HomeMy WebLinkAboutResolution - 2009-R0376 - Contract- Talon/LPE - Installation Of Wheel Washing System, Solid Waste Facility - 09/10/2009A
Resolution No. 2009-80376
September 10, 2009
Item No. 5.12
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock, Job Order Contract No. 09-
069-F-069-NJPA for installation of the Moby Dick Duo 950 GPM Wheel Washing
System at Solid Waste Facility at 1631 84[11 Street per National Joint Powers Alliance
(NJPA), Indefinite Quality Construction Contract, by and between the City of Lubbock
and Talon/LPE of Amarillo, Texas, and related documents. Said Job Order Contract is
attached hereto and incorporated in this resolution as if fully set forth herein and shall be
included in the minutes of the City Council.
Passed by the City Council this
10th day of September '2009.
!�r� --
TO MARTIN, MAYOR
ATTEST:
Rebe cr: Garza, City Secrt;tary
APPROVED AS TO CONTENT:
amen oomis, Assistant City Manager
ran ortation and Public Works
APPROVED AS TO FORM:
Chad Weaver, Assistant City Attorney
vw/ccdocs/RES.Contract-Ta tors
August 13, 2009
City of Lubbock Job Order Resolution No. 2 009-80 3 7 6
This Job Order is governed by all terms and conditions of the Contract referenced below which is hereby
incorporated by reference.
Owner: Wesley Everett, Director of Facilities Management for - Solid Waste
NJPA Contract No.: TX04-061908-TAL, National Joint Powers Alliance (NJPA), Indefinite Quantity
Construction Contract.
Contract Job Order no.: 09-069-F-069-NJPA
Contractor: Talon/LPE.
Date of Contract: September 25, 2008
Job Order Date: August 13, 2009
Project Architect for this Job Order: List name, phone number and firm name of Architect contracted for this
project. NIA
Summary and Description of Statement of Work attached hereto: Install Moby Dick Duo 950 GPM Wheel
Washing System at Solid Waste Facility at 1631 84th Street.
Talon Job Order Number: 009256.00 hereto attached.
Value of pre -priced work: $ 33,198.34
Value of non -pre -priced work: $ 00.00
Payment and Performance Bonds:8$ 51.24 Insurance Requirements per Exhibit A, attached.
Total Fixed Price stipulated suns for this Job Order ("Job Order Sum"):34$ ,049.58
Notice to Proceed Date for this Job Order: To be issued after City Council approval
Expected Completion Date for this Job Order: To be determined after Ci Council avvroval
Liquidated Damages (if different than as set forth in Agreement): $25 per day
CONTRACTOR: CITY OF LUBBOCK, TEXAS (OWNER):
Talon/LPE By: fz
MAYOR
By: -
ATTEST:
PRINTED NAME: BRIDGER HOWARD
TITLE: PROJECT MANAGER
COMPLETE ADDRESS:
Company Talon/LPE
Address 921 N. Bivins Street
City, State, Zip Amarillo, TX 79107
ATTEST:
Corporate Secretary
CQ, 'O_Q�
City Skeretary
APPROVED AS TO CONTENT:
City Attorney
QA PurchaseTublic Works Contractingldob order Contracts 8113/2009
Detailed Scope of Work
To: No Data Input From: No Data Input
Date Printed:
July 29, 2009
Task Order No:
009256.00
Task Order Title:
Lubbock- Wheel Washing System
Brief Scope:
Wheel Washing System Installation
Preliminary
❑ Revised
Final
The following items detail the scope of work as discussed at the site. All requirements necessary to accomplish the
items set forth below shall be considered part of this scope of work.
1. Installation of (1) Moby Dick Duo 950 GPM per the plans and specifications provided by the manufacturer.
2. No inclusion of entrance or exit asphalt.
3. Alternate #1 is for an additional 10'X24'X6" concrete pad for the City provided roll -off box.
Detailed Scope of Work Page 1 of 1
7129/2009
Contractor's Cost Proposal Summary - CSI
Date: July 29, 2009
Contract Number: TX04-061908-TAL
Job Order Number: 009256 00
Job Order Title: Lubbock- Wheel Washing System
Contractor: TalonlLPE
Proposal Value: $1,848.58
Proposal' Name: Lubbock- Wheel Washing System - Alt. #1
Subtotal for Section -01: $552.86
Subtotal for Section -02: $1,295.72
Proposal Total
This proposal total represents the correct total for the proposal. Any discrepancy between line totals,
sub -totals and the proposal total is due to rounding of the line totals and sub -totals.
