HomeMy WebLinkAboutResolution - 2008-R0489 - Change Order To Contract - Deerwood Construction Inc.- Well Field Improvements - 12/17/2008Resolution No. 2008-80489 December 17, 2008 Item No. 5.10 RESOLUTION IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and acted to execute for and on behalf of the City of Lubbock, Change Order No. I to that am Contract by and between the City of Lubbock and Deerwood Construction, Inc., the Bailey County Well Field Improvements, Phase II (ITB# 08 -723 -DD), and related uments. Said Change Order No. 1 is attached hereto and incorporated in this )lution as if fully set forth herein and shall be included in the minutes of the City by the City Council this 17th day of December , 2008. TTEST: Garza, City Secretary OVER AS TO CONTENT: L. Addms" City Manager/Water Utilities Director FIVIKOXIM30A :)n Vandiver 1y Attorney 124848 K-;� - '/ �&4�4 TOM MAR IN, MAYOR ATT\RICHARD\Resolutions\Res.Deerwood Const.ChangcOrder.120808.doc CITY OF LUBBOCK CHANGE ORDER Change Order #: 1 Contractor: Deerwood Construction, Inc. Date: 1 11/1912008 BID/ITB/RFP #: I RFP #08 -723 -DD Contract #: 8493l Project Name: I Bailey County Well Field Improvements Phase II "Change Order" means a written order to a Contractor executed by the Owner in accordance with the contract authorizing an addition to, deletion from, or adjustment or revision of the requirements of the contract documents, or an adjustment to the compensation payable to Contractor, or to the time for performance of the contract and completion of the Project, or a combination thereof, which does not alter the nature of the thing to be constructed and is an integral part of the project objective. Adjustments to "Estimated Quantities" to a tine item in a Unit Price contract do not require a Change Order. All work that alters the nature of the thing, to be constructed or that is not an inte art of the project objective must be let out for public bid. Description of change (alteration, deviation, addition, or deletion) caused by conditions encountered during construction not covered by the specifications and drawings of the project (attack additional pages if necessary): Well #4 has been relocated to provide increased water production. This relocation requires construction of approximately 1,970 feet of additional electric power line with related equipment and mobilization to this remote area of the well field at a total cost of $31,642. Where the Change Order is negotiated, the Change Order must be fully documented and itemized as to costs, including material quantities, material costs, taxes, insurance, employee benefits, other related costs, profit and overhead. Where certain unit prices are contained in the initial contract, no deviations are allowed in computing negotiated change order costs. ITEMIZED COSTS MUST BE FULLY DOCUMENTED AND ATTACHED TO THIS FORM. ITEM DESCRIPTION AMOUNT A. ORIGINAL CONTRACT VALUE: $476,906.00 B. AMOUNT OF THIS CHANGE ORDER: Council approval required ijover $25.000 $31,642.00 C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A): 6.63% D. AMOUNT OF PREVIOUS CHANGE ORDERS: $0.00 E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D): $31,642.00 F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (EIA): 25% Maximum 6.63% G. NEW CONTRACT AMOUNT (A+E): $508,548.00 It is mutually agreed that the above dollar amount and the time extension, as applicable, as set forth in this Change Order constitutes full compensation to the Contractor for all costs, expenses and damages to the Contractor, whether direct, consequential or otherwise, in anyway incident to, or arising out of or resulting directly or indirectly; from the work performed or modified by the Contractor under this Change Order. This Chan a Order is not valid without the following signatures lease si n in order and return 3 originals with Contract Cover Sheet to /i26ce e lz�ybv Date —V&Z 16�� 12- INo (5) CAPITAL P 07ECTS MANAGER Date (6) PURCHASG D CONTRACT MANAGER Date Change Orders over $25,000 require a Contract Cover Sheet and fire following signatures: CITY OF LUBBOCK ATTES 12/17/08 12/17/08 (7 MkYOR Date (8) CI S-.RETARY Date Council Date: December 17, 2008 Agenda Item #: 5-10 Resolution #: 20 0489 PWC -045 (Rev 01108)