HomeMy WebLinkAboutResolution - 2009-R0309 - Amendment To Agreement - Parkhill, Smith, & Cooper - Runway Improvements - 08/13/2009Resolution No. 2009-RO309
August 13, 2009
Item No. 5.13
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock, Amendment No. 12B to the
Architectural/Engineering Services Agreement for Runway 8126 Improvements -Phase I -
Utility Relocation & Perimeter Road Project, by and between the City of Lubbock and
Parkhill Smith & Cooper, and related documents. Said Amendment is attached hereto
and incorporated in this resolution as if fully set forth herein and shall be included in the
minutes of the City Council.
Passed by the City Council this
13th day of August _'2009.
TOM MARTIN, MAYOR
ATTEST:
-CIP r
Rebe a Garza, City Secrewy
APPROVED AS TO CONTENT:
dVW `' !/ ♦ r (_ /rJ ' Vi fK1
Loomis, AssistantCity Manager
ortation and Public Works
APPROVED AS TO FORM:
Chad Weaver, Assistant City Attorney
vw'ccdocs/RES.Airport-Amendment 12B -PSC
July 30, 2009
PARKHILLSMITH&COOPER
Resolution No. 2009-80309
PSC
Mr. James W. Loomis, A.A.E.
Director of Aviation
Lubbock Preston Smith International Airport
Administration Office, 2nd Floor
5401 N. Martin Luther King Jr. Blvd., Unit 389
Lubbock, TX 79403
Re: Amendment No. 12B to Agreement for Professional Services,
Construction Phase Services for: Runway 8/25 Improvements — Phase I
Utility Relocation & Perimeter Road
Dear Mr. Loomis:
July 28, 2009
Last week bids were received for the construction of the utility relocation and perimeter road portion of the
Runway 8/26 project. We have met with your staff, reviewed the proposals submitted by the contractors and
have prepared the attached scope of services for the construction phase of this portion of the project. Parkhill,
Smith & Cooper, Inc. (PSC) currently has two contract amendments in place for the design of the Runway 8/26
improvements. Amendment 12, dated April 23, 2008 is for the design of the components associated with this
project with the exception of the work around the approach end of Runway 8 and reconstruction of Taxiway R.
Amendment 12A, dated July 21, 2008 added the design of these two components to the project. This contract
amendment modifies the scope of the previous two agreements to include PSC's construction phase services for
the utility relocation and perimeter road. Our understanding of the scope and a fee proposal for the professional
services requested for Task 2 (construction) and Task 3 (surveying/testing) are included below.
Task 1 - Fee for Professional Services (Study and Report, Preliminary Design,
Final Design, lump sum).
Task 2 - Construction Phase Services (Bidding/Negotiation, Engineers Services
Paragraph A1.05 of contract, which includes RPR and construction
related Engineering Services, lump sum). $ 346,225.00
Task 3 - Surveying and Testing Services, (reimbursable expense). $ 128.750.00
TOTAL
$474,975.00
* Included under previous agreement(s)
We propose to modify the agreement between the City of Lubbock and Parkhill, Smith & Cooper, Inc. dated
January 13, 2005, and to provide the task 2 services on a lump sum basis under the provisions of the contract,
EXHIBIT B -- PAYMENTS TO THE ENGINEER, LUMP SUM METHOD, Paragraph B4.01.A.1. We
propose to provide the task 3 services as a reimbursable expense as outlined under the provisions of EXHIBIT B
— PAYMENTS TO THE ENGINEER, LUMP SUM METHOD, Paragraph B4.02.A.2, reimbursable expenses.
Compensation for Design Phase - Task 1, Construction Phase - Task 2 services and Task 3, Surveying and
Testing Services shall not exceed $474,975.00 without Owner's approval. PSC is proceeding with the design of
the Runway 8/26 and taxiway improvements and will have bid documents ready for the remainder of the project
Amarillo
EI Paso
Lubbock
Mldland 4222 SSS Street LubbcckTexas 79423 306,473.2200 Fax 806 473.3500
Mr. James Loomis, A.A.E. Page 2 July 28, 2009
in 2010. Once the remainder of this project is bid, PSC will prepare a contract amendment for the construction
phase professional services for the airfield paving improvements portion of the project.
If the terms of this amendment are agreeable to you, please sign and return one copy of this letter to our office.
We will take receipt of this signed letter as our notice to proceed with these services. We look forward to
working with you in completing this project. If you have any questions please call either Mark Haberer or
myself.
Sincerely,
PARKHILL, SMITH & COOPER, INC.
By AE
ohn T. Hamilton, PE
inn Principal
JTH/jbh
Enclosures
IN TRIPLICATE
Accepted by:
CITY OF LUBBOCK
By
Tom Martin
Mayor
Attest:
By rQJ,2.-O,��
Rebecca Garza
City Secretary
to Content:
James W. Loomis, A.A.E.
