HomeMy WebLinkAboutResolution - 2012-R0366 - Contract - Talon/LPE - Precast Buildings - 09/27/2012Resolution No. 2012-RO366 l September 27,2012 Item No. 5.13 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for and on behalf of the City of Lubbock, Contract No. 10918 for site work for two (2) pre -cast CXT buildings, by and between the City of Lubbock and Talon/LPE of Amarillo, Texas, and related documents. Said Contract is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council on September 27, 2012 ,VI'TEST: Rebe ca Garza, City Secretary APPROVED AS TO Scott Snider, Assistant City Manager Community Services APPROVED AS TO FORM: Chad Weaver, Assistant City Attorney vw ecdocs/RES.Contract-Talon LPE September 14, 2012 Resolution No. 2012-80366 Contract No. 10918 Work Order Signature Document BUYBOARD EQIQC Contract No.: 2012 Area i - TAL New Work Order F-1 Modify and Existing Work Order Work Order Number: 013785.00 Work Order Date: 9/10/2012 Work Order Title: Site Work to Install Two (2) Buildings at Berl Huffman Complex and MacKenzie Park Owner Name: City of Lubbock Contractor Name: Talon/LPE Contact: Craig Wuensche Contact: Jody Henderson Phone: (806) 77S-2665 Phone: (806) 467-0607 Work to be Performed Work to be performed as per the Final Detailed Scope of Work Attached and as per the terms and conditions of BuyBoard EZIQC Contract No. 2012 Area J - TAL Brief Work Order Description: Site Work to Install Two (2) Buildings at Berl Huffman Complex and MacKenzie Park Time of Performance 120 Working Days. Liquidated Damages $100 per working day. Work Order Number 013785.00 CITY OF LUBBOCK 7/1 - Robertson, Mayor Attest: Rebecca Garz City Secretary ROVE S NTENT cott Snider, Assistant City Manager Location Berl Huffman Complex Mackenzie Park Amount of Contract 5201,940.63 JodA?Henderson, Project Manager Talon/LPE Owner's Represegtative Craig Wtiepsche, Park Development Manager AP E,D/A TO FORM: Assistant City Attorney r)IQC' W:,Board'- arP.rerh� Detailed Scope of Work r:+a co as Ary {�c�ua To: Jody Henderson Talon/LPE 921 N Bivins Street Amarillo, TX 79107 (806)467-0607 Date Printed: Work Order Number: Work Order Title: Brief Scope: ❑ Preliminary From: Craig Wuensche City of Lubbock 1625 13th St Lubbock, TX 79401 (806) 775-2665 September 18, 2012 013758,00 City of Lubbock - Parks and Rec. Restrooms x 2 COL Parks and Rec. Restrooms x 2 ❑ Revised i -• i Final The following items detail the scope of work as discussed at the site. All requirements necessary to accomplish the items set forth below shall be considered part of this scope of work. Mackenzie Park and Berl Huffman Restrooms: As per Plans & Specs by West Texas Engineering dated September 2012. Both Restroom pane{s will be fed with 100 amps ,per the request of the COL. PROJECT PERFORMANCE: Project Duration will be 120 Days Liquidated Damages are $100.001 Day Project Start Date: TBD by Owner Scope of Work Page f of 1 EZ1QC - Buy Board 9/18/2012 Contractor's Price Proposal CSI - Summary Date: September 18, 2012 Re: IQC Master Contract #- Work Order Jt Owner PO #: Title: Contractor: Proposal Value, 2012 Area J - TAL 013758 00 City o4 Lubbock - Parks and Rec, Restrooms x 2 Talon/LPE $201,94063 01 - General Requirements $2,528.26 03 - Concrete $30,575.34 15 - Mechanical $35,939.00 22 - Plumbing $24,237.04 26 - Electrical $23,561.23 31 - Earthwork $47,521.23 32 - Exterior Improvements $1,778.69 33 - Util'ities $31,737.48 40 - Process Integration $4,062.36 Proposal Total $201,940.63 Contractor's Price Proposal - Summary Page 1 of 1 EZ1QC - Buy Board 911812012 Contractor's Price Proposal CSI - Detail Date: September 18, 2012 Re- IQC Master Contract* 2012 Area J - TAL Work Order #: 013758.00 Owner PO #: Title: City of Lubbock - Parks and Rec. Restrooms x 2 Contractor: TalonILPE Proposal Value: $201,94063 Sect Item Modifier UOM Description 03 11 Line Total Labor Equip. Material (Excluded it marked with an X) 01 - General Requirements 1 01 22 20 00 0010 HR ElectricianTasks in the CTC include appropriate costs to cover labor. These Quantity Unit Price $1,254.13 tasks will be requested specifically by the owner for miscellaneous work not covered in the CTC. Installation 1,34800 x 3.86 x Quantity Unit Price Factor Total Installation 3000 x 32.92 x 1.2800 1,254.13 13 00 0011 0003 Additional labor for non standard electrical hook up of portable restroom. 2 01 22 20 00 0010 HR ElectricianTasks in the CTC include appropriate costs to cover labor. These $1,264.13 tasks will be requested specifically by the owner for miscellaneous work not Quantity Unit Price Factor covered in the CTC. Quantity Unit Price Factor Total Installation 1,34800 x 1.29 x Installation 30.00 x 32,92 x 1.2800 1,264.13 Additional labor for non standard electrical hook up of portable restroom. 