RESOLUTION
IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock an Amendment No. 2 to the
agreement between the City of Lubbock and Parkhill, Smith & Cooper for engineering
services on the Taxiway Lima Project, and all related documents. Said Amendment is
attached hereto and incorporated in this Resolution as if fully set forth herein and shall be
included in the minutes of the Council.
assed by the City Council this 12th
ATTEST:
City Secretary
VED AS TO CONTENT:
Assistant City Manager
and Public Works
APPROVED AS TO FORM:
day of January '2007.
DAVID A. LER, MAYOR
Linda L. Chamales, Senior Attorney
Office Practice Section
LC: LATTY/Linda/RES-PSC AMENDMENT No, 2 -Lima
December 8, 2006
..................
■.....rrr......■.■
MMEMO EMO —
Resolution No. 2007—R0013
Eli"
U101'.
January 12, 2007
� T _
Q. 1 ".: :..:
Item No. 5.24
■I 1. .. O.■
..., .-..
wage..............
...rrwaguuwauwa
November 28, 2006
Mr. James W. Loomis, A.A.E.
Director of Aviation
Lubbock Preston Smith International Airport
Route 3 Box 389
Lubbock, Texas 79403
Re: Amendment No. 2 to Agreement for:
Engineering Services for Construction/Extension of Taxiway Lima:
Additional Construction -Phase Testing
Dear Mr. Loomis:
During construction of the Taxiway L project, site conditions created a need for additional testing over and
above the original scope to ensure that all aspects of the project met the specifications. Specifically, varying in-
situ soil conditions increased the number of lime -treated subgrade proctors and related density tests. Another
major factor that led to increased testing was the reconstruction of the high speed portion of Taxiway J.
Originally it was planned to only remove and replace the concrete pavement. Once the pavement was removed
it was discovered that extensive moisture damage had developed. Therefore, this entire pavement section was
removed, full depth and reconstructed. Testing was required on the subgrade layers, lime treated subbase and
the cement treated base layers reconstructed during this process.
The original project testing budget of $159,500.00 was exceeded by $33,961.00. This amendment would
increase the contract amount of task 3 surveying and testing to a total of $193,461.00-
T wa
00.
Taxiway Lima Construction -Phase Testing
Task 3 - Surveying and Testing Services, (reimbursable expense). Increase the testing
limits from $159,500.00 to $193,461.00 for an increase of $33,961. ��
TOTAL $33,961.00
We propose to modify the agreement between the City of Lubbock and Parkhill, Smith & Cooper, Inc. dated
August 16, 2004. We proposed to provide the Task 3 services as a reimbursable expense as outlined under the
provisions of ATTACHMENT B — COMPENSATION. Additional compensation for Design Phase - Task 1,
Construction Phase - Task 2 services and Task 3, Surveying and Testing Services shall not exceed $33,961.00
without Owner's approval.
Parkhill, Smith & Cooper, Inc.
Engineers ■ Architects ■ Planners
4222 85th Street, Lubbock, Texas 79423
(806) 473-2240 FAX (806) 473-3504
Lubbock EI Paso Midland
Amarillo
Odessa
Mr. James W. Loomis Page 2 November 28, 2006
If the terms of this amendment are agreeable to you, please sign and return one copy of this letter to our office.
We thank you for your assistance in successfully completing this project. If you have any questions please call
either Mark Haberer or myself.
Sincerely, Accepted by:
PARKHILL, SMITH & COOPER INC. CITY OF LUBBOCK
By By—= -7'
y -`
, o T. I larnilton- PE David Miller
L/111rm Principal Mayor
JTHjbh Attest:
Enclosures
By
?0
becca za
IN TRIPLICATE City Secretary
Approved as to Content:
W. Loomis, A.A.E.
)r of Aviation
Approved as to Form:
Linda L. Chamales, Senior Attorney
Office Practice Section
x:ua %273o.DfC0RRESRLTR\cUnUw,,,,s dn=12D C
PARKHILL, SMITH & COOPER, INC. - LUBBOCK
PROJECT BUDGET SHEET
LOCATION CODE:
01
PROJECT NAME:
LIA Taxiway Lima
JOB NO.:
01273004
TASK:
3S&T
DATE:
11/28/06
FEE TYPE:
Other - SEE CONTRACT
PREPARED BY:
MDH
PRINCIPAL.
