HomeMy WebLinkAboutResolution - 2007-R0010 - Amendment To Agreement - Parkhill, Smith, & Cooper - Services To Upgrade FIDS - 01/12/2007Resolution No. 2007--80010
January 12, 2007
Item No. 5,21
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock an Amendment No. 7 to
agreement between the City of Lubbock and Parkhill, Smith & Cooper for
architecture/engineering services for the Upgrade Flight Information Display System
(FIDS) Project, and all related documents. Said Amendment is attached hereto and
incorporated in this Resolution as if fully set forth herein and shall be included in the
minutes of the Council.
Passed by the City Council this 12th day of January , 2007.
GA 10011
City
VED AfS 7 C
DAVID A. MILLER, MAYOR
Loomis, Assistant City Manager
sortation and Public Works
APPROVED AS TO FORM:
Linda L. Charnales, Senior Attorney
Office Practice Section
gs/cityatNRES-PSCC Amendment- FIDS
December 8, 2006
rrrrrrrr.rrrrrrrrr
MOMMUNN00.09...
00.00...............
i����.fAi.M..NF..■
M -■- 'all
It � : :
.� .� ,0000 0000..
0: .r-• .-00■M I un
r. 00
i. 111K
■i wu. r. rr
00o00uu00.iuurr00
oroouruuurr
Mr. James W. Loomis, A.A.E.
Director of Aviation
Lubbock Preston Smith International Airport
Route 3, Box 389
Lubbock, Texas 79403
Resolution No. 2007-80010
January 12, 2007
Item No. 5.21
November 29, 2006
Re: Amendment No. 7 to Agreement for A/E Services for Airport Improvement Projects:
• Upgrade Flight Information Display System
Dear Mr. Loomis;
We have met with your staff, reviewed the project and prepared an Engineers Opinion of Probable Cost (EOPC)
to design the upgrades to the Flight Information Display System as illustrated in the enclosed drawing. Our
understanding of the scope items and a fee proposal for Task 1 (design) and "Task 2 (construction) are detailed in
the Project Budget Sheets which are attached to this amendment.
Up rg ade Flight Information Display System:
Task 1 - Fee for Professional Services (Study and Report, Preliminary Design,
Final Design and Bidding/Negotiation, lump sum). $19,850.00
Task 2 Construction Phase Services (which includes RPR and construction
related Engineering Services, lump sum). $14,200.00
TOTAL $34,050.00
We propose to modify the agreement between the City of Lubbock and Parkhill, Smith & Cooper, Inc. dated
January 13, 2005 and to provide the task 1 and task 2 services on a lump sum basis under the provisions of the
contract, E7(HIBIT B — PAYMENTS TO THE ENGINEER, LUMP SUM METHOD, Paragraph B4.0I.A.1.
Compensation for Design Phase - Task 1 and Construction Phase - Task 2 services shall not exceed $34,050.00
without Owner's approval.
If the terms of this amendment are agreeable to you, please sign and return one copy of this letter to our office.
We will take receipt of this signed letter as our notice to proceed with these services.
Parkhill, Smith & Cooper, Inc.
Engineers ■ Architects ■ Planners
4222 85th Street, Lubbock, Texas 79423
(806) 473.2200 FAX (806) 473-3500
Lubbock EI Paso Midiand
Amarillo
Odessa
Mr. James W. Loomis Page 2 November 29, 2006
We look forward to working with you in completing this project. If you have any questions please call either
Mark Haberer or myself.
Sincerely,
PARICHILL, SMITH & COOPER, INC.
By LT 4��
John T. Hamilton, PE
Firm Principal
JTFFjbh
Enclosures
IN TRIPLICATE
x:519WOOS3.98CIVILUTMLIAIFMMCmnxl wnmYhw7.D0C
Accepted by:
CITY OF LUBBOCK
By---�'
David Mill r
Mayor
Attest:
By
Rebecca Gaba
City Secretary
Approved as to Content:
J
es W. Loomis, A.A.E.
irector of Aviation
Approved as to Form:
By—
Linda L. Chamales, Senior Attorney
Office Practice Section
Resolution No. 2007-R0010
LUBBOCK PRESTON SMITH INTERNATIONAL AIRPORT
2006 PFC APPLICATION PROJECT INFORMATION
PROJECT:
Item 6-4, Upgrade Flight Information Display System
PROJECT DESCRIPTION:
The existing airport Flight Information Display System (FIDS) will be upgraded to current
technology. The computers, displays, cable, power supply, power conditioning and associated
equipment will be replaced.
