Loading...
HomeMy WebLinkAboutResolution - 2009-R0509 - Contract - Parkhill, Smith & Cooper Inc.- Drainage Improvement Project - 11/19/2009Resolution No. 2009-RO509 November 19, 2009 Item No. 5.1.5 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the City Council of the City of Lubbock hereby authorizes and directs the Mayor of the City of Lubbock to execute an Agreement for a Professional Engineering Services Contract by and between the City of Lubbock and Parkhill, Smith & Cooper, Inc., of Lubbock, Texas, for engineering services related to the Northwest Lubbock Drainage Improvement Project, and related documents. Said Agreement is attached hereto and incorporated in this Resolution as if fully set forth herein and shall be included in the minutes of the Council. Passed by the City Council this 19th day of ATTEST: City APPROVED AS TO CONTENT: Michael G. Keenum, P.E. Storm Water Engineer APPROVED AS TO ms,Agrnit-Prof Servs.storm drainageses l 1.05.09 November , 2009. TOM MARTIN, MAYOR ity Attorney Resolution No. 2009—RO509 AGREEMENT FOR ENGINEERING SERVICES THIS AGREEMENT, between the City of Lubbock, Texas (hereinafter referred to as Owner) and Parkhill, Smith & Cooper, Inc., with principal offices at 4222 85a' Street, Lubbock, Texas 79423 (hereinafter referred to as Engineer): WITNESSETH: WHEREAS, Owner intends to provide storm drainage relief from the Yellowhouse Draw of the Brazos River (the Canyon) to Maxey Park Lake (Lake 43), named as the "Northwest Lubbock Drainage Improvements Project" (hereinafter referred to as the Project); and WHEREAS, Owner requires certain professional engineering services in connection with the Project (hereinafter referred to as the Services) for a design; and WHEREAS, Engineer is prepared and has the ability to provide such Services; NOW THEREFORE, in consideration of the promises contained herein, the parties hereto agree as follows: ARTICLE 1 - EFFECTIVE DATE The effective date of this Agreement shall be November 19, 2009 ARTICLE 2 - SERVICES TO BE PERFORMED BY ENGINEER Engineer shall perform the Services described in Attachment A, Scope of Services, which is attached hereto and incorporated by reference as part of this Agreement. ARTICLE 3 - COMPENSATION Owner shall pay Engineer in accordance with Attachment B, Compensation, which is attached hereto and incorporated by reference as part of this Agreement, and compensation for Design Phase and Bid Phase shall not exceed $2,999,975.00 Two Million Nine Hundred Nine Nine Thousand Nine Hundred Seventv Five Dollars and No Cents). ARTICLE 4 - STANDARD OF CARE Engineer shall exercise the same degree of care, skill and diligence in the performance of the Services as is ordinarily provided by a professional engineer under similar circumstances and Engineer shall, at no cost to Owner, re -perform services which fail to satisfy the foregoing standard of care. ARTICLE 5 - LIMITATIONS OF RESPONSIBILITY Engineer shall not be responsible for actual means, methods, techniques, sequences, procedures or safety precautions and programs used in connection with the Project by others. Engineer shall assist the Owner in the administering of its contracts with any vendor or other Project participant in order to fulfill contractual or other responsibilities to the Owner or to comply with federal, state and local laws, ordinances, regulations, rules, codes, orders, criteria and standards. ARTICLE 6 - OPINIONS OF COST AND SCHEDULE Since Engineer has no control over the cost of labor, materials, equipment or services furnished by others, or over contractors', subcontractors' or vendors' methods of determining prices, or over competitive bidding or market conditions, Engineer's opinion of cost shall be made on the basis of qualifications and experience as a professional engineer. Since Engineer has no control over the resources provided by others to meet contract schedules, Engineer's forecast schedules shall be made on the basis of qualifications and experience as a professional engineer. Engineer cannot and does not guarantee that proposals, bids or actual Project costs will not vary from his opinions of cost or that actual schedules will not vary from his forecast schedules. ARTICLE 7 - LIABILITY AND INDEMNIFICATION 7.1 General. Having considered the risks and potential liabilities that may exist during the performance of the Services and in consideration of the promises included herein, Owner and Engineer agree to allocate such liabilities in accordance with this Article 7. Words and phrases used in this Article shall be interpreted in accordance with customary insurance industry usage and practice. 7.2 Indemnification. Engineer agrees to defend, indemnify and hold Owner whole and harmless against all claims for damages, costs and expenses of persons or property that may arise out of, or be occasioned by, or from; any negligent act, error or omission of Engineer; or any agent, servant or employee of Engineer in the execution or performance of this Contract. 7.3 Defense of Claims. In the event an action for damages is filed in which negligence is alleged on the part of Owner and Engineer, Engineer agrees to defend Owner. In the event Owner accepts Engineer's defense, Owner agrees, to the extent permitted by law, to indemnify and reimburse Engineer on a pro rata basis for all expenses of defense. Owner also agrees, to the extent permitted by law, to indemnify and reimburse Engineer on a pro rata basis for any judgment or amount paid by Engineer in resolution of such claim. Such pro rata share shall be based upon a final judicial determination of negligence or, in the absence of such determination, by mutual agreement. 7.4 Employee Claims. Engineer shall indemnify Owner against legal liability for damages arising out of claims by Engineer's employees. Owner shall indemnify, to the extent permitted by law, Engineer against legal liability for damages arising out of claims by Owner's employees. 7.5 Limitations of Liability. To the fullest extent permitted by law, Engineer's total liability to Owner for any and all injuries, claims, losses, expenses or damages arising out of or in any way related to the Project or this Agreement from any cause or causes, including but not limited to Engineer's negligence, errors, omissions, strict liability, breach of contract or breach of warranty, shall not exceed the minimum amounts required by Article is of this Agreement. 7.6 Other Project Indemnities. Indemnity provisions shall be incorporated into all Project contractual arrangements entered into by Owner and shall protect Owner and Engineer to the same extent. 7.7 Survival. Upon completion of all services, obligations and duties provided for in this Agreement, or in the event of termination of this Agreement for any reason, the terms and conditions of this Article shall survive. 2 ARTICLE 8 - INDEPENDENT CONTRACTOR Engineer undertakes performance of the Services as an independent contractor and shall be wholly responsible for the methods of its own performance and that of its subcontractors, agents and employees. Owner shall have no right to supervise the methods used, but Owner shall have the right to observe such performance. Engineer shall work closely with Owner in performing Services under this Agreement. ARTICLE 9 - COMPLIANCE WITH LAWS In performance of the Services, Engineer will comply with applicable regulatory requirements, including federal, state and local laws, rules, regulations, orders, codes, criteria and standards. Engineer shall possess the licenses necessary to allow Engineer to perform the Engineering Services. Engineer shall not be responsible for procuring permits, certificates and licenses required for any construction unless such responsibilities are specifically assigned to Engineer in Attachment A, Scope of Services. ARTICLE 10 - INSURANCE Prior to the time Engineer is entitled to commence any part of the Services under this Contract, Engineer shall procure, pay for, and maintain the following insurance written by companies licensed in the State of Texas or meeting surplus lines requirements of Texas law and acceptable to Owner. The insurance shall be evidenced by delivery to Owner of one (1) certificate of insurance, executed by the insurer, listing coverage and limits, expiration date .and term of policy, and certifying that the insurer is licensed to do business in Texas or meets the surplus lines requirements of Texas law, or by delivery to Owner of a certified copy of each policy, including all endorsements. The insurance requirements shall remain in effect throughout the term of this Contract. A. Comprehensive General Liability Insurance The Engineer shall have Comprehensive General Liability Insurance with limits of $1,000,000 per occurrence with a $2,000,000 combined single limit to include: Premises and Operations Explosion and. Collapse Hazard Underground Damage Hazard Products and Completed Operations Hazard Contractual Liability Independent Contractors Coverage Personal Injury (with exclusion "C" waived) The Owner is to be named as an additional insured on this policy for this specific job, and a copy of the endorsement doing so is to be attached to the Certificate of Insurance. B. Comprehensive Automobile Liability Insurance The Engineer shall have Comprehensive Automobile Liability Insurance with limits of not less than: Bodily Injury $250,0001$500,000 Property Damage $100,000 to include all owned and non -owned cars including: Employers Non -ownership Liability Hired and Non -owned vehicles The Owner is to be named as an additional insured on this policy for this specific job and a copy of the endorsement doing so is to be attached to the Certificate of Insurance. C. Workers' Compensation