Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Resolution - 2009-R0467 - Amendment To Agreement - Kimley-Horn And Associates Inc.- Indiana Ave Paving - 11/05/2009
.esolution No. 2009-RO467 ovember 5, 2009 tem No. 5.14 RESOLUTION 3E IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and lirected to execute for and on behalf of the City of Lubbock, Amendment No. 2 to agreement for Engineering Services for Indiana Avenue Paving Improvements (103rd >treet to FM 1585), by and between the City of Lubbock and Kimley-Horn and associates, Inc., and related documents. Said Amendment No. 2 is attached hereto and ncorporated in this resolution as if fully set forth herein and shall be included in the .ninutes of the City Council. Passed by the City Council this 5th ATTEST: Rebec,-a Garza, City Secretary APPROVED AS TO CONTENT: • r LJ . arty D. Hertel, P.E., C. .M. City Engineer APPROVED AS TO FORM: Chad Weaver, Assistant City Attorney vw:ccdocs/RES.Agreement-Amend #2 Kimley-Horn October 15, 2009 day of November , 2009. TOM MARTIN, MAYOR Resolution No. 2009-80467 AMENDMENT NO.2 TO AGREEMENT FOR ENGINEERING SERVICES FOR INDIANA AVE PAVING IMPROVEMENTS (103`t° ST TO FM 1585) CITY OF LUBBOCK, TEXAS AND KIMLEY-HORN AND ASSOCIATES, INC. THIS Amendment No. 2 to Agreement for Engineering Services ("Amendment No. 2"), dated effective this 5th day of November, 2009, is by and between Kimley-Horn and Associates, Inc. ("Engineer") and the City of Lubbock, Texas ("Owner"), a Texas home rule municipal corporation. WHEREAS, pursuant to Agreement for Engineering Services, dated on or about October 23, 2008, Resolution No. 2008-RO417 (the "Original Agreement"), Engineer agreed to provide engineering services to Owner consisting of the design of paving improvements on Indiana Ave. from 103`d St to FM 1585. WHEREAS, Amendment No. 1 to the Agreement for Engineering Services, dated on or about February 26, 2009, Resolution No. 2009-R0088, Engineer agreed to provide certain additional engineering services to Owner on the Indiana Ave. project. WHEREAS, Owner and Engineer now desire to amend the Original Agreement with this Amendment No. 2 as follows By adding attachment "SCOPE OF SERVICES - CONTRACT AMENDMENT #2 and attachment "ATTACHMENT C1 — WORKPLAN FOR LUMP SUM SERVICES" to this "Amendment No. 2" resulting in a Base increase of $20,100.00 for additional engineering services for the Indiana Avenue project for an amended total Lump Sum compensation of $643,800.00. By adding attachment "SCOPE OF SERVICES - CONTRACT AMENDMENT #2" and attachment "ATTACHMENT Cl — WORKPLAN FOR REIMBURSABLE SERVICES" to this "Amendment No. 2" resulting in a Base increase of $7,700,00 for additional services for the Indiana Avenue project for an amended "not -to -exceed" reimbursable fee $273,732.00. The sum of the amended Lump Sum fee and the amended Reimbursable fee result in a total amended contract amount of $917,532.00. ATTEST: Rebecc*arta Cit Secreta Y rY APPR ED AS TOONTE Larry . Hertel, P.E., C.F.M. City Engineer zt9;7L Chad Weaver Assistant City Attorney CITY OF LUBBOCK, TEXAS .' To Martin, MAYOR KIMLEY-HORN AND ASSOCIATES, INC. G. Brad Tribble, P.E. Senior Vice President I Project Manager Indiana Avenue from 103`d St. to F.M. 1585 Scope of Services - Contract Amendment #2 City of Lubbock Project Understanding The Project includes the widening of Indiana Avenue from 103'd Street to F.M. 1585 (13 Street). Street). This Amendment No. 2 includes the additional design of 116"' Street for approximately '/z mile to the half section line, modification of the span wire signal design at FM 1585 to a permanent signal„ and additional parcel descriptions for right of way acquisition along Indiana Ave. Survey Coordination (116th Street Design) 1.1. Coordinate with City designated surveyor 1.1.1 The City of Lubbock has asked Hugo -Reed to prepare additional right of way and topographic survey for 116th Street between Indiana and the 1/2 section line to the east. 1.1.2 Kimley-Horn will coordinate survey needs for the design of 116th Street with Hugo -Reed. They will also work with Hugo -Reed on the right of way and easement required for 116th roadway and channel improvements. Right -of -Way / Easement Instruments of Conveyance 2.1. Increase the number of right-of-way instruments (narrative and graphic exhibits of right-of-way takes). 