JUSTIFICATION:
The existing FIDS system is approximately 6 years old. The system utilizes video and
computer components that typically have a lifespan of 5 years. Most of the displays monitors have
either failed or are not legible for passengers to obtain flight information. Current technology has
improved the user interface for airlines to enter flight data and improved the display monitors to
provide better readability and comprehension of the flight data by passengers.
OBJECTIVE:
The upgraded FIDS will improve the ability for airlines to enter their flight information and
improve the visual dissemination of the airline's flight data to passengers. This project will enhance
the competition between airports and enhance efficiency of passenger movement.
ESTIMATED PROJECT IMPLEMENTATION DATE:
June 2007
ESTIMATED PROJECT COMPLETION DATE:
June 2008
TOTAL ESTIMATED PROJECT COST:
$225,000
TOTAL ESTIMATED PFC AMOUNT:
$225,000
EXISTING AND/OR ANTICIPATED AIP GRANTS:
None
7
1/06/06
City of Lubbock, Texas
Lubbock Preston Smith International Airport
1 Upgrade Flight Information Display System (FIDS)
1 112 71200 6
ENGINEER'S OPINION OF PROBABLE COSTS
Item Description Quantity
Unit
Unit Price
Amount
Project Summary
Upgrade FIDS displays to current technology
Replace computers, display cases, and monitors..
Mobilization
Item P-140, Contractor Mobilization 1
LS
$13,000.00
$13,000
Hardware !Upgrades: Computers. Displays etc...
Terminal Computers with Monitor 3
Each
$6,000.00
$18,000
Server Computer with Monitor for FIDS Network 1
Each
$12,000.00
$12,000
LCD Display Monitors 15
Each
$6,000.00
$90,000
Architectural Display Stands for LCD Monitors 4
Each
$7,500.00
$30,000
Miscellaneous carpetAg/flooring and ceiling repairs 1
LS
$12,500.00
$12,500
Subtotal
162,500
Construction Contingency on Base Bid 10%
15,450
SUB -TOTAL BASE BID
$190,950
Professional Services
Basic Engineering Services (Study and Report, Preliminary Design, Final Design and Bidding/Negotiation)
$19,850
Phase Services Includes RPR and Construction related En r. Services
$14 200
LCon,struction
total Professional Services
050
TAL ENGINEERS OPINI N OF PROBABLE PR JECT COSTS BASE BID
5 000
X%I gg84etl16.981CIVILVTHILIATIOSTIDS EOPC 11-2"6.MIs
I
dT
a
II
Ah
w
`f a
�. r d
Cl - (j� aAw
<,
i
C1 UPPERLEVEL r�
PLAN
I l
if
L
Is
N
9pl)MAIN LEVELt'•,ar PLAN
Mx
6
! 1 am
1131 r 0114
•: LOWER LEVEL
NrtJ I.WLW PLA„
NOTES
t RE -USE EXIST04 TELEvSiDN SCREENS. NSTALL
=M AT THE TAXI DODRMATOkN STAND,
IB10p
D iELEvwONi REPLACE TELEVISIONS WITH
WED W LLD DELAY. CONNECT NEN
:XISTINC vlDEO FEED FROM ExSTNL 7W SYSTEM.
NTEO TELEVMK*a REPLACE TELEVISIONS WITH
I DISPLAY. MOUNT NEW DISPLAY ONTO NEW
IL DISPLAYS. PROVIDE MECESS Y RENOVATIONS TO
ITE NEW DISPLAY STAND" CONNECT NEW DISPLAY
VIDEO FEED FROM EYISTNO SOS' SYSTEW.
IPUTER OWNED BY AWPORT. COYPuTERS wiLL RE
0 CONNECTED TO DxSTINC FOS NETWORK.
S' SERVER COMPUTER TO BE REPLACED CONNECT
xISTINC "AW NETWORK.
ST TELLVISON SCREEN MOUNTED N SECMM CDN60IE,
NSON SCREEN WITH NEW 40' LCD DISPLAY
KITH SECURITY PERSONNEL FOR MOUNTING LOCATKk
S' EOUIPMENI TO REMAIN
LEGEND
SYMBOL
DESCRIPTION
TO 8 REPLACER ■TH LIOMWTOR
Inv
TO BE REFP CTEOLEMAOM YOMITOR
EIPSTW BIDS MWAD TO RD"
EMT= WS, LCO DNSPLAT TO
REMAN
ion No. 2007-RO01(
a C:
■� iN ■. rr■ u■u
■� ■■ v u■rW
■N Liu r► r i� �■
■u■■■■■■■euuiu
Parkhill, Smith S Cooper, tnc.