and Employer's Liability Insurance Engineer shall elect to obtain workers' compensation coverage pursuant to Section 406.002 of the Texas Labor Code. Further, Engineer shall maintain said coverage throughout the term of this Agreement and shall comply with all provision of Title 5 of the Texas Labor Code to ensure that the Engineer maintains said coverage. Any termination of workers' compensation insurance coverage by Engineer or any cancellation or non -renewal of workers' compensation insurance coverage for the Engineer shall be a material breach of this contract. The policy must be endorsed to include a waiver of subrogation in favor of the City of Lubbock. Employer's Liability with limits of at least $500,000 each accident, $500,000 by disease policy limit, and $500,000 by disease each employee shall also be obtained and maintained throughout the term of this Agreement. D. Professional Liability Insurance (including errors and omissions) with minimum limits of $1,000,000 per claim. Engineer shall furnish owner certificates of insurance which shall include a provision that such insurance shall not be canceled without at least thirty (30) days written notice to Owner. ARTICLE 11 - OWNER'S RESPONSIBILITIES Owner shall be responsible for all matters described in Attachment C, Owner's Responsibilities, which is attached hereto and incorporated by reference as part of this Agreement. For purposes of this Agreement, Owner may act through its governing body or through administrative officials. ARTICLE 12 - REUSE OF DOCUMENTS All documents, including drawings, specifications and computer software, prepared by Engineer pursuant to this Agreement are instruments of service in respect to this Project. They are not intended or represented to be suitable for reuse by Owner or others on extensions of this Project or on any other project. Any reuse without written verification or adaptation by Engineer for the specific purpose intended will be at Owner's sole risk and without liability or legal exposure to Engineer. ARTICLE 13 - AMENDMENT, TERMINATION AND STOP ORDERS This Contract may be altered or amended only by mutual written consent of both parties hereto and may be terminated by the Owner at any time by written notice to the Engineer_ Upon receipt of such notice, the Engineer shall, unless the notice directs otherwise, immediately discontinue all work in connection with the performance of this Contract and shall proceed to cancel promptly all existing orders insofar as such orders are chargeable to this Contract. The Engineer shall submit a statement showing in detail the work performed under this Contract to the date of termination. The Owner shall then pay the Engineer promptly that proportion of the prescribed fee which applies to the work actually performed under this Contract, less all payments that have been previously made. Thereupon, copies of all completed work accomplished under this Contract shall be delivered to the Owner. The Owner may issue a Stop Work Order to the Engineer at any time. Upon receipt of such order, the Engineer is to discontinue all work under this Contract and cancel all orders pursuant to the Contract, unless the order otherwise directs. If the Owner does not issue a Restart Order within 60 days after receipt by the Engineer of the Stop Work Order, the Engineer shall regard this Contract terminated in accordance with the foregoing provisions. ARTICLE 14 - NONDISCLOSURE OF PROPRIETARY INFORMATION Engineer shall consider all information provided by Owner to be proprietary unless such information is available from public sources. Engineer shall not publish or disclose proprietary information for any purpose other than the performance of the Services without the prior written authorization of Owner or in response to legal process. ARTICLE 15 - NOTICE Any notice, demand or request required by or made pursuant to this Agreement shall be deemed properly made if personally delivered in writing or deposited in the United States mail, postage prepaid, to the address specified below. To Engineer: Parkhill, Smith & Cooper, Inc. ATTN: Robert P. McMillen, P.E. 4222 85th Street Lubbock, Texas 79423 To Owner: City of Lubbock ATTN: Michael Keenum, P.E. P.O. Box 2000 Lubbock, Texas 79457-0001 Nothing contained in this Article shall be construed to restrict the transmission of routine communications between representatives of Engineer and Owner. ARTICLE 16 - UNCONTROLLABLE FORCES Neither Owner nor Engineer shall be considered to be in default of this Agreement if delays in or failure of performance shall be due to uncontrollable forces the effect of which, by the exercise of reasonable diligence, the nonperforming party could not avoid. The term "uncontrollable forces" shall mean any event which results in the prevention or delay of performance by a party of its obligations under this Agreement and which is beyond the control of the nonperforming party. It includes, but is not limited to, fire, flood, earthquakes, storms, lightning, epidemic, war, riot, civil disturbance, sabotage, Owner -directed changes to design criteria or scope services once criteria and scope have been agreed upon, Owner -directed changes to plans after plans have been reviewed and approved (including partial submittal progress reviews), inability to procure permits, licenses or authorizations from any state, local or federal agency or person for any of the supplies, materials, accesses or services required to be provided by either Owner or Engineer under this Agreement. Neither party shall, however, be excused from performance if nonperformance is due to uncontrollable forces which are removable or remediable and which the nonperforming party could have, with the exercise of reasonable diligence, removed or remedied with reasonable dispatch. The provisions of this Article shall not be interpreted or construed to require Engineer or Owner to prevent, settle or otherwise avoid a strike, work slowdown or other labor action. The nonperforming party shall, within a reasonable time of being prevented or delayed from performance by an uncontrollable force, give written notice to the other party describing the circumstances and uncontrollable force preventing continued performance of the obligations of this Agreement. ARTICLE 17 - GOVERNING LAW This Agreement shall be governed by the laws of the State of Texas. Any suit brought to enforce any provision of this Agreement or for construction of any provision thereof shall be brought in Lubbock County, Texas. ARTICLE 18 - MISCELLANEOUS 18.1 Nonwaiver_ A waiver by either Owner or Engineer of any breach of this Agreement shall not be binding upon the waiving party unless such waiver is in writing. In the event of a written waiver, such a waiver shall not affect the waiving party's rights with respect to any other or further breach. 18.2 Severability. The invalidity, illegality or unenforceability of any provision of this Agreement, or the occurrence of any event rendering any portion or provision of this Agreement void, shall in no way affect the validity or enforceability of any other portion or provision of the Agreement. Any void provision shall be deemed severed from the Agreement and the balance of the Agreement shall be construed and enforced as if the Agreement did not contain the particular portion or provision held to be void. The parties further agree to reform the Agreement to replace any stricken provision with a valid provision that comes as close as possible to the intent of the stricken provision. The provisions of this Article shall not prevent the entire Agreement from being void should a provision which is of the essence of the Agreement be determined to be void. ARTICLE 19 - INTEGRATION AND MODIFICATION This Agreement represents the entire and integrated agreement between the parties and supersedes all prior negotiations, representations and agreements, either written or oral. This Agreement may be amended only by a written instrument signed by each of the parties. ARTICLE 20 - SUCCESSORS AND ASSIGNS Owner and Engineer each binds itself and its directors, officers, partners, successors, executors, administrators, assigns and legal representatives to the other party to this Agreement and to the partners, successors, executors, administrators, assigns and legal representatives of such other party, in respect to all covenants, agreements and obligations of this Agreement. ARTICLE 21 - ASSIGNMENT Neither Owner nor Engineer shall assign, sublet or transfer any rights under or interest in (including, but without limitation, monies that may become due or monies that are due) this Agreement without the written consent of the other, except to the extent that the effect of this limitation may be restricted by law. Unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under this R Agreement. Nothing contained in this paragraph shall prevent Engineer from employing such independent consultants, associates and subcontractors as he may deem appropriate to assist him in the performance of the Services hereunder. ARTICLE 22 - SUBCONTRACTORS No work herein called for by the Engineers shall be subcontracted to a subcontractor who is not acceptable to the Owner or assigned without prior written approval of the Owner. The Engineer shall require subcontracts to conform to the applicable terms of this Contract and include provisions which require subcontractor compliance with Owner's Rules. ARTICLE 23 - THIRD PARTY RIGHTS Nothing herein shall be construed to give any rights or benefits to anyone other than Owner and Engineer. IN WITNESS WHEREOF, the parties have executed this Agreement. CITY OF LUBBOCK. TEXAS APPROVED AS TO CONTENT: Michael G. Keenum, P.E. Tom Martin, Mayor Storm Water Engineer APPROVED AS TOFORM: i t City Attorney Attest r�o Rebecca arta City Secretary PARKHILL SMITH & COOPER INC. By; PdreAttest X�/?M `ly(44L Robert H. (Holly) H de , P.E. Robert P. (Paul) McMillen, P.E. Resolution No. 2009-80509 ATTACHMENT A TO AGREEMENT FOR ENGINEERING SERVICES Owner: City of Lubbock, Texas Project: Engineering Services for Storm Drainage Design and Bid: From Yellowhouse Draw of the Brazos River (the Canyon) to Maxey Park Lake (Lake 43), named the "Northwest Lubbock Drainage Improvements Project". A DESCRIPTION OF SCOPE OF SERVICES The scope of services for this project is as follows: Work will not proceed until Owner has authorized Engineer in writing to proceed. 