2.1.1 Up to 12 additional right of way parcels are anticipated 2.1.2 Includes parcels to be converted from right of way easement to dedicated right of way 2.2. Individual parcel exhibits shall be on 8',fa"x11" paper, shall be sealed, dated, and signed by a Registered Professional Land Surveyor and shall contain the following: 2.2.1 Parcel number 2.2.2 Area required 2.2.3 Area remaining 2.24 Legal description 2.2.5 Current owner 2.2.6 Any existing platted easements or easements filed by separate instrument including easements provided by utility companies 2.2.7 All physical features 2.2.8 Metes and bounds description of parcel to be acquired. The description shall be provided on a separate sheet from the exhibit. Each type of easement shall be described separately. Preliminary Design 3.1. Project Management 3.1.1 Additional coordination with franchise utility companies. 3.1.2 Additional coordination with TOOT regarding permanent signal at FM 1585 instead of span wire signal. 3.2. Roadway and Channel 3.2.1 Data Collection • City appointed surveyor, Hugo -Reed, will provide the right of way and topographic survey information for 116th Street. 3.2.2 Prepare the preliminary roadway alignment • Prepare typical sections - existing and proposed • Typical Sections to include subgrade and pavement design specification provided by the City • Prepare preliminary plan and profile (electronic roll plot format, 1 "=50' scale). Items to be included: Plan: - Control data - Existing 1 proposed right-of-way - Existing topography - Existing pavement - Proposed centerline alignment and horizontal curve data City of Lubbock - Indiana Avenue from 103rd St. to F.M. 1585 Page 1 of 3 Scope of Services - Contract Amendment #2 Novemver 5, 2009 Proposed face of curb Proposed transition pavement tie-ins to existing pavement - Existing water line locations Existing sanitary sewer line locations Existing franchise utility locations (based upon SUE information) Profile: - Existing ground profiles at the proposed ROW lines - Proposed vertical alignment - Proposed grade line (PGL) will be located at the gutter line (flowline at the face of curb) - Superelevation data (if applicable) 3.3. Traffic 3.3.1 Traffic Signals • Modify preliminary design of span wire traffic signal installation to permanent traffic signal at F.M. 1585 and Indiana Avenue. Locate pole locations, controller cabinet assemblies, and power sources Locate conduit, ground boxes, and identify cabling requirements Identify detection system equipment requirements Identify emergency pre-emption equipment requirements - Identify pedestrian accommodations (crosswalks, ADA barrier free ramps, pedestrian signals, and push -buttons) Prepare preliminary intersection layouts and summary charts for each intersection Prepare list of applicable City and TxDOT design details and standard sheets for inclusion in the plans Prepare list of specifications 4. Final Design 4.1. Roadway and Channel 4.1.1 Incorporate the 60% review comments 4.1.2 Prepare plan / profile sheets (22"x34" plan sheets at a scale of 1"=50' horizontal, and 1"=2' vertical). The final bid documents will be 11"x17" plan sheets at a scale of 1 "=100' horizontal, and 1 "=4' vertical Include the following items in addition to those included in the preliminary design submittal: - Proposed easement locations (if any) - Proposed sidewalk locations - Proposed residential and commercial driveways - Horizontal Alignment Data - Traffic Control Phasing layouts Pavement marking layouts - Erosion control plans - Barrier free ramps Demolition plan Intersection layouts Small sign summary Standard design details - TxDOT standards 4.1.3 Develop design cross-sections • Develop on 50' station intervals • Show pavement and subgrade, right-of-way limits, side slopes, pavement cross slopes, curbs, and sidewalks • Cross-sections will not be provided in the bid documents but will be made available to prospective bidders City of Lubbock - Indiana Avenue from 103rd St. to F.M. 1585 Page 2 of 3 Scope of Services - Contract Amendment #2 Novemver 5, 2009 4.2. Traffic 4.2.1 Traffic Signals • Design of permanent signal instead of span wire signal at intersection of FM 1585 and Indiana Avenue - Incorporate the preliminary design submittal review comments - Finalize the layouts and summary charts for the intersection - Finalize the applicable Tx'DOT and