December 16, 2009
Item No. 5.12
RESOLUTION
T IT RFq(3I .VF.T7 RV TNF. CTTV COI 1NCIT. OF TNF, CTTV OF i.T TRRCICK,
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock, an Agreement for
Engineering Services, by and between the City of Lubbock and Parkhill, Smith & Cooper,
Inc., and related documents. Said Agreement is attached hereto and incorporated in this
resolution as if fully set forth herein and shall be included in the minutes of the City
Council.
Passed by the City Council this 16th
ATTEST:
LQ aer��
Rebee a Garza, City Secretary
APPROVED AS TO CONTENT:
day of December , 2009.
TOM MARTIN, MAYOR
Michael G. Keenum, P.E., Storm Water Engineer
vw:ccdocs/RES.Agreement-Parkhill Smith & Cooper
December 3, 2009
Resolution No. 2009-RO563
AGREEMENT
FOR
ENGINEERING SERVICES
THIS AGREEMENT for Engineering Services is entered into on this the 16th day of
December , 2009, by and between the City of Lubbock, Texas (hereinafter referred to as
"Owner") and Parkhill, Smith & Cooper, Inc., with principal offices at 4222 85h Street, Lubbock,
Texas 79423 (hereinafter referred to as "Engineer"):
WITNESSETH:
WHEREAS, Owner intends to provide new and improved storm water sampling capabilities, named
as the "Storm Water Sampling Station Vaults and Upgrades" (hereinafter referred to as the Project);
and
WHEREAS, Owner requires certain professional engineering services in connection with the Project
(hereinafter referred to as the Services) for a design; and
WHEREAS, Engineer is prepared and has the ability to provide such Services;
NOW THEREFORE, in consideration of the promises contained herein, the parties hereto agree as
follows:
ARTICLE 1 - EFFECTIVE DATE
The effective date of this Agreement shall be December 16, 2009.
ARTICLE 2 - SERVICES TO BE PERFORMED BY ENGINEER
Engineer shall perform the Services described in Attachment A, Scope of Services, which is attached
hereto and incorporated by reference as part of this Agreement.
ARTICLE 3 - COMPENSATION
Owner shall pay Engineer in accordance with Attachment B, Compensation, which is attached hereto
and incorporated by reference as part of this Agreement, and compensation for Design Phase and Bid
Phase shall not exceed $50,000.00 (Fifty Thousand Dollars and No Cents).
ARTICLE 4 - STANDARD OF CARE
Engineer shall exercise the same degree of care, skill and diligence in the performance of the
Services as is ordinarily provided by a professional engineer under similar circumstances and
Engineer shall, at no cost to Owner, re -perform services which fail to satisfy the foregoing standard
of care.
ARTICLE 5 - LIMITATIONS OF RESPONSIBILITY
Engineer shall not be responsible for actual means, methods, techniques, sequences, procedures or
safety precautions and programs used in connection with the Project by others. Engineer shall assist
the Owner in the administering of its contracts with any vendor or other Project participant in order
to fulfill contractual or other responsibilities to the Owner or to comply with federal, state and local
laws, ordinances, regulations, rules, codes, orders, criteria and standards.
ARTICLE 6 - OPINIONS OF COST AND SCHEDULE
Since Engineer has no control over the cost of labor, materials, equipment or services furnished by
others, or over contractors', subcontractors' or vendors' methods of determining prices, or over
competitive bidding or market conditions, Engineer's opinion of cost shall be made on the basis of
qualifications and experience as a professional engineer.
Since Engineer has no control over the resources provided by others to meet contract schedules,
Engineer's forecast schedules shall be made on the basis of qualifications and experience as a
professional engineer. Engineer cannot and does not guarantee that proposals, bids or actual Project
costs will not vary from his opinions of cost or that actual schedules will not vary from his forecast
schedules.
ARTICLE 7 - LIABILITY AND INDEMNIFICATION
7.1 General. Having considered the risks and potential liabilities that may exist during the
performance of the Services and in consideration of the promises included herein, Owner and
Engineer agree to allocate such liabilities in accordance with this Article 7. Words and phrases used
in this Article shall be interpreted in accordance with customary insurance industry usage and
practice.
7.2 Indemnification. Engineer agrees to defend, indemnify and hold Owner whole and harmless
against all claims for damages, costs and expenses of persons or property that may arise out of, or be
occasioned by, or from; any negligent act, error or omission of Engineer; or any agent, servant or
employee of Engineer in the execution or performance of this Contract.
7.3 Defense of Claims. In the event an action for damages is filed in which negligence is alleged
on the part of Owner and Engineer, Engineer agrees to defend Owner. In the event Owner accepts
Engineer's defense, Owner agrees, to the extent permitted by law, to indemnify and reimburse
Engineer on a pro rata basis for all expenses of defense. Owner also agrees, to the extent permitted
by law, to indemnify and reimburse Engineer on a pro rata basis for any judgment or amount paid by
Engineer in resolution of such claim. Such pro rata share shall be based upon a final judicial
determination of negligence or, in the absence of such determination, by mutual agreement.
7.4 Employee Claims. Engineer shall indemnify Owner against legal liability for damages arising
out of claims by Engineer's employees. Owner shall indemnify, to the extent permitted by law,
Engineer against legal liability for damages arising out of claims by Owner's employees.
