HomeMy WebLinkAboutResolution - 2007-R0012 - Amendment To Agreement - Parkhill, Smith, & Cooper - Entrance Road Project - 01/12/2007Resolution No. 2007-R0012
January 12, 2007
item No. 5_23
RESOLUTION
IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock an Amendment No. 9 to the
agreement between the City of Lubbock and Parkhill, Smith & Cooper for engineering
services on the entrance road repaving and signage project, and all related documents.
Said Amendment is attached hereto and incorporated in this Resolution as if fully set
forth herein and shall be included in the minutes of the Council.
Passed by the City Council this 12th day of January , 2007.
i./1/ .. /
TTEST:
City Secretary
VED AS TO
Loomis, Assistant City Manager
sortation and Public Works
AS TO FORM:
L L. Chamales, Senior Attorney
e Practice Section
UATfY/Linda/RES-PSC AMENDMENT No.9-Repaving & signage
ember 8, 2006
Mr. James W. Loomis, A.A.E.
Director of Aviation
Lubbock Preston Smith International Airport
Route 3 Box 389
Lubbock, Texas 79403
Resolution No. 2007-R0012
January 12, 2007
Item No. 5.23
November 28, 2006
Re: Amendment No. 9 to Agreement for AIE Services for Airport Improvement Projects:
■ Entrance Road Repaving and Informational Signage Improvements
Dear Mr, Loomis:
We have met with your staff, reviewed the project and prepared an Engineers Opinion of Probable Cost (EOPC)
to design the improvements to the LBB Entrance Road and related informational signage as illustrated in the
enclosed drawing. Our understanding of the scope items and a fee proposal for Task 1 (design), Task 2
(construction) and Task 3 (surveymg/testing) are detailed in the Project Budget Sheets which are attached to this
amendment.
Entrance Road Repaving and Informational Si aIm rovements:
Task 1 - Fee for Professional Services (Study and Report, Preliminary Design,
Final Design and Bidding/Negotiation, lump sum). $127,200.00
Task 2 - Construction Phase Services (which includes RPR and construction
related Engineering Services, lump sum). $112,100.00
Task 3 - Surveying and Testing Services, (reimbursable expense). $49,300.00
TOTAL $288,600.00
We propose to modify the agreement between the City of Lubbock and Parkhill, Smith & Cooper, Inc. dated
January 13, 2005, and to provide the task 1 and task 2 services on a lump sum basis under the provisions of the
contract, E3G-IIBTT B — PAYMENTS TO THE ENGINEER, LUMP SUM METHOD, Paragraph B4.0I.A.1.
We propose to provide the task 3 services as a reimbursable expense as outlined under the provisions of
EXHIBIT B — PAYMENTS TO THE ENGINEER, LUMP SUM METHOD, Paragraph B4.02.A.2,
reimbursable expenses. Compensation for Design Phase - Task 1, Construction Phase - Task 2 services and
Task 3, Surveying and Testing Services shall not exceed $288,600.00 without Owner's approval.
Parkhill, Smith & Cooper, Inc.
Engineers ■ Architects ■ Planners
4222 85th Street, Lubbock, Texas 79423
(806) 473-2200 FAX (806) 473-3500
Lubbock EI Paso Midland
Amarillo
Odessa
Mr. James W. Loomis Page 2 November 28, 2006
If the terms of this amendment are agreeable to you, please sign and return one copy of this letter to our office.
We will take receipt of this signed letter as our notice to proceed with these services. We look forward to
working with you in completing this project. If you have any questions please call either Mark Haberer or
myself.
