Loading...
HomeMy WebLinkAboutResolution - 2007-R0011 - Amendment To Agreement - Parkhill, Smith, & Cooper - Airfield Pavement Analysis - 01/12/2007Resolution No. 2007-RO011 January 12, 2007 Item No. 5.22 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock an Amendment No. 8 to the agreement between the City of Lubbock and Parkhill, Smith & Cooper for engineering services on the Airfield Pavement Analysis Project, and all related documents. Said Amendment is attached hereto and incorporated in this Resolution as if fully set forth herein and shall be included in the minutes of the Council. Passed by the City Council this 12th day of January , 2007. 11 r• 1r r •R A'T'TEST: Rebecca Ga za, C Secretary ry ED AS TO7 :ycJ_ d if . Loomis, Assistant City Manager sortation and Public Works APPROVED AS TO FORM: Linda L. Chamales, Senior Attorney Office Practice Section LC: L/ATTY/Linda/RES-PSC AMENDMENT No.8-Pavement analysis December 8, 2006 Mr. James W. Loomis, A.A.E. Director of Aviation Lubbock Preston Smith International Airport Route 3 Box 389 Resolution No. 2007-80011 January 12, 2007 Item No. 5.22 November 29, 2006 Lubbock, Texas 79403 Re: Amendment No. 8 to Agreement for AIE Services for Airport Improvement Projects: Airfield Pavement Analysis Dear Mr. Loomis: We have met with your staff, reviewed the project and have prepared the following fee to perform the airfield pavement analysis. Our understanding of the scope items and a fee proposal for this project is detailed in the Project Budget Sheets which are attached to this amendment. Airfield Pavement Analysis', Task 1 - Fee for Professional Services (Study and Report, Geotechnical and Site Investigation, lump sum). $91,000.00 We propose to modify the agreement between the City of Lubbock and Parkhill, Smith & Cooper, Inc. dated January 13, 2005, and to provide the task 1 services on a lump sum basis under the provisions of the contract, EXHIBIT B — PAYMENTS TO THE ENGINEER, LUMP SUM METHOD, Paragraph B4.01.A. L These services shall not exceed $91,000.00 without Owner's approval. If the terms of this amendment are agreeable to you, please sign and return one copy of this letter to our office. We will take receipt of this signed letter as our notice to proceed with these services. We look forward to working with you in completing this project. If you have any questions please call either Mark Haberer or myself. Parkhill, Smith & Cooper, Inc. Engineers ■ Architects ■ Planners 4222 85th Street, Lubbock, Texas 79423 (806) 473-2200 FAX (806) 473-3500 Lubbock E3 Paso Midland Amarillo Odessa Mr. James W. Loomis Page 2 November 29, 2006 Sincerely, Accepted by: PARKI LL, SMITH & COOPER, INC. CITY OF LUBBOCK By hn T. Hamilton, PE David Mill Firm Principal Mayor JTHfjbh Attest: Enclosures By1 ,.� IN TRIPLICATE becca City Secretary Approv to Content: James W. Loomis, A E. Director of Aviation Approved as to Form: By Com.-- Linda. L. Chamales, Senior Attorney Office Practice Section X:11996OOI5.9&CIVIL\JTHILIA1PavementArdysislCowwtam nkwnt8.DOC Resolution No. 2007-R00: LUBBOCK PRESTON SMITH INTERNATIONAL AIRPORT 2006 PITC APPLICATION PROJECT INFORMATION PROJECT: Item 6-5, Airfield Pavement Analysis PROJECT DESCRIPTION: This project will prepare an in-depth pavement analysis of the entire airfield pavement. This analysis will include identifying pavement sections, age of pavement surfacing, aircraft weight capacity and existing condition. Geotechnical testing may be required to obtain data necessary to develop the airfield pavement analysis. The analysis will present a rating for the entire airfield pavement to be used as a guide for maintenance or rehabilitation actions to extend the life of the pavement. JUSTIFICATION: The airport is required as part of their Grant Assurances to perform an airfield pavement analysis. The airport must update the pavement analysis regularly to track the pavement condition and to utilize the pavement condition to schedule maintenance or rehabilitation to maximize the life of the pavement. OBJECTIVE: The airfield pavement analysis will be used by the airport to schedule maintenance and rehabilitation actions to extend the life of the pavement and reduce the potential for hazardous debris from deteriorating pavement surface material. This project will enhance the safety and capacity of the airport by keeping the airfield pavement open to aircraft. ESTIMATED PROJECT IMPLEMENTATION DATE: January 2007 ESTIMATED PROJECT