E*m n . Arc ilach • Planners
L,400 D P1® Md., N+ mI Oar!■
UPGRADE INFORMATION
DISPLAY
SYSTEM (FIDS)
LUBBOCK PRESTON SMITH
INTERNATIONAL AIRPORT
LUBBOCK, TEXAS
MD GTE DESCAPh7V
amoc arnm-umem pm"cT NQ
SITE PLAN
G101
� 1
UPGRADE INFORMATION
DISPLAY
SYSTEM (FIDS)
LUBBOCK PRESTON SMITH
INTERNATIONAL AIRPORT
LUBBOCK, TEXAS
MD GTE DESCAPh7V
amoc arnm-umem pm"cT NQ
SITE PLAN
G101
PARKHILL, SMITH & COOPER, INC. -
LUBBOCK
PROJECT BUDGET SHEET
LOCATION CODE:
01
PROJECT NAME:
LBB Up rade FIDS
JOB NO.:
TASK:
IDSN
DATE.
11/28/06
FEE TYPE:
Lump Sum
PREPARED BY:
MDH
PRINCIPAL:
JTH
PROJ. MANAGER:
JTH
OVERHEAD RATE:
PROFIT ON LABOR:
PROFIT ON REIMS:
15.00%
PROFIT ON DIRECTS:
15.00%
FEE:
$1 v9•— 1,850
LABOR:
$16,565
OVERHEAD:
REIMS. CONSULTANTS:
REIMS. EXPENSES:
DIRECT CONSULTANTS:
DIRECT EXPENSES:
$2,858
LABOR BUDGETS:
CODE
DESCRIPTION
HOURS COSTS
01
Firm Principal
25 $3,150
#N/A
#N/A
03
Engineer
34 $3.264
11
Resident Project Representati
85 $6,885
07
Engineer -in -Training
4 $292
14
CADD Operator
38 $2,394
18
Clerical
10 $580
Page 1 of 3
FEE ESTIMATING SHEET PROJECT:
L9eUpgrade FICS
JOB NO.:
TASK:
ID5N
SALARY
CATEGORY
OF PERSONNEL
RATE PER HOUR
FP
ENG
RPR EIT
CADDOPT
CLERICAL
TASK
01 #N/A
03
11 07
14
18
Tris
$126,00
$96.00
$81 00 $73.00
$63.00
$58.fl0 TOTAL
STUDY AND REPORT PHASE
Predesign Conference 1
2
2
2
6
Site visits, Gather Data 3
6
6
Develop/analyze project scope 1
2
2
PRELIMINARY r)FqIGN PHASE
Refine scope, coord. with Owner 1
2
2
4
Meetings and conferences 2
4
4
4
12
Review equipment options
8
8
Preliminary design documents
preliminary drawings (9 sheets)
27
18
outline specifications
4
8
4
review w/ Owner
2
2
2
6
Revise opinion of costs
1
4
5
FINAL DESIGN PHASE
Final drawings
8
16
24
Final specifications
6
4
4
14
Final opinion of costs
1
2
3
Review with Owner 1
2
2
2
6
Revisions
2
4
6
Mlsc meetings and conferences 2
BIDDING PHASE
Assisi in advertisement
2
2
Plan distribution - issue/record/deposits
2
2
Conduct Pre -Bid Conference, minutes 1
2
2
4
Miscellaneous addenda
2
2
4
Attend Bid Opening 1
2
2
4
Evaluate bids, bid tabulation, award
2
2
Check out Contr, subcontractors, etc.
2
2
Review substitute mate rials/equipment
2
2
QC/PM (3 mos. 4 1 hrs./mo.)
3
3
Prepare stmts. (4 4 1 hr.)
2
2
4
Monthly Progress Reports (0.5 hr, each)
2
2
Coordination with Owner
2
2
BUDGET SUBTOTALS: HOURS/ Trips - 1325
34
85 4
38
10
19
SALARY
$3,150
$3,264
$6,885 $292
$2,394
$580
1 $16,565
Page 2 of 3
EE ESTIMATING SHEET PROJECT
IRECTS
LBB Upgrade FIDS ,JOB NO..
TASK..