7.5 Limitations of Liability. To the fullest extent permitted by law, Engineer's total liability to
Owner for any and all injuries, claims, losses, expenses or damages arising out of or in any way
related to the Project or this Agreement from any cause or causes, including but not limited to
Engineer's negligence, errors„ omissions, strict liability, breach of contract or breach of warranty,
shall not exceed the minimum amounts required by Article 10 of this Agreement.
7.6 Other Project Indemnities. Indemnity provisions shall be incorporated into all Project
contractual arrangements entered into by Owner and shall protect Owner and Engineer to the same
extent.
7.7 Survival. Upon completion of all services, obligations and duties provided for in this
Agreement, or in the event of termination of this Agreement for any reason, the terms and conditions
of this Article shall survive.
2
ARTICLE 8 - INDEPENDENT CONTRACTOR
Engineer undertakes performance of the Services as an independent contractor and shall be wholly
responsible for the methods of its own performance and that of its subcontractors, agents and
employees. Owner shall have no right to supervise the methods used, but Owner shall have the right
to observe such performance. Engineer shall work closely with Owner in performing Services under
this Agreement.
ARTICLE 9 - COMPLIANCE WITH LAWS
In performance of the Services, Engineer will comply with applicable regulatory requirements,
including federal, state and local laws, rules, regulations, orders, codes, criteria and standards.
Engineer shall possess the licenses necessary to allow Engineer to perform the Engineering Services.
Engineer shall not be responsible for procuring permits, certificates and licenses required for any
construction unless such responsibilities are specifically assigned to Engineer in Attachment A,
Scope of Services.
ARTICLE 10 - INSURANCE
Prior to the time Engineer is entitled to commence any part of the Services under this Contract,
Engineer shall procure, pay for, and maintain the following insurance written by companies licensed
in the State of Texas or meeting surplus lines requirements of Texas law and acceptable to Owner.
The insurance shall be evidenced by delivery to Owner of one (1) certificate of insurance, executed
by the insurer, listing coverage and limits, expiration date and term of policy, and certifying that the
insurer is licensed to do business in Texas or meets the surplus lines requirements of Texas law, or by
delivery to Owner of a certified copy of each policy, including all endorsements. The insurance
requirements shall remain in effect throughout the term of this Contract.
A. Comprehensive General Liability Insurance
The Engineer shall have Comprehensive General Liability Insurance with limits of
$1,000,000 per occurrence with a $2,000,000 combined single limit to include:
Premises and Operations
Explosion and Collapse Hazard
Underground Damage Hazard
Products and Completed Operations Hazard
Contractual Liability
Independent Contractors Coverage
Personal Injury (with exclusion "C" waived)
The Owner is to be named as an additional insured on this policy for this specific job,
and a copy of the endorsement doing so is to be attached to the Certificate of Insurance.
B. Comprehensive Automobile Liability Insurance
The Engineer shall have Comprehensive Automobile Liability Insurance with limits of
not less than:
Bodily Injury $250,0001$500,000
Property Damage $100,000
to include all owned and non -owned cars including:
Employers Non -ownership Liability
Hired and Non -owned vehicles
3
The Owner is to be named as an additional insured on this policy for this specific job
and a copy of the endorsement doing so is to be attached to the Certificate of Insurance.
C. Workers' Compensation and Employer's Liability Insurance
Engineer shall elect to obtain workers' compensation coverage pursuant to Section
406.002 of the Texas Labor Code. Further, Engineer shall maintain said coverage
throughout the term of this Agreement and shall comply with all provision of Title 5 of
the Texas Labor Code to ensure that the Engineer maintains said coverage. Any
termination of workers' compensation insurance coverage by Engineer or any
cancellation or non -renewal of workers' compensation insurance coverage for the
Engineer shall be a material breach of this contract. The policy must be endorsed to
include a waiver of subrogation in favor of the City of Lubbock.
Employer's Liability with limits of at least $500,000 each accident, $500,000 by disease
policy limit, and $500,000 by disease each employee shall also be obtained and
maintained throughout the term of this Agreement.
D. Professional Liability Insurance (including errors and omissions) with minimum limits
of $1,000,000 per claim.
Engineer shall furnish owner certificates of insurance which shall include a provision that such
insurance shall not be canceled without at least thirty (30) days written notice to Owner.
ARTICLE 11 - OWNER'S RESPONSIBILITIES
Owner shall be responsible for all matters described in Attachment C, Owner's Responsibilities,
which is attached hereto and incorporated by reference as part of this Agreement. For purposes of
this Agreement, Owner may act through its governing body or through administrative officials, as
authorized.
ARTICLE 12 - REUSE OF DOCUMENTS
All documents, including drawings, specifications and computer software, prepared by Engineer
pursuant to this Agreement are instruments of service in respect to this Project. They are not
intended or represented to be suitable for reuse by Owner or others on extensions of this Project or on
any other project. Any reuse without written verification or adaptation by Engineer for the specific
purpose intended will be at Owner's sole risk and without liability or legal exposure to Engineer.
ARTICLE 13 - AMENDMENT, TERMINATION AND STOP ORDERS
This Contract may be altered or amended only by mutual written consent of both parties hereto and
may be terminated by the Owner at any time by delivering written notice to the Engineer. Upon
receipt of such notice, the Engineer shall, unless the notice directs otherwise, immediately
discontinue all work in connection with the performance of this Contract and shall proceed to cancel
promptly all existing orders insofar as such orders are chargeable to this Contract. The Engineer
shall submit a statement showing in detail the work performed under this Contract to the date of
termination. The Owner shall then pay the Engineer promptly that proportion of the prescribed fee
which applies to the work actually performed under this Contract, less all payments that have been
previously made. Thereupon, copies of all completed work accomplished under this Contract shall
be delivered to the Owner.
