HomeMy WebLinkAboutResolution - 2012-R0116 - Supplement To Amendment- Parkhill Smith & Cooper -Offset Construction Admin Cost - 03/29/2012Resolution No. 2012—RO116 March 29, 2012 Item No. 5.14 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for and on behalf of the City of Lubbock, a Supplement to Amendment No. 3 to offset the cost of additional construction administration services, by and between the City of Lubbock and Parkhill Smith & Cooper, and related documents. Said Supplement to Amendment No. 3 is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council on ATTEST: Rebecca arza, City Sccretary V ED AS TO CONT.N T: Loomis, Director of Aviation APPROVED AS TO FORM: V �I Chad Weaver, Assistant City Attorney vw: ccdocs/RES. Sup. Amend #3 Agrmt-PSC February 27, 2012 March 29, 2012 TOM MARTIN, MAYOR IM Mr. James W. Loomis, A.A.E. Director of Aviation Lubbock Preston Smith International Airport Administration Office, 2nd Floor 5401 N. Martin Luther King Jr. Blvd., Unit 389 Lubbock,Texas 79403 PAR KH I LLSM ITH &COO P E R Resolution No. 2012-Ro116 February 16, 2012 Re: Supplement to Amendment No. 3 Construction Phase Services for LBB Runway 08126 and Taxiway Improvements Phase 2 Dear Mr. Loomis: As previously discussed, we have prepared a Supplement to Amendment No. 3 for construction phase services related to Phase 2 of the LBB Runway 08/26 and Taxiway Improvements project. This supplemental agreement is related to additional services provided by PSC due to the Contractor overrunning the allotted contract time. For your reference. I've attached Exhibit B— Payments To Engineer Lump Sum Method from our Agreement for Professional Services. According to Article 4 (64.01)(A)(4), "The Lump Sum is conditioned on Construction Contract Times to complete the Work not exceeding months. Should the Construction Contract Times to complete the work be extended beyond this period, the total compensation to ENGINEER shall be appropriately adjusted". As seen in Amendment 3 attached, the original construction duration was planned to be 340 calendar days. Referring to Change Order 3 attached, you will see that completion was actually achieved on October 25, 2011 as opposed to September 13, 2011. Excluding weekend days, this resulted in a total overrun of 30 days. In order to offset the cost of additional construction administration services, the Contractor was assessed liquidated damages at a rate of $1,450/day for 30 days, totaling $43,500. This daily rate was determined prior to start of construction and an itemized breakdown was provided as justification to City of Lubbock Purchasing. In order to be as accurate as possible when determining the value of additional services provided, PSC has compiled the following for your consideration: 1. Total hours charged to project between 9/14/11 and 10/25/11. See summary attached. 2. Total hours were then adjusted down to exclude non -working days and staff working on items unrelated to the Contractor's progress in the field, although PSC's effort did not always cease when the Contractor was not working. A summary of our daily logs is provided for your review. 