Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Resolution - 2013-R0348 - CO To Contract - Allen Butler Construction Inc.- Water Line Adjustments - 10/24/2013
'Resolution No. 2013-RO348 October 2 2013 Item No. 5.5 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for and on behalf of the City of Lubbock, Change Order No. 1 to that certain Contract No. 11078 by and between the City of Lubbock and Allen Butler Construction, Inc. for adjustments to an existing 12 inch water line and for plan design for roadway illumination, and related documents. Said Change Order No. 1 is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council on October 24, 2013 *GC. MAYOR ATTEST: 5�_ Rebe a Garza, City Secretary APPROVED AS TO CONTENT: fes. R. Keith Smith, P.E., Director of Public Works APPROVED AS TO FORM: Chad Weaver, Assistant City Attorney vw:ccdocs'RES.Chg0rd#1 Contract -Allen Butler September 9, 2013 Kesolution No. 2U13-RU348 CITY OF LUBBOCK CHANGE ORDER Change Order #: 1 Contractor: Allen Butler Construction, Inc. Date: 10-7-13 BID/ITB/RFP #: ITB# 13 -11078 -CI Contract #: 11078 Project Name: Paving Improvements: Milwaukee Avenue "Change Order" means a written order to a Contractor executed by the Owner in accordance with the contract authorizing an addition to, deletion from, or adjustment or revision of the requirements of the contract documents, or an adjustment to the compensation payable to Contractor, or to the time for performance of the contract and completion of the Project, or a combination thereof, which does not alter the nature of the thing to be constructed and is an integral part of the project objective. Adjustments to "Estimated Quantities" to a line item in a Unit Price contract do not require a Change Order. All work that alters the nature of the thins to be constructed or that is not an intesral part of the project objective must be let out for public bid. Description of change (alteration, deviation, addition, or deletion) caused by conditions encountered during construction not covered by the specifications and drawings of the project (attach additional pages if necessary): Amendment #1 involves two changes to the project: 1) Adjust of an existing 12 -inch water line by lowering it to the proper depth. Although the city utility was installed to the proper depth at the time of its original construction, those standards were less than current standards. The widening of Milwaukee Avenue and the associated grade changes of the widened pavement will now leave the utility with less than the current required minimum cover, thus the water line will be lowered to achieve the appropriate cover. Cost of this adjustment is $229,771.43 which is 2.80% of the contract value. Thirty (30) days will be added to the contract to accomplish this work. 2) Adjust the plan design for roadway illumination. The plans originally called for 40 -foot tall streetlight poles to be installed along both sides of Milwaukee Avenue. However, SPEC currently maintains an overhead electric utility along the west side of Milwaukee Avenue that is too low to accommodate the placement of new light poles beneath the electric lines. This amendment eliminates the light poles from the west side of Milwaukee Avenue, and modifies the height of the poles on the east side of Milwaukee to 30 - feet. At the request of LP&L, this amendment removes the option of allowing aluminum poles, and instead requires steel poles. Cost of this adjustment is a cost savings to the contract in the amount of ($22,409.22) which is (0.27%) of the contract value. No additional time will be added to accomplish this work. Where the Change Order is negotiated, the Change Order must be fully documented and itemized as to costs, including material quantities, material costs, taxes, insurance, employee benefits, other related costs, profit and