The Percent of NPP on this Proposal: 0.00%
$1,848.58
Cost Proposal Summary - CSI Page 1 of 1
7/29/2009
Contractor's Cost Proposal Detail - CSI
Date: July 29, 2009
Contract Number:
TX04-061908-TAL
Job Order Number:
009256.00
Job Order Title:
Lubbock- Wheel Washing System
Contractor:
Talon/LPE
Proposal Value:
$1,848.58
Proposal Name:
Lubbock- Wheel Washing System - Alt. #1
Rec# Sect. Item
Mod. UOM description Line Total
Section -01
1 01590 0212 DAY 60" Wide, 113 CY Bobcat, With Full -Time Operator $422.42
Quantity Unit Price Factor Total
Installation 1.00 x $326.70 x 1.2930 = $422.42
2 01590 0817 EA Bobcat Del iverylMoblDemobNote: Use for bobcat or similar sized equipment. $130.44
Includes delivery fee, delivery, set-up and return.
Quantity Unit Price Factor Total
Installation 1.00 x $100.88 x 1.2930 = $130.44
Subtotal for Section -01: $552.86
Section -02
3 02210 0003 CY Excavation For Building Foundations And Other Structures By Bobcat in Soil $17.20
This proposal total represents the correct total for the proposal. Any discrepancy between line totals,
sub -totals and the proposal total is due to rounding of the line totals and sub -totals.
The Percent of NPP on this Proposal: 0.00%
Non Prepriced Worksheet Page 1 of 1
7129/2009
Quantity Unit Price Factor
Total
Installation 5.00 x $2.66 x 1.2930
$17.20
4 02614 0015
SF 6" (15 cm) Thick Slab On Grade, 3000 PSI, Includes Forms, Wire Mesh And
$968.20
Reinforcing Rods, Vapor Barrier, Concrete, Curing, Expansion And Construction
Joints And Finish. Excavation And Earthwork Not Included,
Quantity Unit Price Factor
Total
Installation 240.00 x $3.12 x 1.2930 =
$968.20
5 02MOD 0015 0576
For Quantities Up To 500, Add
$310.32
Quantity Unit Price Factor
Total
Installation 240.00 x $1.00 x 1.2930 =
$310.32
Subtotal for Section -02:
$1,295.72
Proposal Total
$1,848.58
This proposal total represents the correct total for the proposal. Any discrepancy between line totals,
sub -totals and the proposal total is due to rounding of the line totals and sub -totals.
The Percent of NPP on this Proposal: 0.00%
Non Prepriced Worksheet Page 1 of 1
7129/2009
Contractor's Cost Proposal Summary - CSI (000
Date: July 29, 2009
Contract Number:
TX04-061908-TAL
Job Order Number:
009256.00
Job Order Title:
Lubbock- Wheel Washing System
Contractor:
Talon/LPL
Proposal Value:
$32,201.00
Proposal Name:
Lubbock- Wheel Washing System
Subtotal for Section -01: $5,842.77
Subtotal for Section -02: $4,448.74
Subtotal for Section -15: $1,085.55
Subtotal for Section -16: $20,823.94
Proposal Total
This proposal total represents the correct total for the proposal. Any discrepancy between line totals,
sub -totals and the proposal total is due to rounding of the line totals and sub -totals.
The Percent of NPP on this Proposal: 0.00%
$32,201.00
Cost Proposal Summary - CSI Page 1 of 1
7129/2009
Contractor's Cost Proposal Detail - CSI
Date: July 29, 2009
Contract Number:
TX04-061908-TAL
Job Order Number:
009256.00
Job Order Title:
Lubbock- Wheel Washing System
Contractor:
Talon/LPE
Proposal Value:
$32,201.00
Proposal Name:
Lubbock -Wheel Washing System
Rec# Sect. Item
Mod. UOM Description Line Total
Section -01
1 01352 0010
HR Electrician, Note: Line items in the CTC include appropriate casts to cover labor-
$368.76
These items will be requested specifically by the owner for miscellaneous work not
covered in the CTC.