4
The Owner may issue a Stop Work Order to the Engineer at any time. Upon receipt of such order,
the Engineer shall discontinue all work under this Contract and cancel all orders pursuant to the
Contract, unless the order otherwise directs. If the Owner does not issue a Restart Order within 60
days after receipt by the Engineer of the Stop Work Order, the Engineer shall regard this Contract
terminated in accordance with the foregoing provisions.
ARTICLE 14 - NONDISCLOSURE OF PROPRIETARY INFORMATION
Engineer shall consider all information provided by Owner to be proprietary unless such information
is available from public sources. Engineer shall not publish or disclose proprietary information for
any purpose other than the performance of the Services without the prior written authorization of
Owner or in response to legal process.
ARTICLE 15 - NOTICE
Any notice, demand or request required by or made pursuant to this Agreement shall be deemed
properly made if personally delivered in writing or deposited in the United States mail, postage
prepaid, to the address specified below.
To Engineer: Parkhill, Smith & Cooper, Inc.
ATTN: Robert P. McMillen, P.E.
4222 $51h Street
Lubbock, Texas 79423
To Owner: City of Lubbock
ATTN: Michael Keenum, P.E.
P.O. Box 2000
Lubbock, Texas 79457-0001
Nothing contained in this Article shall be construed to restrict the transmission of routine
communications between representatives of Engineer and Owner.
ARTICLE 16 - UNCONTROLLABLE FORCES
Neither Owner nor Engineer shall be considered to be in default of this Agreement if delays in or
failure of performance shall be due to uncontrollable forces the effect of which, by the exercise of
reasonable diligence, the nonperforming party could not avoid. The term "uncontrollable forces"
shall mean any event which results in the prevention or delay of performance by a party of its
obligations under this Agreement and which is beyond the control of the nonperforming party. It
includes, but is not limited to, fire, flood, earthquakes, storms, lightning, epidemic, war, riot, civil
disturbance, sabotage, Owner -directed changes to design criteria or scope services once criteria and
scope have been agreed upon, Owner -directed changes to plans after plans have been reviewed and
approved (including partial submittal progress reviews), inability to procure permits, licenses or
authorizations from any state, local or federal agency or person for any of the supplies, materials,
accesses or services required to be provided by either Owner or Engineer under this Agreement.
Neither party shall, however, be excused from performance if nonperformance is due to
uncontrollable forces which are removable or remediable and which the nonperforming party could
have, with the exercise of reasonable diligence, removed or remedied with reasonable dispatch. The
provisions of this Article shall not be interpreted or construed to require Engineer or Owner to
prevent, settle or otherwise avoid a strike, work slowdown or other labor action. The nonperforming
5
party shall, within a reasonable time of being prevented or delayed from performance by an
uncontrollable force, give written notice to the other party describing the circumstances and
uncontrollable force preventing continued performance of the obligations of this Agreement.
ARTICLE 17 - GOVERNING LAW
This Agreement shall be governed by the laws of the State of Texas. Any suit brought to enforce any
provision of this Agreement or for construction of any provision thereof shall be brought in Lubbock
County, Texas.
ARTICLE 18 - MISCELLANEOUS
18.1 Nonwaiver. A waiver by either Owner or Engineer of any breach of this Agreement shall not
be binding upon the waiving party unless such waiver is in writing. In the event of a written waiver,
such a waiver shall not affect the waiving party's rights with respect to any other or further breach.
18.2 Severability. The invalidity, illegality or unenforceability of any provision of this
Agreement, or the occurrence of any event rendering any portion or provision of this Agreement
void, shall in no way affect the validity or enforceability of any other portion or provision of the
Agreement. Any void provision shall be deemed severed from the Agreement and the balance of the
Agreement shall be construed and enforced as if the Agreement did not contain the particular portion
or provision held to be void. The parties further agree to reform the Agreement to replace any
stricken provision with a valid provision that comes as close as possible to the intent of the stricken
provision.
The provisions of this Article shall not prevent the entire Agreement from being void should a
provision which is of the essence of the Agreement be determined to be void.
ARTICLE 19 - INTEGRATION AND MODIFICATION
This Agreement represents the entire and integrated agreement between the parties and supersedes all
prior negotiations, representations and agreements, either written or oral. This Agreement may be
amended only by a written instrument signed by each of the parties.
ARTICLE 20 - SUCCESSORS AND ASSIGNS
Owner and Engineer each binds itself and its directors, officers, partners, successors, executors,
administrators, assigns and legal representatives to the other party to this Agreement and to the
partners, successors, executors, administrators, assigns and legal representatives of such other party,
in respect to all covenants, agreements and obligations of this Agreement.
ARTICLE 21 - ASSIGNMENT
Neither Owner nor Engineer shall assign, sublet or transfer any rights under or interest in (including,
but without limitation., monies that may become due or monies that are due) this Agreement without
the written consent of the other, except to the extent that the effect of this limitation may be restricted
by law. Unless specifically stated to the contrary in any written consent to an assignment, no
assignment will release or discharge the assignor from any duty or responsibility under this
2
Agreement. Nothing contained in this paragraph shall prevent Engineer from employing such
independent consultants, associates and subcontractors as he may deem appropriate to assist him in
the performance of the Services hereunder.