overhead. Where certain unit prices are contained in the initial contract, no deviations are allowed in computing negotiated change order costs. ITEMIZED COSTS MUST BE FULLY DOCUMENTED AND ATTACHED TO THIS FORM. ITEM DESCRIPTION AMOUNT A. ORIGINAL CONTRACT VALUE: $ 8,198,189.43 B. AMOUNT OF THIS CHANGE ORDER: Council approval required iifover525,000 $ 207,362.21 C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A): 2.52% D. AMOUNT OF PREVIOUS CHANGE ORDERS: $ 0 E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D): $ 207,362.21 F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): 25%Marinnan 2.52% G. NEW CONTRACT AMOUNT (A+E): $ 8,405,551.64 It is mutually agreed that the above dollar amount and the time extension, as applicable, as set forth in this Change Order constitutes full compensation to the Contractor for all costs, expenses and damages to the Contractor, whether direct, consequential or otherwise, in anyway incident to, or arising out of or resulting directly or indirectly; from the work performed or modified by the Contractor under this Change Order. Page 1 of 2 PWC -045 (Rev 01/08) This Change Order is not valid without the following signatures (please sign in order and return 3 originals (1) CONTRACTOR j` Date O PROMCHITECT/ENGINEER Date Approved as to Con / t: Approved a t f. (3) OWNER'S REPRESENTATIVE D to (4)IT ATTORNEY Da 10/4001�� (5) CAPITAL PROJECTS MANAGER Date (6) PURCHASING AND PNTRACT MANAGER Date Change Uraers over 323,ouu regntre a Lontract CITY OF LUBBOCK / (7) MAYO VZ — "" " Council Date: October 24, 2013 PWC -045 (Rev 01108) street arta ttte)ottoivtng signatures: ATTEST: 10!2413 10.24' 13 Date I Y SECRETARY Date Agenda Item #: 5.5 Resolution #: 2013-RO348 Page 2 of 2 EM Kimley-Horn F1 and Associates, Inc. October 8, 2013 Mr. Neil Welch, P.E. Assistant City Engineer City of Lubbock P.O. Box 2000 Lubbock, TX 79457 OCT 2013 ST 0 .7u v:r`i Re: Milwaukee Avenue and 98`i' Street Reconstruction Change Order No. I — Adjust City of Lubbock 12 -inch Water Line and Adjust Plan Design for Roadway Illumination K14A No. 063126010 Dear Mr. Welch: Attached is Change Order No. 1 for the Milwaukee Avenue and 98"' Street Reconstruction project. Item 1 - This change will adjust an existing City of Lubbock 12 -inch water line by lowering it to the proper depth. The existing 12 -inch water line is located within a utility easement adjacent to the east right of way line of Milwaukee Avenue, between 104`i' Street and 114"' Street. Although this utility was originally installed at the proper depth, those standards do not meet current depth requirements. Thus the widening of Milwaukee Avenue and the associated grade changes of the widened pavement will leave the utility with less than the minimum required cover. The line will be lowered within the existing easement and no new right of way will be required. Item 2 - This change will adjust the plan design for roadway illumination. The plan design called for 40 -foot tall light poles to be installed along both sides of Milwaukee Avenue between 94`x' Street and 114`x' Street. However, SPEC currently maintains an overhead electric utility that runs along the west side of Milwaukee Avenue. This overhead utility is too low to accommodate the placement of new light poles beneath the electric lines. Therefore, this amendment eliminates the light poles from the west side of Milwaukee Avenue between 94`i' Street and 114`x' Street. At the request of LP&L, this amendment also removes the option that would allow the use of aluminum poles, and instead requires the use of steel poles. Thirty (30) days of time will be added to the contract to accomplish Item 1. No additional time is needed for Item 2. The cost of Item 1 is $229,771.43. This equals to 2.80% of the contract value. The cost of Item 2 is ($22,409.22). This equals to (0.27%) of the