Quantity Unit Price Factor
Total
Installation 8.00 x $35.65 x 1.2930 =
$368.76
Assist with Assmebling of Control. panel frame, Install conduit for motors, final electrical connections to control
panel
2 01352 0023
HR Plumber,NoW Line items in the CTC include appropriate costs to cover labor.
$375.28
These items will be requested specifically by the owner for miscellaneous work not
covered in the CTC.
Quantity Unit Price Factor
Total
Installation 8.00 x $36.28 x 1.2930 =
$375.28
Final Plumbing Connections, water makeup
3 01352 0039
HR Laborer, Note: Line items in the CTC include appropriate costs to cover labor.
$356.66
These items will be requested specifically by the owner for miscellaneous work not
covered in the CTC.
Quantity Unit Price Factor
Total
Installation 16.00 x $17.24 x 1.2930 =
$356.66
Set equipment, attach equipment to concrete
4 01431 0004
EA Laboratory Compaction Test, ASTM D1557
$142.23
Quantity Unit Price Factor
Total
Installation 1.00 x $110.00 x 1.2930 =
$142.23
5 01431 0011
EA Proctor Compaction 4" Standard Mold
$147.63
Quantity Unit Price Factor
Total
Installation 1.00 x $114.18 x 1.2930 =
$147.63
6 01590 0212
DAY 60" Wide, 113 CY Bobcat, With Full -Time Operator
$844.85
Quantity Unit Price Factor
Tate,
Installation 2,00 x $326,70 x 1.2930 =
$844.85
7 01590 0398
DAY Trencher, To 4' Deep With Full-time Operator
$1,708.85
Quantity Unit Price Factor
Total
Installation 3.00 x $440.54 x 1.2930 =
$1,708.85
8 01590 0551
DAY 30 Ton Lift Hydraulic Crane, With Full -Time Operator
$1,224.32
Quantity Unit Price Factor
Total
Installation 1.00 x $946.88 x 1.2930 =
$1,224.32
9 01590 0805
EA 20 To 30 Ton Move On/Off Cost, Truck Mounted Crane
$465.48
Quantity Unit Price Factor
Total
Installation 1.00 x $360.00 x 1.2930 =
$465.48
10 01590 0816
EA Trencher DeliverylMob/DemobNote: Use for trencher or similar sized equipment-
'$78.27
Includes delivery fee, delivery, set-up and return._
Quantity Unit Price Factor
Total
Installation 1,00 x $60.53 x 1.2930
$78.27
Cost Proposal Detail - CSI Page 1 of 6
7129/2009
Cost Proposal Detail - CSI Continues..
Job Order plumber:
009256 00
Job Order Title:
Lubbock- Wheel Washing System
Rec#
Sect.
Item Mod.
UOM Description
Line Total
Section -01
11
01590
0817
EA Bobcat Dei iverylMoblDemobNote: Use for bobcat or similar sized equipment.
$130.44
Includes delivery fee, delivery, set-up and return.
Quantity Unit Price Factor
Total
Installation 1,00 x $100.88 x 1,2930 -
$130.44
Subtotal for Section -01:
$5,842.77
Section -02
12
02205
0003
CY Bulk Excavation by Hydraulic Excavator, Front End Loader, Backhoe in Soil
$51.00
Quantity UnR Prica Factor
Total
Installation 17,00 x $2.32 x 1.2930 -
$51.00
13
02210
0017
CY Backfilling Around Building Foundations And Other Structures by Bobcat
$50.43
Quantity Unit Price Factor
Total
Installation 30.00 x $1,30 x 1.2930 =
$50.43
14
02213
0004
CY Native SoUDirt - Common
$170.81
Quantity Unit Price Factor
Total
Installation 10.00 x $13.21 x 1.2930 -
$170.81
15
02213
0020
CY #6 Stone Aggregate Fill (3/8" To 314" Clean)
$91622
Quantity Unit Price Factor
Total
Installation 30.00 x $23.62 x 1.2930 -
$916.22
16
02215
0002
CY 12" Wide or Less, Excavation for Trenching by Machine in Soil
$188.78
Quantity Unit Price Factor
Total
Installation 4000 x $3.65 x 1.2930 -
$188.78
Electrical Trenching
17
02215
0002
CY 12" Wide or Less, Excavation for Trenching by Machine in Soil
$14.16
Quantity Unit Price Factor
Total
Installation 3.00 x $3.65 x 1.2930 =
$14.16
Water Line Trenching up to 20' from control box
18
02215
0010
CY Backfilling or Placing Subbase for Trenches with Imported or Stockpiled Materials
$61.55
by Machine
Quantity Unit Prig Factor
Total
Installation 40.00 x $1.19 x 1.2930 -
$61.55
19
02215
0013
CY Compaction of Fill or Subbase for Trenches by Vibratory Plate, Air Tamper, etc.