ARTICLE 22 - SUBCONTRACTORS
No work herein called for by the Engineers shall be subcontracted to a subcontractor who is not
acceptable to the Owner or assigned without prior written approval of the Owner. The Engineer shall
require subcontracts to conform to the applicable terms of this Contract and include provisions which
require subcontractor compliance with Owner's Rules.
ARTICLE 23 - THIRD PARTY RIGHTS
Nothing herein shall be construed to give any rights or benefits to anyone other than Owner and
Engineer.
IN WITNESS WHEREOF, the parties have executed this Agreement.
CITY OF LUBBOCK. TEXAS
APPROVED AS TO CONTENT:
Michael G. Keenum, P.E. Tom Martin, Mayor
Storm Water Engineer
Attest R de, ,
Rebecca Garza
City Secretary
PARKHILL. SMITH & COOPER. INC.
By: Attest &4Z&,W ,W *A4
Robert H.( y Holder, P.E. Robert P. (Paul) McMillen, P.E.
Firm Princi 1 Corporate Associate
7
Resolution No. 2009-RO563
ATTACHMENT A
TO
AGREEMENT FOR ENGINEERING SERVICES
Owner: City of Lubbock, Texas
Project: Engineering Services for Storm Drainage Design and Bid: "Storm Water
Sampling Station Vaults and Upgrades."
A DESCRIPTION OF SCOPE OF SERVICES
The scope of services for this project is as follows: Work will not proceed until Owner has
authorized Engineer in writing to proceed.
I. BASIC SERVICES
A. DESIGN SERVICES
1. Design services as defined by the tasks and man-hours in Exhibit A-1.
2. Deliver to the Owner one (1) reproducible plus three (3) non -reproducible copies
of drawings and technical specifications developed for each plans, specifications
and estimates (PS&E) package.
3. Deliver to the Owner one (1) complete hard copy and automated copy of any
supporting data and calculations developed during the design of each PS&E
package.
4. Deliver to the Owner disks containing the electronic files associated with the
design of the project, including the supporting data, plans, specifications and
opinions of probable construction costs.
B. BID PHASE SERVICES
1. Bid Phase services as defined in Exhibit A-1..
2. Bid Phase services are limited to assisting the Owner with soliciting and
evaluating bids for the proposed storm water sampling vaults and equipment in
paragraph I.A.1. above.
C. ADDITIONAL SERVICES
At the request of the OWNER, the ENGINEER will provide Additional Services
as included herein or upon agreement between OWNER and the ENGINEER
defining the extent of such Additional Services and the amount and manner in
which ENGINEER will be compensated for such Additional Services.
A-1
2. Additional Services may include but are not limited to geotechnical
investigations, surveys, groundwater monitoring, building wireless network
screens, and preparing easement documents and surveys as may be required.
Any work requested by the OWNER that is not included in one of the items listed
in any other place will be classified as Additional Services.
4. Additional services may be authorized by a notice -to -proceed in writing from the
City Engineer and addressed to the Engineer.
A-2
Resolution No- 2009-RO563
ATTACHMENT B
TO
AGREEMENT FOR ENGINEERING SERVICES
Owner: City of Lubbock, Texas
Project: Engineering Services for Storm Drainage Design and Bid: "Storm Water
Sampling Station Vaults and Upgrades."
COMPENSATION
BASIC AND SUPPLEMENTAL SERVICES
For these services covered by this Agreement, the Owner agrees to pay the Engineer as follows:
A. GENERAL
1. The Engineer will be paid on an hourly rate basis shown in Table B-1 and
subcontract personnel services will be billed at cost. Engineer and subcontractor
reimbursable expenses will be billed at cost plus 15 percent surcharge.
Reimbursable expenses are shown in Table B-1.
2. The Engineer agrees to use its best efforts to perform services as defined herein
within the billing limits stated below.
3. It is understood and agreed that the maximum billings of each of the items listed
below are based on the start of Services being authorized not later than
January 30, 2014. If start of Basic Engineering Services is not authorized by date
given, it is understood and agreed that the upper billing limit will be adjusted
accordingly by a supplement to this Agreement.
4. Monthly payments shall be made to the Engineer by the Owner based on
Engineer's statement. The statement shall be itemized to indicate the amount of
work performed and the associated reimbursable expenses and subcontract costs.
5. The uncontested amount of each statement shall be due and payable upon receipt
by the Owner. Carrying charges of 1-112 percent per month from the billing date
shall be due for accounts that are not paid within 60 days after the billing date.
6. The Engineer shall keep records on the basis of generally accepted accounting
practices of costs and expenses and which records shall be available for
inspection by Owner during normal business hours.
7. The Engineer shall complete the services described herein within the schedule
attached after the date of the Owner's notice -to -proceed.
B. BASIC ENGINEERING SERVICES
The maximum billed for Basic Engineering Services including personnel services
and reimbursable expenses for the Engineer and Subcontractors is shown as
follows:
Basic Basic
Personnel Reimbursable
Services Expenses
Parkhill, Smith & Cooper, Inc. $ 46,523.00 $ 3,477.00
TOTAL BASIC ENGINEERING DESIGN SERVICES
NOT TO EXCEED $ 50,000.00
2. The Engineer shall start the performance of the Basic Design Services within ten
(10) days of receipt of notice to proceed and will complete the Basic Design
Services within the scheduled time. A schedule for Basic Design and Bid Phase
Services is attached.