1. BASIC SERVICES A. DESIGN SERVICES Design services as defined by the tasks and man-hours in Exhibit A-1. Within the tasks and man-hours defined in Exhibit A-1, there are noted four (4) plans, specification and estimate (PS&E) design packages. Those four PS&E packages are further defined as follows: a. One PS&E package that covers a proposed gravity flow trunk storm sewer line from the Canyon to west of Indiana Avenue and including intercepting inlet for overflow from Lake 52. b. One PS&E package that covers the following proposed gravity flow storm sewer line segments and gravity flow appurtenances: Indiana Avenue to Maxey Park Lake (Lake 41). C. One PS&E package that covers the following proposed gravity storm sewer line segments and gravity flow appurtenances: Lake 45 to the proposed trunk storm sewer line in paragraph I.A.I.b. plus Lake 46 to the proposed trunk storm sewer line in paragraph I.A. Lb. d. One PS&E package that covers the following proposed gravity storm sewer line segment and gravity flow appurtenances: Lake 71 to the proposed trunk storm sewer line in paragraph I.A. t.b. C. The PS&E packages described herein and the engineering services compensation described in Attachment B are based on a Quaker Avenue — Erskine Street proposed trunk storm sewer line route. Any other route must be authorized and compensated as additional services. Geotechnical services as described by the tasks and man-hours in Exhibit A-1. Surveying services as defined by the tasks and man-hours in Exhibit A-1. A-1 4. Subsurface Utility Engineering Services as defined by the tasks and man-hours in Exhibit A-1. 5. Groundwater monitoring and testing services as defined by the tasks and man- hours in Exhibit A-1. 6. Deliver to the Owner one (1) reproducible plus three (3) non -reproducible copies of drawings and technical specifications developed for each PS&E package. 7. Deliver to the Owner one (1) complete hard copy and automated copy of any supporting data and calculations developed during the design of each PS&E package. S. Deliver to the Owner disks containing the electronic files associated with the design of the project, including the supporting data, plans, specifications and opinions of probable construction costs. 9. Provide exhibits and coordination for Burlington Northern Santa Fe and Texas Department of Transportation construction and storm sewer utility permits as defined by the tasks and man-hours in Exhibit A- 1. B. BID PHASE SERVICES 1. Bid Phase services as defined in Exhibit A-2. 2. Bid Phase services are limited to assisting the Owner with soliciting and evaluating bids for the proposed trunk storm sewer line in paragraphs I.A. La and I.A.I.b above since the bidding of the remaining PS&E packages cannot be established at the time of this agreement. 3. Bidding period services for the remaining PS&E packages for proposed storm sewers described in paragraphs I.A. Lc and I.A. Ld above must be authorized and compensated as additional services. C. SUPPLEMENTAL SERVICES Supplemental services include: Supplemental Services 4 Type A a. Initial coordination with the Corps of Engineers (COE) or the Environmental Protection Agency (EPA) concerning their requirements for the project. Tasks and man-hours are defined in Exhibit A-3. Furnish cut and fill quantities within jurisdictional areas of the playa lakes. A-2 D. ADDITIONAL SERVICES At the request of the OWNER, the ENGINEER will provide Additional Services as included herein or upon agreement between OWNER and the ENGINEER defining the extent of such Additional Services and the amount and manner in which ENGINEER will be compensated for such Additional Services.. 2. Additional Services may include but are not limited to preparing permits as may be required by the Corps of Engineers (COE) or the Environmental Protection Agency (EPA) or such other regulatory agency. The extent and scope of such services can not be fully defined at this time. 3. Any work requested by the OWNER that is not included in one of the items listed in any other place will be classified as Additional Services. 4. Additional services may be authorized by a notice -to -proceed in writing from the City Engineer and addressed to the Engineer. A-3 Resolution No. 2009—RO509 ATTACHMENT B TO AGREEMENT FOR ENGINEERING SERVICES Owner: City of Lubbock, Texas Project: Engineering Services for Storm Drainage Design and Bid: From Yellowhouse Draw of the Brazos River (the Canyon) to Maxey Park Lake. COMPENSATION BASIC AND SUPPLEMENTAL SERVICES For these services covered by this Agreement, the Owner agrees to pay the Engineer as follows: A. GENERAL I. The Engineer will be paid on an hourly rate basis shown in Table B-1 and subcontract personnel services will be billed at cost. Engineer and subcontractor reimbursable expenses will be billed at cost plus 15 percent surcharge. Reimbursable expenses are shown in Table B-1. 2. The Engineer agrees to use its best efforts to perform services as defined herein within the billing limits stated below. 3. It is understood and agreed that the maximum billings of each of the items listed below are based on the start of Services being authorized not later than December 31, 2009. If start of Basic Engineering Services is not authorized by date given, it is understood and agreed that the upper billing limit will be adjusted accordingly by a supplement to this Agreement. 4. Monthly payments shall be made to the Engineer by the Owner based on Engineer's statement. The statement shall be itemized to indicate the amount of work performed and the associated reimbursable expenses and subcontract costs. 5. The uncontested amount of each statement shall be due and payable upon receipt by the Owner. Carrying charges of 1-1/2 percent per month from the billing date shall be due for accounts that are not paid within 60 days after the billing date. 6. The Engineer shall keep records on the basis of generally accepted accounting practices of costs and expenses and which records shall be available for inspection by Owner during normal business hours. 7. The Engineer shall complete the services described herein within 24 calendar months of the date of the Owner's notice -to -proceed. The attached schedule can be adjusted based on the actual date of the Owner's notice -to -proceed. B. BASIC ENGINEERING SERVICES 1. The maximum billed for Basic Engineering Services including personnel services and reimbursable expenses for the Engineer and Subcontractors is shown as follows: Basic Personnel Services Parkhill, Smith & Cooper, Inc. $ 1,309,302.00 Hugo Reed and Associates, Inc. $ 330,916.00 Surveying Geotechnical Subsurface Utilities Engineering Monitoring Wells TOTAL BASIC ENGINEERING DESIGN SERVICES NOT TO EXCEED Basic Reimbursable Expenses $ 77,144.00 $ 12,479.00 $ 555,278.00 $ 204,515.00 $ 222,400.00 $ 207,290.00 $ 2,919,324.00 2. The Engineer shall start the performance of the Basic Design Services within ten (10) days of receipt of notice to proceed and will complete the Basic Design Services within 24 months. A schedule for Basic Design and Bid Phase Services is attached. The Engineer shall start the performance of Basic Bid Phase Services upon authorization by the Owner. If Basic Bid Phase Services are not authorized within six (6) months of the completion of the Basic Design Services, it is understood and agreed that the upper billing limit will be adjusted accordingly by a supplement to this agreement. The maximum billed for Basic Bid Services including personnel services and reimbursable expenses at the time of the notice - to -proceed for this agreement is shown as follows: Basic Basic Personnel Reimbursable Services Expenses Parkhill, Smith & Cooper, Inc. 30 696.00 1,026.00 Hugo Reed and Associates, Inc. $ 12,688.00 $ 705.00 TOTAL BASIC BID PHASE SERVICES NOT TO EXCEED 45 115.00 C. SUPPLEMENTAL SERVICES — TYPE A 1. The maximum billed for Supplemental Services Type A including personnel services and reimbursable expenses for the Engineer and subcontractor is shown as follows: Supplemental Supplemental Personnel Reimbursable Services Expenses Parkhill, Smith & Cooper, Inc. $ 17,626.00 $ 2,544.00 Hugo Reed and Associates, Inc. $ 13,572.00 $ 1,794.00 TOTAL SUPPLEMENTAL TYPE A SERVICES NOT TO EXCEED $ 35,536.00 2. The Engineer shall start the performance of the services within ten (10) days of receipt of notice to proceed and will complete the Supplemental Services Type A within the time period to be determined by mutual consent between the Owner and the Engineer and dependent upon regulatory agency cooperation. D. ADDITIONAL SERVICES Additional services must be authorized in writing by the Owner. 1. The maximum billed for Additional Services will be determined by mutual consent before the Additional Services are authorized by the Owner. 