Director of Aviation
Approved to
By
Chad Weaver
Assistant City Attorney
XA-1(X)12711fi.0W- Vp.M - RT NEU ITIATIONSIftw Agwrwnt\08-26 Way Cnmtr=W Mtwc oaw wwr J=n 12B.Jtxx
Page 1 of 3
ResplUtiQn
No.
2009-80309
PARKHILL, SMITH & COOPER, INC. - LUBBOCK
PROJECT BUDGET SHEET
LOCATION CODE:
01
PROJECT NAME:
LBB 8126 Utilities
JOB NO.:
01-2706-08
TASK:
2CST
DATE:
07/28/09
FEE TYPE:
Lump Sum
PREPARED BY:
JTH
PRINCIPAL:
JTH
PROD. MANAGER:
MDH
OVERHEAD RATE:.
PROFIT ON LABOR:
PROFIT ON REIMS;
15.00%
PROFIT ON DIRECTS:
15.00%
FEE:
$346,225
LABOR:
$330,972
OVERHEAD:
REIMS. CONSULTANTS:
REIMB. EXPENSES:
DIRECT CONSULTANTS:
DIRECT EXPENSES:
$13,264
LABOR BUDGETS:
CODE
DESCRIPTION HOURS
COSTS
01
Firm Principal
128
$17,536
03
Engineer
476
$49,980
11
Resident Project Representati
1,765
$185,325
11
Resident Project Representati
575
$51„175
07
Engineer-in-Training
260
$23,I40
14
CADD Operator
48
$3,312
18
Clerical
8
$504
Page 1 of 3
FEE ESTIMATING SHEET PROJECT:
LBB 8126Uti toes
JOB NO.:
01-2706.08
TASK:
2CST
SALARY
CATEGORY OF PERSONNEL.
RATE PER
HOUR
FP
ENG
RPR
RPR
EIT
CADD OPT
CLERICAL
TASK
01
03
11
11
07
14
18
Tris
$137.00
$105.00
$105.00
$89.00
$89.00
$69.00
$63.00
TOTAL
RPR (221 calendar day constructionperiod)
Preconstruction Conference
2
4
4
4
4
16
162 Days at 9 Hrs/ Day
162
972
486
1,458
20 Pre/Post Days at 4.5 Hrs/ Day
20
45
45
90
30 Days at 24 Hrs/ Day
72
60
720
780
CONSTRUCTION PHASE
Conduct Preconstr Conference, minutes
1
3
8
2
13
Coord baseline surveys, benchmark
2
2
4
Site visits, notes, progress meetings
60
48
240
120
408
Coord. with RPR, Contractor, Owner
24
16
80
32
128
Routine change orders
B
8
16
Review submittals
8
18
26
Pay estimates including final
18
32
50
Certifications, guarantees & warranties
8
8
16
Final inspection and notes/findings
4
16
8
28
MISCELLANEOUS ITEMS
QC/PM (8 mos. @ 2 hrs./rno.)
16
16
Prepare stints. (9 @ 1 hr.)
9
9
Monthly Progress Reports (0.5 hr. each)
4
4
Coordination with Owner
16
16
CLOSEOUT PHASE
Record drawings
8
8
16
48
80
Warranty insp.
4
4
4
4
2
18
Addnl. compliance insps.
4
4
4
4
16
Final test and QC rpt.
8
16
24
16
4
68
BUfJGET SUBTOTALS: HOURS/ Trips -
341
1$17,536
128
476
1765
575
260
488
3260
SALARY
$49,980
$185,325
$51,175
$23,140
$3,312
$504
$330,972
Page 2 of 3
FEE ESTIMATING SHEET PROJECT:
IRECTS
LBB 6/26 Utilities JOB NO.: 01-2706-08 TASK:
2GST
DIRECT CONSULTANT COSTS
SUBTOTAL
611 STRUCTURAL CONSULTANTS
612 MECFWLEC CONSULTANTS
613 ENV & CIVIL CONSULTANTS
614 LANDSCAPE CONSULTANTS
615 TESTING CONSULTANTS
616 SURVEYING CONSULTANTS
617 INTERIOR DESIGN CONSULTANTS
616 OTHER CONSULTANTS
TOTAL DIRECT CONSULTANTS
DIRECT EXPENSES
521 TRAVEULODGING
MOTEL DAYS @
AIR TRAVEL AIR FARE p
PARKING DAYS 0
CAR RENTAL DAYS @
MILEAGE 55 MILES 0
MEN @
MEN 0
[DAY
/DAY
$0,550 @
/MANDAY =
/MAN =
=
_
341 TRIPS = $10,315.25
SUBTOTAL
$10.315
622 REPRODUCTIONS
BLUELINE PRINTS 47
SEPIA PRINTS
PRINTING:
ORIGINAL SET-UP COST
COST PER SHEET
BINDING COST
XEROX 500
SHTS @ $2.55 @ 5 SETS = $599.25
SHTS 0 $8.51 a SETS =
ORIGINALS +a+ $0.15 /ORI.