1 DSN
DIRECT CONSULTANT COSTS
SUBTOTAL
611 STRUCTURAL CONSULTANTS
612 MECH'ELEC CONSULTANTS
_
613 ENV & CIVIL CONSULTANTS
614 LANDSCAPE CONSULTANTS
615 TESTING CONSULTANTS
616 SURVEYING CONSULTANTS
617 INTERIOR DESIGN CONSULTANTS
_
618 OTHER CONSULTANTS
-
TOTAL DIRECT CONSULTANT$
DIRECT EXPENSES
621 TRAVELLODGING
MOTEL DAYS a
AIR TRAVEL AIR FARE a
PARKING DAYS a
CAR RENTAL DAYS a
MILEAGE 30 MILES a
$0.445
MEN a MANDAY =
MEN a ;MAN =
/DAY =
+DAY =
a 13 TRIPS -
_ SUBTOTAL
$173.55
$174
622 REPRODUCTIONS
BLUELINE PRINTS
SEPIA PRINTS
PRINTING:
ORIGINAL SET-UP COST
COST PER SHEET
BINDING COST
XEROX
9 SHTS a
SHTS a
12 ORIGINALS
20 SETS a
20 SETS ®
500 SHTS a
$2.55 a 20 SETS =
$8.51 ra SETS =
a $0.45 /ORI. _
$0.08 /SHT a 225 SHEETS-
S2.00 'SET =
$0.08 %SHT =
SUBTOTAL
$459.00
$1.80
$360.00
$40.00
$40.00
$901
623 MODEL RENDERINGS/PHOTOS
Shots a
%Short
S200
624 TELEPHONE 100 Calls a
$2.00
Call
_ 5200
625 MEALS DAYS a
MEN a
WANDAY
626 FIELD SUPPLIES
628 POSTAGE 40 Mailings a
55.00 /Mailing
$200
629 PUBLICATIONS & SUBSCRIPTIONS
630 MISC DIRECT EXP
631 FAX 200 Pages a
$1.00
$200
632 TEMPORARY PERSONNEL
633 DRAFTING SUPPLIES
634 OFFICESUPPLIES
635 CADD 123 HOURS a
58,00 /HOUR
$984
636FIELD FQUiP RENTAL
_
546 SOFTW..ARE
_
TOTAL DIRECT EXPENSES
$2,858
Page 3 of 3
PARKHILL, SMITH & COOPER, INC. -
LUBBOCK
PROJECT BUDGET SHEET
LOCATION CODE:
01
PROJECT NAME:
LBB Upgrade FIDS
JOB NO.:
TASK:
2CST
DATE:
11/28/06
FEE TYPE:
Lump Sum
PREPARED BY:
MDH
PRINCIPAL:
JTH
PROJ. MANAGER:
JTH
OVERHEAD RATE:
PROFIT ON LABOR:
PROFIT ON REIMB:
15.00%
PROFIT ON DIRECTS:
15.00%
FEE:
$1 ( i , ZCO
LABOR:
$12,236
OVERHEAD:
REIMS. CONSULTANTS:
REIMB. EXPENSES:
DIRECT CONSULTANTS:
DIRECT EXPENSES:
$1,743
LABOR BUDGETS:
CODE
DESCRIPTION
HOURS COSTS
01
Firm Principal
21 $2,646
#N/A
#N/A
03
Engineer
34 $3,264
11
Resident Project Representat
72 $5,832
07
Engineer-in-Training
14
CADD Operator
6 $378
18
Clerical
2 $H61
Page 1 of 3
FEE ESTIMATING SHEET PROJECT:
LBB Upgrade FIDS
JOB NO.:
TASK:
2CST
SALARY
CATEGORY OF PERSONNEL
RATE PER HOUR
FP
ENG
RPR FIT
CPDD OPT
CLER➢CAL
TASK
01 #N/A
03
11 07
14
18
Tris
$126.00
$96.00
$81.00 $73.00
$63.00
$58.00
TOTAL
RPR (75-day onnstruc ionrR�i=
Preconstruction Conference
1
2
2
2
6
11 weeks 0 3 Hrs/ week
11
33
33
2 Pre/Post Days at 5 Hrs/ Day
2
10
10
CONSTRUCTION PHASE
Conduct Preconstr Conference, minutes
1
2
2
4
Monthly progress meetings, minutes
3
6
6
12
Coord. with RPR, Contractor, Owner
2
5
5
10
Routine change orders
4
4
Review submittals
6
6
Pay estimates including final
4
4
Certifications, guarantees & warranties
2
2
Initial operation/startup, performance tests
1
2
2
4
Final inspection and notes/findings
1
3
3
3
9
MISCELLANEOUS ITEMS
)CIPM (3 mos. @ 1 hrs./mo.)