C. ADDITIONAL SERVICES
Additional services must be authorized in writing by the Owner.
The maximum billed for Additional Services will be determined by mutual
consent before the Additional Services are authorized by the Owner.
2. The Engineer shall start the performance of the authorized Additional Services
within ten (10 days of the receipt of notice to proceed and will complete the
Additional Services within the time period determined by mutual consent before
the Additional Services are authorized by the Owner.
TABLE B -I
PERSONNEL SERVICES RATES
TO
AGREEMENT FOR ENGINEERING SERVICES
Owner: City of Lubbock, Texas
Project: Engineering Services for Storm Drainage Design and Bid: "Storm Water
Sampling Station Vaults and Upgrades."
+COMPENSATION RATES
Hourly fees listed herein will apply for the term of this contract.
A.PERSONNEL SERVICES
Category of Personnel
Parkhill. Smith & CooD@r. Inc.
Principal -in -Charge
$180.00
Project Manager
$160.00
Senior Professional Engineer
$136.00
Professional Engineer
$116.00
Engineer -In -Training
$98.00
Technician/Designer
$87.00
CADD Operator
$79.00
Clerical
$69.00
B. REIMBURSABLE EXPENSES
The following expenses are reimbursable:
1. Expenses directly applicable to the project (such as vehicle mileage, postage,
reproductions, equipment rentals, etc.).
Resolution No. 2009-RO563
ATTACHMENT C
TO
AGREEMENT FOR ENGINEERING SERVICES
Owner: City of Lubbock, Texas
Project: Engineering Services for Storm Drainage Design and Bid: "Storm Water
Sampling Station `faults and Upgrades."
OWNER'S RESPONSIBILITIES
The Owner will furnish, as required by the work and not at the expense of the Engineer, the
following items:
1. Access to all maps, drawings, reports, records, audits, annual reports and other data that
are available in the files of the Owner and which may be useful in the work involved
under this Contract.
2. Secure permission to enter upon public and private property when required in
performance of the Engineer's services,
3. Access to existing property, boundary, easement, right-of-way, utility surveys and
property descriptions.
4. Full disclosure regarding the Project.
5. A Project Manager fully acquainted with the Project who has authority to approve
changes in the Project within the delegated authority of the Project Manager, render
decisions promptly, and furnish information in a reasonable time frame. It is
recognized that certain changes or decisions will require City Manager and/or City
Council approval.
6. Pay all costs for advertising and reproduction incident to advertising public meetings
except for those public meetings advertisements which the Engineer is obligated to
perform under Basic or authorized Supplemental Services.
7. Examine all studies, reports, sketches, drawings, specifications, proposals and other
documents presented by Engineer, obtain advice of an attorney, insurance counselor
and other consultants as. Owner deems appropriate for such examination, and render in
writing decisions pertaining thereto within a reasonable time so as not to delay the
services of Engineer.
8. Provide such legal accounting, independent cost estimating and insurance counseling
services as may be required for the Project and such auditing services as Owner may
require to ascertain how or for what purpose any contractor has used the monies paid to
him under the construction contract.
C-1
9. Give prompt written notice to Engineer whenever Owner observes or otherwise
becomes aware of any defect in the Project.
10. Cooperate with Engineer in securing preliminary approvals and consensus from the
governmental authorities having jurisdiction over the Project and such approvals and
consents from others as may be necessary for completion of the Project.
It. Furnish, or direct Engineer to provide, necessary Supplemental Services as stipulated in
Attachment A of this Agreement or other services as required.
12. Bear all costs incident to compliance with the requirements of this Attachment C.
R:IClericallACiREE\720G91Lubback Stormwater Vault Designitlgreement_Final.doc
C-2
Resolution No. 2009-R0563
EXHIBIT A-1
BASIC DESIGN SERVICES
TASKING, MAN-HOURS, AND REIMBURSABLES
CITY OF LUBBOCK, TEXAS
ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN
STORM WATER SAMPLING STATION VAULTS REPLACEMENTS AND UPGRADES
ESTIMATE OF MAN-HOURS, WORKSHEET 1
BASIC DESIGN SERVICES, ESTIMATE OF MAN-HOURS AND TASKS
File: SAMPLING VAULTS -1 (Rev. 12-1-09).XLS EXHIBIT A-1
Firm
Task
Prin.
or
Officer
Proi.
Mgr.
Sr.
Engr,
Prof.
Engr.
(Civil)
Prof.
Engr.
(EEISCADA)
Prof.
Engr,
(Strutt.)
FIT
Technician
or
Designer
CADD Opr.
or
CADD Tech.