3. Total mileage charged excluding non -working days. See backup documentation attached. Applying PSC's 2011 Hourly Rate Schedule to the hours compiled in #2 above and including applicable reimbursable mileage charges yields a total additional services amount of $32,629.16, which is more than offset by the liquidated damages assessed to the Contractor. This is the amount proposed in the Supplement to Amendment 3 as additional services. ,Amarillo EI Paso Las Cruces Lubbock Midland 4222 855 Street Lubbock, Texas 79423 806,473.221'G0 Fax 806 473.3500 Mr. James Loomis, A.A.E. Page 2 February 16, 2012 If the terms of this supplemental agreement are agreeable to you, please sign and return one copy of this letter to our office. We appreciate your consideration in this matter. Sincerely, PARKHILL, SMITH & COOPER, INC. By �i . k"'� ohn T. Hamilton, PE \jFirm Principal IN TRIPLICATE Accepted by: CITY OF LUBBOCK By %/rtey �'_ Tom Martin Mayor Attest: By P , Re cca Garza City Secretary Approv as to Content: By G mes W. Loomis, A.A.E. irector of Aviation Approved as to Form: By Chad Weaver City Attorney JTH/lf Enclosures 1Vatal'PrapctQOI042709.10ADMIMGONTRACTSTINAL�contrad amandment 3 (supplem nt 2-16-12).dac Resolution leo. 2012—RO116 EXHIBIT B PAYMENTS TO ENGINEER LUMP SUM METHOD Article 4 of the Agreement is amended and supplemented to include the following agreement of the parties: ARTICLE 4 -- PAYMENTS TO THE ENGMEER B4.01 For Basic Services Having A Determined Scope --Lump Sum Method of Payment /:g 1. A Lump Sum amount of $ * based on the following distribution of compensation: a. Study and Report Phase $ b. Preliminary Design Phase $ c. Final Design Phase $ d. Bidding and Negotiating Phase $ e. Construction Phase $ 2. The Lump Sum includes compensation for ENGMEER's services and services of ENGINEER's Consultants, if any. Appropriate amounts have been incorporated in the Lump Sum to account for labor, overhead, profit, and Direct Expenses, 3. The portion of the Lump Sum amount billed for ENGINEER's services will be based upon ENGINEER's estimate of the proportion of the total services actually completed during the billing period to the Lump Sum. 4. The Lump Sum is conditioned on Construction Contract Times to complete the Work not exceeding * months. Should the Construction Contract Times to complete the Work be extended beyond this period, the total compensation to ENGINEER shall be appropriately adjusted. 5. If more prime contracts are awarded for Work designed or specified by ENGINEER for this Project than identified in Exhibit A - Part 1, the ENGINEER shall be compensated an additional amount equal to $ for all Basic Services for each prime contract added. * To be neeotiated when required. B4.02 For Authorized Additional Services --Standard Hourly Rates Method of Payment. A. OWNER shall pay ENGINEER for authorized Additional Services as follows: 1. For labor on an hourly rate basis in accordance with Appendix l.. 2. For reimbursable expenses, on the basis of cost times a factor of 1.15 B. The hourly rate schedule will be adjusted each January Ist to reflect cost of living adjustments. Page 1 of 2 gages Sheet B -I (Exhibit B - Payments to Engineer) July 26, 2010 Mr. James W. Loomis, A.A.E. Director of Aviation Lubbock Preston Smith International Airport Administration Office, 2nd Floor 5401 N. Martin Luther King Jr. Blvd., Unit 389 Lubbock,Texas 79403 Re: Amendment No. 3 to Agreement for Professional Services, Construction Phase Services for LBB Runway 08/26 and Taxiway Improvements Phase 2 Dear Mr. Loomis: As requested, we have prepared Amendment No. 3 for construction phase services related Phase 2 of the LBB Runway 08126 and Taxiway Improvements project. Refer to the detailed fee sheets attached for an itemization of the scope of services. This amendment corresponds to the construction project duration of 340 calendar days. The contract amendment modifies the scope of professional services included in our original agreement dated January 14, 2010. Construction phase services for Phases 3 and 4 of the LBB Runway 08/26 and Taxiway Improvements project will be negotiated prior to the start of construction for each phase. Task 1 - Lump Sum Fee for Construction Phase