2. The Engineer shall start the performance of the authorized Additional Services within ten (10 days of the receipt of notice to proceed and will complete the Additional Services within the time period determined by mutual consent before the Additional Services are authorized by the Owner. TABLE B-1 PERSONNEL SERVICES RATES TO AGREEMENT FOR ENGINEERING SERVICES Owner: City of Lubbock, Texas Project: Engineering Services for Storm Drainage Design and Bid: From Yellowhouse Draw of the Brazos River (the Canyon) to Maxey Park Lake. COMPENSATION RATES Hourly fees listed herein will apply for the term of this contract. A.PERSONNEL SERVICES Category of Personnel $ R Parkhill. Smith & Cooper, Inc. Principal -in -Charge $180.00 Project Manager $160.00 Senior Professional Engineer $136.00 Professional Engineer $116.00 Engineer -In -Training $98.00 Technician/Designer $87.00 CARD Operator $79.00 Clerical $69.00 Hugo Reed and Associates Principal -in -Charge or Officer $150.00 Project Manager $135.00 Senior Engineer $125.00 Professional Engineer $105.00 Engineer -in -Training $90.00 CADD Technician $69.00 Clerical $50.00 B. REIMBURSABLE EXPENSES The following expenses are reimbursable: Expenses directly applicable to the project (such as vehicle mileage, postage, reproductions, equipment rentals, etc.). Resolution No. 2009-80509 ATTACHMENT C TO AGREEMENT FOR ENGINEERING SERVICES Owner: City of Lubbock, Texas Project: Engineering Services for Storm Drainage Design and Bid: From Yellowhouse Draw of the Brazos River (the Canyon) to Maxey Park Lake. OWNER'S RESPONSIBILITIES The Owner will furnish, as required by the work and not at the expense of the Engineer, the following items: Access to all maps, drawings, reports, records, audits, annual reports and other data that are available in the files of the Owner and which may be useful in the work involved under this Contract. 2. Secure permission to enter upon public and private property when required in performance of the Engineer's services. 3. Access to existing property, boundary, easement, right-of-way, utility surveys and property descriptions. 4. Full disclosure regarding the Project. 5. A Project Manager fully acquainted with the Project who has authority to approve changes in the Project within the delegated authority of the Project Manager, render decisions promptly, and furnish information in a reasonable time frame. It is recognized that certain changes or decisions will require City Manager and/or City Council approval. b. Pay all costs for advertising and reproduction incident to advertising public meetings except for those public meetings advertisements which the Engineer is obligated to perform under Basic or authorized Supplemental Services. 7. Examine all studies, reports, sketches, drawings, specifications, proposals and other documents presented by Engineer, obtain advice of an attorney, insurance counselor and other consultants as Owner deems appropriate for such examination, and render in writing decisions pertaining thereto within a reasonable time so as not to delay the services of Engineer. 8. Provide such legal accounting, independent cost estimating and insurance counseling services as may be required for the Project and such auditing services as Owner may require to ascertain how or for what purpose any contractor has used the monies paid to him under the construction contract. C-1 9. Give prompt written notice to Engineer whenever Owner observes or otherwise becomes aware of any defect in the Project. 10. Cooperate with Engineer in securing preliminary approvals and consensus from the governmental authorities having jurisdiction over the Project and such approvals and consents from others as may be necessary for completion of the Project. 11. Provide orthophotography and photogrammetry for the project in a format, accuracy, and resolution suitable for construction plans at 1"=50' scale. 12. Furnish, or direct Engineer to provide, necessary Supplemental Services as stipulated in Attachment A of this Agreement or other services as required. 13. Bear all costs incident to compliance with the requirements of this Attachment C. X:1200912672.091CLGR[C AL\Agree12672-Agrcememi_rinal.doc C-2 Resolution No. 2009-R0509 EXHIBIT A -I BASIC DESIGN SERVICES TASKING, MAN-HOURS, REIMBURSABLES, AND SUBCONTRACTORS CITY OF LUBBOCK, TEXAS ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN NORTHWEST LUBBOCK DRAINAGE IMPROVEMENTS PROJECT ESTIMATE OF MAN-HOURS, WORKSHEET 1 BASIC DESIGN SERVICES, ESTIMATE OF MAN-HOURS AND TASKS File: NWLDIP-1.XLS EXHIBIT A-1 26 -Oct -09 01:55 PM Firm Task Prin. Pro!. Sr. Prof. Prof. ET Technician CADD Opr. Clerical Total Total or Mgr. Engr. Engr. Arch or or Hours Extension Officer Desk ner CADD Tech. $ PSC $180.00 $16000 $13600 $116.00 $98.00 $87.00 $79.00 569.00 HR c«««««< Rates $150.00 $135.00 $125.00 $105.00 $90.00 $69.00 $50.00 PSC A. REVIEW SELECTED PROJECT W/CITY STAFF 1 8 6 4 19 $2,548 HR 1. Identity any needed modifications since completion 1 e 4 13 $1,510 of Feasibility Study, review with City PSC 2. Reserved 0 $0 HR 0 $0 PSC 3. Review w/City scope and schedule for recommended 1 2 2 2 2 1 10 $1,171 HR ground survey needs (Preliminary) 6 1 2 2 1 12 $1,223 PSC 4. Review w/Cfty scope and schedule for recommended 1 4 2 2 2 11 $1,422 HR geotechnical investigations (Preliminary) 1 2 2 5 $580 PSC 5. Review w/City potential utility relocation/coordination r, a 4 14 $1,816 HR needs, make preliminary identifications prior to SUE 4 4 $500 PSC 6. Identity potential easement/property acquisition needs 18 0 6 30 $4,164 HR Review w/City (Preliminary) 16 2 16 36 $3,900 PSC 7. Discuss affected regulatory agency coordination needs $0 HR (See Su lemental Services) $0 PSC 8. Coordinate anticipated prefect construction budget 8 8 a 20 $2,600 HR (Prelimirar) 4 F 12 $1,340 PSC 9, Reserved 0 $0 HR 0 $0 PSC 10. Review with City proposed new monilor well 1 4 2 2 9 $1.248 HR locations (Preliminary) 1 4 5 $650 PSC 11. Reserved 0 $0 HR 0 $o B. COORDINATE ACQUISITION OF DESIGN DATA PSC J $0 1.. Reserved HR 0 60 Page 1 of 12 Basic Services CITY OF LUBBOCK, TEXAS ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN NORTHWEST LUBBOCK DRAINAGE IMPROVEMENTS PROJECT ESTIMATE OF MAN-HOURS, WORKSHEET 1 BASIC DESIGN SERVICES, ESTIMATE OF MAN-HOURS AND TASKS Fop Nwi 17111P-1 xi c EXHIBIT A-1 26 -Oct -09 01 155 PM Firm Task Prin, Prof. Sr. Prof. Prof. EIT Technician CADD Opr- Clerical Total Total or Mgr. Engr. Engr. Archi or or Hours Extension Officer Designer CADD Tech. ($) PSC $180.00 $160.00 5136.00 $116.00 $98.00 567.00 $79.00 $69.00 HR «««mac«« Rates »»»»»» $150.00 $135.00 $125.00 $105.00 $90.00 $69.00 $50.00 PSC 2. Coordinate with surveyors for ground Surveying 1 64 64 32 12 2 175 $22,066 HR 1 64 64 32 12 2 175 $16,678 PSC 3. Coordinate geotechnical investigations, analyze data 1 40 24 60 8 2 135 $16,014 HR 8 1 9 $1,050 PSC 4. Onsite direction for soil sampling for TPH analysis 1 6 24 2 39 $4,362 HR during geotechnical investigation 2 2 $250 (Three LPST site suspected) PSC 5. Onsite direction for soil sampling for arsenic, pH analysis 2 12 14 $1,496 HR during geotechnical investigation 0 $0 (One arsenic site suspected) PSG 6. Water sampling for TPH and BTEX, pH, arsenic 4 36 36 76 $7,300 HR 0 $01 PSC 7. Coordination and onsite presence for monitor 1 32 72 1 106 $11,633 HR well. construction (up to 20 new welis) 8 1 9 $770 PSC S. Measure groundwater levels, 20 wells @ 2 per well 1 B 96 2 107 $9,950 HR Summarize groundwater data (up to 20 new wells) 4 4 $500 Retrieve samples for analysis PSC 9. Incorporation andcheck of aerials furnished by Owner 1 24 24 72 80 6 207 $20.594 HR Trials for compatibly of scale, TIN and DTM 1 16 16 48 80 1 162 $13,1380 PSC 10. Review environmental records search update 1 8 24 24 1 58 $5,969 HR and plot new data on plan -profile sheets Q $0 PSC 11. Retrieve additional LPST records from 1 4 28 33 $4,068 HR TC€O, if possible 0 $0 PSC 12. Collate and interpret field data as it becomes available 2 80 60 96 64 4 326 $37.160 HR and correlate data between subs (geotech, monitor well, 2 24 24 24 4 78 $8.180 surveys, environmental search) throughout design PSC 13. Confirm storm sewer route with City staff, prepare 2 1242 32 2 90 $9,062 HR exhibits as necessary for coordination with Staff 2 6 20 12 2 44 $4,028 Review with staff alternate route if warranted Page 2 of 12 Basic Services CITY OF LUBBOCK, TEXAS ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN NORTHWEST LUBBOCK DRAINAGE IMPROVEMENTS PROJECT ESTIMATE OF MAN-HOURS, WORKSHEET 1 BASIC DESIGN SERVICES, ESTIMATE OF MAN-HOURS AND TASKS File: NWLDIP-1.KLS EXHIBIT A-1 26 -Oct -09 01:55 PM Firm Task Prin. Proj. Sr. Prof. Prof. ET Technician CADD Opn Clerical Total Total or Mgr Engr. Engr. Arch, or or Hours Extension Officer Designer CADD Tech $ PSC $160.00 $160.00 $136.00 $116.00 $98.00 $87.00 $79.00 569.00 HR <<<<<<<<<<<< Rates $150.00 $135.00 $125.00 $105.00 $90.00 $69,00 $50.00 C. REFINE MODEL OF SELECTED ALTERNATIVE 1. Verity desired level of protection with City staff PSC 1 3 4 $660 HR 1 3 4 $525 PSC 2. Use runoff curve numbers from feasibility study 1 2 2 5 $586 HR (No additional effort) Develop runoff curve numbers for 1 1 $135 Rawls Lake watershed and indiana local inflow (addl. effort) PSG 3. Use drainage area boundaries from feasibility study 3 4 4 11 $1,260 HR (No additional effort), additional drainage calcs for Rawls 2 2 4 $430 Course Lake and local inflows at Indiana (add], effort) PSC 4. Use times of concentration from feasibility study 2 1 _ 5 $632 HR (No additional effort), calculate times of concentration 2 1 r 5 $555 for additional areas added (add], Effort) PSC 5. Revise elevation -area -storage data for lakes using 1 =.5 36 4G 40 133 $13,996 HR new orthophotograhy and DTM plus bathymetric 1 A i6 16 41 $3,694 field survey data, incorporate field survey data into lakes DTMs (LCU lake, L42, L43, L45, L46, L47, L52, L71 LSOS). Use beginning water surface elevations from feasibility study or as directed by Owner. Update Excel tables. PSC Coordinate with Owner about using fully -developed :. 