03 11 13 00 0011 0005 Subtotal for 01 - General Requirements $2,528,26 03 - Concrete 3 03 11 13 00 0011 SF X12" High Slab Edge and 61ock-Out Wood Formwork $6,660.20 Quantity Unit Price Factor Total Installation 1,34800 x 3.86 x 1.2800 6,560.20 4 03 11 13 00 0011 0003 For Curved Formwork, Add $2,225.82 Quantity Unit Price Factor Total Installation 1,34800 x 1.29 x = 1,2800 2,225.82 5 03 11 13 00 0011 0005 For < 1000, Add $362.11 Quantity Unit Price Factor Total Installation 4�0,00 x 0.69 x 1.2800 3 362.11 8 03 11 13 00 0011 SF X12" High Slab Edge and Block -Out Wood Formwork $2.025.73 Quantity Unit Price Factor Total Installation 410.00 x 3.86 x 1-2800 2,025.73 7 03 11 13 00 0011 0005 For < 1000, Add $362.11 Quantity Unit Price Factor Total Installation 41000 x 0.89 x 1.2800 362.11 8 03 21 11 00 0006 TON Grade 60 Reinforcing Steel, Footings And Slabs, 113-118 $6,639.85 Quantity Unit Price Factor Total Installation 323 x 1,606,00 x t 2860 Y 8,839,85 9 03 21 11 00 0006 TON Grade 80 Reinforcing Steel, Footings And Slabs, 11348 $1,891 23 Quantity Unit Price Factor Total Installation 0.92 x 1,60600 x 12800 1,89123 10 03 31 13 00 0021 CY Direct Chute, Place 3000 PSI Concrete Grade Seams $1,802.75 Quantity Unit Price Factor Total Installation 14.00 x 100,60 x 1 2800 ' 1,802.75 Contractor's Price Proposal - Oetail Page 1 of 14 E7JQC - Buy Board 911812012 Contractor's Price Proposal - Detail Continues.. Work Order Number: 013758.00 Work Order Title: City of Lubbock - Parks and Rea. Restrooms x 2 Sect Itam Modifier UOM Description Line Total Labor Equip. Material [Excluded it marked with an XI 03 - Concrete 11 03 31 13 00 0021 0043 For Up To 20, Add $73 83 Quantity Unit Pnce Factor Total Installation 14.00 x 4.12 x i 2800 1383 12 03 31 13 00 0021 CY Direct Chute, Place 3000 PSI Concrete Grade Beams 16 00 0189 LF 2" Inside Diameter Copper Pipefrubing Type L 58,953.47 22 - Plumbing Quantity Unit Price Factor Total 17 22 11 16 00 0185 Installation 54.00 x 100.60 x 1.2800 J 6,953.47 $275.20 13 03 35 16 00 0005 SF Concrete Floor Finishes, Steel Trowel Factor Total S126.72 Quantity Unit Price Factor Total For Type K Tubing Instead Of Type L, Add 10 22 11 16 00 0185 Installation 220.00 x 0.45 x 1.2800 ' 126.72 $275.20 14 03 35 18 00 0005 0054 For � 50 To 250 SF, Add Factor Total $128.72 Quantity Unit Price Factor Total 12800 ' 96.00 Installation 220,00 x 0,45 x 1.2800 126.72 18 000189 0026 15 03 35 18 oa 0005 SF Concrete Floor Finishes, Steel Trowel $23.55 $1,324.80 Quantity Unit Price Factor Total Total Installation 2,300.00 x 0.45 x 1 2800 ' 1,324.80 Installation 20A0 x 092 x Subtotal for 03 - Concrete 23.55 22 $30,575.34 15 - Mechanical LF 2" Inside Diameter Copper Pipefrubing Type L $52736 1s 150110 0050 EA Upgrade ISR station components to sfsndardaed COL specOleetions per dkent,request ' 00 Factor Total .. _, ..--. .,.�.. ..,.._... .ay ..-,. ........ ..-.. ., .. �llantlt} •� j hit Hce"";. , ' - iC't gs"tr 4+I +! i•w. .. NPP Installation 1.00 x` " . ' 36.934 00 : >E 1.000 1 s _ 3tl"939 aG Upgrade IN station components to stsndvdtsse COL spedllcatlans pair client requast. , Subtotal for 15 - Mechanical 22 11 16 00 0189 LF 2" Inside Diameter Copper Pipefrubing Type L $35,939.00 22 - Plumbing $527.38 17 22 11 16 00 0185 LF 314" Inside Diameter Copper Pipe/Tubing Type L Total $275.20 Quantity Unit Price Factor Total 527,38 Installation_ 50.00 x 4.30 x 1.2800 275.20 For Type K Tubing Instead Of Type L, Add 10 22 11 16 00 0185 LF 314" Inside Diameter Copper Piperrubing Type L $96 00 $275.20 Quantity Unit Price Factor Total installation 50.00 x 430 x 1.2800 275.20 12800 ' 19 22 11 16 00 0189 LF 2" Inside Diameter Copper Pipefrubing Type L $527.38 Quantity Unit Price Factor Total Installation 20.00 x 2060 X 12800 527,38 20 22 11 18 00 0189 0011 For Type K Tubing Instead Of Type L, Add $96 00 Quantity Unit Price Factor Total Installation 2000 x 375 x 12800 ' 96.00 21 22 11 18 000189 0026 For Work In Restricted Working Space, Add $23.55 Quantity Unit Price Factor Total Installation 20A0 x 092 x 1 2800 ' 23.55 22 22 11 16 00 0189 LF 2" Inside Diameter Copper Pipefrubing Type L $52736 Quantity Unit Price Factor Total Installation 2000 x 2060 x 1 2800 527.36 Contractor's Price Proposal . Detail Page 2 of 14 EZ10C - guy Board 911812012 Contractor's Price Proposal - Detail Continues.. Work Order Number- 013758.00 Work Order Title: City of Lubbock - Parks and Rec. Restrooms x 2 26 Sect. Item Modifer UOM Description EA 314" 90 Degree Elbow, Capper Line Total Labor Equip. Material (Excluded if marded with an X) 22 - Plumbing Factor Total 23 22 11 16 00 0189 0017 For Type K Tubing Instead Of Type L, Add x 1 2800 ' 596,00 27 22 11 Quantity Unit Price Factor Total $112,97 Installation 20.00 x 3.75 x 1.2800 J 96.00 24 22 11 16 00 0189 0026 For Work In Restricted Working Space, Add $2355 Installation 2.00 x 44.13 Quantity Unit Price Factor Total 28 22 11 16 00 0213 Installation 2000, x 0.92 x 12800 ' 23.55 25 22 11 16 00 0209 EA 314" 90 Degree Elbow, Copper $82.53 Factor Total Quantity Unit Price Factor Total Installation 2,00 x 9,70 x Installation 4.00 x 16.12 x 12800 ' 82.53 29 26 22 11 16 00 0209 EA 314" 90 Degree Elbow, Capper $82.53 Quantity Unit Price Factor Total Installation 4.00 x 1812 