HomeMy WebLinkAboutResolution - 2009-R0279 - Change Order To Contract - Allen Butler Construction Inc. - 07/28/2009Resolution No. 2009—RO279 July 28, 2009 Item No. 5.16 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock, Change Order No. 2 to that certain. Contract by and between the City of Lubbock and Allen Butler Construction, Inc. (ITB# 0$ -721 -BM), and related documents. Said Change Order No. 2 is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council this 28th day of July , 2009• TOM MARTIN, MAYOR ATTEST: Reber .a Garza, City Secretary APPROVED AS TO CONTENT: City Engineer APPROVED AS TO FORM: Chad Weaver, Assistant City Attorney vw/ChadAResolutions/RES.ChgOrd#2-Allen Butler Construction July 13, 2009 CITY OF LUBBOCK CHANGE ORDER Change Order #: 2 Contractor: Allen Butler Construction Inc. Date: 7-10-09 BID/ITB/RFP #: 08 -721 -BM Contract #: 8489 Project Name: Paving Improvements on Slide Rd and Erskine St "Change Order" means a written order to a Contractor executed by the Owner in accordance with the contract authorizing an addition to, deletion from, or adjustment or revision of the requirements of the contract documents, or an adjustment to the compensation payable to Contractor, or to the time for performance of the contract and completion of the Project, or a combination thereof, which does not alter the nature of the thing to be constructed and is an integral part of the project objective. Adjustments to "Estimated Quantities" to a line item in a Unit Price contract do not require a Change Order. All work that alters the nature of the thing to be constructed or that is not an integral part ref the project objective must be let out for public bid. Description of change (alteration, deviation, addition, or deletion) caused by conditions encountered during construction not covered by the specifications and drawings of the project (attach addidonalpages tjnecessary): Change Order #2 addresses the following issues: (1) it directs that a portion of Chicago Ave, just north of Erskine St, to be paved, striped and signed under this contract; (2) it compensates the contractor for irrigation repair and relocation that was necessary to install new curb and gutter and sidewalk along Erskine St; (3) it provides an increase in the amount of concrete driveway construction for the properties along the north side of Erskine St, between Salem Ave and Utica Ave, to improve access to these properties; and (4) it provides temporary pedestrian bridges for these properties to provide safer access during construction. Where the Change Order is negotiated, the Change Order must be fully documented and itemized as to costs, including material quantities, material costs, taxes, insurance, employee benefits, other related costs, profit and overhead. Where certain unit prices are contained in the initial contract, no deviations are allowed in computing negotiated change order costs. ITEMIZED COSTS MUST BE F LLY DOCUMENTED AND ATTACHED TO THIS FORM. ITEM DESCRIPTION A. ORIGINAL CONTRACT VALUE:. B. AMOUNT OF THIS CHANGE ORDER: count" approval r galred ifowr $25,000 C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A): D. AMOUNT OF PREVIOUS CHANGE ORDERS: E_ TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D): F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): 