JTH
PROJ. MANAGER:
JTH
OVERHEAD RATE:
170.00%
PROFIT ON LABOR:
15.00%
PROFIT ON REIMB:
PROFIT ON DIRECTS:
15.00%
FEE:
$33,961
LABOR:.
OVERHEAD:
REIMB. CONSULTANTS:
$33,961
REIMB. EXPENSES:
DIRECT CONSULTANTS:
DIRECT EXPENSES:
ABOR BUDGETS:
CODE
DESCRIPTION HOURS COSTS
01
Firm Principal
#NIA
#NIA
03
Engineer
09
Engineering Technician
07
Engineer -in -Training
14
CADD Operator
18
Clerical
Page 1 of 2
EE ESTIMATING SHEET PROJECT:
EIMBURSABLES
LIA Taxiway Lima JOB NO..
01273004 TASK:
358.7
REIMBURSABLE CONSULTANT COSTS
SUBTOTAL
511 STRUCTURAL CO
512 MECHiELEC CONSULTANTS
513 ENV & CIVIL CONSULTANTS
514 LANDSCAPE CONSULTANTS
515 TESTING CONSULTANTS
Terra Testing, Inc.
$33.861
516 SURVEYING CONSULTANTS
517 INTERIOR DESIGN CONSULTANTS
518 OTHER CONSULTANTS
TOTAL REIMBURSABLE CONSULTANTS
REIMBURSABLE EXPENSES
521 TRAVEL/LODGING
MOTEL DAYS @
AIR TRAVEL AIR FARE ®
PARKING DAYS 4
CAR RENTAL DAYS ®
MILEAGE MILES
MEN 0
MEN ®
/DAY
/DAY
$0.345
/MANDAY -
MAN =
=
=
TRIPS -
SUBTOTAL
522 REPRODUCTIONS
BLUELINE PRINTS
SEPIA PRINTS
PRINTING:
ORIGINAL SET-UP COST
COST PER SHEET
BINDING COST
XEROX
SHTS @ $2.55 0 8 SETS
SHTS 0 $8.51 @ SETS =
ORIGINALS Q $0.15 /Ow _
SETS 0 $0,06 ISHT 0 250 SHEETS =
SETS 0 $2.00 ISET =
SHTS 4 $0.08 7SHT =
SUBTOTAL
523 MODEURENDERINGS/PHOTOS
Shots a
iSi
524 TELEPHONE Calls Q
$2.00 /Call
525 MEALS DAYS 0
MEN ®
WANDAY
526 FIELD SUPPLIES
528 POSTAGE Mailings a
$2.00 Wailing
529 PUBLICATIONS 8 SUBSCRIPTIONS
530 MISC REIMBURSABLE _EXP_ _
531 FAX Pages a
$1.00
532 TEMPORARY PERSONNEL
533 DRAFTING SUPPLIES
534 OFFICE SUPPLIES
535 CARD HOURS 4
$6.00 iHOUR
536 FIELD EQUIP RENTAL
546SOFTWARE
TOTAL REIMBURSABLE EXPENSES
Page 2 of 2
Agenda Item #.##
Consider a resolution authorizing the Mayor to approve Amendment 92 to the
agreement between the City of Lubbock and Parkhill Smith & Cooper for the
Taxiway L projcct.
Item Summary
This amendment modifies the original agreement with Parkhill, Smith and Cooper
for engineering services for construction/extension of taxiway Lima at the Lubbock
Preston Smith international Airport.
During construction of the -taxiway Lima project, site conditions created a need for
additional soil testing over and above the original scope to ensure that all aspects
of the project met FAA specifications.
In addition, the reconstruction of taxiway Juliet east of runway 17R/35L uncovered
extensive soil moisture damage in the pavement subgrade requiring full depth
reconstruction of this portion of pavement. Additional testing was required on the
subgrade layers.
Fiscal Impact
The original project testing budget of $159,500 was exceeded by $33,961. This
amendment will increase the surveying and testing services for this project to
$193,461. The increase in engineering fees will be offset by a change order to the
construction contract reducing the contract by $37,306.66 for a quantities
adjustment. Project 253.94351.
Staff Submitting/Recommendation
James Loomis, Transportation and Public Works Assistant City Manager.
The Airport Board and Airport staff are recommending approval of Amendment #2
for the increase in construction phase testing services from $159,500 to $193,461.
City Council Meeting