Sincerely,
Accepted by:
PARKHILL, SMITH & COOPER, INC. CITY OF LUBBOCK
f
By
�43ohn T. Hamilton, PE David er
Firm Principal Mayor
JTI Ujbh
Enclosures
IN TRIPLICATE
XA19WODI5.*C1VIL11`1` UA%En==Roadand SignageTunu ctwm dmem9.DOC
Attest:
Rcbccca za
/e,
City Secretary
Approv as :x7
ntent:
arrles W. Loomis, A.A.E
Director of Aviation
Approved as to Form:
Linda L. Chamales, Senior Attorney
Office Practice Section
Resolution No. 2007-R0012
LUBBOCK PRESTON SMITH INTERNATIONAL AIRPORT
2006 PFC APPLICATION PROJECT INFORIV[ATION
PROJECT:
Item 6-8, Entrance Road Repaving and Informational Signage Improvements
PROJECT DESCRIPTION:
The portion of Martin Luther King Boulevard north of Regis Street is commonly referred to
as Terminal Drive. This roadway, which provides exclusive access to the airport, is in need of
rehabilitation and repair. Also, the way finding signs, located on airport property, that direct the
airport users and the flying public around the perimeter of the airport have become faded from
exposure to the sun. This project will rehabilitate both the airport Terminal Building entrance road
and the signage.
JUSTIFICATION:
The airport Terminal Building entrance road is steadily deteriorating from the elements and
in some cases pot -holes have started to form. The informational signs located on airport property are
several years old have faded and are becoming difficult to read. Some signs are warn from the
effects of the wind and require maintenance. This project will enhance the safety of the airport by
providing clear legible signage and a smooth, safe driving surface for persons using the airport.
OBJECTIVE:
The modifications to the existing entrance road and way finding signage included under this
project will provide a clear, understandable entrance to the airport and a repaved entrance road.
Completion of this project will enhance the safety of the airport.
ESTIMATED PROJECT IMPLEMENTATION DATE:
June 2007
ESTIMATED PROJECT COMPLETION DATE:
June 200$
TOTAL ESTIMATED PROJECT COST:
$2,125,000
TOTAL ESTIMATED PFC AMOUNT:
$2,125,000
EXISTING AND/OR ANTICIPATED AIP GRANTS:
None
13
1/06/06
City of Lubbock, Texas
:s93egu- ,i. Lubbock Preston Smith International Airport
Entrance Road Repaving and Informational Signage
Improvements
11/2712006
ENGINEER'S OPINION OF PROBABLE COSTS
Item Description
Quantity
Unit
Unit Price
Amount
Prolect Summary
Reconstruct Entrance Road
Rehabilitate Existing Signs
Mobilization
Item P-140, Contractor Mobilization
1
LS
$79,700.00
$79,700
Entrance Road Paving, Base, Subgrade. Excavation and Grading
Traffic Control and Barricading
4
Months
$15,000.00
$60,000
Bomag existing HMAC & Base to form "Recycled" base course, 10 -inch thickness
51,900
SY
$9.50
$493,050
Hot mix asphaltic concrete pavement, Type D, 2.5 -inch thickness