Clerical
Total
Hours
Total
Extension
{$)
PSC
««<c<<<<<< Rates »»»»»»
$180.00
$166.00
$136.00
$116.00
$136.00
$116.00
$98.00
$87.00
$79.00
$69.00
PSC
A. ProjDd Iniltisitk lPhave
3
3
2
8
$1,100
1. Predesign Meeting
PSC
2. Respond to questions and/or issues
2
1
3
$368
PSC
3. Reserved
0
$0
PSC
4. Reserved
0
$0
PSC
5. Predesign Tasks
0
$0
PSG
a. Field visit to existing vaults
4
8
8
8
28
$3,440
PSC
b. Visit central SCADA control
12
12
24
$2,808
PSC
e. Surveying (minimal, use assumed site TBM's)
4
8
8
20
$2,352
PSC
d. Coordinate radio survey
4
8
12
$1,328
PSC
6, Reserved
0
$0
PSC
7. Reserved
0
$0
Page 1 of 8 Basic Services
CITY OF LUBBOCK, TEXAS
ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN
STORM WATER SAMPLING STATION VAULTS REPLACEMENTS AND UPGRADES
ESTIMATE OF MAN-HOURS, WORKSHEET 1
BASIC DESIGN SERVICES, ESTIMATE OF MAN-HOURS AND TASKS
File:. SAMPLING VAULTS -1 (Rev. 12-1-09).XLS EXHIBIT A-1 01 -Dec -09 03:31 PM
Firm
Task
_
Prin.
or
Officer
Proj.
Mgr.
Sr.
Engr.
Prof.
Engr.
(civil)
Prof.
Engr.
(EEJSCADA)
Prof.
Engr.
(Slruct.)
EIT
Technician
or
Designer
CARD Opt.
or
CARD Tech.
Clerical
Total
Hours
Total
Extension
($J
PSC
««««« Rates »»»»»»
$180.00
$160.00
$136.00
$118.00
$136.00
$116,00
$98.00
$87.00
$79.00
$69.00
PSC
B. Early Design Phase - Design and CADD
to 75% Submittal
1
1
2
$195
1 Cover sheet
PSC
2. Location map and index
1
2
3
$274
PSC
3. Erasion control plan - generic (each site less than 1 acre
not part of larger development)
2
2
4
$354
PSC
4. 26th and Ivory Location
a. Site plan (use existing city aerials and contours)
1
1
1
2
5
$488
PSC
b. Demolition plan
1
1
3
5
$451
PSC
c. Structural details
1
1
d
4
10
$940
PSC
d. Lighting plan and details
1
1
4
4
10
$960
PSC
is. Instrumentation plan and details
1
6
2
9
5802
PSC
I. Reserved
0
$0
PSC
5. 44th & MLK Location
g. Site plan (use existing city aerials and contours)
1
1
1
2
5
$488
Page 2 of 8 Basic Services
CITY OF LUBBOCK, TEXAS
ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN
STORM WATER SAMPLING STATION VAULTS REPLACEMENTS AND UPGRADES
ESTIMATE OF MAN-HOURS, WORKSHEET 1
BASIC DESIGN SERVICES, ESTIMATE OF MAN-HOURS AND TASKS
File: SAMPLING VAULTS -1 (Rev. 12-1-09).XLS EXHIBIT A-1 01 -Dec -09 03:31 PM
Firm
Task
Pnn.
or
Officer
Pro).
Mgr.
Sr.
Engr.
Prof.
Engr.
(civil)
Prof.
Engr.
(FFISCADA)
Prof.
Engr.
(Struct.)
EIT
Technician
or
Designer
CADD Opr.
or
CADD Tech.
Clerical
Total
Hours
Total
Extension
W
PSC
«««««« Rates >>>>>>»»»
$180.00
$360.00
$136.00
$116.00
$136.00
$116.00
$98.00
$87.00
$79.00
$69.00
PSG
h. Demolition plan
1
1
3
5
$451
PSC
i. Structural details
1
1
4
4
10
$940
PSC
j. Lighting plan and details
1
1
4
4
10
$960
PSC
k. Instrumentation plan and details
1
6
2
9
$882
PSG
I. Reserved
0
$0
PSC
6. Atzlan Park Location
m, Site plan (use existing city aerials and contours)
1
1
1
2
5
$488
PSC
n. Demolition plan
1
1
3
5
$451
PSC
o. Structural details
1
1
4
4
10
$940
PSC
p. Lighting pian and details
1
1
4
4
10
$960
PSC
q. Instrumentation plan and details
1
4
4
9
$844
PSC
r. Reserved
0
$0
Page 3 of 8 Basic Services
CITY OF LUBBOCK, TEXAS
ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN
STORM WATER SAMPLING STATION VAULTS REPLACEMENTS AND UPGRADES
ESTIMATE OF MAN-HOURS, WORKSHEET 1
BASIC DESIGN SERVICES, ESTIMATE OF MAN-HOURS AND TASKS
File: SAMPLING VAULTS -1 (Rev. 12-1-09).XLS EXHIBIT A-1 01 -Dec -09 03:31 PM
Firm
Task
Prin.
or
Officer
Proj.
Mgr.
Sr.
Engr.
Prof.
Engr.
(Civil)
Prof.
Engr.
(EEISCADA)
Prof.
Engr.
(Struct.)
EIT
Technician
or
Designer
CADD Opr,
or
CADD Tech.