Services (PSC) (Construction administration, Resident Project Representative, etc.) $519,800 Task 2 - Reimbursable Fee for Construction Phase Services (PSC Subs) (Construction administration, site visits, etc.) $113,300 Task 3 — Surveying and Testing Services related to Phase 2 construction, (Reimbursable expenses/fees not to exceed) $387,100 Task 4 - Reimbursable Fee for Construction Phase Services (Fiber Optic Cable Sub) (Construction administration, site visits, etc.) $17,250 TOTAL $1,037,450 We propose to modify the agreement between the City of Lubbock and Parkhill, Smith & Cooper, Inc. dated January 14, 2010 and to provide the additional Task 1 through Task 4 services under the provisions of the contract, EXHIBIT B - PAYMENTS TO THE ENGINEER, PARAGRAPH B4.02. Compensation for Construction Phase - Tasks 1-4 Services shall not exceed $1,037,450 without Owner's approval. CITY OF LUBBOCK CHANGE ORDER Chani: c Order =: 3 Contractor: Duininck, Inc. Date: November 21, 2011 BID/ITB/RFP #: ITB # 10 -099 -DD Contract #: 9593 Project Name: Lubbock Preston Smith International Airport Runway 08P26 Taxiway Improvements Phase 11 "Change Order" means a written order to a Contractor executed by the Owner in accordance with the contract authorizing an addition to, deletion from, or adjustment or revision of the requirements of the contract documents, or an adjustment to the compensation payable to Contractor, or to the time for performance of Ute contract and cornpletion of the Project, or a combination thereof, which does not alter the nature of the thing to be constructed and is an integral part of the project objective. Adjustments to "Estimated Quantities" to a line item in a Unit Price contract do not require a Change Order. All work that alters the nature of the thing,to be constructed or that is not an integral part of the proiect obiective must be let out for public bid. Description of change (alteration, deviation, addition, or deletion) caused by conditions encountered during constniction not covered by the specifications and drawings of tate project (allach additional pages ifnecessw)J: Change Order #3: Refer to drawings attachments for supplemental information. I. Quantity Adjustments (See Attachment A) 2. Liquidated Damages (October 25, 2011 completion) NTP — October 5, 2010 Final Completion — 340 days Weather Days — 3 days Total Days — 343 days Scheduled Final Completion — September 13, 2011 Actual Final Completion — October- 25, 2011 Days Overran — 30 (weekdays only) Q. $1,450/day 3. Removal of 75' of existing duct bank, hauling off debris 4. Install 8 non -coated grates on existing headwall 5. Hot Pour Joint Seal at Blast Pad and New Runway 6. Silt Fence Removal TOTAL ($ 1.036,206.68t ($ 43,500.00) backfilling to 95% density S 18,400.00 $ 13,800.00 $ 325.24 $ 5,280.00 (S 1.041,E}01.14) Where the Change Order is negotiated, the Change Order must be fully documented and itemized as to costs, including material quantities, material costs, taxes, insurance, employee 'benefits, other related co,t,, piofit and overhead. Where certain unit prices arc contained in the initial contract, no deviations are allowed in computing negotiated change order costs. ITEMIZED COSTS MUST BE FULLY DOCUMENTED AND ATTACHED TO THIS FORM ITEM DESCRIPTION AMOUNT A. ORIGINAL CONTRACT VALUE: $ 13,292,395.29 B. AMOUNT OF TI IIS C.IIAN GE ORDER: Count dupprosalrequiredoifuwr.125NO ($ 1,041,901.44) C. PERCEN I' OF CONTRA(;' VALUE 'THIS CHANGE ORDER (B/A): -7.84° o D. AMOUNT OF PREVIOUS CHANGE ORDERS. $ 187,367.74 h. TOTAL AMOUNT OF AL1, CHANGE ORDERS (B D): ($ 854,533.70) F. PERCENT OF CONTRACT OF ALI. CHANGF OIU)LRS (L A)- 25A..Maronum, -6,430o G. NEW CON'rRACT