7,300
Ton
$85.00
$620,500
Bituminous prime coat (0.3 gal1SY)
15,600
Gallon
$4.00
$62,400
Seal Coat
50,400
SY
$2.00
$100,800
Remove Excess Base Coarse
2,900
CY
$3.00
$8,700
Remove and Replace Damaged Curb and Gutter
500
LF
$20.00
$10,000
Valley Gutter
150
LF
$45.00
$6,750
4" Stn in
1
LS
$50,000.00
$50,000
ubtotal
$1,412.200
Other Items
Rehab Type 2 Sign "District ID Monument"
2
Each
$14,000.00
$28,000
Rehab Type 3 Sign "District Tenant Monument'
6
Each
$12,000.00
$72,000
Rehab Type 5 Sign 'Parking Directional Sign"
5
Each
$3,000.00
$15,000
Rehab Type 6 Sign "3 -Panel Overhead Sign"
3
Each
$9,000.00
$27,000
Rehab Type 7 Sign "1 -Panel Overhead Sign"
2
Each
$6,000.00
$12,000
Rehab Type 10 Sign "Parking Rate Sign"
3
Each
$3,000.00
$9,000
Rehab Type 11 Sign "Accessible Parking Sign"
1
Each
$750.00
$750
Rehab Type 12 Sign "Curbside Canopy Sign"
4
Each
$1,650.00
$6,600
Rehab Type 14 Sign "Curbside Regulatory Sign"
12
Each
$700.00
$8,400
Rehab Type 16 Sign "Parking Information Sign"
1
Each
$750.00
$750
Rehab jy2e 21 Sign "Parking Shuttle Sign"
2
Each
$750.00
$1,500
Subtotal
41
$181,000
Construction Contingency on Base Bid 10%
M3,500
SUB -TOTAL BASE BID
$1,836,400
Professional Services
Basic Engineering Services (Study and Report, Preliminary Design, Final Design and BiddinglNegobation)
$127,200
Construction Phase Services (Includes RPR and Construction related Engr. Services)
$112,100
Surveying and Testing Services
$49300
Subtotal Professional Services
0881,00
TOTAL ENGINEERS OPINION OF PROBABLE PROJECT COSTS
$2,125,000
x:5199850015.985CIVILUTHSLIA�Entma Road and SlgnageEnt load EQPC 11-28-06.x1s
;",
Resolution No. 2007-ROO12
WESTPORT DISTRICT EASTPORT DISTRICT
■..■i■1111. ■.1111■
;;;;;;,,; PROJECT NAME: ENTRANCE ROAD & SIGN IMP SHEET: 1 OF 2
.. i`■■■■"i■■■■■■■ PROJECT ADDRESS: LUBBOCK PRESTON SMITH ISSUE DATE:
i..........■...i.■
;; ;; W. ;; ; ;; ;; INTERNATIONAL AIRPORT REVISIONS:
.I .1 ■. \.■\
■1 - ■\ ■ Ilii■
■1 __/ice\. ■ lig\■
ll ■.i■ WI � 1- 1■
■1 ■■■■ ■ �■ PSC PROJECT #: .
. 1111. ... ...
M i
Y,- 16 SIGON,
TY 5 SIGN
TY 7 SIGN AL
TY 14 SIGN
TY 12 SIGN
TY 14 SIG
TY 12 SIGN 7
TY 14 SIGN
TY 21 SIGN
.TY 12 SIGN
14 SIGN
TY 21, SIGN
277 TY 14
TY 12 `.
TY 6 SIG
TY 11 7,116:
onsamE
111111111111mr-TY 14 SIG, - - U—m—
TY 5
A I-- TY F)
TY 5 SIGN TY 6 1
2007—ROO12
IF I
LEGEND OF PROPOSED IMPROVEMENTS #
[7] ENTRANCE ROAD REHAB I
W caste SIGN
PROJECT NAME: ENTRANCE ROAD AND SIGNAGE IMPROVEMETINS
SHEET: 2 OF 2
PROJECT ADDRESS LUBBOCK PRESTON SMITH INTERNATIONAL AIRPORT
ISSUE DATE:
REVISIONS:
V.•....,••
o::: lall .1
PSC PROJECT #:
Drawing File: X-.\1998\0015.98\CIVIL\JTH\LIA\Fntrcnce Road and S1gncge\Fntrcincc Rocid.dwg (Rmulter) 1/28/2006 11:43:16
PARKHILL, SMITH & COOPER, INC.
- LUBBOCK
PROJECT BUDGET SHEET
LOCATION CODE:
01
PROJECT NAME:
LBB Entr Road Impr
!