$82.23
Quantity Unit Price Factor
Total
Installation 40.00 x $1.59 x 1.2930 -
$82.23
20
02215
0021
CY Spread Excess Or Imparted Material On Site With Machine
$50.17
Quantity Unit Price Factor
Total
Installation 40.00 x $0.97 x 1.2930 -
$50'.17
21
02441
0128
EA 2" (50mm) Reduced Pressure Backflow Preventer
$435.07
Quantity Unit Price Factor
Total
Installation 1.00 x $336.48 x 1.2930 =
$435.07
22
02614
0015
SF 6" (15 cm) Thick Slab On Grade, 3000 PSI, Includes Forms, Wire Mesh And
$968.20
Reinforcing Rods, Vapor Barrier, Concrete, Curing, Expansion And Construction
Joints And Finish. Excavation And Earthwork Not Included.
Quantity Unit Price Factor
Total
Installation 240.00 x $3.12 x 1.2930
$968.20
Cost Proposal Detail - CSI Page 2 of 6
7129!2009
Cost Proposal Detail - CSI Continues..
Job Order Number: 009256.00
Job Order Title: Lubbock- Wheel Washing System
Rec# Sect. Item Mod. I Description Line Total
Section -02
$438.20
Conduit
23 02614
0019
SF 12" (30 cm) Thick Slab On Grade, 3000 PSI, Includes Forms, Wire Mesh And
$1,183.42
Factor
Total
Reinforcing Rods, Vapor Barrier, Concrete, Curing, Expansion And Construction
$2,824.18 x
1.2930 =
$438.20
Joints And Finish. Excavation And Earthwork Not Included.
$49.55
Quantity Unit Price Factor
Total
Factor
Total
Installation 175.00 x $5.23 x 1.2930 =
$1,183.42
24 02520
0003
LF 6" X 12" Cast in Place Concrete Curb
$276.70
Quantity Unit Price Factor
Total
Page 3 of 6
Installation 40.00 x $5.35 x 1.2930
$276.70
7/29/2009
8" X 8" Concrete Curb
Subtotal for Section -02:
$4,448.74
Section -15
25 15064
0335
LF 112" Pipe Schedule 40 PWC Socket Weld
$256.01
Quantity Unit Price Factor
Total
Installation 120.00 x $1.65 x 1.2930 =
$256.01
26 15064
0337
LF T' Pipe Schedule 40 PVC Socket Weld
$355.32
Quantity Unit Price Factor
Total
Installation 120.00 x $2.29 x 1.2930 =
$355.32
27 15064
0340
LF 2" Pipe Schedule 40 PVC Socket Weld
$295.06
Quantity Unit Price Factor
Total
Installation 70.00 x $3.26 x 1.2930 =
$295.06
28 15064
0422
EA 112" Male Adapter, PVC Schedule 40 Socket Weld X Male Thread
$30,05
Quantity Unit Price Factor
Total
Installation 4.00 x $5,81 x 1.2930 =
$30.05
29 15064
0424
EA 1" Male Adapter, PVC Schedule 40 Socket Weld X Male Thread
$49.29
Quantity Unit Price Factor
Total
Installation 4.00 x $9.53 x 1.2930 =
$49.29
30 15064
0427
EA 2" Male Adapter, PVC Schedule 40 Socket Weld X Male Thread
$99.82
Quantity Unit Price Factor
Total
Installation 4,00 x $19.30 x 1.2930 =
$99.82
Subtotal for Section -15:
$1,085.55
Section -16
31 16120
0076
MLF #10 AWG Cable - Type USE. Underground Feeder And Branch Circuits
$585.26
Quantity Unit Price Factor
Total
Installation 0.50 x $905.28 x 1.2930 =
$585.26
32 16120
0239
MLF #6 AWG Cable - Type THHN-THWN 600 V Copper, Single Stranded, Placed In
$1,256.24
Conduit
Quantity Unit Price Factor
_
Total
Installation 0.75 x $1,295.43 x 1.2930 =
$1,256.24
33 16120 0242 MLF #2 AWG Cable -Type THHN-THVM 600 V Copper, Single Stranded, Placed In
$438.20
Conduit
Quantity
_
Unit Price
Factor
Total
Installation 0.12 x
$2,824.18 x
1.2930 =
$438.20
34 16120 1131 EA 1-114" Weatherproof Conduit Hubs
$49.55
Quantity
Unit Price
Factor
Total
Installation 1.00 x
$38.32 x
1.2930 =
$49.55
Cast Proposal Detail - CSI
Page 3 of 6
7/29/2009
Cost Proposal Detail - CSI Continues..