AMOUN1 (A+E): $ 12,437,861.59 I1 is mutual]) agreed that the above dollar amount and the time extension, as applicable, as set forth in this Change Order constitutes full compensation to the Contractor for all costs, expense; and damages to the Contractor, whether direct, consequential or otltenvise, in anyway incident to, or arising out of or resulting directly or indxrecdy; from Ute work performed or modified by the Contractor under this Change Order. kWata I Trojecl$\201 W709.101Constniction PhaselChange Ordm\Changc Order 31LBB P112 CO � dor PWC -045 (Rev 01/08) MEETING MINUTES 09.21.11 PARKHILL &COOPER PROJECT NAME: Lubbock Prestorf Smith Internetlonal Airport Runway 08126 & Taxiway improvements — PHASE 2 PSC PROJECT NO.: 01.2709.10 CITY OF LUBBOCK NO. 10 -099 -DD DATE: September 21, 2011 TIME: 1:30 PM LOCATION: LBB Board Rooth ATTACHMENTS: DTX 2 week schedule, Sign -in Sheet The following minutes summarize the discussion regarding the referenced subject. The items are not necessarily in order of discussion. Please notify PSG within 2 days with any corrections. Items shown in red Indicate meeting discussion. 1. Sign In Sheet. See attached sign in sheet. 2. Review of last meeting minutes. No comments. 3. Project Schedule.. a. Summary of Time Used 1) Phase ia: (NTP- 1014110) a. Substantial Completion date: 05120111 b. Total 228 Calendar days used 2) Phase 1 b: (NTP — 11130110) a. Substantial Completion date: 06125111 b. Total 207 Calendar days used c. Overrun of 73 calendar days 3) Phase 3b: 94 days (NTP — 06120111) b. DTX understands that LD's may be assessed to cover additional RPR and Engineer time since construction time exceeded contract time. c. Tasks completed 09107111 through 09121111 P-501 completed on north Twy J shoulder P-501 completed on Twy R (west side — 10 ft. lane) P-401 repair completed on Twy G shoulder Elec. trench and bottom half of light cans installed on both sides of Twy R. Elec. along Twy J complete either 9121 or 9/22 d. Planned tasks 09121111 through 10105111 1) Updated schedule from DTX (see attached) e. Long -Term Schedule 1) PSC still anticipating late September for edge light testing and electricalINavaid punch list. Targeting 1011 for Navaid/E'lec. punchlist inspection. Crossno, Hutsko, Hightower, Leavell and Cooks to be invited. 2) DTX anticipating early October for completion of project. PA►RKHILLSMITH&COOPER f TO:i Mr, James Loomis MEMO FROM: Mark D. Haberer, P.E. PROJECT NAME: Runway 8-26 & Taxiway Improvements, 'Phase 2 PROJECT NO.: 01-2709-10 DATE: February 15, 2012 Date Work Performed September 14, 2011 Prepare west 10' lane at shoulder of Taxiway R for 9" concrete paving. Concrete encased light cans on east shoulder of Taxiway R. September 15, 2011 No work performed September 16, 2011 No work performed September 17, 2011 No work performed September 18, 2011 No work performed September 19, 2011 Poured 15' lane of 9" concrete paving on north shoulder of Taxiway J. Preparing shoulders at old Taxiway G for asphalt repair. Surveyed and staked cut/fill at Taxiway K. Setting up 10' lane on west shoulder of Taxiway R. Removed cores for lights on south shoulder of Taxiway J. Installing top half of light cans on south shoulder of Taxiway J. September 20, 2011 Placed P-401 asphalt on shoulders of Taxiway J at old Taxiway G. Finished setting up 10' lane on west shoulder Taxiway R. Poured 10' lane on west shoulder of Taxiway R. Poured top electrical can concrete encasement on lights at south side Taxiway J. September 21, 2011 Prepping 15' lane on west shoulder of Taxiway R for 9" concrete paving. Installing lights and wiring at Taxiway J. Removing old lead-in lines at Taxiways R, G, and K. September 