x 1 2800 ' 82.57 27 22 11 16 00 0213 EA 2" 90 Degree Elbow, Copper $112,97 Quantity Unit Price Factor Total Installation 2.00 x 44.13 x � 12600 - 112.97 28 22 11 16 00 0213 0026 For Work In Restricted Working Space, Add $17,15 Quantity Unit Price Factor Total Installation 2,00 x 9,70 x 1.2800 17.15 29 22 11 16 00 0213 EA 2" 90 Degree Elbow, Copper $112,97 Quantity Unit Price Factor Total Installation 2.00 x 44.13 x 1.2800 112.97 30 22 11 18 00 0213 0026 For Work In Restricted Working Space, Add 517,15 Quantity Unit Price Factor Total Installation 2,00 x 6.70 x 12800 ' 17.15 31 22 11 18 00 0228 EA 3/4" 45 Degree Elbow, Copper $174.39 Quantity Unit Price Factor Total Installation 8.00 x 17.03 x 1.2600 174.39 32 22 t 1 16 00 0228 EA 314" 45 Degree Elbow, Copper $174.39 Quantity Unit Price Factor Total Installation 8.00 x 1703 x 1.2800 ' 174.39 33 22 11 18 00 0232 EA 2" 45 Degree Elbow, Copper $109.00 Quantity Unit Price Factor Total Installation 2.00 x 42.58 x 12500 ' 109.04 34 22 11 16 00 0232 0026 For Work In Restricted Working Space, Add $17,15 Quantity Unit Price Factor Total Installation 2,00 x 8.70 x 12800 ' 17,15 35 22 t1 16 00 0232 EA 2" 45 Degree Elbow, Copper $109.00 Quantity Unit Price Factor Total Installation 2.00 x 42.58 x 12800 a 109.40 36 22 11 t6 00 0232 0028 For Work In Restricted Working Space, Add $17.15 Quantity Unit Price Factor Total Installation 2.00 x 8.70 x 12800 a 17.15 Contractors Price Proposal - Detail Page 3 o1 14 EZlQC - Buy Board 911812012 Contractor's Price Proposal - Detail Continues.. Work Order Number: 013758.00 Work Order Title: City of Lubbock - Parks and Rec. Restrooms x 2 Sect Item Modifer UCM Description Line Total Labor Equip. Material (Excluded if marked with an XI 22 - Plumbin 22 11 18 00 0283 EA 314" Reducing Copper Coupling 37 22 11 18 CO 0269 EA 314" Straight Copper Coupling $19778 Quantity Unit Prion Quantity Unit Price Factor Total InsWtabon 1000 x 1545 x 12800 197.78 38 22 11 16 00 0269 EA 314" Straight Copper Coupling 22 11 16 00 0298 $197.76 Quantity Unit Price Factor Total Installation 10.00 x 15.45 x 12800 197.76 39 22 11 16 00 0283 EA 3l4" Reducing Copper Coupling Instailafion 4.00 x 15.92 x $77.98 81.51 Quantity Unit Price Factor Total EA 314" Copper Adapter, Male Installation4 00 x 15.23 x 1 2800 77.98 40 22 11 18 00 0283 EA 314" Reducing Copper Coupling $77.98 Quantity Unit Prion Factor Total Installation4.00 x 15.23 x 12800 77,98 41 22 11 16 00 0298 EA 314" Copper Adapter, Male 381.51 Quantity Unit Price Factor Total Instailafion 4.00 x 15.92 x 1.2800 _ 81.51 42 22 11 18 00 0298 EA 314" Copper Adapter, Male $81.51 Quantity Unit Price Factor Total Installation 4.00 x 15.92 x 12800 y 81.51 43 22 11 18 00 0365 EA 2" Copper Flange, Sweat $120.18 Quantity Unit Price Factor Total Installadan 1.00 x 93.89 x 1.2800 120.18 44 22 11 16 00 0365 EA 2" Copper Flange, Sweat $120.18 Quantity Unit Price Factor Total Installation 1.00 x 93,89 x 1,2800 120.18 45 22 11 19 00 0093 EA 112" Trap Primer, Flow Through Type With Sediment Strainer $217.19 Quantity Quantity Unit Price Factor Total Installation 00 x 42.42 x 124100 217,19 48 22 11 19 00 0093 EA 1!2" Trap Primer, Flow Through Type With Sediment Strainer $217.19 Quantity Unit Price Factor Total Installation 4.00 x 42.42 x 1.2800 217.19 47 22 13 16 00 0997 LF 4" Schedule 40 ABS -PVC DVW Pipe $1,42338 Quantity Unit Price Factor Total Installation 200.00 x 5.56 x 12800 1,423.36 48 22 13 15 00 0997 0034 For Work In Restricted Working Space, Add $258.56 Quantity Unit Price Factor Total Installation 200.00 x 101 x 12800 258.56 49 22 13 18 00 0997 LF 4" Schedule 40 ASS -PVC DVW Pipe $1,423.38 Quantity Unit Price Factor Total Installation 20000 x 5,56 x 12800 - 1,425.36 50 22 t3 18 00 0997 0034 For Work In Restricted Working Space, Add $258.50 Quantity Unit Price Factor Total Installation 20000 x 1.01 x 12800 258.56 Contractor's Price Proposal - Detail Page 4 of 14 EZ1QC - Buy Board 9/18/2012 Contractor's Price Proposal - Detail Continues... Work Order Number: 313758.00 Work Order Title: City of Lubbock - Parks and Rec. Restrooms x 2 Contractor's Pre& Proposal - Detail Page 5 of 14 EZlQC - Buy Board 9/18/2012 Sect Item Modifer UOM Description Line Total Labor Equip. Material (Excluded if marked with an x) 22 - Plumbing 51 22 13 16 00 0998 LF 6" Schedule 40 ABS -PVC DVW Pipe $520.96 Quantity Unit Price Factor Total Installation 50.00 x 8.14 x 12800 520.96 52 22 13 16 00 0998 LF 6" Schedule 40 ABS -PVC DWV Pipe $52098 Quantity Unit Price Factor Total Installation 50.00 x 8.14 x 12800 ' 520.98 53 22 13 18 00 1006 EA 4" Schedule 40 ABS -PVC DVW 114 Bends $405.50 Quantity Unit Prtce Factor Total Installation 16,00 x 19.80 x 12800 , 405.50 54 22 13 16 00 1006 EA 4" Schedule 40 ABS -PVC DVW 114 Bands 3405.50 Quantity Unit Price Factor Total Installation 16.00 x 19.80 x 1.2800 = 405,50 55 22 13 16 00 1014 EA 4" Schedule 40 ABS -PVC DWV 118 Bends $383,39 Quantity Unit Price Factor Total Installation 1&00 x 18-72 x 12800 = 383.39 58 22 13 18 00 1014 EA 