25%maxrmum G. NEW CONTRACT AMOUNT (A+E): AMOUNT S 18,578,777.94 $ 118,101,55 0.64% $ 73,231.40 S 191,332.95 1.03% S 18,770,110.89 It is mutually agreed that the above dollar amount and the time extension, as applicable, as set forth in this Change Order constitutes full compensation to the Contractor for all costs, expenses and damages to the Contractor, whether direct, consequential or otherwise, in anyway incident to, or arising out of or resulting directly or indirectly; from the work performed or modified by the Contractor under this Change Order. X:1200812764.081CIVILIChange 0rdeaS\C0-24C42.docx PWC -045 (Rev 01108) --~' k 7-10-01 (I) CONTRACTOR Date (2) PR E T HITECTIENGINEER Date Approved a U it Appro d 0 {RJEPRESENTATIVM1E �Jy Date (� CITY ATTORNEY Date � �f� r17. .01 () APITAI, PROJECTS MANAGER Date (6) PURCHAS ND CONTRACT MANAGER Date CITY OF LUBBOCK TEST: 7/28/04 7/28/09 (7) MK YOR Date (8) tny SECRETARY Date Council Date: July 28, 2009 Agenda Item #: 5.16 Resolution #: 2009-80277 Change Orders over 525,000 require a Contract Cover Sheet and the following signatures: X:12008121764,081CIVILIChangc OrdenCO-2100-2.docx PWC -045 (Rev 01/08) Slide/Erskine Change Order #2 COlussue Item Unit Quantity Price Extension (1) 6" Flex Base Sy 1269 $ 12.00 $ 15,228.00 (1) 1.5" HMAC Ty C Sy 1269 $ 20.00 $ 25,380.00 (1) Excavation cy 265 $ 6.55 $ 1,735.75 (1) Subgrade Preparation Sy 1269 $ 8.42 $ 10,684,98 (1) 4" Pavement Marking if 979 $ 1.06 $ 1,037.74 (1) 8" Pavement Marking if 127 $ 1.98 $ 251.46 (1) 12" Pavement Marking if 35 $ 7.48 $ 261.80 (1) Signage Is 1 $ 2,251.00 $ 2,251.00 (2) Irrigation ea 172 $ 117.56 $ 20,220.32 (3) Driveways sy 538.9 $ 45.00 $ 24,250.50 (4) Pedestrian Bridges ea 6 $ 2,800.00 $ 16,800.00 $ 118,101.55 H 100, 200' SCALE; I 100' ■ 118` x 2 610 - 75 END OF y RETURN VALLE "k45 - RAM nc 4 -44 s cil QN 1 I J!. ` _ .»IL11 AMP z � o cn �` iNr, EDGE OF VALLE NORTH EDC —+ GUTTER OF ALLEY L 20' LEGEND Area to be paved (1.269 sy @ 1.5" HMAC over 6" Base) i 1` QA 4" SOLID WHITE STRIPE 8" SOLID WHITE STRIPE (@ 45.) Q 4" BROKEN WHITE STRIPE Q 4" SdL1O YELLOW STRIPE { 8i SOLID YELLOW STRIPE (@ 45.) ' r 12' 'tet te- 17'---r=4-VARIES �'-t I { � F Iii Q SECTION 2Y _4-6. _I W III() CL O fIQ a1 \lyy 06 TL F— �1 *: u� K'✓LE W JACKSON 0 983' 0 "S \ Y Q G� 0� h NORTHWEST PASSAGE ERSKINE STREET AND SLIDE ROAD CITY OF LUBBOCK LUBBOCK, TX CO2 E/0212009 AOWOK PAYING/STRIPING AEONC CAfAM AVE NO OAIE DEWFUMON 5Sw C 0£DCE: LuBBOCk PROTECT NO: 2699.09 CHICAGO AVE PAVING AND STRIPING PLAN 1 OF 1 0 100' 200' 1 SCALE. I °' 100' z ,K n C 11 u k Ir cn Z m ti 1 1 Iuo' 3 i at rw r t I �I Til 1 s• i 1. 61-i ENp pE Y VALLE R—\\\ £pG€ OF VALLE NORTH €PGE RETU TER pf ALLEY 20'G "r 3APr IN ' 0 LEGEND Area to be paved (1.259 Sy 1.5" HMAC over 6" Bases i` Q 4" SOLID WHITE STRIPE 1 QB 8" SOLID WHITE STRIPE SCC 45'] � QC4" BROKEN WHITE STRIPE � 4" SOLID YELLOW STRIPE 6 SOLID YELLOW STRIPE {@ 45'7 -00 -.t Alk -5 1-im OW -- � a � � 1 LLLJJJ SECTION Z j � I 101 i,5- rE' 11 �� 11 q 1 .... I KYLE W JACKSON / 98310 NORTHWEST PASSAGE ERSKINE 'STREET AND SLIDE ROAD C11Y OF LUBBOCK LUBBOCK, TX CO2 5 Oi AB[KIICNAL PAYING/S,RIP41G ALONG Gil ND DATE OESCRIPMON SSDING OFICE: LLBBOOK PRGJECt N6 26DO6 CHICAGO AVE PAVING AND STRIPING PLAN 1 OF 1