22, 2011 Finished preparing 15' lane on west shoulder of Taxiway R for 9" concrete paving. Removed forms from10' lane at shoulder north side Taxiway J. Shoulder -up at north side Taxiway J. Painted edge stripes on Taxiway J at K, R and G. September 23, 2011 Poured 15' lane of 9" concrete paving on west shoulder of Taxiway R. Shoulder - up on north side Taxiway J and at Taxiway G. Cleaning up and starting to demobilize. September 24, 2011 No work performed September 25, 2011 No work performed Amarillo cr:,t1:L C- PC !Ur urs r El Paso Las Cruces Lubbock Midland 4222 851h Street Lubbock. Texas 19423 8U6.473.2200 Fax 806.473.3500 PARKHILLSMITH&COOPER all September 26, 2011 Preparing 10' lane at east shoulder of Taxiway R for 9" concrete paving. Shoulder -up at Taxiway J and J exit. Removed forms from 15' lane on west shoulder of Taxiway R. Demobilizing. September 27, 2011 Poured 10' lane on shoulder east side Taxiway R. Poured 15' lane on north shoulder of Taxiway J, west end. Grading and checking slopes on Taxiway J and J Exit. Sweeping and cleaning at Taxiway J and J Exit. September 28, 2011 Prepping 15' lane on east shoulder of Taxiway R for 9" concrete paving. Shoulder -up on west side of Taxiway R. Demobilizing. September 29, 2011 Poured 15' lane of 9" concrete paving on east shoulder of Taxiway R. Grading west of Taxiway R and east of Taxiway J. Demobilizing. September 30, 2011 Cleaning around Taxiway R. Demobilizing October 1, 2011 Cleaning around Taxiway R. Demobilizing October 2, 2011 Cleaning around Taxiway R. Demobilizing. October 3, 2011 Cleaning around Taxiway R. Shoulder- up at east side Taxiway R. Demobilizing. Installing top portion of light cans on east side of Taxiway R. October 4, 2011 Cutting grade on east side of Taxiway R and hauling excess material to Taxiway K. Concrete encased top portion on light cans at Taxiway R. Continue to demobilize October 5, 2011 Sealing joints on Taxiway R east shoulder. Cleaning area around Taxiway R. Installing lights on east shoulder Taxiway R. October 6, 2011 Grading at Taxiway K. Cleaning at Taxiway J. finished installing lights at east shoulder of Taxiway R. October 7, 2011 Cleaning surface of concrete at Taxiway R, Repositioned barricades at Taxiway R. Grading at Taxiway K. Mauling off CTB and asphalt from Taxiway K. October 6, 2011 No work performed October 9, 2011 No work performed October 10, 2011 Sawing and sealing joints at Taxiway R. Addressing punch list items: concrete repairs, grading. Cutting 1112" lip around paving at Taxiway R. Preparing for electrical inspection. October 11, 2011 Applied EB -44 rejuvenator to shoulders at Taxiway G repairs, touch-up areas at blast pad, and on MALSR road (east -west asphalt section). Notching down required 1 1h" at edge of paving. Working on punch list items. Re -cut grade in drainage swell on north MALSR road. October 12, 2011 Making repairs to concrete paving on Taxiway J. Grading 1 lh' drop at edge of paving on Taxiway R. Applied EB -44 to MALSR road (east -west section). Straightened sensor manhole at Taxiway R. Cleaning around light cans at Taxiways. Amarillo .Lm;*__Nr=L��w�,?,u esacruFw EI 'Faso Las Cruces Lubbock Midland 4222 85th Street LUbbo,;k. i : xa 1'N23 805.473.2200 Fax 806.473 3500 PARKHI LLSM ITH &COO'PER "I October 13, 2011 Continue with repairs on concrete paving at Taxiway J and R. Recut ditch line on west side of MALSR road (north of MALSR shelter). Fine grading around blast pad. Working through punch list items. October 14, 2011 Cut drainage channel for north side of east -west portion of MALSR road. Completed repairs on concrete paving at Taxiway R. Grading along east -west MALSR road, west of service