3 $480 HR �6. on TTU agricuttural property 3 5375 PSC 7. Revise baseline hydrologic models using revised 1 6 8 96 113 $11,796 HR lake elevation -area -storage relationships and run 1 4 16 21 $2,370 baseline models (existing, future no -action) (Existing condition and future no -action 5-, 10-, 25-, 5(3 - and 100 -year events). Update model input, run and compare to feasibilfty study results. Insert routing L47 -L52 PSC B. Revise feasibility study adlQPR model for Alt. 5, 8 8 96 112 $11,616 HR using revised lake elevation -area -storage relation- 4 4 16 24 $2.720 ships (5-, 10-, 25-, 50-, and 100 -year events). Update input, add routing, run, compare to feasibility sty results. PSC 9. Refine adlCPR model storm sewer profiles based 1 32 24 64 1 122 $14,905 HR on Initial field data for utilities- 1 16 16 1 34 $3,643 PSC 10. Coordinate with City staff on manhole spacings 1 1 S116 HR and locations for model refinement 0 $0 (proposed storm sewer) Page 3 of 12 Basic Services CITY OF LUBBOCK, TEXAS ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN NORTHWEST LUBBOCK DRAINAGE IMPROVEMENTS PROJECT ESTIMATE OF MAN-HOURS, WORKSHEET 1 BASIC DESIGN SERVICES, ESTIMATE OF MAN-HOURS AND TASKS File: NWLDIP-1.XLS EXHIBIT A-1 26 -Oct -09 01x5 PM Firm Task Prin. Proj. Sr. Prof. Prof. EIT Technician CADD Opr. Clerical Total Total or Mgr. Engr. Engr, Arch. or or Hours Extension Officer Designer CADD Tech. (S) PSC $180.00 $160.00 $136.00 $116.00 $98-00 $87.00 $79-00 $69.00 Hp ««<«««< Rates »»»>»»> $150.00 $135.00 $125.00 $105.00 $90.00 $69.00 $50.00 PSG 11. Routing cross sections take -off from CTM, L47 to L45, 6 10 40 16 72 S7,304 HR L46 to L52, data for proper routing and hydrograph 6 6 $750 timing accounting at Indiana PSC 12. Refine model staged conduit sizes 1 24 32 64 32 153 $16,532 HR Refinement to include looking at box Indiana ID Quaker 10 10 20 $2,300 as potential feasible, maybe smaller box east of Indiana PSC 13. Review model results with City Staff, prepare summaries 1 16 32 60 1 110 $13,041 HR and graphs, est. two meetings for review 8 6 16 $1,720 (Also refine Item G12 for review purposes) PSG 14. Update Opinion of Probable Construction Cost 2 16 32 108 2 160 $17,354 HR based on refined model (Use existing quantity 48 64 112 $11,760 information as appropriate)(update each 6 months) _ PSC 15. Prepare final adICPR model as refined from 2 8 12 48 16 2 88 $9,506 HR design drawings„ QA review by HRA 12 8 20 $2,220 PSC 16. Run FIS model and outflow hydrograph from drain system, 8 8 1 17 $2,133 HR Analyze for increases in peak discharge above FIS flow rates 16 64 2 82 $7,860 in main Canyon, check for depth of flow over dam, effect on Erskine sag vertical curve PSG 17. Coordinate with Owner on potential re-route of system 1 8 12 12 1 34 $4.097 HR and/or reconfiguring profile based on field data, testing, 1 8 9 $1,230 and utilities D. DETAILED DESIGN ITEMS 1. Submerged intlet structures -- Minor -- (5 estimated) PSC 1 4 64 69 $8.244 HR primarily dimensional and Structural analysis 0 50 PSC 2. Submerged intlet structures -- Major (1 estimated) 3 48 16 67 $7.61$ HR primarily dimensional and structural analysis 0 $0 (Large L43 structure) PSC 3. Outlet structure at Canyon (potential erosion 1 15 24 24 65 57,876 HR control measures such as rock riprap may be 1 6 7 5780 necessary, also unknown what Corps may require) PSG 4. Transition of storm drain conduit for conformity to Sopa 20 32 16 68 $8,480 HR primarily dimensional and structural analysis 6 6 $750 Page 4 of 12 Basic Services CITY OF LUBBOCK, TEXAS ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN NORTHWEST LUBBOCK DRAINAGE IMPROVEMENTS PROJECT ESTIMATE OF MAN-HOURS, WORKSHEET 1 BASIC DESIGN SERVICES, ESTIMATE OF MAN-HOURS AND TASKS File: NWLDIP-1.XLS EXHIBIT A-1 26 -Oct -09 01:55 PM Firm Task Prin. Pro}, Sr. Prof. Prot EIT Technician CADD Opt. Clerical Total Total or Mgr. Fngr. Engr. Arch. or or Hours Extension Officer Desi ner CADD Tech. $} PSC $180.00 $160.00 $136.00 $116.00 $98.00 $87.00 $79.00 $69.00 HR ««<c««« Hales >>>>>>>>>>>> $150.00 $135.00 $125.00 $105.00 $90.00 $69.00 $50.00 PSC 5. Triple inlets frank at Indiana for overflow interception from 16 56 24 96 $11,406 HR Rawls Course Lake 0 $0 Dimensional and strucrtural analyses PSC 6. 0584, 19th Street, Loop 2B9 and US62 Crossings -- (3) 1 16 44 84 145 $16.076 HR (involves tunneling and de -watering, tunnel stresses) 0 $0 primarily dimensional and structural analysis PSC 7. Jackson Delindng, University, Indiana„ Quaker, 4th St 1 20 46 112 179 $19,692 HR crossings (4) (involves tunneling and dewatering) 0 $0 primarily dimensional and structural analysis PSC B. Railroad Crossings ( 1 set of tracks in 1 crossing( 1 6 32 32 71 $7,986 HR (involves tunneling and tunnel stresses) 4 4 $500 PSC 0 $0 HR 0 $0 PSC 10. Backfill Requirements (use typical requirements rather 1 6 16 16 8 47 $5,260 HR than reach specific requirements, geotech materials 4 4 4 12 $860 eneral grouping of backfill) PSC 11. Pavement Cut and Repair (Use a typical section per 1 4 16 1 22 $2,457 HR street type such as residential, industrial service, 4 8 1 13 $1,270 Ne -lane and seven -lane service), Coord. Wicity PSC 12. Reserved 0 $0 HR 0 $0 PSC 13. Calculate pipe D -loads for open trench, loads on bDM. 1 24 24 140 189 $20,524 HR 8 20 28 $2,800 PSG 14. Coordinate with City staff on allowable pipe 1 16 24 3 44 $5,731 HR materials and point types, research permissible box joint 8 1 9 $1,050 options PSC 15. Architectural treatment of inlelatheadwalls, 1 18 20 32 4 75 $8,184 HR Use previous concepts, meet with lake owners or Parks 4 4 1 9 $970 as al PSC 16. Impact structure energy dissipating at Canyon, 6 6 12 $1,656 HR evaluate velocities from conduit (no structural or details) 2 2 $250 Page 5 of 12 Basic Services CITY OF LUBBOCK, TEXAS ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN NORTHWEST LUBBOCK DRAINAGE IMPROVEMENTS PROJECT ESTIMATE OF MAN-HOURS, WORKSHEET 1 BASIC DESIGN SERVICES, ESTIMATE OF MAN-HOURS AND TASKS Fiip Nwi nip -1 xl lq EXHIBIT A-1 26 -Oct -09 01:55 PM Firm Task Prin. Proj. Sr. Prof. Prof. FIT Technician CAD Clair. Clerical Total Total or Mgr. Engr. Engr. Arch. or or Hours Extension Officer Designer CADD Tech. (�} FSC $180.00 $160,00 $136.00 $116.00 $98.00 $87.00 $79.00 $69.00 HR Rates »»»»»» $150.00 $135.00 $125.00 $105.00 $90.00 $69,00 $50.00 E. PREPARATION OF PLANIPROFILE DRAWINGS 1 L43 to Canyon, 27,000 If estimated PSC 2 78 200 320 120 400 1120 $109,440 HR Utility add -ins, boring and monitor well locations, pipe 0 $0 grades and call outs. D -load call outs, reviews, 30 sheets PSC 2. Lake 45 tc Trunk Sewer -- 2,600 If estimated 4 4 $640 HR Utility add -ins, boring and monRcr well Ioactions, pipe 1 4 26 17 9 80 137 $10,470 grades and call outs, D -load call outs, reviews, 2 sheets PSC 3. Lake 46 to Trunk Sewer -- 1,300 If estimated 4 4 $640 HR Utility add -ins, boring and monitor well locations, pipe 1 2 13 30 12 40 96 $7.245 grades and call outs, D -load call outs, reviews, 1 sheets PSC 4. Lake 71 to Trunk Sewer - 13,100 If estimated 1 32 100 1 r0 60 200 553 $53,600 HR Utility add -ins, boring and monitor well locations, pipe 0 $0 grades and call outs, D•load call outs, reviews, 15 sheets PSC 5. Allowance for re-route basedon subsurface conditions, 1 46 124 184 220 577 $57,656 HR ability to procure easements, and environmental testing 1 26 28 72, 80 209 $18,870 PSC 6. Finish grading at 5 inlets, cullet, riprap details 14 24 32 140 210 $19.220 HR different const packages 4 8 12 36 60 $4,904 PSC 7. Traffic control plans, 4 const packages, numerous sheets 1 24 100 60 180 365 $35.720 HR Coord. With Owner on roadl closures 1 6 6 12 48 73 $5.982 PSC 8. General Notes, four const packages 2 12 6 20 $2,186 HR 2 2 2 6 $618 Page 6 of 12 Basic Services CITY OF LUBBOCK, TEXAS ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN NORTHWEST LUBBOCK DRAINAGE IMPROVEMENTS PROJECT ESTIMATE OF MAN-HOURS, WORKSHEET 1 BASIC DESIGN SERVICES, ESTIMATE OF MAN-HOURS AND TASKS File NWI DIP -1 )(I.q EXHIBIT A-1 26-0ct•09 01755 PM Firm Task Prin. Proj. Sr. Prof. Prof. FIT Technician CADD Opt. Clerical Total Total or Mgr. Engr. Engr. Arch. or or Hours Extension Officer Designs CADD Tech_ ($) PSC $160.00 $160.00 $136.00 $110.00 $96.00 $87.00 $79.00 $69.00 HR «««««« Rates $150.00 $135.00 $125.00 $105.00 $90.00 $69.00 $50.00 PSC 9 Reserved 0 s0 HR 0 $0 PSC 10. Reserved 0 $0 HR 0 $0 PSC 11. Reserved 0 $0 HR 0 $0 PSC 12. Reserved 0 $0 HR 0 $o PSC 13- Reserved 0 $0 HR 0 $0 F. PREPARATION OF MISC'De7AIL SHEETS PSC 1. Trenching, Excavation and Backfill 6 5 4 C 44 1 60 $5,477 HR Typical details (not customized, use prior project with 2 2 0 4 1 9 $716 with revisions for this project )(2 sheets est. for pipe plus one new sheet for box) PSC 2, Manholes 1 14 12 8 72 1108 $10,353 HR Two sets of details, large dia. pipe and small dia. pipe 2 4 4 1 11 $936 special details associated wleach (3 sheets est.) (prior project sheets with revisions, plus 2 new shts box) PSC 3, Headwalls & Wingwalls. box sewer at outlet, swing grate B 12 12 96 128$11,432 HR Highly detailed dimensional and reinforcing 0 $0 steel details, several views each (2new sheet est.) Page 7 of 12 Basic Services CITY OF LUBBOCK, TEXAS ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN NORTHWEST LUBBOCK DRAINAGE IMPROVEMENTS PROJECT ESTIMATE OF MAN-HOURS, WORKSHEET 1 BASIC DESIGN SERVICES, ESTIMATE OF MAN-HOURS AND TASKS File: NWLDIP-1,XLS EXHIBIT A-1 26 -Oct -09 01:55 PM Firm Task Prin. Proj. Sr. Prot. Prof. EIT Technician CAPD Opr. Clerical Total Total or Mgr. Engr. Engr. Arch. or or Hours Extension Officer Designer CADD Tech. {$} PSC $180.00 $160.00 $136.00 $116.00 $98.00 $87.00 $79.00 $69.00 FIR «cocaaacc« Rates >>>>>>>>>>>> $150.00 $135.00 $125.00 $105.00 $90,00 $69.00 $50.00 PSC 4. Tunnelling 1 6 8 B D 16 39 $4,116 HR Typical tunneling details T1 sheet est.) 4 0 0 6 4 8 $776 PSC 5. Pavemenl Cut and Repair, pipe and box sections 1 4 6 6 40 1 5B $5,333 HR Typical details ior approx. 