY $13.30 $376,733-45 9.106.20 $121,11246 4 item P-150, Remove and Dispose of 7" to 8' P-501 and 6' P-301 Pavement Sac- 12,745 SY $9.00 3114,705.00 14,371.50 SY $9.00 $17113 62U 1,626.80 $14,641,20 5 Item P-150, Remove and Dispose of 4'P-401 and 9' Base Material Pavement Section 3,686 BY $4.40 $16214.0 3,93840 BY $4.40 $17,328.98 253.40 111,114.96 6 Ike. P-150, Remove and Dispose of 4" P401 and 8" P-209 Pavement $action 8 Item P-150, Remove and Dispose of 4" to 6' P401 and 12' P-209 Pavement Sec. 9 Item P-150, MITI 4" or P401 from Taxiway B In Preparation lot Reconstruction 13,150 26.050 2,755 SY SY SY $4-60 $5.70 $2.11C $80 490.00 $148,485.00 $7,989.50 13,364.30 25,752.70 2,943.80 BY SY SY $4.50 $5.70 $2.90 $61,475.78 $146,790.39 $8,537.02 214.30 (297.30) 188.80 $085.78 (51,694.61) $547.52 10 Item P-152, Excavation Including the Removal of 2-fL'Unsuitable Material" 11 Item P -i 52, Embankment 269,921 39,116 CY Cy $720 $1.30 $1.943,431.20 550,850.80 221,767.10 42,943.50 Cy Cy $7.20 S1.30 $1,596,723.12 $55.828.55 (48.153.90) 3;827.50 ($346.70598) $4.975-75 12 Item P-152, Grading and Subqrade Preparation Under 14" Concrete 47,520 BY $2.80 $133,056.00 45,594.86 SY $2.00 $126.505,51 (1,625.14) 154,550.-391 13 Item P-152, Grading and Subgrade Preparation Under 7' Concrete, 4' Bituminous Pavement and 2" Bduminous Pavement 14Item P-162. Grading and Topsoil Preparation In Unpaved Areas 43,213 623,340 SY SY $1.00 $0.70 $43,213.00 $436,336.00 21,077.60 449,450.40 SY SY $1.00 $0.70 $21,077.60 $314.61528 (22.135.401 (173.589.607 ($22.135401 1$121,722 721 15 Item P-155, Lime -Treated Subqrade. Excluding Lime, 6-mch thickness 65,375 BY $2.50 $163,437,50 78,095.96 SY $2.50 $195.239.90 12.720.96 531,60240 16 Item P-155, Lime Used in Lime -Treated Subqrade {5%1 1S Item P-304, Cement Treated Base Course, 8 -inch thickness 19 Item P304, Cement for Cement Treated Base Course (6%) 20 TxDOT Item 292, Asphalt Stabilized Base Course 21 Item P401, Bituminous Surface Course 860 47,520 2,950 6,460 2,440 Ton BY CWT Ton Ton $140.00 $11.40 58.00 $66.0 $64.00 $119,OOD,00 $541,728,00 522,800,00 $439,280.00 $204,960.00 90 8.30 51,715.38 20,931.60 5.483.42 3.197.51 Ton SY CWT Ton Ton S140.00 $11.40 $5.00 $68.00 $8490 $127.18290 5589.555.33 $167.452.80 $372.872.55 $2511.599.24 58.30 4.195.38 18.081.50 1975.581 757,61 $516200 547,627.33 $144,65250 ($66.407.441 $63,639.24 22 Item P401, Bituminous Surface Course (6% Bonus, calculated by multiplying total cost of Bid Item 21 by 6%) 1 LS $12,297.60 512,297.60 1.26 LS $12,297.60 $15.526.38 0.26 $3.220.78 24 Item P-501, Portland Cement Concrete Pavement, 14 -inch thwkness 47,520 BY $50.00 52,376,000.00 51.243.16 SY $50.00 $2.562,15890 3.723.16 $156,158.00 25 Item P-501, Portland Cement Concrate Pavement {6% Bonus, includas 7" and 14' pavenenl, calculated by summinq total cost for Bid Items 23 and 24, mus- by 6%) 26 Item P-602. Bituminous Prime Coat, Including herbicidal treatment 27 Item P-603,Bituminous Tack Coat 28 Item P-609, Bltuminous Seal Coat (bond breaker} 1 5,360 1,790 65,375 LS Galion Galion BY 5144,583.50 $3.50 $2.10 $1.70 5744.583.50 5x8,760.00 $3,769.00 $111,137.50 1.08 4.880.00 1,425.00 70.173.10 LS Gallon Gallon SY $144.,583.50 $3.50 $2.10 $1.70 $155,752.911 $17.01090 $2.992.50 $119.294.27 0-08 (500.001 1365.0} 4.798.10 511,16948 (51,750-001 ($766.50) $8.15&. i7 29 Item P-620, Obliterate Exlstlnq Runway and Taxiway Painting 5,413 SF 52.10 $11,367.30 3.451.00 SF $21D 57,247.10 11,962.0) 154,120.20) 30 Item P-620, Permanent Pavement Morklnq for Runway. Taxivviay and Service Rd. 25,900 SF $2.00 $51,8000 34,095.50 SF $z0$68.101.00 a, 195.50 $16,391.00 32 Item X701, 24- rich Reinforced Concrete Pipe (Installed In Iran&. including excavation and backfill) 35 Item 11405, Perforated Edge Drain System (including cleanoulsl 3,617.0 9,080 LF LF $70.00 $27.00 $253,190.00 $245,180.00 3,795.48 