road. October 15, 2011 No work performed October 16, 2011 No work performed October 17, 2011 Removing silt fence from package 1 placement. Saw cut joint at blast pad and 8- 26. October 16, 2011 Removing silt fence from package 1 placement. Sealed joint between HMAC and concrete at old Taxiway G. October 19, 2011 Removing silt fence from package 1 placement. Sealed joint between HMAC and concrete at blast pad. October 20, 2011 No work performed October 21, 2011 No work performed October 22, 2011 No work performed October 23, 2011 No work performed October 24, 2011 No work performed October 25, 2011 Sealed cracks on asphalt portion of MALSR road. Amarillo EI Paso Las Cruces Lubbock Midland 4222 85th Street Lubbock. Texas 79423 808.473.2200 Fax 806,4i3.3500 L88 Runway 8/26 and Taxiway Improvements - Phase 2 Construction Administration Summary of Additional Services due to Contract Time Overrun Labor Reimbursable Expenses Mileage See Summary attached 882.66 Total Additional Services $ 32,629.16 Total Hours 9/14/11 to Deduct Non -working Hourly Rate as of Total Additional Labor Staff Member 10/25/11 days by DTX Net "Extra" Hours 10/25/2011 Service John Hamilton 8.5 0 8.5 $ 171.00 $ 1,453.50 Mark Haberer 47 12 35 $ 129.00 $ 4,515.00 Richard Multer 22 2.5 19.S $ 112.00 $ 2,184.00 Craig Boyer 72.5 41.5 31 $ 94.00 $ 2,914.00 Zane Bond 52 12 40 $ 94.00 $ 3,760.00 Mark Carpenter 191.5 40 151.5 $ 94.00 $ 14,241.00 Richard Pinkerton 36.5 8 28.5 $ 94.00 $ 2,679.00 $ 31,746.50 Reimbursable Expenses Mileage See Summary attached 882.66 Total Additional Services $ 32,629.16 Project Detail Parkhill, Smith & Cooper, Inc. Transactions for W14/2011 through 10/2512011 Thursday,Feoruary, ti,za,l 11:29:25 AM 4 ompensation 519,800.00 Regular Total Total Regular Total Consultant Fee. Hours Ovt Hrs Hours Amount Amount Project Number: 01270910.00 LBB RUNWAY 08126 PHASE 2 CST Rennburs Pllow: Billing Manager: Mark Haberer Percen, Compl: Compensation: Pra,ect Manager. Mark Haberer Labor Pct Compl: Consultant Fee: Client: Lubbock Preston Smith Int'I Airport Expense Pct Compl: Relmburs Allow: Profit Center: 01:01 Start Date: Status: Active Est Compl Date: Type. Regular F 01046 Hamilton, John 9123/2011 Task Number. 1CST PHASE 2 CONSTRUCTION ADMIN Billie g Manager. k H._:berer Percent Compl: , ' 4 ompensation 519,800.00 Project Manager: Mark Haberer Labor Pct Compl: Consultant Fee. Ghent: Lubbock Preston Smith Int" Airport Expense Pct Compl: Rennburs Pllow: Profit Center: 01:01 Start Dale: Budgeted OH Rate: Status: Dormant Est Compl Date Multiplier/Amount- Type- Regular Unit Table: Revenue Method: 1 Labor 01 FIRM PRINCIPAL F 01046 Hamilton, John 9123/2011 7.30 7.30 321.78 321.78 F 01046 Hamilton, John 10/21/2011 1.20 1.20 52.90 52.90 Total for 01046 6.50 8.50 374.68 374.68 F 01089 Haberer, Mark 9/23/2011 19.00 19.00 672.03 672,03 F 01089 Haberer, Mark 10(712011 12.50 12.50 442.13 442.13 F 01089 Haberer, Mark 10/21/2011 15.50 15,50 563.74 56374 Total for 01089 47.00 47.00 1,67790 1 67790 Total for FIRM PRINCIPAL 55.50 55.50 2,052.58 2,05258 03 ENGINEER F 01100 Muller, Richard 9.2312011 1750 17.50 499.63 499.63 F 011 DO Muller, Richard 1017i2011 3.00 3.00 85.65 85.65 F 01100 Muller, Richard 10121/2011 1.50 1.50 42.83 42.83 Total for 01100 22.00 22.00 628.11 628,11 • F 05028 i -frees, Amdmew *2WO"I f -85-.00 55,W 999.15 4199.25 Total for 05022 35.00 35.00 999.25 999.25 Total for ENGINEER 57.00 57.00 1,627.36 1,627.36 07 EIT F 01054 Boyer, Craig 9/23/2011 72.50 72.50 1,950.98 1,950.98 T 0!e54 BeVef. Graig 116R,2011 67.00- -67..GA 1,891.97 1j802.97 1: 91064-90yer 6r&*- 46Rd2B44 --67.90 - X06 -4,40a.W --1,$82.W C1054 Bum. eraig•- - 1&2 V261 i 54-00-- -54.00 1,453:1-4 1,453. h4 - iTBt$54 Boyer;eraig 1&E111011-- -5r4-.09'---T- -54:40 -1.45&1-4 -1,453.14 Total for 01054 72.50 72.50 1.95098 1,950.98 F 01061 Bond, Zane Cola 9/2312011 26.00 26.00 699.66 699.66 F 01061 Bond, Zane Cole 101712011 20.00 20.00 :338.20 538.20 F 01061 Bond, Zane Cote 10/2112011 600 6,00 161,46 161.46 Total for 01061 52.00 52.00 1,399.32 1,399.32 F 01071 Carpenter. Mark 9/23/2011 46.50 46.50 1,215.05 1,215.05 F 01071 Carpenter, Mark 10/712011 76.50 76.50 1,998.95 1,998.95 F 01071 Carpenter, Mark 10121/2011 68.50 68.50 1,789.91 1,769.91 Total for 01071 191.50 191.50 5,003.91 5,003.91 Total for LIT 316,00 316.00 8,354.21 8,354.21 11 RPR F 01057 Pinkerton, R,chard 9/23.12011 36.50 36.50 982.22 982.22 Total for 01057 36.50 36.50 982.22 982.22 Total for RPR 36.50 36.50 982.22 982.22 v6.1.600 (MHABERER) - Cost and Billing, Selected By: Projects, Tasks with Activity Page 1 of 4 Project Detail Transactions for 911412011 through 10/25/2011 Thursday, rebruary 16, 2012 11:29:25 AM Regular Total Total Regular Total Total for 618.00 Hours Ovt Hire Hours Amount Amount 18 CLERICAL / Hamilton, John 18,87 I Mileage Concrete Pour F 01093 Sturdivant, Paulette 9/23/2011 4.40 1.50 5.90 89.32 135.00 F 01093 Slurdivant, Paulette 101712011 3.30 .50 3.80 66.99 82.22 F 01093 Sturdlvant, Paulette 10/21/2011 1.60 F EX 0015137 9/20/2011 1.60 32.48 32.48 Total for 01093 9.30 2.00 11.30 188.79 249.70 F 01153 Schreder, Lauren 10/7/2011 4.20 22.76 4.20 47.08 47.08 F 01153 Schrader, Lauren 10/21/2011 1.40 1 AIRPORT CONCRETE 1.40 15.69 15.69 Total for 01153 23.31 5.60 5.60 62.77 62,77 F 10001 Camacho, Eva 10/7/2011 .90 .90 9.79 9.79 Total for 10001 Mileage MC .90 .90 9.79 979 Total for CLERICAL 15.80 2.00 17.80 261.35 322.26 Expenses Direct Expenses 618.00 Other Consultant 9/10-9/16 Total for 618.00 416.00 621.00 Travel *F EX 0015548 10113!2011 / Hamilton, John 18,87 I Mileage Concrete Pour F EX 001 51 34 9121/201 1 ! Boyer, Craig 1 19.43 Progress Meeting P0141(60014, 54 Fig 99164374?4612044 Richard / Mileage -RP F EX 0015137 9/1912011 I Pinkerton, 22.20 Richard / Mileage -RP F EX 0015137 9/20/2011 f Pinkerton, 37.74 Richard I Mileage -RP F EX 0015137 9/23/2011 / Pinkerton, 20.54 Richard / Mileage -RP F EX 0015138 9/14/2011 1 Bond, Zane Cole 22.76 /AIRPORT CONCRETE F EX 0015138 9/27/2011 / Bond, Zane Cole 39.41 1 AIRPORT CONCRETE F EX 0015141 9/19/2011 1 Carpenter, Mark 1 23.31 Mileage MC F EX 0015141 9/20/2011 1 Carpenter, Mark / 28.42 Mileage MC F EX 0015141 9121/2011 1 Carpenter, Mark / 26.09 Mileage MC F EX 0015141 9/22/2011 1 Carpenter, Mark / 23.31 Mileage MC F EX 0015141 9/23/2011 / Carpenter, Mark / 28.42 Mileage MC Mileage MC F EX 0015327 9/26/2011 i Carpenter, Mark / 43.85 Mileage MC F EX 0015327 9127/2011 I Carpenter, Mark / 25.53 Mileage MC F EX 0015327 9/28/2011 I Carpenter, Mark 1 24.98 Mileage MC F EX 0015327 9/29/2011 I Carpenter, Mark / 27.20 Mileage MC F EX 0015327 9/30/2011 / Carpenter, Mark / 21.09 Mileage MC F EX 0015327 10x3/2011 / Carpenter, Mark 1 23.31 Mileage MC v6.1.600 (MHAHE"RER) - Cost and B,Illng, Selected By. Prgects, Tasks with Activity Page 2 of 4 Project Detail Transactions for 9/14/2011 through 10/2512011 Thursday, February 16, 2012 11:29:25 AM Regular Total Total Regular Total Hours Ovt Hrs Hours Amount Amount F EX 0015327 10/412011 1 Carpenter, Mark / 28.31 Mileage MC F EX 0015327 10/5/2011 / Carpenter, Mark 1 26.64 Mileage MC F EX 0015327 10/6/2011 / Carpenter, Markt 27.75 Mileage MC F EX 0015327 10/7/2011 / Carpenter, Mark 1 26.49 Mileage MC F EX 0015327 10/10/2011 / Carpenter, Mark 23.87 Mileage MC F EX 0015327 10/11/2011 / Carpenter. Mark 22-�6 / Mileage MC F EX 0015327 10/1212011 / Carpenter, Mark 27.20 1 Mileage MC F EX 