Clerical
Total
Flours
Total
Extension
($)
PSC
««<e««« Rates »»»»»»
$180.00
$160.00
$136.00
$116.00
$136.00
$116.00
$98.00
$87.00
$79.00
$69.00
PSC
6. Existing Vault Locations (2 locations)
m. Site plan (use existing city aerials and contours)
1
1
2
4
$372
PSC
n. Rehabilitation details
1
2
2
5
$470
PSC
o. Structural details - none programmed
0
$0
PSC
p. Lighting plan and details
2
2
6
6
16
$1,566
PSG
q. Instrumentation plan and details
3
6
6
15
$1,470
PSG
r. Reserved
0
$0
PSC
7. Specifications
4
4
2
2
8
8
28
$2,944
PSC
8. Opinion of Probable Cost
4
3
3
4
3
17
$1,849
PSC
9. Submit to Owner and Review Meeting
3
3
2
8
$1.100
PSC
10. Reserved
0
$0
PSC
D. Construction Documerde - Design and CADD
from the 75% lovell to the 100% final level
1
1
$79
1. Cover sheet
PSG
2. Location map and index
1
1
$79
rage 4 or 8 Basic 5ervrces
CITY OF LUBBOCK, TEXAS
ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN
STORM WATER SAMPLING STATION VAULTS REPLACEMENTS AND UPGRADES
ESTIMATE OF MAN-HOURS, WORKSHEET 1
BASIC DESIGN SERVICES, ESTIMATE OF MAN-HOURS AND TASKS
File: SAMPLING VAULTS -1 (Rev. 12-1-09).XLS EXHIBIT A-1 01 -Dee -09 03:31 PM
Firm
Task
Prin.
or
Officer
Proj.
Mgr.
Sr.
Engr.
Prof.
Engr.
(Civil)
Prof.
Engr.
(EE/SCADA)
Prof.
Engr.
(Strutt.)
EIT
Technician
or
Designer
CADD Opr.
or
CADD Tech.
Clerical
Total
Hours
Total
Extension
($)
PSC
«o«<««« Rates »»»»»»
$160-00
$160.00
$136.00
$116.00
$136.00
$116.00
$96.00
$87.00
$79.00
$69.00
PSC
3. Erosion control plan - generic
1
1
$79
PSC
4. 26th and Ivory Location
a. Slte plan
1
1
2
$195
PSC
b. Demolition plan
1
1
2
$195
PSC
c. Structural details
1
1
1
1
4
$409
PSC
d. Lighting plan and details
1
1
1
2
5
$508
PSC
e. Instrumentation plan and details
1
1
2
4
$392
PSC
I. Reserved
0
$0
PSC
5. 441h & MILK Location
g. Site plan
1
1
2
$177
PSC
h. Demolition plan
1
1
$79
PSG
i. Structural details
1
1
1
1
4
$409
PSC
j. Lighting plan and details
1
1
1
1
4
$429
Page 5 of 8 Basic Services
CITY OF LUBBOCK, TEXAS
ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN
STORM WATER SAMPLING STATION VAULTS REPLACEMENTS AND UPGRADES
ESTIMATE OF MAN-HOURS, WORKSHEET 1
BASIC DESIGN SERVICES, ESTIMATE OF MAN-HOURS AND TASKS
File: SAMPLING VAULTS -1 (Rev. 12-1-09).XLS EXHIBIT A-1 01 -Dec -09 03:31 PM
Firm
Task
Prin.
or
Officer
Prol.
Mgr.
Sr.
Engr.
Prof.
Engr.
(Civil)
Prof.
Engr.
(EE/SCADA)
Prof.
Engr.
(Struct.)
EIT
Technician
or
Designer
CADD Opr.
or
CADD Tech.
Clerical
Total
Hours
Total
Extension
($)
PSC
««««<<<< Rates >»»»»»>
$180.00
$160.00
$136.00
$116.00
$136.00
$116.00
$98.00
$87.00
$79.00
$69.00
PSC
k, Instrumentation pian and details
1
1
1
3
$313
PSC
I. Reserved
0
$0
PSC
6. Atxlan Park Location
m. Site pian
1
1
1
3
$293
PSC
n. Demolition plan
1
1
2
$195
PSC
o. Structural details
1
1
1
3
$293
PSC
p. Lighting plan and details
1
1
1
1
4
$429
PSC
q. Instrumentation plan and details
1
1
1
3
$313
PSC
r. Reserved
0
$0
PSC
6. Existing Vault Locations (2 locations)
m. Site plan
1
1
1
3
$293
PSC
n. Rehabilitation details
1
2
2
5
$470
PSC
o. Structural details - none programmed
0
$0
Page 6 of 8 Basic Services
CITY OF LUBBOCK, TEXAS
ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN
STORM WATER SAMPLING STATION VAULTS REPLACEMENTS AND UPGRADES
ESTIMATE OF MAN-HOURS, WORKSHEET 1
BASIC DESIGN SERVICES, ESTIMATE OF MAN-HOURS AND TASKS
File: SAMPLING VAULTS -1 (Rev. 12-1-09).XLS EXHIBIT A-1 01 -Dec -09 03:31 PM
Firm
Task
Prin.
or
Officer
Proj.
Mgr.
Sr.
Engr.
Prof.
Engr.
(Civil}
Prof.
Engr.
(EEISCADA)
Prof.
Engr,
(Struct.)
EIT
oror
TechnicianFCADD
Designer
D Opr.
Tech.