Job Order Number: 009256.00
Job Order Title:
Lubbock- Wheel Washing System
Recp
Sect.
Item Mod.
UOM Description
Line Total
Section -16
III
35
16120
1141
EA 1-114" Galvanized Weatherhead For #4 Thru M2 AWG Cable Service Entrance
$52.74
Threaded Weatherhead
Quantity Unit Price
Factor
Total
Installation 1.00 x $40.79 x
1.2930 =
$52.74
36
16131
0003
LF 112" RGS Conduit, PVC Coated, Urethane Lined
$64.39
Quantity Unit Price
Factor
Total
Installation 10.00 x $4.98 x
1.2930 =
$64.39
37
16131
0005
LF V RGS Conduit, PVC Coated, Urethane Lined
$91.29
Quantity Unit Price
Factor
Total
Installation 10.00 x $7.06 x
1.2930 =
$91.29
38
16131
0008
LF 2" RGS Conduit, PVC Coated, Urethane Lined
$170.29
Quantity Unit Price
Factor
Total
Installation 10.00 x $13.17 x
1.2930 =
$170.29
39
16131
0016
EA 112" Coupling, RGS PVC Coated, Urethane Lined
$68.79
Quantity Unit Price
Factor
Total
Installation 10.00 x $5.32 x
1.2930 =
$68.79
40
16131
0018
EA 1" Coupling, RGS PVC Coated, Urethane Lined
$101.37
Quantity Unit Price
Factor
Total
Installation 10,00 x $7.84 x
1.2930 =
$101.37
41
16131
0021
EA 2" Coupling, RGS PVC Coated, Urethane Lined
$163.22
Quantity Unit Price
Factor
Total
Installation 10.00 x $14.17 x
1.2930 =
$183.22
42
16131
0029
EA 112" Standard Degree Elbow, RGS PVC Coated, Urethane Lined
$103.13
Quantity Unit Price
Factor
Total
Installation 4.00 x $19.94 x
1.2930 =
$103.13
43
16131
0031
EA 1" Standard Degree Elbow, RGS PVC Coated, Urethane Lined
$136.80
Quantity Unit Price
Factor
Total
Installation 4.00 x $26.45 x
1.2930 =
$136.80
44
16131
0034
EA 2" Standard Degree Elbow, RGS PVC Coated, Urethane Lined
$245.72
Quantity Unit Price
Factor
Total
Installation 4.00 x $47.51 x
1.2930 =
$245.72
45
16131
0166
EA 112" Straight Grounded Sealtight Conduit Fittings, RGS PVC Coated, Urethane
$168.37
Lined
Quantity Unit Price
Factor
Total
Installation 2.00 x $65.11 x
1.2930 =
$168.37
46
16131
0168
EA 1" Straight Grounded Sealtight Conduit Fittings, RGS PVC Coated, Urethane Lined
$254.31
Quantity Unit Price
Factor
Total
Installation 2.00 x $98.34 x
1.2930 =
$254.31
47
16131
0658
EA RGS 112" Steel Bushing Set With Looknuts, Mounted Exposed On
Flat Wall
$12.65
Quantity Unit Price
Factor
Total
Installation 2.00 x $4.89 x
1.2930 =
$12.65
48
16131
0744
EA RGS 1-114" Off -Set Nipple, Insulated, Mounted Exposed On Flat
Wall
$14.75
Quantity Unit Price
Factor
Total
Installation 1.00 x $11.41 x
1.2930 =
$14.75
Cost Proposal Detail
- CSI
Page 4 of 6
7129/2009
Cost Proposal Detail - CSI Continues.