JOB NO.:
TASK:
1DSN
DATE:
11/28/06
FEE TYPE:
Lump Sum
PREPARED BY:
MDH
PRINCIPAL:
JTH
PROJ. MANAGER:
JTH
OVERHEAD RATE:
PROFIT ON LABOR:
PROFIT ON REIMB:
15.00%
PROFIT ON DIRECTS:
15.00%
FEE:
$127
170. ZV0
LABOR:
$118,387
OVERHEAD:
REIMS. CONSULTANTS:
REIMB. EXPENSES:
DIRECT CONSULTANTS:
DIRECT EXPENSES:
$7,699
LABOR BUDGETS:
CODE
DESCRIPTION
HOURS
COSTS
01
Firm Principal
107
$13,482
#N/A
#N/A
03
Engineer
377
$36,192
09
Engineering Technician
200
$16,200
07
Engineer -in -Training
459
$33,507
14
CADD Operator
298
$18,774
18
Clerical
4
$232
Page 1 of 3
FEE ESTIMATING SHEET PROJECT:
Lab Enb Road imp
JOB NO.:
TASK: asN
SALARY
CATEGORY OF PERSONNEL
RATE
PER HOUR
FP
ENG
ENG TECH
CIT
(-,ADD OPT CLERICAL
TASK
01 9N1A
03
09
07
14 18
Tris
$126.00
$96.00
$81.00
$73.00
$63.00 $5800
TOTAL
ST F- LDY_ AND BEPORT PHASE
Predesign Conference
1
3
3
6
Site Visits, Gather Data
4
16
16
32
Develop/analyze project scope
1
16
16
32
Coordinate geotechnical investigation
24
8
32
Coordinate survey
8
8
16
PRF1 IMINARY DESIGN PHASE
Reline scope, coord. with Owner
1
8
8
16
Meetings and conferences
2
8
8
16
Analyze Drainage
8
24
16
48
Analyze Grading
8
24
16
48
Analyze existing electrical and sign lighting
24
18
42
Analyze signs for structural repairs
24
24
48
Explore signage rehab options
18
40
58
Preliminary design documents
preliminary drawings (25 sheets)
50
100
75
100
325
outline specifications
24
32
4
60
review wi Owner
4
4
8
Opinion of costs
4
16
20
FINAL DESIGN PHASE
Final drawings
50
60
75
100
285
Final specifications
24
32
56
Dev and coord phasing plan with Owner
1
4
16
16
36
Assist/consult with govt authorities
1
8
8
16
Final opinion of costs
4
8
12
Review with Owner
1
3
3
6
Revisions
8
40
16
50
114
Misc meetings and conferences
2
4
4
8
FAA Form 7460-1
1
3
4
BIDDING PHIAS
Assist in advertisement
4
4
Plan distribution - issue/record/deposits
8
8
Conduct Pre -Bid Conference, minutes
1
3
8
11
Miscellaneous addenda
4
8
12
Attend Bid Opening
1
2
2
4
Evaluate bids, bid tabulation, award
8
$
16
Check out Contr, subcontractors, etc.
8
8
16
Review substitute inaterials/equipment
2
8
10
MISCELLANEOUS ITEMS
QC/PM (4 mos. @ 2 hrs.lmo.)
6
8
Prepare stints. (5 d 1 h(.)
5
S
Monthly Progress Reports (0.5 hr. each)
3
3
Coordination with Owner
4
4
BUDGET SUBTOTALS: HOUR5/ Trips -16
107
377
200
459
298 4
1445
SALARY
$13,482
$36,192
$16,200
$33,507
$18,774 5232 I
$118.387
Paae 2 of 3
EE ESTIMATING SHEET PROJECT:
IRECTS
LBB Enlr Road Impr JOB NO:
TASK:
1 DSN
DIRECT CONSULTANT COSTS
SUBTOTAL
611 STRUCTURAL CONSULTANTS
612 MECHiELEC CONSULTANTS
613 ENV & CIVIL CONSULTANTS
614 LANDSCAPE CONSULTANTS