4 street types (3 sheets est,j 1 3 $300 PSC 6. Erosion and Sediment Control 1 6 6 B 2 23 $2,606 HR Construction activity controls (typ. where possible) 45 32 96 2 176 $16,084 (4 sheets est.) _ _ PSC 7. Additional items for delivering four (4) PS&E 6 96 84 96 48 132 12 474 $51,024 packages such as project title differences. drawing 4 20 14 24 24 3 89 $8,536 notes that apply to only one package, consistency HR between PS&E packages, detailed notes revisions, elc. PSC 8. Reserved 0 $0 HR 0 $0 PSC 9. Miscellaneous Utility Adjustments 0 $0 HR (Utilfty adjustments design not a part of contract 0 $0 PSC 10. Flatwork, Park Drains and Miscellaneous Concrete 1 18 8 12 16 26 2 81 $8,428 HR 3sheets est. 1 16 24! 48 24. 96 6 215 $15,914 PSC 0 $0 HR 0 $0 PSC 12. Special consideration at outlet, either an energy impact 2 54 96 96 172 2 422 $43,270 HR basin, or transition to smaller boxes, mult. Barrels 6 6 $750 5 sheets est. PSC 13. Detail triple inlet set, interception at Indiana 2 4B 6G 48 19D 348 $34,714 HR est. six detail sheets 8 8 16 $1,920 PSC 14. Reserved 0 $0 HR 0 $0 & PREPARATION OF SPECIFICATIONS 1. Prepare outline of specifications sections PSC 2 48 48 30 9 137 $17,169 HR (Four separate PS&E packages) 2 4 24 8 3 41 $4,190 Page 8 of 12 Basic Services CITY OF LUBBOCK, TEXAS ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN NORTHWEST LUBBOCK DRAINAGE IMPROVEMENTS PROJECT ESTIMATE OF MAN-HOURS, WORKSHEET 1 BASIC DESIGN SERVICES, ESTIMATE OF MAN-HOURS AND TASKS File NWi NP -1 Xi r; EXHIBIT A-1 26 -Oct -09 D1;55 PM Firm Task Prin. Proj. Sr. Prof. Prof. EIT Technician CADD Opr. Clerical Total Total or Mgr. Engr. Engr. Arch. or or Hours Extension Officer Designer CADD Tech. ($ PSG $180.00 $160.00 $136.00 $116.00 $96.00 $87.00 $79.00 $69-00 HR ««««c<<< Rates >>>>>»»>>> $150.00 $135.00 $125.00 $105.00 $90.00 $69.00 $50-00 PSC 2. Coordinate General Conditions with City 2 40 24 3 69 $9,751 HR (Four separate PS&E packages) 2 16 16 3 37 $4,130 PSC 3. Prepare individual Specification Sections 1 100 168 168 48 485 $55,444 HR (Four separate PS&E packages) (revise per pk) 1 56 56 42 155 $14,290 PSC 4. QAIOC of plans and specifications 1 196 10 207 $32,230 HR (final QA/QC, four packages) 1 132 6 139 $16,950 PSC 5. Perform quantity take offs, revise Opinion of 1 72 108 172 172 168 6 719 $71,314 HR Probable Construction Cost (Four PS&E Packages) 1 32 68 48 40 6 196 $14,350 PSC 6. Coordinate with City staff on format of bid form 1 40 40 16 8 105 $13,340 HE and any alternate bids (Four PS&E packages) 1 12 12 12 6 43 $4,290 PSC Quantity and detail compliance with street repair/rebuild 32 48 48 48 176 $19,184 HE 17. ordinance 8 16 24 48 $4,096 PSC 8. Prepare Exhibit A bid formats four construction packages 28 72 32 12 144 $16,796 HR 6 20 8 3 39 $3,970 H, RIGHT OF WAY 1. Coordinate with City staff on easement and right PSC 2 80 80 80 72 12 326 $36,796 HR of way needs, crossing permits status 2 64 32 48 8 154 $15,372 PSC 2. Prepare easement and right of way parcel drawings 1 96 3 100 $15.747 HR and metes and hounds descriptions for private 1 96 3 100 $12,300 property right of way/easement acquisition (City to furnish existing property metes and bounds) Oversight task PSC 3. Coordinate with TxDOT and Railroad for highway 1 20 40 16 16 12 1 u5 $11,68o HR and railroad crossings 1 12 6 8 3 32 $3.072 PSC 4. Prepare permit applications and supporting 1 6 40 60 72 6 185 517,762 HR exhibris (TxDOT ® US84, 4th Street, 19th Street, 6 6 12 $1,380 Loop 289 and US62) PSC 5. Prepare permit applications and supporting 1 4 8 32 32 8 85 $7,964 HR exhibits for railroad crossings (one permit for 4 4 $500 1 locations involving 1 track Page 9 of 12 Basic Services CITY OF LUBBOCK, TEXAS ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN NORTHWEST LUBBOCK DRAINAGE IMPROVEMENTS PROJECT ESTIMATE OF MAN-HOURS, WORKSHEET 1 BASIC DESIGN SERVICES, ESTIMATE OF MAN-HOURS AND TASKS rd.- KJW1 NP -1 Yi c EXHIBIT A-1 26 -pct -09 01:55 PM Firm Task Prin. Proj. Sr. Prof. Prof_ EIT Technician CADD Opr. Clerical Total Total or Mgr. Engr. Engr. Arch. or or Hours Extension Officer Designer CADD Tech. ($} PSC $160.00 $160.00 $136.00 $116.00 $98.00 $57.00 $79.00 $69.00 HR Rates »»»»»» $150-00 $135-00 $125.00 $105.00 $90.00 $69.00 $50.00 PSC 6. Reserved 0 $0 HR 0 $0 I- COORDINATION WITH UTILITIES Coordinate with SUE subconsultant PSC 1 48 48 36 36 169 $19,800 �1. HR 1 6 6 13 $1,530 PSC 2. Reserved 0 $0 HR 0 $0 PSC 3. Identify utility adjustments necessary to the project 1 40 40 56 56 24 6 223 823,890 HR (Utility adjustment designs not part of this scope) 1 16 16 24 16 2 75 $7.194 PSC 4. Notify City staff and review utility adjustments 1 12 4 17 $2,376 HR recommendations 8 6 14 $1.300 PSC 5 Reserved 0 s0 HR 0 $0 K- SID PHASE SERVICES 1. See Exhibit A-2 PSC 0 $0 HR 0 $0 PSC 2. Reserved 0 $0 HR 0 $0 PSC 3. Reserved 0 $0 HR 0 $0 PSC 4, Reserved 0 $0 HR 0 $0 PSC 5. Reserved D $0 HH 0 $0 Page 10 of 12 Basic Services CITY OF LUBBOCK, TEXAS ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN NORTHWEST LUBBOCK DRAINAGE IMPROVEMENTS PROJECT ESTIMATE OF MAN-HOURS, WORKSHEET 1 BASIC DESIGN SERVICES, ESTIMATE OF MAN-HOURS AND TASKS Rlw NWLDIP-1 XLS EXHIBIT A-1 26-Oci-09 01:55 PM Firm Task Prin. Proj. Sr. Prof. Prof. EIT Technician CADD Opr. Clerical Total Total or Mgr. Engr. Engr. Arch. or or Hours Extension Officer Designer CADD Tech. ($} PSC $180.00 $160.00 $136.00 $116.00 598.00 $87.00 $79.00 $69.00 HR «««««« Rates »»»»»» $150.00 $135.00 $125.00 $105.00 S90.00 $69.00 $50.00 L. DELIVERY TO CITY 1. Organize and consolidate final design data PSC 2 24 54 32 72 12 196 $20,116 HR (Four PS&E packages) 2 B 32 16 16 a 82 $7,604 PSC 2. Reproduce duplicate sets of the design data and a' 4 211 6 34 $3,478 deliver to City HR Four PS&E packages 4 20 3 31 $2,870 PSC 3. Organize electronic files and directories, write to 4 10 16 16 3 49 $4,839 HR CD, deliver CD's of electronic files 4 6 6 8 2 28 $2,532 (Four PS&E packages) M'. OTHER ITEMS PSC 1. Reserved 0 SO HR 0 SO PSC 2. Reserved 0 $o HR 0 $0 PSG 3. Reserved 0 $0 HR 0 $0 PSC 4. Coordination with Parks Dept. 24 24 24 72 $8,068 HR 12 12 $1,500 PSC 5. Coordination with private lake owners w/City Staff 1 2532 24. 24 16 125 $11,988 HR 1 16 16 6 8 47 $4,922 PSC i6. Detailed design and drawing details for storm water 8 z 16 96 132 $11,824 HR sampling station (est. 2 sheets) 0 1 $0 Page 11 of 12 Basic Services CITY OF LUBBOCK, TEXAS ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN NORTHWEST LUBBOCK DRAINAGE IMPROVEMENTS PROJECT ESTIMATE OF MAN-HOURS, WORKSHEET 1 BASIC DESIGN SERVICES, ESTIMATE OF MAN-HOURS AND TASKS File_ NWLDIP-1.XLS EXHIBIT A-1 26 -Oct -09 01:55 PM Firm Task Prin, Rroj. Sr. Prof. Prof. FIT Technician CADD Opr. Clerical Totai Total or Mgr. Engr. Engr. Arch. or or Hours Extension Officer Designer CADD Tech. ($j PSC $180.00 $160,00 $136.00 $116.00 $98.00 $87.00 $79.00 $69.00 HR «««««ate Rates »»»»»» $150.00 $135.00 $125.00 $105.00 $90.00 $69.00 $50-00 PSC 0 $0 HR 0 $0 PSC 0 $0 HR 0 $0 PSC 0 $0 HR 0 $0 118 2174 1026 3162 24 0 4235 627 3778 362 15706 PSG 77 2089 68 2571 24 0 3466 730 2974 226 12225 78% HR 41 85 958 591 0 0 769 97 804 136 3481 22% 15706 Totals for Worksheet 1 — Basic Design Services PSC $13,864 $334,240 $9.248 $298,236 $0 $0 $339,668 $63,510 $234,946 $15,594 $1,309,302 80% HR $6,150 $11,475 $119,750 $62,055 $0 $0 $69,210 $0 $55,476 $6,600 $330,916 20% $1,640.218 Page 12 of 12 Basic Services CITY OF LUBBOCK, TEXAS ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN NORTHWEST LUBBOCK DRAINAGE IMPROVEMENTS PROJECT ESTIMATE OF REIMBURSABLE EXPENSES, WORKSHEET 2 BASIC DESIGN SERVICES, REIMBURSABLE EXPENSES File: NWLDIP-2.XLS EXHIBIT A-1 woo PM 26 -Oct -09 Page 1 of 2 Basic Services Reimbursable Expenses Total PSC Mileage 2000 Miles (0 $0.55 per mile $1,100 HH 1004 Miles @ $0.55 per mile $550 PSC Blueline prints -- checksets plus three review sets 5800 Sheets U $3.49 per sheet $20,242 HH only, 200 sheets per review set est., misc.markup sheets. 400 Sheets @ $3-49 per sheet $1,396 13 sets of final drawings to Owner (Four packages) (3 numbered sets at bid period, 10 unnumbered sets) PSC 8.5 x 11 and 11x 17 Reproductions, misc. 8500 Sheets @ $0.10 per sheet $850 HR 2500 Sheets @ Si per sheet $250 PSC Tell telephone 1 Project a $750.00 per project $754 HR 1 Project rad $750.00 per project $750 PSC Fax 1000 Pages @ $1.00 per page $1,000 HR Soo Pages @ $1.00 perpsi $500 PSC Postage, shipping and delivery, misc. 100 Mailings ® $15.00 per mailing $1,500 HR 35 Mailings U $15.00 per mailing $525 PSC CARD charges 3050 Hours « $8.06 per hour $24,400 HR 860 Hours $B.00 per hour $6,880 PSC Interface probe rental charges for groundwater 2 Days a, $150.00 per day $300 HR measurements 0 Days (ri $150.00 per day $0 PSC Mylar for reproducible construction drawings, final sets 2 Rolls ® $320.00 per roll $640 HR 0 Rolls a $320.00 per roll s0 Page 1 of 2 Basic Services CITY OF LUBBOCK, TEXAS ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN NORTHWEST LUBBOCK DRAINAGE IMPROVEMENTS PROJECT ESTIMATE OF REIMBURSABLE EXPENSES, WORKSHEET 2 BASIC DESIGN SERVICES, REIMBURSABLE EXPENSES File: NWLDIP-2.XLS EXHIBIT A-1 05:00 PM 26 -Oct -09 Page 2 of 2 Basic Services Reimbursable Expenses T.xai PSC Update environmental records search 1 Job 4 $1,500.00 per job HR 0 Job a $0.00 per job SC PSC Analytical lab analysis for TPH in sails 40 samples $100.00 per sample ><^ 000 HR 0 samples $100.00 per sample K PSC Analytical lab analysis for BTEX in soil and water 45 samples ii�p $150.00 per sample S6,750 HR 0 samples a $150.00 per sample $0 PSC Analytical lab analysis for arsenic in sail and water 45 samples (n, $90M per sample $4,050 HR 0 samples $90.00 per sample $0 PSC 0 sets w $0.00 per set $0 HR 0 sets - $0.00 per set $0 PSC 0 sets a $0.00 per set $0 HR 191809-61) 0. sets rq, $0,00 per set $0 PSC 0 paired sets a $0.00 per paired set $0 HR C; ly at bA phase. 