SETS 9 $0.08 1SHT @ 225 SHEETS=
SETS 0 $2.00 /SET =
SHTS @ $0.08 ISHT = $40.00
SUBTOTAL
$639
623 MODEUURENDERINGS/PHOTOS
Shots a
/Shot
$200
624 TELEPHONE 225 Calls @
$3.00 /Call
$675
625 MEALS DAYS 0
MEN @
(MANDAY
626 FIELD SUPPLIES
$400
626 POSTAGE 130 Mailings @
$5.00 /Mailing
$650
629 PUBLICATIONS & SUBSCRIPTIONS
630 MISC CIRECT EXP
631 FAX Pages 0
$1.00
632 TEMPORARY PERSONNEL
633 DRAFTING SUPPLIES
634 OFFICE SUPPLIES
535 CARD 48 HOURS @
$6.00 !HOUR
$384
_ 636 FIELD EQUIP RENTAL
546 SOFTWARE
TOTAL DIRECT EXPENSES
$13,264
Page 3 of 3
Resolution No. 2009-80309
PARKHILL, SMITH & COOPER, INC. - LUBBOCK
PROJECT BUDGET SHEET
LOCATION CODE:
01
PROJECT NAME:
LBB 8126 Utilities
JOB NO.:
01-2706-08
TASK.
3S&T
DATE:
07/28/09
FEE TYPE:
Other - SEE CONTRACT
PREPARED BY:
JI'H
PRINCIPAL:
JTH
PROJ. MANAGER:
MDH
OVERHEAD RATE:
PROFIT ON LABOR:
PROFIT ON REIMB:
15.00%
PROFIT ON DIRECTS:
15.00%
FEE:
$12 , 43
LABOR:
OVERHEAD:
REIMB. CONSULTANTS:
$111,350
REIMB. EXPENSES:
DIRECT CONSULTANTS:
DIRECT EXPENSES:
LABOR BUDGETS:
CODE
DESCRIPTION HOURS COSTS
01
Firm Principal
#N/A
#N/A
03
Engineer
09
Engineering Technician
07
Engineer -in -Training
14
CADD Operator
18
Clerical
Page I of 2
FEE ESTIMATING SHEET
HEIMBURSABLES
PROJECT:
LBB 8/26 Utilities JOB NO.:
01.2706-06 TASK:
35&T
REIMBURSABLE CONSULTANT COSTS
SUBTOTAL
511 STRUCTURAL CONSULTANTS
512 MECHIELEC CONSULTANTS
513 ENV & CIVIL CONSULTANTS
514 LANDSCAPE CONSULTANTS
515 TESTING CONSULTANTS
PaveTex Engineering & Testing, Inc.
$409,200
516 SURVEYING CONSULTANTS
Smith SurveyinQ
$2,750
517 INTERIOR DESIGN CONSULTANTS
518 OTHER CONSULTANTS
TOTAL REIMBURSABLE CONSULTANTS
$111,950
REIMBURSABLE EXPENSES
521 TRAVEL/LODGING
MOTEL
AIR TRAVEL
PARKING
CAR RENTAL
MILEAGE
DAYS @
AIR FARE 0
DAYS 0
DAYS ®
MILES 0
MEN ®
MEN 0
/DAY
/DAY
$0.400 @
IMANDAY =
/MAN _
=
r
TRIPS _
SUBTOTAL
522 REPRODUCTIONS
BLUELINE PRINTS
SEPIA PRINTS
PRINTING:
ORfGiNALSET-UP COST
COST PER SHEET
BINDING COST
XEROX
SHTS @ $2.55 ® 6 SETS =
SHTS @ $8.51 @ SETS =
ORIGINALS ® $0.1510RL _
SETS @ $0.08 /SHT @ 250 SHEETS=
SETS 0 $2.00 /SET =
SHTS @ $0.D8 /SHT =
SUBT07AL
523 MODEL/RENDERINGSIPHOTOS
Shots @
/Shot
524 TELEPHONE
Calls @
$2.00 /Call
525 MEALS
DAYS @
MEN 0
/MANDAY
526 FIELD SUPPLIES
528 POSTAGE
Mailings $
$2.00 Wailing
529 PUBLICATUNS & SUBSCRIPTIONS
530 MISC REIMBURSABLE EXP
531 FAX
Pages
$1.00
532 TEMPORARY PERSONNEL
533 DRAFTING SUPPLIES
534 OFFICE SUPPLIES
535 CADD
HOURS 0
$8.00 /HOUR
536 FIELD EQUIP RENTAL
546 SOFTWARE
TOTAL REIMBURSABLE EXPENSES
Page 2 of 2