615 TESTING CONSULTANTS
616 SURVEYING CONSULTANTS
617 INTERIOR DESIGN CONSULTANTS
618 OTHER CONSULTANTS
TOTAL DIRECT CONSULTANTS
0
DIRECT EXPENSES
6211 TRAVEULODGING
MOTEL DAYS Q
AIR TRAVEL AIR FARE ®
PARKING DAYS 0
CAR RENTAL DAYS 0
MILEAGE 35 MILES 0
MEN ® 1MANDAY =
MEN 0 /MAN =
/DAY =
/DAY =
$0.445 ® 16 TRIPS -
SUBTOTAL
$249.20
$249
622 REPRODUCTIONS
BLUELINE PRINTS 25 SHTS 0 $2.55 a 30 SETS =
SEPIAPRINTS SHTS Q $8.51 4 SETS =
PRINTING:
ORIGINAL SET-UP COST 25 ORIGINALS O $0.15 LORI. _
COST PER SHEET 30 SETS ® $0.0B /SHT ® 25 SHEETS =
BINDING COST 30 SETS 0 $2.00 /SET =
XEROX 1000 SHTS ® $0.08 /SHT =
SUBTOTAL
$1,912.50
$3.76
$60.00
$60.00
$80.00
$2,116
623 MODEURENDERINGSIPHOTOS
Shm 0
/Shot
$200
624 TELEPHONE 250 Calls ®
$3,00 /Gail
$750
625 MEALS DAYS 0
MEN Q
/MANDAY
626 FIELD SUPPLIES
628 POSTAGE 40 Mailings
$5.00 /Mailing
$200
629 PUBLICATIONS & SUBSCRIPTIONS
630 MISC DIRECT EXP
631 FAX 200 Pages 0
$1.00
$200_
832 TEMPORARY PERSONNEL
633 DRAFTING SUPPLIES
_
634 OFFICE SUPPLIES
535 CADD 498 HOURS 0
$8.00 /HOUR
$3,984
836FIELD EQUIP RENTAL
646 SOFTWARE
----
TOTAL DIRECT EXPENSES
$77699
Page 3of3
PARKHILL, SMITH & COOPER, INC. -
LUBBOCK
PROJECT BUDGET SHEET
LOCATION CODE:
01
PROJECT NAME:
LBB Entr Road Impr
JOB NO.:
TASK:
2CST
DATE:
11/28/06
FEE TYPE:
Lump Sum
PREPARED BY:
MDH
PRINCIPAL:
JTH
PROD. MANAGER:
JTH
OVERHEAD RATE:
PROFIT ON LABOR:
PROFIT ON REIMB:
15.00%
PROFIT ON DIRECTS:
15.00%
FEE:
$11 64L- # 117- 1100
LABOR:
$105,873
OVERHEAD:
REIMB. CONSULTANTS:
REIMB. EXPENSES:
DIRECT CONSULTANTS:
DIRECT EXPENSES:
$5,434
LABOR BUDGETS:
CODE
DESCRIPTION
HOURS
COSTS
01
Firm Principal
70
$8,820
#N/A
#N/A
03
Engineer
1914
$18,624
11
Resident Project Representati
809
$65,529
07
Engineer -in -Training
156
$11,388
14
CADD Operator
24
$1,512
18
Clerical
Page 1 of 3
FEE ESTIMATING SHEET PROJECT.
LBB Entr Road lmpr
JOB NO.:
TASK:
2CST
SALARY
CATEGORY OF PERSONNEL
RATE PER HOUR
FP
ENG
RPR
EIT
CADD OPT
CLERICAL
TASK
01 #N/A
03
11
07
14
18
Tris
$126.00
$96.00
$81.00
$73.00
$63.00
$58.00
TOTAL
RPR (4-month construction ern iodl
Preconstruction Conference
1
4
4
90 Days at 8 Hrsf Day
90
720
720
10 Pre/Post Days at 4.5 Hrs/ Day
45
45
Conduct Preconstr Conference, minutes
1
3
8
11
Coord baseline surveys, benchmark
2
2
4
Site visits, notes, progress meetings
24
16
32
32
80
Coord. with RPR, Contractor, Owner
24
16
80
32
128
Routine change orders
8
8
16
Review submittals
8
18
26
Pay estimates including final
8
16
24
Certifications, guarantees & warranties
8
8
16
Final inspection and noteslfindings
4
16
8
28
MISCE_t LANEQUS ITEMS
QC/PM (4 mos. 0 2 hrs./mo.)