9101,70 LF LF $70.0 $27,00 $265.663.60 3245,745.90 176.48 21.70 $12,493.60 $585.90 39 Item 0-752, 48" PrecaslConcrete Manhole (including lid and frame) 4 Each $6,400.00 $21,60.00 5.0 Each $5,400.00 $27,4100.00 110 $5,400.00 40 Item T-901, Soil Preparation, Seeding and Fertilizing (Including sorgum or wheat cover crop) 41 itY-904, Soil Preparation. Plugging and Fertilizing 126.4 11,550.0 Acre Sy $560,0 $5,90 $70,764.00 $60,145.00 96.62 0.0 ACTe SY $560.00 $5,90 $54.107,20 s0.0 (29.76) 01.550.00) ($16;67680) ($65.145.00) 42 Item L-108, Underground Electrical Cable, 110 0AWG, 5KV. Cost shall include all include all cable, 2' conduit, grounding rods. frandhinq. backfilling antl pull boxes 12,900 LF $4,30 156.470.0 19,50.0 LF $4.30 $85.140.0 6,90.0 529,670-0 43 item L-108, Counterpoise Wire #8 In Direct Bury, Including Grounding Rads 44 Item L-110, 6 -way, 4 -inch Underground Electrical Dad., Installed by Bare 12,900 560 LF LF $0,90 $210,0 $11,610.0 $117,80.0 19,50.0 243.31 LF LF 50.90 $210.0 $17.820.0 $51.095.10 6.90-0 (316.69) 56,210-0 1556504901 45 Item L-110, 6 -way, 4 -inch Underground Electrical Duct Installed By Open Trench 250 LF $64.0 516,000.00 370.0 LF $64. 0 $23.580.0 120,0 $7,68090 48 Item L-125, High Intensity Runway Edge Licht, with Transformer and Base Can 4 Each $1,230.00 $4,920.0 2.0 Each S1,230.0 $2,460.0 12.01 152,460-01 50 Item L-125, Two Panel infernally Lighted Sign, including New Base Mounting and Concrete Slab 12 Each $3.80.0 $45,600.0 13.0 Each $3,80.0 $49.40.0 1.0 $3,50.0 52 item L-125, Three Panel Internally Lighted Sign, indudiog New Base MounBnq and Concrete Slab 5 Each 5 10.0 S25.500.00 9. Each 10.0 5 900 DO 4.0 $20.40000 TOTAL....................._....................................................$1132.402.80TOTAL..............................,......................._..................... 396045.83 39785,97 OTHER ITEMS Credit for lighted M's 0 LS $29,490.00 So (1) LS $29,490.00 S (29,490.001 (11 S 129,490.01 SBC Line Relocate 0 LS $le,562.31 SO 1 LS $16,562.31 $ 16,562.31 1 $ 16,562.31 Additional riprap under fence Additionalwire fabric Ditching antl duct bank for FAA cables 0 0 C LS LS LS $750.00 $1,870.0 $8,877.0 $0 $0 $0 1 1 1 LS LS LS $750:0 $1,870.00 $6,877.0 $ 760.00 $ 1,870.00 $ 8,877.0 1 1 1 S 750.0 S 1,870.0 S 8,877.0 Seal between HMAC and concrete 0 LF $3.0 $0 1;016 LF $3.0 S 3,048.00 1,016 S 3,048.0 Saw and reseal joint on Twy V 0 LS $1182.D0 $0 1 LS $562.DO 862.00 4 5 862;0 TOTALOTRERITFM5 ................... ....... ...... ...... ....... .. .0 TOTAL OTHER MEMS ................................... ...... _............ $2479.31 2479.31 TOTAL CHANGE ORDER et t5373116 66 ' Agenda Item #.## i Consider a resolution authorizing the Mayor to approve Change Order #1 to the construction agreement between Duininck Brothers, Inc. and the City of Lubbock for the Construction/Extension of Taxiway L Project. Item Summary The construction and extension of Taxiway Lima has been completed. The only outstanding item is for the contractor to come back in the spring of 2007 and re -seed some grass areas that failed to develop an acceptable stand of grass. The re -seeding will be at no additional cost to the project. This final change order reflects the project analysis of actual constructed quantities compared to the original bid quantities contained in the plans and specifications. This analysis has documented a credit to the project of $37,306.66 Fiscal Impact This change order documents a credit to the original contract of $37,306.66 and reduces the contract value by that amount in Project 253.90351, Staff Submitting/Recommendation James Loomis, Transportation and Public Works Assistant City Manager. Airport staff has reviewed these quotes and are recommending approval of this change order to reduce the original Taxiway Lima contract by the amount of $37,306,66 City Council Meeting