City design details - Finalize the specifications - Finalize the traffic signal sheets for inclusion in the plans - End of Scope of Services - City of Lubbock - Indiana Avenue from 103rd St. to F.M. 1585 Page 3 of 3 Scope of Services - Contract Amendment #2 Novemver 5, 2009 Resolution No_ 2009-R0467 INDIANA AVE PAVING IMPROVEMENTS (103RD Street to FM 1585) AMENDMENT No. 2 ATTACHMENT C1 Workplans for:. Kimley-Horn and Associates, Inc. Abacus Engineering and Surveying Kimley-Horn 1MM" and Associates, Inc. lan Budget Client: City of Lubbock Project: Indiana Avenue KHA No. PM: Brad Tribble Attachment C-1 Amendment No. 2 LUMP SUM Resolution No- 2009-80467 Budget Summary Date: Oct 13, 2009 BudgetTask No. Task Name Hours Labor 00 Expense Subtotal 100 Project Mgmt. and Coord. 26 $ 4,200 $ 100 $ $ 4,300 11,200 200 116th Street Design 94 $ 10,600 $ 600 300 FM 1586 Signal Redesign 39 $ 4,400 $ 200 $ 4,600 TOTALS: 1 1591$ 19,2001$ 900 $ 20,100 Task No. iTask Name I Cost I Multiplier i Subtotal TOTALS: Page 1 of 4 ❑_© Kimley-Horn M and Associates, Inc. Project Workplan Budget `¢s`L Attachment C-1 Amendment No. 2 Cate October 13, 2009 !Task Effort Summary Task Information Labor: $ 4,200 Number: 100 Expense: $ 100 Name' Project Mgmt. and Coord. Task Mgr Leslie Bruce TOTAL: 4,300 �cl f Task Descriptions: Client: City of Lubbock Project: Indiana Avenue KHF No: PM: Brad Tribble `¢s`L Attachment C-1 Amendment No. 2 Cate October 13, 2009 !Task Effort Summary Task Information Labor: $ 4,200 Number: 100 Expense: $ 100 Name' Project Mgmt. and Coord. Task Mgr Leslie Bruce TOTAL: 4,300 �cl f Task Descriptions: == - . �■■■■■ W Addifional Project Management SEMEN MEN 01 Additional Survey Coordination■■m r ■�i�i Wdditional Franchise Utility Coordination� ■■■■■ ■■�■■■ MEN Addition �■■■■■�■■■ 0 MEN 0% QAI - MEM ■■■■■ 90% Q' . Review MMM ■■ ■■■MEMMEM 100% QA1QC Review MEM IN NINE EMMEMME i■ ■ NINE MMEEI IN MINE MEN E ■■.■��.��■■■■.■■ ■■ CMEM"'■MEM■■■:_IMIMM Emm�M= MEMMEM MEM MIN �■■s •■ ■■■■■ ■"" ■■■■■■■■■�MIMEMMEM momMom MEMMEM Effort: $ 1,050 1 S 2,090 1 S - 1 $ 750 $ - 1 $ - 1 $ 300 1 1 1 1 1 11$ 4,190 $ - 1 $ 83 Page 2 of 4 ©_FJ Kimley-yam M and Associates, inc. Project Workplan Budget Information -General Project Giient: City of Lubbock Project Indiana Avenue KHA No: PM: Brad Tribble Attachment C-1 Amendment No. 2 Labor: $ 10,600 Expense: $ 600 Allocation: $ - TOTAL: 11,200 1 Date October 13. 2009 i . ... �111[•]IIICIiL0 Number: 200 Narne: 116th Street Design Task Mgr Leslie Bruce Task Descriptions: Preliminary Design Roadway and Channel Design Typical Sections Cross Secftns MEN ��! MEN Pinal Design Roadway and Channel P&P sheets Cross Sections MEN 0101� lE�iM MFinal ON MEN I =MIN ON NoMEN M 0 loom ON EMEN ENOMEMEN MEN� Effort:l$ - J$ 1,330 1 S - J$ 3,3751$ 5,200 680 $ 10,5851$ 5851$ - Page 3 of 4 K:1L4C_Roadway1063126003`PPPIConlractlContract Mod #21LS_amm2_2009-1013.x1s Printed: 10113/2009, 5:04 PM ©)♦� Kimiey-Horn and Associates, Inc. Project Workplan Budget General Project Information Client: City of Lubbock Project: Indiana Avenue KHA No: PM: Brad Tribble Attachment G-1 Amendment No. 2 Date October 13, 2009 ■F113,4041 SlliiliiFii+ ■r•ti�.tEii. �iir•��r.i� Labor: $ 4,400 Number. 300 Expense: $ 200 Name: FIN 1585 Signal Redesign Allocation: $ - Task Mgr Brian Shamburger TOTAL: $ 4,600 t'�4 `fit Task Descriptions. E Preliminary Design Permanent Signal at FM 1585- --OEM MOM MMME MMMM Finall Design Final Signal 6-e-s-t-gn—at F_M_1585 MOM MOM NINON IMM 1111mmmmm mom __MM1 MEMO MEN IMM MOM MOM MEN 1111MMIM MEN MEN e.. ENE ENE MOM ME MEME INS MEMMMIM MMOMMEM IME OWN MEMEMEM IME ENE MENIME MOM WOMEN Effort: $ - 1 $ 5701 $ 560 1 $ 250 K:\LAC_Roadwayk063126003\PPPContractlContract Mod #2SLS amm2_2009-1013.xis $ - 1$ - $ 4,380 1$ 1801$ - Page 4 of 4 Printed: 1011312009, 5:04 PM C_" Kimley-Horn Mand Associates, Inc Project Workplan Budget Client: City of Lubbock Project: Indiana Avenue KHA No. PM: Brad Tribbte Attachment C-1 Resolution No. 2009—Ra467 Amendment No. 2 REIMBURSABLE Budget Summary Date: Oct 13, 2009 4 Schedule: Project Bu.• - Effort Totals: Labor: $ - Expense: $ 7,700 TOTAL: $ 7,700 Page 1 of 1 Subconsultant Summary Task No. Task Name Cost Multiplier Subtotal 730 SUB-ROWIESMT Docs $ 7,000 1.10 $ 7,700 TOTALS: 11 $ 7,0001 is 7,700 Project Bu.• - Effort Totals: Labor: $ - Expense: $ 7,700 TOTAL: $ 7,700 Page 1 of 1