3
3
Prepare stmts. (4 @ 1 hr.)
2
2
4
Monthly Progress Reports (0.5 hr. each)
2
2
Coordination with Owner
2
2
CLOSEOUT PHAaE
Record drawings
2
6
8
O&M manuals
2
2
Warranty insp.
1
2
2
4
Addnl, compliance insps.
2
2
4
Final test and QC rpt.
2
2
BUDGET SUBTOTALS: HOURS/ Trips -
23F
21
34
72
6
211,3
SALARY
$2,646
$3,264
$5,832
$378
$116
$12,236
Page 2 of 3
Resolution No. .2007-R0010
EE ESTIMATING SHEET PROJECT.
IPECTS
LB8 Upgraee FIDS JOB NO..
TASK-
2CST
DIRECT CONSULTANT COSTS
SUBTOTAL
611 STRUCTURAL CONSULTANTS
612 MECH/ELEC CONSULTANTS
613 ENV S CIVIL CONSULTANTS
814 LANDSCAPE CONSULTANTS
615 TESTING CONSULTANTS
616 SURVEYING CONSULTANTS
_
-
617 INTERIOR DESIGN CONSULTANTS
618 OTHER CONSULTANTS
-
-
TOTAL DIRECT CONSULTANTS
DIRECT EXPENSES
621 TRAVELLODGING
MOTEL DAYS 0
AIR TRAVEL AIR FARE 0
PARKING DAYS 0
CAR RENTAL DAYS 0
MILEAGE 55 MILES 0
MEN ® rMANDAY =
MEN 0 WN -
'DAY =
/DAY =
$0.400 ® 23 TRIPS =
SUBTOTAL
5506.00
$506
622 REPRODUCTIONS
BLUEUNE PRINTS 12 SHTS 0 $2.55 0 6 SETS =
SEPIA PRINTS SHTS ® $8,51 A SETS =
PRINTING:
ORIGINAL SET-UP COST 12 ORIGINALS $0.15 /ORI. =
COST PER SHEET 6 SETS 0 $0.08 iSHT 0 72 SHEETS=
BINDING COST 6 SETS 0 52.00 /SET =
XEROX 400 SHTS 0 $0.08 /SHT -
SUBTOTAL
$183.60
51.80
$34.56
$12.00
$32-00
$264
623 MODELIRENDEHINGS/PHOTOS
Shots a
/Shot
$200
624 TELEPHONE 50 Calls
$2.00 %Call
$100
625 MEALS DAYS ®
MEN 0
/MANDAY
626 FIELD SUPPLIES
S4D0
628 POSTAGE 15 Mailings ®
$5.00 Wailing
$75
629 PUBLICATIONS 8 SUBSCRIPTIONS
630 MISC DIRECT EXP
631 FAX 150 Pages 4
51.00
$150
632 TEMPORARY PERSONNEL
633 DRAFTING SUPPLIES
_
634 OFFICE SUPPLIES
635 CADD 6 HOURS ®
58_.00 /HOUR
$48
636 FIELD EQUIP RENTAL
646 SOFTWARE
11
TOTAL DIRECT EXPENSES
11 $1,743
Page 3 of 3
Agenda Item A##
o b . Consider a resolution authorizing the Mayor to approve Amendment #7 to the
f i A/E Services Agreement between the City of Lubbock and Parkhill Smith &
4 Cooper for the Upgrade Flight Information Display System (FIDS) project.
Item Summary
This amendment (No. 7) modifies the original engineering agreement with Parkhill,
Smith and Cooper (PSC) and the Lubbock Preston Smith International Airport to
add engineering services for the upgrade of the Flight Information Display System
(FIDS) at the airport.
The existing airport FIDS in the terminal has become obsolete and is in need of
replacement. This system provides flight information on arrivals and departures at
the airport to travelers throughout the terminal building. Many of the video monitors
have either failed or are not legible. The upgraded FIDS will improve the ability for
the airlines to enter their flight information and improve the visual dissemination of
Right data to passengers.
Fiscal Impact
The engineering services associated with this project will be funded by passenger
facility charges (PFC). The fee for these sei ,ices is $34,050 and will be paid from
project 251.91110.
Staff Submitting/Recommendation
James Loomis, Transportation and Public Works Assistant City Manager.
The Airport Board and Airport Staff are recommending approval of Amendment No.
7 to the agreement with PSC in the amount of $34,050.
City Council Meeting