8
8
Prepare stints. (5 ® 1 hr.)
5
5
Monthly Progress Reports (0.5 hr. each)
2
2
Coordination with Owner
8
8
CLOSEOUT PHASE
Record drawings
8
16
24
48
Warranty insp.
4
4
8
Addnl. compliance insps.
4
4
8
Final test and QC rpt.
8
40
16
64
BUDGET SUBTOTALS: HOURS/ Trips
140
70
194
809
156
24
125
SALARY
$8,820
$18,624
$65,529
$11,388
$1,512
5105,873
Page 2 of 3
EE ESTIMATING SHEET PROJECT:
IRECTS
LBB Entr Road Impr JOB NO:
TASK:
2CST
DIRECT CONSULTANT COSTS
SUBTOTAL
611 STRUCTURAL CONSULTANTS
612 MECHfELEC CONSULTANTS
613 ENV & CIVIL CONSULTANTS
614 LANDSCAPE CONSULTANTS
615 TESTING CONSULTANTS
616 SURVEYING CONSULTANTS
617 INTERIOR DESIGN CONSULTANTS
618 OTHER CONSULTANTS
TOTAL DIRECT CONSULTANTS
DIRECT EXPENSES
621 TRAVEL1LODGWG
MOTEL DAYS 0
AIR TRAVEL AIR FARE ®
PARKING DAYS 0
CAR RENTAL DAYS ®
MILEAGE 55 MILES 0
MEN 0 1MANDAY =
MEN 0 /MAN =
/DAY =
/DAY =
$71.445 a 140 TRIPS = $3.426.50
SUBTOTAL
$3.427
622 REPRODUCTIONS
BLUELINE PRINTS
SEPIA PRINTS
PRINTING:
ORIGINAL SETUP COST
COST PER SHEET
BINDING COST
XEROX 500
SHTS 0 $2.55 a 5 SETS =
SHTS @ $8.51 61 SETS =
ORIGINALS tD $0.15 /ORI. _
SETS 0 $0,06 tSHT ® 225 SHEETS =
SETS 0 $2.00 ISET =
SHTS 0 $0.08 /SHT = $40,00
SUBTOTAL
$40
623 MODELIRENDERINGS/PHOTOS
Shots @
/Shot
$200
624 TELEPHONE 250 CWs @ _ _
$3.00 /Call
$750
625 MEALS DAYS 0
MEN 0
/MANDAY
626 FIELD SUPPLIES
$400
628 POSTAGE 15 Mailings 0
$5.00 /Mailing
$75
629 PUBLICATIONS & SUBSCRIPTIONS
630 MISC DIRECT EXP
631 FAX 350 Pages @ _
$1.00
_ $350
632 TEMPORARY PERSONNEL
633 DRAFTING SUPPLIES
634 OFFICE SUPPLIES
635 CADD 24 HOURS 0
$8.00 /HOUR _ _
$192
636 FIELD EQUIP RENTAL
848 SOFTWARE_
TOTAL DIRECT EXPENSES
$5,434
Page 3 of 3
PARKHILL, SMITH & COOPER, INC. - LUBBOCK
PROJECT BUDGET SHEET
LOCATION CODE:
01
PROJECT NAME:
LBB Entr Road Impr
JOB NO.:
^�
TASK:
3S&T
DATE:
11/28/06
FEE TYPE:
Lump Sum
PREPARED BY:
MDH
PRINCIPAL:
JTH
PROD. MANAGER:
JTH
OVERHEAD RATE:
PROFIT ON LABOR:
PROFIT ON REIMB:
15.00%
PROFIT ON DIRECTS:
15.00%
FEE:
$49
LABOR:
OVERHEAD:
REIMB. CONSULTANTS:
$42,850
REIMB. EXPENSES:
DIRECT CONSULTANTS:
DIRECT EXPENSES:
LABOR BUDGETS:
CODE
DESCRIPTION HOURS COSTS
01
Firm Principal
#N/A
#N/A
03
Engineer
09
Engineering Technician
07
Engineer -in -Training
14
CADD Operator
18
Clerical
Page 1 of 2
EE ESTIMATING SHEET PROJECT:
EIMBURSABLES
LBB Entr Road Impr JOB NO.:
TASK:
3S&T
REIMBURSABLE CONSULTANT COSTS
SUBTOTAL
511 STRUCTURAL CONSULTANTS
512 MECH/ELEC CONSULTANTS
513 £NV & CIVIL CONSULTANTS
514 LANDSCAPE CONSULTANTS
515 TESTING CONSULTANTS
PaveTex Engineenng & Testing. Inc.
