Loading...
HomeMy WebLinkAboutResolution - 2009-R0262 - PO - Interclean Equipment Inc.- Wheel Washing System - 07/08/2009Resolution No. 2009—RO262 July 8, 2009 Item, No. 5.13 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock, Purchase Order No. 348261 for the purchase of Wheel Washing System as per RFP 09 -039 -FO, by and between the City of Lubbock and lnterClean Equipment Incorporated of Ypsilanti, Michigan, and related documents. Said Purchase Order is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council this 8th ATTEST: Rebecc Garza, City Secretary 'ED AS TO CONTENT: i mis, Assistant City Manager tion & Public Works APPROVED AS TO FORM: Chad Weaver, Assistant City Attorney day of July , 2009. TOM MARTIN, MAYOR vw/ccdocs/Chad/Resolutions/RES.InterClean Equip Inc-PurchaseCrd June 2, 2009 T0: ♦ Y URCHASE ORDER INTERCLEAN EQUIPMENT 3939 BESTECH DRIVE YPSILANTI MI 48197 9628 INVOICE TO: CITY OI: LI BR CK :\('('OUNTS PA) ABLE P.O. BOX 2000 IAIBBOCKrr 79457 SHIP T0: BY: Page - 1 Date 6/01/09 Order No. 348261 000 OP Brn/Plt 3511 CITY OF LUBBOCK SANITATION DEPARTMENT 208 MUNICIPAL DRIVE LUBBOCK TX 79403 r ---------------------------- -----tr------------------------- Ordered 06/01/09 Freight FOB Destination Frt Prepaid Requested - 06/23/09 Taken By FELIX ORTA Delivery PER D. FRANKHOUSER REQ# 32401 RFP# 09-039-FO -------------------------------------------------------------------------------------- Description / Supplier Ite Ordered UM Unit Cost MOBY DICK DUO WHEEL WASHING 1.000 EA 111,420.0000 SYSTEM inAklf-C r'COT1CAr ATC DCnl noGn DDInD Tn InICTAI I ATIOKI- UM Extension Req. Dt EA 111,420.00 08/27/09 COMMERCIAL GENERAL LIABILITY- AUTOMTIVE LIABILITY: PER OCCURRENCE - $500,000: Any Auto - Combined Single Limit -$300,000 General Aggregate Products-Comp/Op AGG BUILDERS RISK: Personal & Adv. Injury 100% of The Total Contract Price Contractual Liability WORKERS COMPENSATION - The Contractor shall also provide to the CITY OF LUBBOCK proof of Employers' Liability in an amount no less than $500,000. City of Lubbock is named as primary additional insured on Auto/General Liability with a Waiver of Subrogation in favor of the City of Lubbock on all coverage. This purchase order encumbers funds in the amount of $111,420, for the purchase of Wheel Washing System awarded on June 23, 2009, to InterClean Equipment Incorporated, of Ypsilanti, Michigan, in accordance with to InterClean Equipment Incorporated, of Ypsilanti, Michigan response to RFP#09-039-FO. The following is incorporated into and made part of this purchase order by reference: Proposal submitted by your firm including the Proposal, Specifications, and General Conditions of RFP#09-039-FO. Resolution# 2009-RO262 CITY OF LUBBOCK Tom Martin, Mayor ------------------------------------------ Terms NET 30 ATTEST: V-, 0 ,, , Reber a Garza, City Secretary Toa Order --------------- X11,420.00 InterClean Equipment City of Lubbock 4/15/2009 Moby Dick DUO 950 GPM Resolution No. 2009—R0262 Equipment Services Description Price Moby Dick Duo 480V 3PH 950 GPM 2 Pump System $72,665.00 Increase recycling tank capacity for 3 pumps depth 30 inch, total 59 inches, capacity 5,000 gallons $8,791.00 Side Spray Walls $2,215.00 Increase scraper conveyor discharge chute height to 80 inches for roll off height. $5,714.00 Undercarriage wash with 1 pump $4,945.00 SUB TOTAL EQUIPMENT $94,330.00 Factory supervision of wheelwash installation $1,000 per day plus expenses (3 -4 -days) $4,900.00 Freight to site $6,500.00 Extended Warranty $6,690.00 SUBTOTAL SERVICES $18,090.00 TOTAL PACKAGE $112,420.00 "Installation and Start-up are quoted as one trip each to the site. including lat travel time, and expenses. Additional trips, due to reasons beyond our control, will be charged to the customer ; including labor, travel time, and expenses. System is 460 volt three phase, 55 amp Water make-up at 4 gallons per wash Concrete pad underneath the wheelwash , and concrete 1Oft exit and entrance ramps not included. Price Quoted is good for 60 days Price does not include any sales taxes, permits or fees Heater stack, roof penetration, and stack Installation not included