4" Schedule 40 ABS -PVC DVN/ 118 Bends $383.39 Quantity Unit Price Factor Total Installation 16.00 x 18,72 x 1.2800 383.39 57 22 13 16 00 1022 EA 4" Schedule 40 ABS -PVC DVW Sanitary Tees $308.94 Quantity Unit Price Factor Total Installation 8.00 x 30.17 x 1.2800 308.94 58 22 13 18 00 1022 EA 4" Schedule 40 ABS -PVC DWV Sanitary Tees $308.94 Quantity Unit Price Factor Total Installation 8.00 x 30.17 x 12800 308.94 59 22 13 16 00 1023 F -A 6" Schedule 40 ABS -PVC DWV Sanitary Tees $394.75 Quantity Unit Price Factor Total Installation 4.00 x 77.10 x 1,2800 394.75 60 22 13 18 00 1023 EA 6" Schedule 40 ABS -PVC DWV Sanitary Tees $394.75 Quantity Unit Price Factor Total Installation 4.00 x 77.10 x 12800 394.75 61 22 13 18 00 1048 EA 4" Schedule 40 ABS -PVC DVW P -Traps $273..00 Quantity Unit Price Factor Total Installation 400 x 53.32 x 1.2800 27100 62 22 13 18 00 1048 EA 4" Schedule 40 ABS -PVC DWV P -Traps $273.00 Quantity Unit Price Factor Total Installation 4.00 x 5332 x t 2800 273.00 63 22 13 t8 00 1070 EA 4" Schedule 40 ABS -PVC DVW Wyes $35820 Quantity Unit Price Factor Total Installation 8.00 x 34.98 x 12800 , 358.20 64 22 13 16 00 1070 EA 4" Schedule 40 ABS -PVC DWV Wyes $35820 Quantity Unit Price Factor Total Installation 8.00 x 3498 x 1 2800 ' 358.20 Contractor's Pre& Proposal - Detail Page 5 of 14 EZlQC - Buy Board 9/18/2012 Contractor's Price Proposal - Detail Continues.. Work Order Number: 013758.00 Work Order Title: City of Lubbock - Parks and Rec. Restroorns x 2 Sect Item Modify UOM Description Line Total La11or Equip. Material tExcluded If maAed with an x) 22 - Plumbing 65 22 13 16 00 1105 EA. 4" Schedule 40 ABS -PVC DWV Clean Out Tees With Plug 5472.99 Quantity Unit Price Factor Total Installation 4.00 x 92.38 x 12800 472.99 66 22 13 16 00 1105 EA 4" Schedule 40 ABS -PVC DWV Clean Out Tees With Plug $472.99 Quantity Unit Price Factor Total Installation 400 x 92.38 x 12800 2 472.99 67 22 13 18 0o 1108 EA 8" Schedule 40 ABS -PVC DWV Clean Out Tees With Ptug $908.75 Quantity Unit Price Factor Total Installation 4.00 x 177.49 x 1.2800 ' 908.75 68 22 13 18 00 1106 FA 6" Schedule 40 ABS -PVC DVW Clean Out Tees With Plug $908.75 Quantity Unit Price Factor Total Installation 4.00 x 177.49 x 12800 ' 908.75 69 22 13 16 00 1125 Fro 4" Schedule 40 ABS -PVC Couplings 5437,50 Quantity Unit Price Factor Total Installation 2000, x 17.09 x 12800 437.50 70 22 13 18 00 1125 FA 4" Schedule 40 ABS -FVC Couplings $437.50 Quantity Unit Price Factor Total Installation 20.00 x 17.09 x 1.2800 437,50 71 22 13 16 00 1126 EA 6" Schedule 40 ABS -PVC Couplings 5170,70 Quantity Unit Price Factor Total Installation 4.00 x 33.34 x 1.2800 170.70 72 22 13 le 00 1128 EA 6" Schedule 40 ABS -PVC Couplings $170.70 Quantity Unit Price Factor Total Installation 4,00 x 33.34 x 1.2800 170.70 73 22 13 19 13 0017 FA 12-518" Round Top Floor Drain With 4" Outlet Cast Iron Top $1,696.58 Quantity Unit Price Factor Total Installation 4.00 x 331.36 x 1,2800 ' 1,896.58 74 22 13 19 13 0017 0081 EA For Ductile Iron Grate, Add $0.00 Quantity Und Price Factor Total Installation 000 x 53.00 x 1.2800 ' 0.00 75 12 13 19 13 0017 0205 EA For Primer Tap, Add $171.52 Quantity Unit Price Factor Total Installation 400 x 33.50 x 1 2800 ' 171.52 78 22 13 19 13 0017 0207 FA For Vandal Proof Screws, Add $156.16 Quantity Unit Price Factor Total Installation 400 x 30.50 x 12800 ' 156.16 77 22 13 19 13 0017 EA 12-518" Round Top Floor Drain With 4" Outlet, Cast Iron Top $1,698.58 Quantity Unit Price Factor Total Installation 4.00 x 331 3e x 12800 3 1.696,56 78 22 13 19 13 0017 0061 EA For Ductile Iron Grate, Add $0.00 Quantity Unit Pdce Factor Total Installation 000 x 53.00 x 1 2800 0.00 Contractors Price Proposal - Detail Page 6 of 14 EVOC - Buy Board 9/1812012 Contractor's Price Proposal - Detail Continues.. Work Order Number: 013758.00 Work Order Title: City of Lubbock - Parks and Rec. Restrooms x 2 Sect, Item Modifer UOM Oeecriptlon Line Total Labor Equip. Material (Excluded if marked with an Xy 2.2 - Plumbing 22 13 29 13 0032 EA Float Switch Copper Coated Float, Add, Weather Proof For vertscal sewage MLF p8 AWG Cable - XLP (XHHW). 600 V, Single Stranded, Placed In Conduit 79 22 13 19 13 0017 0205 _ EA For Primer Tap, Add $171 52 ' Quantity Unit Price Factor Total Quantity Unit Price Factor Installation 400 x 33.50 x 12800 3 171.52 80 22 13 19 13 0017 0207 EA For Vandal Proof Screws, Add 1,250.84 19 $156.18 22 13 29 Quantity Unit Price Factor Total Installation 400 x 30.50 x 1.2800 156.18 81 22 13 29 13 0032 EA Float Switch Copper Coated Float, Add, Weather Proof For vertscal sewage MLF p8 AWG Cable - XLP (XHHW). 