Clerical
Total
Hours
Total
Extension
($)
PSC
«««<e«« Rates n»»»>»»
$180.00
$160.00
$136.00
$116.00
$136.00
$116.00
$98.00
$87.00$79.00
$69.00
PSG
p. Lighting plan and details
1
1
2
2
6
$606
PSC
q. Instrumentation plan and details
1
1
2
2
6
5606
PSC
r. Reserved
0
50
PSC
17. Specifications
2
3
2
2
8
5
22
P.301
PSC
8. Opinion of Probable Cost
1
2
2
1
2
2
10
$1.134
PSG
9. Suhm4t to Owner
2
1
3
$301
PSC
10. Develop Exhibit A hid form
1
2
2
3
6
$795
PSC
10. Reserved
0
$0
PSC
E. CO+ORDINATION WIITHUTIl
0
$0
1. None Cihr will perform and relay to consultant
PSG
2. Reserved
o
:0
$0
Page 7 of 8 Basic Services
CITY OF LUBBOCK, TEXAS
ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN
STORM WATER SAMPLING STATION VAULTS REPLACEMENTS AND UPGRADES
ESTIMATE OF MAN-HOURS, WORKSHEET t
BASIC DESIGN SERVICES, ESTIMATE OF MAN-HOURS AND TASKS
File: SAMPLING VAULTS -1 (Fiev. 12-1-09).XLS EXHIBIT A-1 01 -Dec -09 03:31 PM
Firm
Task
Prin.
or
Officer
Pro!.
Mgr.
Sr.
Engr.
Prof.
Engr.
(Civil)
Prof.
Engr.
(EEISCADA)
Prof.
Engr.
(Strutt.)
EIT
Technician
or
Designer
CADD Qpr.
or
CARD Tech.
Clerical
Total
Hours
Total
Extension
($)
PSC
«««««« Rates »»»»»»
$180.00
$160.00
$136.00
$116.00
$136.00
$116.00
$98.00
$87.00
$79.00
$69.00
PSC
F. OTHFIR rTF-MS
1. QA/QC
4
6
2
2
2
16
$2,036
$0
PSC
2. (Deleted)
0
0
$0
$0
PSC
3. Reserved
0
0
$0
S0
PSC
0
26
0
77
59
20
143
0
100
17
442
$0.00
$4,160.00
$0.00
$8,932.00
$8,024.00
$2,320.00
$14,014.00
$0.00
$7,900.00
$1,173.00
$46,523.00
Totals for Worksheet 1 --- Basic Design Services
PSC
$0
$4,160
$0
$8.932
$8,024
$2,320
$14,014
$0
$7,900
$1,173
$46,523
100%
Page 8 of 8 Basic Services
CITY OF LUBBOCK, TEXAS
ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN
STORMWATER SAMPLING STATION VAULTS REPLACEMENTS AND UPGRADES
ESTIMATE OF REIMBURSABLE EXPENSES, WORKSHEET 2
BASIC DESIGN SERVICES, REIMBURSABLE EXPENSES
File: SAMPLING VAULTS -2 (Rev. 12-1-09).XLS
EXHIBIT A-1 0331 I'M 01 -flee -09
Page 1 of 1 Basic Services
Reimbursable Expenses
Total
PSC
Mileage
450
Miles
(M
$0.55
per mile
5248
PSC
Blueline prints -- 2 submittal sets, 5 sets per submittal
75
Sheets
53 49
per sheet
5262
plus 20 sheets miscellaneous allowance for coordination
Est. 25 sheets bound sets, no bid sets or distribution
(5x2x5)+25-
PSC
8.5 x 11 and 11 x 17 Reproductions, mise.
980
Sheets
0
$0.10
per sheet
S9H
PSC
Toll telephone
1
Project
a
$30.00
per project
$30
PSC
Fax
20
Pages
S1.00
perpage
520
PSC
Postage, shipping and delivery, mist.
5
Mailings
114
$20.00
per mailing
$100
PSC
CADD charges
0
Hours
$8.00
per hour
$0
PSC
Meals allowance (SCADA travel team, 4 days, 2 people, 2 meals)
16
Meals
0
$12.00
per meal
$192
PSC
Mylar for reproducible construction drawings, final sets
0.2
Roils
@
$320.00
per roll
$64
PSC
Air travel (2 persons, 2 trips each)
4
Each
@
$300.00
per each
$1,200
PSC
Motel (2 persons, 2 nights each)
4
Day
@
S135.00
per day
5540
PSC
Airport parking
4
Day
@
$20.00
per day
$80
PSC
Car Rental
2
Day
r
S95.00
per day
$190
Subtotals for Worksheet 2 --- Basic Design Services
PSC
53,023
w/ Contract muMiplier for reimbursables - 1.15
Total
53.477
Page 1 of 1 Basic Services
CITY OF LUBBOCK, TEXAS
ENGINEERING SERVICES FOR STORM DRAINAGE DESIGN
STORM WATER SAMPLING VAULTS REPLACEMENTS AND UPGRADES
ESTIMATE OF SUBCONSULTANT EXPENSES, WORKSHEET 3
BASIC DESIGN SERVICES, SUBCONSULTANT EXPENSES
File: SAMPLING VAULTS -3 (Rev. 12-1-09).XLS EXHIBIT A-1 03:31 PM 01 -Dec -09
Page; 1 of 1 BASIC SERVICES
Subconsultent Expenses
I alai
Subtotal
^'
Su"evina fsubconsultantl
Surveys - NONE
56
Subtotals for Worksheet 3 -- Basic Design Services
>;lt
Sutxolal from Worksheet 1
Subtotal from Worksheet 2
-.
Total Estimated Professional Basic Design Services Fee
$50,000
Page; 1 of 1 BASIC SERVICES
Resolution No. 2009-RQ563
SCHEDULE
BASIC ENGINEERING DESIGN AND BID SERVICES
No Text