$29,800
518 SURVEYING CONSULTANTS
Smith Surve n
$13,250
517 INTERIOR DESIGN CONSULTANTS _
518 OTHER CONSULTANTS
TOTAL. REIMBURSABLE CONSULTANTS
$42,850
REIMBURSABLE EXPENSES
521 TRAVEULODGING
MOTEL DAYS 0
AIR TRAVEL AIR FARE 0
PARKING DAYS 0
CAR RENTAL DAYS 0
MILEAGE MILES 0
MEN O
MEN 0
/DAY
/DAY
$0.400 0
IMANDAY =
/MAN =
=
TRIPS =
SUBTOTAL
522 REPRODUCTIONS
BLUELINE PRINTS
SEPIA PRINTS
PRINTING:
ORIGINAL SETUP COST
COST PER SHEET
BINDING COST
XEROX
SHTS 0 $2.55 0 B SETS
SHTS 0 $8.51 0 SETS =
ORIGINALS 0 $0.15 /ORI.
SETS 0 $0.08 /SHT 0 250 SHEETS=
SETS 0 $2.00 /SET =
SHTS 0 $0.08 rSHT =
SUBTOTAL
523 MODEURENDERINGS/PHOTOS
Shots 0
/Shot
524 TELEPHONE Calls 0
$2.00 ICall
525 MEALS DAYS 0
MEN 0
/MANDAY
528 FIELD SUPPLBES
528 POSTAGE Mwsl ngs 0
$2.00 /Mailing
529 PUBLICATIONS & SUBSCRIPTIONS
530 MISC REIMBURSABLE EXP
531 FAX Pages 0
$1.00
532 TEMPORARY PERSONNEL
533 DRAFTING SUPPLIES
534 OFFICE SUPPLIES
535 CARO HOURS 0
$8.00 /HOUR
538 FIELD EQUIP RENTAL
548 SOFTWARE
TOTAL REIMBURSABLE EXPENSES
Page 2 of 2
Agenda Item #. ##
Consider a resolution authorizing the Mayor to approve Amendment #9 to the
agreement between the City of Lubbock and Parkhill Smith & Cooper for the
Entrance Road Repaving and Signage Improvement project.
Item Summary
This amendment (No. 9) modifies the original engineering agreement with Parkhill,
Smith and Cooper (PSC) and the Lubbock Preston Smith International Airport to
add engineering design and construction phase services for the rehabilitation of
Martin Luther King Boulevard (aka Terminal Drive) north of Regis Street and the
replacement of informational signage that directs airport users around the perimeter
of the airport.
The airport entrance road is steadily deteriorating from the elements and is in need
of rehabilitation and repair. The informational signs located on airport property are
several years old, faded, and are difficult to read. This project will enhance the
safety of the airport by providing clear, legible signage and a smooth, safe driving
surface for airport users.
Fiscal Impact
The engineering design and construction phase services associated with this
project will be funded by passenger facility charges (PFC). The fee for these
services is $288,600 and will be paid from project 251.91109.
Staff Submitting/Recommendation
James Loomis, Transportation and Public Works Assistant City Manager.
The Airport Board and Airport Staff are recommending approval of Amendment No.
9 to the agreement with PSC in the amount of $288,600.