600 V, Single Stranded, Placed In Conduit $1,250.84 $1,265.52 pumps Quantity Unit Price Factor Total Quantity Unit Price Factor Total Installation 0.90 x 1,098.54 x 12800 1,265.52 Installation 2.00 x 488.81 x 1 2800 ' 1,250.84 19 82 22 13 29 t6 0037 EA High-water Alarm For Submersible Sewage Pump S441.09 Quantity Unit Price Factor Quantity Unit Price Factor Total Installation 2.00 x 172.30 x 1.2800 441.09 63 22 13 29 16 0038 EA Float Switch For Submersible Sewage Pump MLF k4 AWG Cable - XLP (XHHW), 600 V, Single Stranded, Placed rn Conduit $7489 $1,117,68 Quantity Unit Price Factor Total Quantity Unit Price Factor Total Installation 1.00 x 58.51 x 12800 74,89 84 22 13 29 33 0017 EA 48" Diameter x 48" High Fiberglass Basin And Lid With Inlet And Hub 26 05 $1,528.70 16 0028 MLF M3 AWG Cable - XLP (XHHW), 600 V. Single Stranded, Placed In Conduit Quantity Unit Price Factor Total Quantity Unit Price Factor installation 1,00 x 1,194.30 x 12800 1,528,70 Subtotal for 22 - Plumbing $24,237.04 26 - Electrical 85 26 05 19 16 0022 MLF #10 AWG Cable - XLP (XHHW), 600 V, Single Stranded, Placed In Conduit $1,498.11 Quantity Unit Price Factor Total Installation 220 x 532.00 x 1,280Q 1,498.11 88 26 05 19 16 0023 MLF 08 AWG Cable - XLP (XHHW), 600 V, Single Stranded, Placed In Conduit $9570 Quantity Unit Price Factor Total Installation 0.10 x 74787 x 12800 95,70 87 28 05 19 16 0024 MLF U6 AWG Cable - XLP (XHHW). 600 V. Single Stranded, Placed In Conduit $112.49 Quantity/ Unit Price Factor Total Installation 008 x 1,098.54 x 1 2800 ' 112.49 88 26 05 19 18 0024 MLF p8 AWG Cable - XLP (XHHW). 600 V, Single Stranded, Placed In Conduit $1,265.52 Quantity Unit Price Factor Total Installation 0.90 x 1,098.54 x 12800 1,265.52 89 28 05 19 16 0025 MLF M4 AWG Cable - XLP (XHHW), 600 V, Single Stranded, Placed In Condud $1,117.68 Quantity Unit Price Factor Total Installation 055 x 1,58782 x 1.2800 1,117.68 90 28 05 19 16 0025 MLF k4 AWG Cable - XLP (XHHW), 600 V, Single Stranded, Placed rn Conduit $1,117,68 Quantity Unit Price Factor Total Installation 055 x 1,58762 x 1.2800 1,117.68 91 26 05 19 16 0028 MLF M3 AWG Cable - XLP (XHHW), 600 V. Single Stranded, Placed In Conduit $49.21 Quantity Unit Price Factor Total Installation 002 x 1,922-24 x 12800 49,21 Contractors Price Proposal - Detail Page 7 of 14 EZIQC - Buy Board 9118/2012 Contractor's Price Proposal - Detail Continues.. Work Order Number: 013758.00 Work Order Title: City of Lubbock - Parks and Rec. Restrooms x 2 Sect Item Modifer UOM Description Line Total Labor Equip. Material (Excluded if marked with an X) 26 - Electrical 92 26 05 19 16 0026 MLF #3 AWG Cable - XLP (XHHW), 600 V, Single Stranded, Placed In Conduit $4921 Quantity Und Price Factor Total Installation 0.02 x 1,922-24 x 12800 49,21 93 26 05 19 16 0027 MLF #2 AWG Cable - XLP (XHHW), 600 V. Single Stranded, Placed In Conduit $899.43 Ouantity Unit Price Factor Total Installation 030 x 2,34228 x 1.2800 o 899.43 94 26 05 19 16 0028 MLF 01 AWG Cable - XLP (XHHW), 600 V. Single Stranded, Placed In Conduit $588.25 Quantity Unit Price Factor Total Installation 0.15 x 3,05336 x 1,2800 = 586.25 95 28 05 19 16 0028 MLF 01 AWG Cable - XLP (XHHW), 600 V. Single Stranded, Placed In Conduit $588.25 Quantity Unit Price Factor Total Installation 015 x 3,053,36 x 1.2800 ' 588.25 96 26 05 19 16 0030 MLF 210 AWG Cable - XLP (XHHVV), 600 V, Single Stranded, Placed In Conduit $468.47 Quantity Unit Price Factor Total Installation 0.08 x 4.574.93 x 1,2800 486.47 97 26 05 19 18 0031 MLF 310 AWG Cable - XLP (XHHW), 600 V. Single Stranded, Placed In Conduit $502.83 Quantity Unit Price Factor Total Installation 0.07 x 5,811.90 x 1.2800 _ 502.83 98 26 05 33 13 0049 LF 2" RGS Conduit With Coupling, Mounted Exposed On Flat Well $215.55 Quantity Unit Price Factor Total Installation 20.00 x 8.42 x 1.2800 215.55 99 26 05 33 13 0049 LF 2" RGS Conduit With Coupling, Mounted Exposed On Fiat Wail $215.55 Quantity Unit Price Factor Total Installation 20.00 x 8.42 x 1.2800 21555 100 26 05 33 13 0050 LF 2-112" RGS Conduit WSth Coupling, Mounted Exposed On Flat Wall $332.03 Quantity Unit Price Factor Total Installation 20.00 x 12.97 x 1,2800 m 332.03 101 28 05 33 13 1339 LF 1" PVC Schedule 40 Conduit With Coupling, Direct Burial, Glued Coupling $908.24 Quantity Unit Price Factor Total Installation 600.00 x 1,18 x 1.2800 908.24 102 26 OS 33 13 1339 LF 1" PVC Schedule 40 Conduit With Coupling, Direct Burial, Glued Coupling $908.24 Quantity Unit Price Factor Total Installation 600.00 x 1.18 x 1.2800 906.24 103 26 05 33 13 1340 LF 1-1l4" PVC Schedule 40 Conduit With Coupling, Direct Burial, Glued Coupling $58.45 Quantity Unit Price Factor Total Installation 30.00 x 1.47 x 1.2800 58.45 104 28 05 33 13 1340 LF 1-114" PVC Schedule 40 Conduit With Coupling, Direct Burial, Glued Coupling $225.79 Quantity Unit Price Factor Total Installation 120.00 x 147 x 12800 s 225.79 105 26 05 33 13 1341 LF 1-112" PVC Schedule 40 Conduit With Coupling, Direct Burial, Glued Coupling $11.98 Quantity Unit Price Factor Total Installation 2000. x 164 x 12800 41.98 Contractor's Pnce Proposal - Detail Page 8 of 14 E1:ZJQC - Buy Board 9119/2012 Contractor's Price Proposal - Detail Continues.. Work Order Number: 013758.00 Work Order Title: City of Lubbock - Parks and Rec. Restrooms x 2 Sect. Item Modifer UOM Description Line Total Labor Equip, Material (Excluded if marked with an x) 26 - Electrical f 06 26 05 33 13 1341 LF 1-12" PVC Schedule 40 Conduit With Coupling, Direct 8urioi, Glued Coupling $41,98 Quantity Unit Price Factor Total Installation 2000 x 1,64 x 12800 s 41.98 107 26 05 33 13 1343. LF 2-112" PVC Schedule 40 Conduit With Coupling, Direct Burial, Glued Coupling $481.92 Quantity Unit Price Factor Total Installation 150.00 K 251 x 1 2800 481.92 108 26 05 33 13 1352 EA 1" PVC Schedule 40 Elbow 90 Degree Direct Burial, Glued Coupling $17,48 Quantity Unit Price Factor Total Installation 2.00 x 6.83 x - 12800 17.48 f09 26 05 33 13 1352 EA 1" PVC Schedule 40 Elbow 90 Degree Direct Burial, Glued Coupling $17.48 Quantity Unit Price Factor Total Installation 2.00 x 6.83 x 1.2800 17,46 110 28 22 13 00 0058 EA 15 KVA, 480 V - 2081120 V, Transformer With 12 - 1 Pole / 4 - 3 Pole Max, 40 $3,674.25 A Breakers Quantity Unit Price Factor Total Installation 100 x 2,870.51 x 12800 - 3,674.25 111 26 24 13 00 0308 EA 60 A, 3 Phase, 480 V Switchboard Branch Breaker $490.74 Quantity Unit Price Factor Total Installation 1.00 x 383,39 x 12800 490.74 112 26 24 16 00 0029 EA 100 A With 20. 20 A Breakers, 120/240 V, 3 Wire, 1 Phase Panelboard, Main $1,581.62 Breaker, Assembled, 24 Circuit Capacity Quantity Unit Price Factor Total Installation 1.00 x 1,235.64 x 1.2800 1,581.62 113 26 24 t6 00 0029 0388 EA For Weathertight NEMA 3R Panelboards, Add $445.44 Quantity Unit Price Factor Total Installation 1.00 x 346.00 x 1.2800 445.44 114 28 24 16 00 0054 EA 225 A With 32 - 20 A Breakers, 1201206 V, 4 Wire, 3 Phase Panelboard, Main $2,805.38 Lugs, Assembled, 42 Circuit Capacity Quantity Unit Price Factor Total Installation 100 x 2,191.89 x 12800 ' 2,805.38 113 26 24 18 00 0054 0388 EA For Weathertight NEMA 3R Panelboards, Add $445.44 Quantity Unit Price Factor Total instaitation 100 x 348,00 x 1.2800 ' 445.44 116 26 24 14 00 0714 EA Fused Disconnect Type, Size 4 Space Complete With Bus And Hardware $57158 Quantity Unit Price Factor Total Installation 1.00 x 44655 x 1 2800 ' 571.58 117 26 24 19 00 0714 EA Fused Disconnect Type, Size 4 Space Complete With Bus And Hardware $571 58 Quantity Unit Price Factor Total Installation 1 00 x 448.55 x 12800 ' 57158 118 28 27 13 00 0008 EA 320 A, 3 Phase, 4 W1re, 7 Terminal Meter Socket With Bypass, And Jaw $583.85 Release, Exposed On Wood, Quantity Unit Price Factor Total Installation 1,00 x 456.13 x 12800 ' 583.85 Contractors Price Proposal - Detail Page 9 of 14 EZIQC - Buy Board 9118/2012 Contractor's Price Proposal - Detail Continues., Work Order Number: 013758.00 Work Order Tide: City of Lubbock - Pants and Rec. Restrooms x 2 Sect Item Modifer UONI Description Llne Total Labor Equip- Material iExcluded If marked with an XI 26 - Electrical 114 26 27 13 00 0008 EA 320 A, 3 Phase, 4 NAre, 7 Terminal Meter Socket With Bypass, And Jaw $583.85 Release, Exposed On Wood Quantity Quantity Unit Price Factor Total Installation x 456.13 x 12800 58385 Subtotal for 26 - Electrical $23,561.23 31 - Earthwork 120 31 05 13 00 0011 CY Sand Fill, Washed Aggregate $2,110.08 Quantity Unit Price Factor Total Installation 75.00 x 21.98 x 1.2800 2,110.08 121 31 05 13 00 0011 CY Sand Fill, Washed Aggregate $1,125.38 Quantity Unit Price Factor Total Installation 40.00 x 21.98 x 1.2800 ' 1,125.38 122 31 23 16 13 0005 CY Over 12" Wide, Excavation for Trenching by Machine in Loose Rock $23,109.12 Quantity Unit Price Factor Total Installation x x 2,950.00 8.12 1.2800 23,109.12 123 31 23 18 13 0005 0105 For > 1000, Deduct -$5,652.48 Unit Price Factor Total InstallationQuantity 2,400.00 x -1.84 x 11800 -5,852.46 124 31 23 18 13 0005 CY Over 12' Wide, Excavation for Trenching by Machine in Loose Rock $19,740.87 Quantity Unit Price Factor Total Instatiation 2,520.00 x 6.12 x 12800 y 19,740.67 125 31 23 16 13 0005 0105 For > 1000, Deduct -$5,935.10 Quantity Unit Poce Factor Total Installation a 2,520.00 x -1.64 x 1.2800 95,93510 128 31 23 18 13 0011 CY Backfilling or Placing Subbase for Trenches with Imported or Stockpiled $40&34 Materials by Hand Quantity Unit Price Factor Tota! Installation 35.00 x 9,07 x 12800 4D6.34 127 31 23 16 13 0011 CY Backfilling or Placing Subbase for Trenches with imported or Stockpiled $406.34 Materials by Hand Quantity Unit Price Factor Tata! Installation 35.00 x 9.07 x 12800 408.34 128 31 23 16 13 0014 CY Compaction of Fill or Subbase for Trenches by Hand $3,600.96 Quantity Unit Price Factor Total Installation 276.00 x 10.23 x 1 2800 3,600.98 129 31 23 16 13 0014 CY Compaction of Fill or Subbase for Trenches by Hand $3.60098 Quantity Unit Price Factor Total Installation , 275.130 x 10.23 x 1 280 3,600.96 930 31 23 16 33 0005 CY Bulk Excavation by Hydraulic Excavator, Front End Loader, Backhoe in Loose $196.99 Rock Quantity Unit Price Factor Total Installation45 00 x 3.42 x 12800 196.99 Contractor's Price Proposal - Detail Page 10 of 14 EZ1QC - Buy Board 9/16/2012 Contractor's Price Proposal - Detail Continues.. Work Order Number: 013758.00 Work Order Title: City of Lubbock - Parks and Rec. Restrooms