COMPLETION DATE: June 2007 TOTAL ESTIMATED PROJECT COST: $91,000 TOTAL ESTIMATED PFC AMOUNT: $91,000 EXISTING AND/OR ANTICIPATED AIP GRANTS: None 8 1/06/06 PARKHILL, SMITH & COOPER, INC. - LUBBOCK PROJECT BUDGET SHEET LOCATION CODE: 01 PROJECT NAME: LBB Pvmt Analysis JOB NO.: TASK: l DSN DATE: 11/28/06 FEE TYPE: Lump Sum PREPARED BY: MDH PRINCIPAL: JTH PROJ. MANAGER: JTH OVERHEAD RATE: PROFIT ON LABOR: PROFIT ON REIMB: 15.00% PROFIT ON DIRECTS: 15.00% FEE: $91,072p 01� LABOR: $50,203 OVERHEAD: REIMB. CONSULTANTS: REIMB, EXPENSES: DIRECT CONSULTANTS: $32,450 DIRECT EXPENSES: $3,088 LABOR BUDGETS:. CODE DESCRIPTION HOURS COSTS 01 Firm Principal 57 $7,182 #N/A #N/A 03 Engineer 186 $17,856 07 Engineer -in -Training 237 $19,197 11 Resident Project Representat: 14 CADD Operator 80 $5,040 18 Clerical 16 $928 Page 1 of 3 FEE ESTIMATING SHEET PROJECT: L88 Pvmt Analysis JOB NO.: TASK: IOSN SALARY CATEGORY OF PERSONNEL. RATE PER HOUR FP ENG EIT RPR CA060PT CLERFCAL TASK 01 #NIA 03 07 11 14 18 Tris $126.00 $96,00 $81.00 $73.00 $63.00 $58.00 TOTAL Data Analysis Project scoping conference 1 3 3 3 9 Site Visits, research old documents/plans 5 20 20 Pavement condition assessment 5 4 45 16 65 Coordinate geotechnical investigation 4 8 16 28 Review geotechnical investigation data 8 8 16 32 Prelimiinanr Rannrt develop report format/content 8 16 16 8 48 develop tabular information including pavement condition, strength and # of operations 4 20 40 64 develop narrative 4 24 40 4 72 develop schematic layouts 4 16 24 40 84 review with FAA, Owner 1 3 3 3 9 Final Report finalize tabular information 4 16 24 44 finalize narrative 4 16 16 4 40 finalize schematic layouts 4 a 16 24 52 review with FAA, Owner 1 3 3 3 9 UI]GET SUBTOTALS: HOURS/ Trips- Ir 13 57 186 237 80 16 57 11 SALARY $7182 $17856 $19,197 $5040 $928 $50,203 Page 2 of 3 Resolution No. 2007-80011 EE ESTIMATING SHEET PROJECT. - IRECTS L8B Pvmt Analysis JOB NO. TASK. t pSN 01RECT CONSULTANT COSTS SUBTOTAL 611 STRUCTURAL CONSULTANTS 612 MECHiELEC CONSULTANTS 613 ENV 8 CIVIL CONSULTANTS 614 LANDSCAPE CONSULTANTS 615 TESTING CONSULTANTS Rode uez Engineering LaboraloneS 532.450 616 SURVEYING CONSULTANTS 617 INTERIOR DESIGN CONSULTANTS 618 OTHER CONSULTANTS TOTAL DIRECT CONSULTANTS 532,450 DIRECT EXPENSES 621 TRAVELLODGING MOTEL DAYS @ AIR TRAVEL AIR FARE 41 PARKING DAYS 0 CAR RENTAL DAYS 0 MILEAGE 30 MILES @ MEN 0 iMANDAY MEN 0 ;MAN = QDAY - %DAY = $0.400 0 13 TRIPS = SUBTOTAL $156.00 $156 622 REPRODUCTIONS BLUELINE PRINTS 30 SHTS 0 $2.55 0 15 SETS = SEPIA PRINTS SHTS 0 $8,51 0 SETS = PRINTING: ORIGINAL SET-UP COST 30 ORIGINALS a 50.15 /ORI. = COST PER SHEET 10 SETS 4 $0.08 /SHT 0 300 SHEETS= BINDING COST 10 SETS 0 $2.00 /SET = XEROX 1000 SHTS (d $0.08 /SHT = SUBTOTAL $1.147.50 $4.50 $240.00 $20.00 $80.00 $1.492 623 MODEL'RENDERINGSiPHOTOS Shots ® JShot $200 624 TELEPHONE 100 Calls ® $2.00 !Calk $200 525 MEALS DAYS 0 MEN MANDAY 626 FIELD SUPPLIES _ 628 PCSTAGE 40 Mailings 0 $5.00 /Mailing $200 5529 PUBLICATIONS &SUBSCRIPTIONS _ 630 MISC DIRECT EXP 631 FAX 200 Pages 4 $1.00 $200 632 TEMPORARY PERSONNEL 533 DRAFTING SUPPLIES _ 634 OFFICE SUPPLIES 635 CADD 60 HOURS 0 $8.00 iHOUR $640 636 FIELD EQUIP RENTAL 646 SOFTWARE _ TOTAL DIRECT EXPENSES 53,088 Page 3 of 3 Agenda Item #.## Consider a resolution authorizing the Mayor to approve Amendment #8 to the agreement between the City of Lubbock and Parkhill Smith & Cooper for the Airfield Pavement Analysis project. Item Summary This amendment (No. 8) modifies the original engineering agreement with Parkhill, Smith and Cooper (PSC) and the Lubbock Preston Smith International Airport to add engineering services for conducting an analysis of the airfield pavements at the airport. The airport is required by the FAA as part of the federal grant assurances to perform an airfield pavement analysis. The airport must update the pavement analysis regularly to track the condition of the pavement and use the analysis for scheduling maintenance or rehabilitation to maximize the life of the pavement. Fiscal Impact The engineering services associated with this project will be funded by passenger facility charges (PFC). The fee for these services is $91,000 and will be paid from project 251.91111. Staff Submitting/Recommendation James Loomis, Transportation and Public Works Assistant City Manager. The Airport Board and Airport Staff are recommending approval of Amendment No. 8 to the agreement with PSC in the amount of $91,000. City Council Meeting