0015327 1011312011 1 Carpenter, Mark 26.09 1 Mileage MC F EX 0015327 10/14/2011 / Carpenter, Mark 22.76 1 Mileage MC F EX 0015327 10/1712011 /Carpenter, Mark 48.29 / Mileage MC F EX 0015327 10/18/2011 / Carpenter, Mark 44.96 1 Mileage MC F EX 0015327 10119/2011 / Carpenter, Mark 47,73 1 Mileage MC 0 Go 410F. Mark F. / Mileage MC Ve eft! Mark F / Mileage MC pemle?' / Mileage MC F EX 0015558 10/11/2011 1 Haberer, Mark f 19,98 Mileage F EX 0015308 9/2812011 1 Camacho, Eva 1 11.77 Lub Preston Smith Int'I Airport Total for 621.00 1,023.09 A L • 2 (ti Task Number: 2SUB 'OHASE 2 CONSTRUCTION-SUBCONSULTANTS v6.1,600 (MHABERER) - Cost and Billing, Selected By: Projects, Tasks with Activity Page 3 of 4 Owner: Project: Agreement Date: Classification Hourly Rate PROFESSIONAL LEVEL VII $171.00 Engineer VII Architect VII Landscape Architect VII Interior' Designer VII PROFESSIONAL LEVEL VI $145.00 Engineer VI Architect VI Landscape Architect VI Interior Designer VI PROFESSIONAL LEVEL V $129.00 Engineer V Architect V Landscape Architect V Interior Designer V PROFESSIONAL LEVEL IV $112.00 Engineer III, IV Architect IV, Intern (Architect) IV Landscape Architect IV Interior Designer IV Technologist IV Resident Project Representative IV PROFESSIONAL LEVEL 111 $94.00 Engineer 1111 Architect III, Intern (Architect) III Landscape Architect ll[ Intern (Landscape Architect) III Interior Designer III Technologist [Il Resident Project Representative III PROFESSIONAL LEVEL II $84.00 Intern (Architect) It Interior Designer II, Intern (Interiors) II Landscape Architect II Technologist 11 Resident Project Representative II Clerical Supervisor It Expenses Resolution No. 2012-R0116 Parkhill, Smith & Cooper, Inc. Hourly Rate Schedule Current through december 31, 2011 January 1, 2411 Classification Hourly Rate PROFESSIONAL LEVEL I Intern (Architect) I Intern (Interiors) I Intern (Landscape Architect) I Technologist I Resident Project Representative I Clerical Supervisor I. SUPPORT STAFF [II Engineering Technician Ill, IV CARD III, IV Administrative Secretary [[I Architect Technician III, IV Project Assistant I/11 SUPPORT STAFF II Architect Technician I, 11 Engineering Technician 1, [1 CADD I, II Accounting Clerk 1, 11 Administrative Secretary 1, II Project Assistant EL Word Processor I, 11 Receptionist 1, 11 File Clerk I SUPPORT STAFF I Architectural Student EL Engineering Student EL Landscape Architecture Student EL Interiors Student EL CADD EL Accounting Clerk EL Word Processor EL Receptionist EL File Clerk EL $76.00 $73.00 $67.00 $38.00 Reimbursement for expenses, as fisted below, but not limited to, incurred in connection with the services, will beat cost plus fifteen percent for items such as: 1. Maps, photographs, postage, telephone, reproductions, printing, equipment rental, and special supplies related to the services. 2. Consultants, soils engineers, surveyors, contractors, and other outside services. 3. Rented vehicles, local public transportation and lexis, road toll fees, travel, and subsistence. 4. Special or pob specific lees, Insurance, permits, and licenses applicable to the work services. 5. Mileage at IRS approved rate. Rate for professional staff for legal proceedings or as expert witnesses will be a rate one and one-half times the Hourly Rates specified above. Exclse and gross receipts taxes, If any, will be added as an expense. The foregoing Schedule of Charges Is Incorporated Into the agreement for the services provided, effective January 1, 2011 through December 31, 2011. Aher December 31, 2011, Invoices will reflect the Schedule of Charges currently In effect. Qalatlslds_Cetl WSP. Standard Forms\PSG Hourly Rat$ S&oduialWAGE-2011-wdireds.doc