x 2 143 31 23 16 36 0018 cola For > 20 To 50, Add $9933 Quantity Unit Price Factor Total Installation 4000 x 194 x 1 2800 99.33 Contractor's Price Proposal - Detail Page 11 of 14 EZJQC - Buy Board 9118/2012 Sect Item Modifer UOM Description Line Total Labor Equip. Material lExctuded if marked with an 1Q 31 - Earthwork 131 31 23 16 33 0005 CY Bulk Excavation by Hydraulic Excavator, Front End Loader. Backhoe in Loose $328.32 Rock Quantity Unit Price Factor Total Installation 75,00 x 3,42 x 12800 328.32 132 31 23 16 36 0014 CY Relocating On Site Excavated Material From Excavation For Building $32768 Foundations and Other Structures Over 500' to 1000' Quantity Unit Price Factor Total Installation 5000 x 5.12 x 12800 32768 133 31 23 18 36 0014 0016 For > 20 To 50, Add $245.78 Quantity Unit Price Factor Total Installation 5000 x 3.84 x 1.2600 = 245.78 134 31 23 16 36 0014 CY Relocating On Site Excavated Material From Excavation For Building $282.14 Foundations and Other Structures Over 500' to 1000' Quantity Unit Price Factor Total {nstallation 40.00 x 5.12 x 12800 262.14 135 31 23 16 36 0014 0016 For > 20 To 50, Add $196.81 Quantity Unit Price Factor Total Installation= 4[1.00 x 3.84 x 1.2800 196.61 136 31 23 16 38 9014 CY Relocating On Site Excavated Material From Excavation For Building $491.52 Foundations and Other Structures Over 500'(* 1000' Quantity Unit Price Factor Total Installation 75,00 x 5.12 x 1.2800 491.52 137 31 23 16 36 0014 0017 For> 50 To 250, Add $196.80 Quantity Unit Price Factor Total Installation= 75.00 x 2.05 x 1.2800 196.80 138 31 23 18 36 0014 CY Relocating On Site Excavated Material From Excavation For Building $327,68 Foundations and Other Structures Over 500' to 1000' Quantity Unit Price Factor Total Installation 50.00 x 5.12 x 1,2800 327.68 139 31 23 18 38 0014 0016 For > 20 To 50, Add $245.76 Quantity Unit Price Factor Total Installation 50.00 x 3,84 x 1.2800 245.76 140 31 23 16 36 0018 CY Sackfilling Around Building Foundations And Other Structures By Hydraulic $24760 Excavator, Backhoe, Loader Quantity Unit Price Factor Total Installation 75.00 x 258 x 1.2800 = 247.88 141 31 23 16 38 0018 0017 For > 50 To 250, Add $98.88 Quantity Unit Price Factor Total Installation 7500 x 1.03 x 1.2800 s 98.88 142 31 23 18 36 0018 CY Backfilling Around Building Foundations And Other Structures By Hydraulic $132.10 Excavator, Backhoe, Loader Quantity Unit Price Factor Total Instaitation 40.00 x 2.58 x 12800 132.10 143 31 23 16 36 0018 cola For > 20 To 50, Add $9933 Quantity Unit Price Factor Total Installation 4000 x 194 x 1 2800 99.33 Contractor's Price Proposal - Detail Page 11 of 14 EZJQC - Buy Board 9118/2012 Contractor's Price Proposal - Detail Continues., Work Order Number: 013758.00 Work Order Title: City of Lubbock - Parks and Rec. Restraoms x 2 Sect Item Modifar UOM Description Line Total Labor Equip. Material (Excluded If marked with an X) 31 - Earthwork 144 31 23 16 360019 CY Backfilling Around Building Foundations And Other Structures By Hand $119.42 Quantity Unit Price Factor Total installation Goo x 15-55 x 1 2800 119.42 145 31 23 18 360019 CY Backf4 ing Around Building Foundations And Other Structures By Hand $796 16 Quantity Unit Price Factor Totai Installation 40.00 x 15 55 x 1.2800 796.16 146 31 23 16 38 0021 CY Compaction Of Fill Or Subbase For Building Foundations and Other Structures $298.56 by Vibratory Plate, Air Tamper, Etcetera Quantity Unit Price Factor Total Installation 75.00 x 3.11 x 12800 2 298.58 147 31 23 18 38 0021 0021 For > 50 To 250, Add $119.04 Quantity Unit Price Factor Total Installation 75.00 x 1.24 x 1.2800 = 119.04 148 31 23 18 36 0021 CY Compaction Of Fill Or Subbase For Building Foundations and Other Structures $159.23 by Vibratory Plate, Air Tamper, Etcetera Quantity Unit Price Factor Total Installation 40,00 x 3.11 x 1.2800 159.23 149 31 23 18 38 0021 0020 For ? 20 To 50, Add $119.30 Quantity Unit Price Factor Total Installation= 40.00 x 2.33 x 1.2800 119.30 Subtotal for 31 - Earthwork $47,521.23 32 - Exterior Improvements 150 32 31 13 00 0149 LF 8' Galvanized Chain Link Fence, 9 Gauge Coiled Spring Mesh, Top And •� $1,162.75 Bottom Rails, 2-112" Line Post At 10' O.C., 3" Comer Post Quantity Unit Price Factor Total Installation 40.00 x 22.71 x 12800 1,162.75 151 32 31 13 00 0149 0179 For Installation In Concrete (Excludes Drilling), Add $32,77 Quantity Unit Price Factor Total Installation 40.00 x 0,84 x 12800 = 32.77 152 32 31 13 00 0149 0184 For 1-314" Mesh Fabric, Add $144.90 Quantity Unit Price Factor Total Installation 40.00 x 283 x 1.2800 = 144.90 153 32 31 13 00 0148 0188 For Posts 5' On Centers, Add $230.91 Quantity Unit Price Factor Total Installation 40.00 x 4.51 x 12800 230,91 154 32 31 13 00 0149 0189 For Up To 100, Add $207.38 Quantity Unit Price Factor Total installation 40.00 x 4.05 x 12800 a 207.36 Subtotal for 32 - Exterior Improvements $1,778.69 33 - Utilities 155 33 11 13 13 0020 EA 4" Diameter Mechanical Joint Ductile Iron 90 Degree Elbow $2,963.15 