Loading...
HomeMy WebLinkAboutResolution - 2009-R0392 - Amendment To Contract - HDR Engineering Inc.- Water System Capital Improvements - 09/24/2009Resolution No. 2009-80392 September 24, 2009 Item No. 5.5 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock, Amendment #4 to the Contract for engineering services for water systems capital improvement projects, by and between the City of Lubbock and HDR Engineering, Inc. of Austin, Texas, of October 27, 2005, and related documents. Said Amendment is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council this 24th ATTEST: - P, '-- Rebec -arta, City Secretary APPROVED S TO CONTENT: 4/j W �TFr in ChiUtilities Director APPROVED AS TO FORM: Assistant City Attorney vw/cdocsJRes.Contract-Amend #4 HDR Engineering September 8, 2009 day of September , 2009. TOM MARTIN, MAYOR Resolution No. 2009—RO392 AMENDMENT #4 TO AGREEMENT BETWEEN THE CITY OF LUBBOCK, TEXAS AND HDR ENGINEERING, INC. FOR PROFESSIONAL ENGINEERING SERVICES THIS IS AN AMENDMENT TO THE AGREEMENT dated and effective as of October 27, 2005 between The City of Lubbock, Texas and HDR Engineering, Inc. OWNER and ENGINEER in consideration of their mutual covenants as set forth herein agree to modify the Agreement as follows: Revise Exhibit C, Paragraph C4.01A to read as follows: A. Owner shall pay Engineer for Basic Services set forth in Exhibit A, except for services of Engineer's Resident Project Representative and Post -Construction Phase services, if any, as follows: 1. A Lump Sum amount of $1,573,982.00 based on the following assumed distribution of compensation: a. Study and Report Phase $ 183,850.00 b. Design Phase $ 859,531.00 c. Bidding Phase $ 54,601.00 d. Construction Phase, excluding RPR and CMT services $ 476,000.00 Revise Exhibit C, by adding a new paragraph C4.02 to read as follows: 04.02 Compensation for Resident Project Representative and Construction Material Testing Services A. Owner shall pay Engineer for Resident Project Representative Services as follows: 1. Resident Project Representative Services. For services of Engineer's Resident Project Representative under paragraph A1.05A of Exhibit A, an amount equal to the cumulative hours charged to the Project times an hourly rate of $81.25 for a senior RPR and an hourly rate of $52.50 for junior RPR for all Resident Project Representative services performed on the Project, plus related Reimbursable Expenses. If the number of hours worked in a week by the Resident Project Representative exceeds 40, Owner shall pay Engineer for the hours worked in excess of 40 at a rate of 1.5 times the hourly rate set forth. B. Compensation for Construction Materials Testing and other Reimbursable Expenses 1. For those Reimbursable Expenses under paragraph C4.02A that are either directly related to the services of Resident Project Representative or for Page 1 of 2 Construction Materials Testing, Owner shall pay Engineer an amount equal to the cost of such expenses plus a five percent (5%) surcharge. Reimbursable expenses include mileage reimbursement (calculated at the rate set forth by the Internal Revenue Service), providing and maintaining field office facilities (estimated to be $750 per month), toll telephone calls, reproduction charges, the charges of Terra Testing, Inc. and PaveTex Engineering and Testing, Inc. (or other CMT laboratory approved by Owner) for construction materials testing, and similar Project -related items. C. Estimated Fee 1. The total compensation for Resident Project Representative and Construction Materials Testing Services (labor plus reimbursable expenses) is estimated to be $761,128.00 based upon on a combined total duration of 19 months for both construction contracts and a normal 40 -hour work -week. Total billed amount will not exceed this estimate without prior written authorization from the City of Lubbock. IN WITNESS WHEREOF, the parties hereto have executed this Amendment. OWNER: City of Lubbock, Texas Ey: Title: TOM MARTIN, MAYOR Date Signed: September 24, 2009 ATTEST: City retary Approved: As to Content, ENGINEER: HDR Engine g, Inc. Title: "'&w %t Date Signed: .9-9-09 ^ Page 2 of 2