10 G ily sets a4ef award, 1 PSC, 1 HPA) 0 paired sets 9 $0.00 per paired set $0 PSC 404 19-48) 9,.'^TeR1 ^' 49 13;61 Sells •^ ^'^^ 0 shipments $0.00 per shipment $0 HR eseaeray sewise 0 shipments $0.00 per shipment $0 Subtotals for Worksheet 2 --- Basic Design Services PSC $67.082 HR $10,851 wl Contract multiplier for reimbursables = 1.15 Total $89,623 Page 2 of 2 Basic Services CITY OF LUBBOCK, TEXAS ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN NORTHWEST LUBBOCK DRAINAGE IMPROVEMENTS ESTIMATE OF SUBCONSULTANT EXPENSES, WORKSHEET 3 BASIC DESIGN SERVICES, SUBCONSULTANT EXPENSES F=ile: NWL,MP-3.XLS EXHIBIT A-1 n1 -e! PA.1 Page 1 of 3 BASIC SERVICES Subconsultant Expenses Total Subtotal Geotechnical Services Jsubcons iltantl Geotechnical, hollow stem auger drilling, SPT ® 2-1F2', 5' and 5' intervals thereafter a. 6 lest holes to maximum 30' depth each (one hole at at each lake inlet and outlet location) ISO Lit a $ 18X0 per foot $3,240 b. Value of cohesion at each lake inlet location plus outlet location, cohesion depth by Engineer 5 Each a $ 100.00 per each $500 c. 36 lost holes to maximum 50' depth each (average depth, est. one per quarter mile) 1,800 Lit ka $ 16.00 perfect $32,400 (6 of these test holes contingent on route) d. 5 lest hales to maximum Well each feet each with split spoon samples for chemical 250 Lft a $ 15.00 per fool $3,750 analysis, decontamination between samples, in conjunction with the above test holes, these are additional charges for reduced drilling production rates, sampling interval in the field to be determined by the Engineer e. Laboratory feeling including moisture content, percent 440 Each a $ 75.00 per each $33,000 passing #200 sieve, Atterberg Limits, and soil calssificatlun, est. at 5 feet initial depth and 5 feet intervals thereafter, 36 primary plus 6 contingent fast holes I. Grouting test holes upon completion 11890 Lff a $ 15.00 per foot $29,700 g. Core drib through auger refusal reaches (suspected rock) 1,200 Lit a $ 30.00 per foot $36,000 h. Coring through concrete of asphalt and repairing, estimate 12 test hales 12 Each a $ 150.00 per each $1,800 i. Triaxial shear test, ASTM 0-2650, unconsolidated and 12 Each a $ 175.00 per each $2,100 undrained, estimated at one per mile and at tunnel portals j. Retrieve ROO cares, estimated at 2 per test hole on average (store longer than 6 men.) 470 Lft a $ 30.00 per foot $14,100 k. Perform soil resislvity, test 147 lest hales, 6 of which are contingent) 70 Each a $ 150.00 per each $10,500 I. Perform pH test of soil 47 Each a $ 25.00 per each $1,175 m, Engineering analysis and recommendation (4 reports pius one contingent report) based 40 Hours 0 $ 125.00 per hour $5,Oi70 on design packages n. Traffic control (per TXOCT on TXOOT right-of-way, per City on City right-of-way) 20 days a $ 650.00 per day $13,000 c. Rental charges for traffic signs 20 days a $ 200.00 per day $4,000 p. Clearing test holes with utl6lles 40 Hours a $ 65.00 per hour $2,600 q. Mobilization of HAS drill rig 24 days a $ 4WOO per day $9,600 r. Mobilization of decontamination equipment 5 days a $ 350.00 per day $1,750 s. Orahing, word processing, report production 1 Project 0 $ 300.00 per project $300 $204.5-15 City to provide access permission onto private row Terra to assist PSC with sampling for chemical analysis Page 1 of 3 BASIC SERVICES CITY OF LUBBOCK, TEXAS ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN NORTHWEST LUBBOCK DRAINAGE IMPROVEMENTS ESTIMATE OF SUBCONSULTANT EXPENSES, WORKSHEET 3 BASIC DESIGN SERVICES, SUBCONSULTANT EXPENSES File: NWLDIP-3.XLS EXHIBIT A-1 n1 -e7 PU 9a -M. -ni Page 2 of 3 BASIC SERVICES Subconsultanl Expenses Total Subtotal Aerial Photoaraahv (subcgnsulumll None - digital aerials, digital TIN tiles, digital DTM based on aerial photogrammetry to be furnished by others under separate contract with the City of Lubbock. Drainage design consultant team can rely on information as correct. " 1Su"Ciing fsubconsultabtl See Workshaet3 and 3A $555,278 City to obtain access permission onto private row Subsurface Utility Engineering (SUE) lsubconsuitanl a. Estimaled 146,060 utility feet of utilities 146,400 LF a $0.90 per LF $131,400 b. Allowance for tour vacuum truck mobilizations for locating utilities 4 Each a $750.00 each $3,000 c. Allowance for up to 50 locate holes, 0-4 feet deep So Each a $750.00 each d. Allowance for up to 50 locate hales, 4.1-8 feet deep 50 Each a $950.00 each $47,500 e. Allowance for up to 15 locate holes, 8.1-12 feet deep 15 Each a $1,150.00 each $17,250 I. Allowance for up to 15 locate holes, 12.1-15 feet deep 15 Each t$ $1,550.00 each $23,250 $222,40U Monitoring well fsubconsultantl a, Mobilization, drill rig i ancillary equipment & crew (estimate one mobilization per two wells) i0 Each ® $ 175.06 per each $ 1,750 b. Monitoring wail drilling operations t0 drill 7-10 inch borehole, 0.010 inch 2,000 Feet a $ 77.60 per foot $ 155,200 screen, filter pack, grout, bentonite, based on 100 feel average per well, 15 basic wells estimated, 5 webs contingent, casing and screen Schad. 4C PVC, foam andlor water allowed as conditions require c. Pilot hole drilling, 4 -inch bet, air drilled, for water table detection, based 1.460 Feet a $ 5.25 per toot $ 7,350 on 70 feel average per well, 15 basic wells plus 5 wells contingent d. Allowance for split spoon soil sampling and decontamination between samples 4 Hole a $ 675.00 per hole $ 2,700 split spoon sampling only required at selected well locations as determined by Engineer (unit price includes Increased labor and slower drilling production allowances) (sampling interval estimated beginning at 5 -foot below grade and at 5 -foot intervals thereafter, plus sample at groundwater surface interface) e. Allowance for mobi0zing decontamination equipment, (estimate one mobilization per well) 4 Hole m $ 165.00 per hole $ 660 decontamination only required at selected well locations as determined by Engineer I. Manhole surface finish, 15 basic wells, 5 welts Contingent, manhole surface 20 Each a $ 165.00 per each $ 3,300 9. Protective steel casing surface finish, painted (g needed, replaces manhole surface qty) 1 51 Each I a I$ 165.D0 I per each I I $ 825 Page 2 of 3 BASIC SERVICES CITY OF LUBBOCK, TEXAS ENGINEERING, SERVICES FOR STORM DRAINAGE DESIGN NORTHWEST LUBBOCK DRAINAGE IMPROVEMENTS ESTIMATE OF SUBCONSULTANT EXPENSES, WORKSHEET 3 BASIC DESIGN SERVICES, SUBCONSULTANT EXPENSES File: NWLDiP-3.XLS FX14IRIT,S_1 .1.-- Page 3 of 3 BASIC SERVICES Subconsultant Expenses Total Subtotal h. Protective steel bollards and rails, painted, with surface slab (if needed) 5 Each a $ 500At1 per each $ 2,500 I. Mobilization of Smeal 5T balling/pumping truck & crew, 15 wells basic, 5 wells contingent 6 Each a $ 262.50 per each $ 1,575 j. Balldngtpumping set up and preparation 20 Each a $ 750.00 per each $ 15,000 k. Balling/pumping operation downhole, no water capture 20 Hours Q $ 100,00 per hour $ 2,000 (contaminated water not anticipated), one hour per well I. DtlRy clearances prior to drilling each well 24 Hours ito $ 125.00 per hour $ 3,000 m. Site cleanup (drill cuttings hauled to Lubbock. landfill, no 20 Each a $ 175.00 per each $ 3,500 Upping fee anticipated for City work) n. Tratficlpedestrian control is wells expected le be in non-vehicde area) 15 Each ® $ 125.00 per each $ 1,875 e. Gut and remove asphalt pavement 15 Each a $ 225.00 per each $ 3,375 p. Plug pilot holes per TNRCC $ HPIIWCD rules, est. at 8 pilot holes 0 100' ea 666 Feet a $ 3.35 per foot $ 2,680 $ 207,290 q. Copies of wed reports to be furnished to the Engineer r. City to obtain access permission onto private row s. Engineer may make adjustments at each well based on field conditions to total depth, screened Inlerval, cement grout deptfl and surface finish. L It depth to water table is 100 feet or greater, then depth to water will be noted and pilot hole plugged. u. Quantities herein based on averages and on HPUWCD 1995 Atlas. Actual field concittions and quantities may vary. Subtotal$ for Worksheet 3 — Basic Design Services $1,189,483 Subtotal from Worksheet S $7,640,218 Subtotal from Worksheet 2 $89.623 Total Estimated Professional Basic Design Services Fee $2,919,324 Page 3 of 3 BASIC SERVICES CITY OF LUBBOCK, TEXAS ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN NORTHWEST LUBBOCK DRAINAGE IMPROVEMENTS ESTIMATE OF SUBCONSULTANT EXPENSES, WORKSHEET 3A (Surveying) BASIC DESIGN SERVICES, SUBCONSULTANT EXPENSES File: NWLDIP-3.XLS EXHIBIT A-1 04:15 PM 26 -Oct -09 Task Engr. or Reg:. Prof. Technician Senior Total Total Principal In p Surveying Lend Senior Prof. Prof. EIT or Survey CADD Survey Crew Hours Extension Charge Project Surveyor Engineer Engineer Crew Technician $i - ... Rates »..... >> 5150.00 3135.00 $110.00 $125.00 5105.00 590.00 575.00 575.00 $175.00 Surveying Establish Project Horizontal and Vertical Control 1 4 8 i 21 40 65 1 $9,470 Locate Section Comers to Establish Alignment 6 24 40 16D 232 $34,720 Set Permanent Control Monuments (Approx. 