Quantity Unit Price Factor Total Installation 8.00 x 289.37 x 12800 = 2,983.15 Contractor's Price Proposal - Detail Page 12 of 14 EZIQC - Buy Board 9r18l2012 Contractor's Price Proposal - Detail Continues.. $17628 Work Order Number: 013758.00 Installation 100 x 137,72 x 12800 178,28 Work Order Title: City of Lubbock - Parks and Rec. Restrooms x 2 $243,47 Quantity Unit Price Sect Item Modifier UOM Description Installation 100 x 190.21 x 12800 Line Total Labor Equip. Material (Excluded If marked with an X) 33 - Utilities Contractors Price Proposal - Detail 158 33 11 13 13 0072 EA 8' x 6" Mechanical .Joint Ductile Iron Tee 9J18/2012 $56680 Quantity Unit Price Factor Total Installation 1.00 x 442.03 x 1 2800 565.80 157 33 11 13 23 0007 LF 2" Class 200, SDR 21 PVC Pressure Pipe $3,153.92 Quantity Unit Price Factor Total Installation 1,600.00 x 1.54 x 12800 3.153.92 158 33 11 13 23 0007 0044 For > 1000, Deduct -$163.84 Quantity Unit Price Factor Total Installation 1,50000 x -0.08 x 12800 = -163.84 159 33 11 13 23 0072 LF 2" Schedule 40 PVC Pipe 341,22 Quantity Unit Price Factor Total Installation 20.00 x 1.61 x 1.2800 41.22 160 33 11 13 23 0072 LF 2" Schedule 40 PVC Pipe $41 ,22 Quantity Unit Price Factor Total Installation 2000, x 1.61 x 12800 41.22 161 33 11 13 23 0081 EA 2" Schedule 40 PVC 90 Degree Elbow $36.92 Quantity Unit Price Factor Total Installation 2.00 x 14,42 x 12800 36.92 162 33 11 13 23 0081 EA 2' Schedule 40 PVC 90 Degree Elbow $36.92 Quantity Unit Price Factor Total Installation 2.00 x 14.42 x 1.2800 ' 38.92 163 33 11 13 23 0090 EA 2' Schedule 40 PVC 45 Degree Elbow $36.74 Quantity Unit Price Factor Total Installation 2.00 x 14.35 x 1-2800 38.74 164 33 11 13 23 0090 EA 2" Schedule 40 PVC 45 Degree Elbow $3e.74 Quantity Unit Price Factor Total Installation 2.00 x 14.35 x 1 2800 36.74 165 33 12 18 00 0007 EA 36" To 48" High, Two Piece, Screw Type, 2-112" Shaft, Round Head, Cast Iron $136.84 Service Boxlncludes cover, top section and bottom section. Quantity Unit Price Factor Total Installation 1.00 x 108.91 x 1.2800 136.84 168 33 12 18 00 0007 EA 36" To 48" High, Two Piece, Screw Type, 2-112" Shaft, Round Head, Cast Iron $138.84 Service Boxlncludes cover, top section and bottom section. Quantity Unit Price Factor Total Installation 100 x 106.91 x 1.2800 = 136.84 167 33 12 16 00 0180 EA 2" Threaded, Class 150, Bronze Angle Valve 3176.28 Quantity Una Price Factor Total Installation 1.00 x 137.72 x 12800 a 17828 168 33 12 16 00 0180 EA 2" Threaded, Class 150, Bronze Angle Valve $17628 Quantity Unit Price Factor Total Installation 100 x 137,72 x 12800 178,28 169 33 12 16 00 0187 EA 2" Threaded Ball Meter Valve (Mueller B-20200) $243,47 Quantity Unit Price Factor_ Total Installation 100 x 190.21 x 12800 243.47 Contractors Price Proposal - Detail Page 13 of 14 EZIQC - Buy Board 9J18/2012 Contractor's Price Proposal - Detail Continues.. Work Order Number: 013758.00 Work Order Title: City of Lubbock - Parks and Rec. Restrooms x 2 Sect Iter" Modifier UOM Description Line Total La bar Equip, Material (Excluded if marked with an X) 33 - Utilities 170 33 12 18 00 0187 EA 2" Threaded Ball Meter Valve (Mueller B-20200) $243.47 Quantity Unit Price Factor Total Installation 1.00 x 190-21 x 1.2800 243,47 171 33 31 00 00 0149 LF 6" Solvent Weld SDR 35 PVC Pipe $3,379.20 Quantity Unit Pnce Factor Total Installation 60000 x 440 x 1.2800 3,379.20 172 33 32 16 13 0002 EA 2 HP Submersible Grinder Pump, 2001208, 230V, 1 Phase, 3450 RPM, 1-112" $0.00 Threaded DischargeZoeller 840 series. Quantity Unit Price Factor Total Installation 0.00 x 1,618.52 x 12800 ' 0.00 173 33 32 16 13 0005 EA Duplex Control Panel With Auto Reversing SwitchFor Zoeller 840 series $1,752.64 grinder pump. Quantity Unit Price Factor Total Installation 1,00 x 1,389-25 x 12800 ' 1,752.84 174 33 32 16 13 0006 EA Grinder Pump, 120 Gallon Sewage Basin, t HP, 120 V Environment One $17,670.40 Model 2012-74 Quantity Unit Price Factor Total Installation 2.00 x 6,902.50 x 1.2800 ' 17,870.40 175 33 39 13 00 0170 EA 24" Square Aluminum Manhole Cover With Frame $1,073.27 Quantity Unit Price Factor Total Installation 1.00 x 838.49 x 1.2800 a 1,073.27 Subtotal for 33 - Utilities $31,737.48 40 - Process Integration 178 40 05 13 1q0218 EA Cut And Prepare 2" Stainless Steel Pipe - $127.49 - Quantity Unit Price Factor Total Installation 10.00 x 9.99 x 1,2800 ' 127,49 177 40 05 13 19 1130 LF 2" Pipe, Stainless Steel Schedule 40 Type 316 For Butt Weld Fitting $889,60 Quantity Unit Price Factor Total Installation 20.00 x 34.75 x 1.2800 889.60 178 40 05 13 19 1199 EA 2" Flanges, Stainless Steel Schedule 40 Type 316 $3,045.27 Quantity Unit Price Factor Total Installation 2400 x 99.13 x 1.2800 ' 3,045.27 Subtotal for 40 - Process Integration $4,002.38 Proposal Total $201,940.83 This total represents the correct total for the proposal. Any discrepancy between line totals, sub -totals and the proposal total is due to rounding. Contractor's Price Proposal - Detail Page 14 of 14 EVOC - Buy Board 911812012