Job Order Number: 009256,00
Job Order Title:
Lubbock- Wheel Washing System
Rec#
Sect.
Item Mod.
UOM Description
Line Total
Section -16
49
16131
0865
LF 112" EMT Conduit, Mounted Exposed On Flat Wall
$23.02
Quantity Unit Price
Factor
Total
Installation 10.00 x $1.78 x
1.2930 =
$23.02
50
16131
0867
LF 1" EMT Conduit, Mounted Exposed On Flat Wali
$35.95
Quanttyr Unit Price
Factor
Total
Installation 10.00 x $2.78 x
1.2930 =
$35.95
51
16131
0868
LF 1-114" EMT Conduit, Mounted Exposed On Flat Wall
$87.92
Quantity Unit Price
Factor
Total
Installation 20.00 x $3.40 x
1.2930 =
$87.92
52
16131
0900
EA 1" EMT Compression Coupling, Mounted Exposed On Flat Wall
$10.37
Quantity Unit Price
Factor
Total
Installation 2.00 x $4.01 x
1.2930 =
$10.37
53
16131
0901
EA 1-1/4" EMT Compression Coupling, Mounted Exposed On Flat Wall
$6.76
Quantity Unit Price
Factor
Total
Installation IIA0 x $5.23 x
1.2930 =
$6.76
54
16131
0934
EA 1-1/4" EMT Box Connector, Compression
$12.30
Quantity Unit Price
Factor
Total
Installation 1,00 x $9.51 x
1.2930 =
$12.30
55
16131
1538
LF 1!2" Liquid Tight Flex Conduit
$20.04
Quantity Unit Price
Factor
Total
Installation 10.00 x $1.55 x
1.2930 =
$20.04
56
16131
1540
LF 1'" Liquid Tight Flex Conduit
$32,07
Quantity Unit Price
Factor
Total
Installation 10.00 x $2.48 x
1.2930 =
$32.07
57
16134
0316
EA 12"x12"x12" Explosion Proof Junction Box
$4,496,14
Quantity Unit Price
Factor
Total
Instailation 1.00 x $3,477.29 x
1.2930 =
$4.496.14
58
16170
0015
EA 100 A, Fused Disconnect Switch, NEMA 1, Heavy Duty, With Fuses, 600 V. 1
$731.11
Phase, 2 Pale ----
Quantity Unit Price
Factor
Total
Installation 1.00 x $565.44 x
1.2930 =
$731.11
59
16181
0063
EA 60 Amp, 600 Volt, Current Limiting Fuse RK1, Fefrule Type
$95.00
Quantity Unit Price
Factor
Total
Installation 3.00 x $24.49 x
1.2930 =
$95.00
60
16252
0017
EA 5 KVA, Uninterrupted Power Supply, 480 V Input, 1 Phase, 60 Hz, 120 V Output,
$10,810.27
With Static Transformer Switch, Mechanical Bypass Switch And Meters
Quantity Unit Price
Factor
Total
Installation 1,00 x $8,360.61 x
1.2930 =
$10,810.27
61
16430
0007
EA 200 A, 3 Phase, 4 Wire, 7 Terminal Meter Socket With Bypass And Jaw Release,
$405.82
Exposed On Wood
Quantity Unit Price
Factor
ToW
Installation 1.00 x $313.86 x
1.2930 =
$405.82
62
16452
0003
EA 518" Diameter 10° Long Copper -Clad Ground Rods
$60.10
Quantity Unit Price
Factor
Total
Installation 1.00 x $46.48 x
1.2930 =
$60.10
Subtotal for Section -16:
$20,823.94
Cost Proposal Detail
- GSI
Page 5 of 6
7129/2009
Cost Proposal Detail - CSI Continues..
Job Order Number: 009256 00
Jab Order Title: Lubbock- Wheel Washing System
Proposal Total $32,201.00
This proposal total represents the correct total for the proposal. Any discrepancy between line totals,
sub -totals and the proposal total is due to rounding of the line totals and sub -totals.
The Percent of NPP on this Proposal: 0.00%
Non Prepriced Worksheet Page 6 of 6
7/29/2009