5 Monuments/Mile) 1 4 16 12 16 160 209 $32,554 Establish Existing Rights-oi-Way 8 24 20 160 212 $33,220 Develop Right -of -Way Basemap 2 12 24 40 320 398 $31,560 Detail Survey of Quaker Avenue and Marsha Sharp Freeway 1 4 8 ® 32 32 85 510,170 Detail Survey of Quaker Avenue and 19th Street Intersection 4 4 24 24 56 $6,740 Detail Survey of Quaker Avenue and 4th Street Intersection 4 4 24 24 56 $6,740 Detail Survey of Quaker Avenue, Erskine Street, North Loop 289, and Texas Tech Parkway Intersection q 8 81 32 32 94 $10,020 Detail Survey of Erskine Street and Indiana Avenue Intersection and Approximately 1,200 LF South of Erskine Street Along Indiana 4 4 32 24 64 $7,340 Detail Survey of Erskine Street and US Highway 84 Intersection B 16 6 32 40 104 $12,840 Detail Survey of Erskine Street and University Avenue Intersection 4 4 24 24 56 $6,740 Tepographic/Improvement Survey of Quaker Avenue Corridor from 261h Street to Erskine Street 4 6 16 120 160 308 $39,620 Topographic/Improvement Survey of Erskine Street Corridor from Quaker Avenue to Avenue U 4 6 16 120 160 308 $39,820 Topographic/Improvements Survey of Route from Playa Lake 71 to Trunk 2 8 80 100 194 $24„610 Topographic/improvements Survey of Route (26th Street) from Playa Lake 46 to Trunk 2 16 16 36 $4,370 Topographic/Improvements Survey of Route (17th Street) from Playa Lake 45 to Trunk 4 12 32 60 108 $14,240 Topographic Survey for Outlet Design u 4 32 32 72 58.740 Bathymetric(Topographicllmprovement Survey for lniet Design - Playa Lake 43 4 4 24 32 64 $8,140 5athymetriclTopographic/Improvement Survey for Inlet Design - Playa Lake 71 4 24 32 64 $8,140 Bathymetric/Tapographicllmprevoment Survey for Infet Design - Playa Lake 47 414 24 32 64 $6,140 CITY OF LUBBOCK, TEXAS ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN NORTHWEST LUBBOCK DRAINAGE IMPROVEMENTS ESTIMATE OF SUBCONSULTANT EXPENSES, WORKSHEET 3A (Surveying) BASIC DESIGN SERVICES, SUBCONSULTANT EXPENSES File. NWLDiP-3.xLS EXHIBIT A-1 04:15 PM 26 -Oct -09 Task PrincipalBeg. In Charge Engr_ pr Surveying Project MrinAnpr Prof. Land Surveyor Senior Prof. Engineer Prof. Engineer EIT Technician or Survey Crew Senior CARD Technician Sunray Craw Total Hours Total Extension ($} «.......... Rates ............ 5150.00 5135.00 S110.00 S125.4C S105.00 590.00 575.40 S75 CO $175.00 Surveying Topographic Survey for Inlet Design - Playa Lake 46 4 a 24 32 64 $8.140 BathymetricJTopographic/Improvement Survey for Inlet Design - Playa Lake 45 4 4 24 32 64 $8,140 Locate Surface Evidence of Existing Utilities Including Manholes with Inverts, Water Valves, Gas Valvas, We. 8' 16 24 40 160 248 1 $35,640 Locate Geotechnical Test Holes 2 8 4 24 24 62 $7.450 Locate Monitoring Welts (Assume 20 Monitoring Wells) 2 a 4 24 16 54 $6,050 Develop 3-D Terrain Model of Project Corridor for Design 12 8 40 60 $4,920 Party Chief, Office Calculations, Record peeping 120 120 $9,000 RPLS, Supervision, Data Processing, Calculations and Record Keeping 1601 1 164 $17,640 Drainage and/or Working Easements (Assumed 10 Parcel Surveys) a 44 1 24 80 120 272 $34,280 Expenses (See Worksheet 7) $66,128 Surveying Subtotal HourslCosts 5 82 438 0 0 0 426 12$4 1728 3943 $555,278 Subtotal Hours 5 82 438 0 0 0 426 1264 1728 3943 $ 555,278 HRA Basic Surveying Services S 750 S 11,070 $ 48,180 $ - S - 5 - S 31,950 S 94,800 $ 302,400 1 S 489,150 CITY OF LUBBOCK, TEXAS ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN NORTHWEST LUBBOCK DRAINAGE IMPROVEMENTS ESTIMATE OF SUBCONSULTANT EXPENSES, WORKSHEET 3B (Surveying) BASIC DESIGN SERVICES, SUBCONSULTANT EXPENSES File: NWLDIP-3.XL5 EXHIBIT A-1 04:15 PM 26 -Oct -09 Subconsultant Expenses city Unit Unit Price Total Surveying Surrey Equipment - Trimble 5800, Trimble 5603 Mileage CADD Charges 218 2500 1264 days miles hours $200.00 $0.505 $10.00 $43,600 $1,263 $12,640 Surveying Subtotal Hours/Costs $57,503 With multiplier for reimbursables = 1.15 $66,128 Total HRA Surveying Expenses $66,128 Resolution No. 2009-80509 EXHIBIT A-2 BASIC BID SERVICES TASKING, MAN-HOURS, REIMBURSABLES, AND SUBCONTRACTORS CITY OF LUBBOCK, TEXAS ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN NORTHWEST LUBBOCK DRAINAGE IMPROVEMENTS PROJECT ESTIMATE OF BASIC BID SERVICES, WORKSHEET 4 File: NWLDIP-4.XLS EXHIBIT A-2 25 -Oct -09 05:45 PM Page 1 of 2 BASIC BID SERVICES Prin. Proj. Sr. Prof. Prof. EIT Technician Drafter Clerical Total Total Firm Combined Labor, Reimbursables and Subconsuitants or Mgr. Engr. Engr. Arch or or CADD Hours Extension Officer Desi ner O eratvs ($ PSC $t60.00 $160.00 $136,00 $115.00 $96.90 $67.00 $79.00 $69.00 HR $150.00 $135.00 $125.00 $105.00 $90,00 $69.00 $50.00 PSC Prepare for and attend up to four pre-bid conferences, 4 96 48 48 48 8 252 $30,696 HR address questions or clarifications in addenda, attend bid 4 40 24 24 32 4 128 $12,686 opening Bid and bidder evaluations by Owner PSC Reserved 0 $0 HR 0 $0 PSC Reserved 0 $0 HR 0 $0 PSC Reserved 0 $0 HR 0 $0 PSC PSC Totals (Personnel) 1 4 96 0 48 0 0 48 0 48 B 252 $30,696 HR HR Totals Personnel 4 0 40 24 0 0 24 0 32 4 128 $12,688 Begin reimbursable expenses PSC Printing for distribution to bidders by Owner under $0 HR separate reproductions contract, therefore not included $0 herein. PSG Mileage 250 miles 9 $0.55 per mile $138 HR 150 miles 4 $0.55 per mile $83 PSG Toll telephone 1 project @ $140.00 per project $140 HR 1 project 0 $140.00 per project $140 PSC Fax 200 pages @ $1.00 per page $200 HR 200 pages @ $1.00 per page $200 Page 1 of 2 BASIC BID SERVICES CITY OF LUBBOCK, TEXAS ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN NORTHWEST LUBBOCK DRAINAGE IMPROVEMENTS PROJECT ESTIMATE OF BASIC BID SERVICES, WORKSHEET 4 File- NWLMP-4.XLS EXHIBIT A-2 25 -Oct -09 05:45 PM Page 2 of 2 BASIC BID SERVICES Prin. Proj. Sr. Prof. Prof. EIT Technician Drafter Clerical Total Total Firm Combined Labor, Reimbursables and Subconsuftants or Mgr. Engr. Engr. Arch or or GADD Hours Extension Officer Desi ner Operator $ PSG $180.00 $160.00 $136.00 $116.OD $96:00 $87,00 $79-00 $69.00 HR $150.00 $135.00 $125.00 $105.00 $90.00 $69.OD $50.00 PSC Reserved $0 HR $0 PSC Miscellaneous mail 25 mailings @ $15.00 per mailing $375 HR 10 mailings @ $15.00 per mailing $150 PSC Reserved $0 FIR $0 PSC Miscellaneous reproductions 500 sheets @ $0.09 per sheet $40 HR 500 sheets a $0.08 per sheet $40 PSC Reserved $0 FIR $0 PSC Subtotal reimbursable expenses $893 HR $613 15% of reimbursable expenses to account for 1.15 multiplier $226 Total reimbursable expenses $1,731 Reserved Total for Worksheet 4 $45,115 Page 2 of 2 BASIC BID SERVICES Resolution No. 2009--R0509 EXHIBIT A-3 SUPPLEMENTAL SERVICES TYPE A TASKING, MAN-HOURS, REIMBURSABLES, AND SUBCONTRACTORS CITY OF LUBBOCK, TEXAS ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN NORTHWEST LUBBOCK DRAINAGE IMPROVEMENTS PROJECT ESTIMATE OF SUPPLEMENTAL SERVICES, WORKSHEET 5 SUPPLEMENTAL SERVICES — TYPE A File: NWLDIP-5.XL5 EXHIBIT A-3 23 -Oct -09 04:10 PM Page 1 of 2 Supplemental Senile w Type A Prin. Pro}. Sr. Prof. Prof. EIT Technician CADD Opr. Clerical Total Total Firm Combined Labor, Reimbursables and Subconsullants or Mgr. Engr. Engr. Arch or or Hours Extension Officer Des1 ner CADD Tech. {$) PSC $180.00 $160.00 $136.00 $116.00 S98.00 $87.00 $79.00 $69.00 HR $150.00 $135.00 $125.00 $105.00 $90.00 $69.00 $50.00 PSC Limited local coordination, limited misc correspondence, 2 48 48 16 28 6 148 $17,626 HR miscellaneous telecons, up to two airline trips to Fort Worth 2 118 48 16 28 6 148 $13,572 to meet with Corps of Engineers, one trip t0 Dallas to meet with EPA (if necessary) related to regulatory issues (Note: Does not include permit applications or data acquisition to support a permit application. Worts under this budget to be performed on an as -needed basis to the extent of the budget limits. Work directed by the City that exceeds this budget and is related to regulatory issues will be performed under Additional Services). (Roes include jurisdictional cut/fill quantities from grading PSC plans developed under the Basic Services design phase) 0 $0 HR 0 $0 PSC Reserved 0 $0 HR 0 $0 PSC Reserved 0 $0 HR 0 $0 PSC 2 48 0 48 0 0 0 16 28 fi 148 $17,626 HR Totals {Personnel) 2 0 408 48 0 0 0 1fi 28 6 148 $13,572 Begin reimbursable expenses PSC Airlinetravel 3 tickets @ $250.00 each $750 HR 3 tickets @ $250.00 each $750 PSC Mileage 200 miles @ $0.55 per mile $110 HR 200 miles @ $0.55 per mile $110 PSC Toll telephone 1 project @ $80.00 per project $80 HR 1 project @ $50.00 per project $50 PSG Fax 150 pages @ $1.00 per page $150 HR 90 pages @ $1.00 per page $90 Page 1 of 2 Supplemental Senile w Type A CITY OF LUBBOCK, TEXAS ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN NORTHWEST LUBBOCK DRAINAGE IMPROVEMENTS PROJECT ESTIMATE OF SUPPLEMENTAL SERVICES, WORKSHEET 5 SUPPLEMENTAL SERVICES — TYPE A PlP NW1 nip -F w p EXHIBIT A-3 23-0ct-09 04:10 PM Page 2 of 2 Supplemental Services Type A Prin. Proj. Sr. Prof. Prof. EIT Technician CADD Opr. Clerical Totai Total Firm Combined Labor, Reimbursables and Subconsultants or Mgr. Engr. Engr. Arch or ox Hours Extension Dfficer Designer CADD Tech. ($1 PSC Postage, shipping and delivery 15 mailings @ $15.00 per mailing $225 HR 10 mailings @ $15.00 per mailing $150 PSC CADD charges 44 hours ® $8.00 per hour $352 HR 44 hours @ $8.00 per her $352 PSC Reproductions 500 sheets a $0.10 per page $50 HR 200 sheets @ $0.10 per page $20 PSC Blueline prints 45 sheets a $2.55 per sheet $115 HR 15 sheets 0 $2.55 per sheet $38 PSG Car rental 4 days a $95.00 per day $360 HR I $0 PSC Subtotal reimbursable expenses $2,212 HR $1,560 15% of reimbursable expenses to account for 1.15 multiplier $566 Total reimbursable expenses $4,338 Reserved $0 Total far Worksheet 5 $35,536 Supplemental Services — Type A Page 2 of 2 Supplemental Services Type A Resolution No. 2009-80509 SCHEDULE BASIC ENGINEERING DESIGN AND BID SERVICES 0 m