contract value, which results in a savings to the contract. The total cost of Change Order No. 1 is $207,362.21 which is 2.52% of the contract value. ■ Building 8, Suite 101 7021 Kewanee Avenue Lubbock, Texas 79424-7050 806 686-1086 Kimley-Horn Mr. Neil Welch, August 23, 2013, Page 2 and Associates, Inc. Kimley-Horn and Associates, Inc. recommends approval of Change Order No. 1. Thank you for the opportunity to be of service to the City of Lubbock. If you have any questions or comments, please do not hesitate to call. Very truly yours, KIMLEY-HORN AND ASSOCIATES, INC. Kerry C. Miller, P.E. Enclosures - Change Order No. 1 and supporting documents KCMikcm Milwaukee Avenue and 98th Street Paving Improvements - ALTERNATE Engineer's Opinion of Probable Construction Cost cTt accnflnTcn 1allru sir--- nc 11-lu 1.1-ic. I IWc Dnember 17. 2012 Revised SUBTOTAL r(E1115 M7 -#90: DOLLARS tS SUBTOTAL NEW ITEMS #113-X110: DOLLARS i5 SUBTOTAL ITEMS #73 - #91) and #113-#120: DOLLARS IS I 5 192,02584 5 _5 000 5 _3 14/.80250 _1 Original Alternate Bid Price 5192,02-5.84 New Alternate Bid Price S-421.797:7 Difference: 5229,771.43 345.952 97 7384430 Original Original Estcmknl Revised Retired Extended Item No. Description Unit Estimated Unit Price Amount Quantity Unit Price Amount Quantig, Quantity 73 Famish and install hcatj• pol3cthtlene teaming tape with trace wire, complete In place, per linear LF 2914 50.53 SI,544d2 6042 S053 $3.0216 loot 74 Fu ish and install OSI IA approved wench sakty stem for utility lines as required, per linear LF 9 214 S053 S 1344 42 5932 50.53 S3,143.96 Rat LF $2625 514,67375 $26.25 S14,67375 7G Famish and install 8' C900 DR 18 PVC eater line, including all labor, material and equipmem. LF 1143 $28.35 $32.46075 1150 $28.35 532,602.50 complete In place per linear foot 77 Famish and install 10' C900 DR 18 PVC eater line. including all labor material and equipment, LF 125 537.80 $4,725.00 160 537.80 $6,048.0 complete in place, per linear font 78 Fumuh and install L" C900 DR 18 PVC water hlia, meluding all lahor. material and equipment LF It.. 542.00 545,570.00 4055 $42.00 5170,31000 complete in place per linear foxn 79 Furnish and install 6" gate raise and bot, including all appurtenances, complac to place, per EA 7 $1.05000 $7,35000 In $1,050.00 $10,500.00 80 Furnish and Install 8' gate vnhn and bot, mdudine all appurter- complete in place. per EA 14 51,575.00 $22,050.00 16 $1,575.00 $'-5.200.00 caeh 81 and install 10' gate valve and bus. including. all appurtcoloves atmplcte In place, per EA 3 S'-,205 00 56,615.00 5 $2.20500 EI L025 00 aumuh ch Furnish and mAall l2'x6'Wppingslecta and nsectatod appttiviali-m onellw mpiuc,itleJA $1,260.00 58,82000 $1,260.00 $8,82000 1 81 I Furnish aN nerll 12' x go Upping stmt and a:a %-d apptetrnm.xy, amplele In place. poo° Icach $1.680.00 55.010 00 $1.680 00 S5,04000 84 ruaush cod maa1112'. Rr turpmg slate a ad ussoculcl aFpurkn---amtplelcw pl-,. OO 1� .� $1,89000 $5,67000 E1,890.W $5,67000 '5 Famish and Install tiro hesiranl q,or I c m I-, : er ea h 8 53,675.00 $2`9.400.( I I 53,675.00 S40,425.W 86 htunlsh and install R' oluv. - kic nt rla•.c t, caeh 1 5315,00 $4,01) 00 14 S31500 $4,41000 87 Fumish :mJ msta1110"rlua. vol- -In 1-loc Per caeh 542000 $840.00 4 $420W $1,68000 +W -ary •ho- [;p a�A 12 lua ew rlete.r 4acc r- .,41 _ - S472.50 $47250 5472.50 $472.50 8'! Furi end taaall V' s 15, ret-- me whng ell eppruae m asitpicte m place, pair each $367.50 5367.50 S367.50 5367.50 W Fumish and inetal113"<Srt,:. Indudme all annnlnenaneey, u>mnlcte mplac-rr each I 5787.50 5787.50 3 5787.50 52362.50 113 Fumuh and Install 10"X6- tin, includlnc all appurtenances. eompletc m lac. -.r caeh 1! 1 $74250 $742.50 114 Fumuh and install 12'X(,' ire, melwlma ail anpurtcnances, ttlmp'ctL. tn. lac. r�r each. 0 2 _ $ 9 So SL595 W 115 Fumuh and Install 12'X10' roc, mcludma all ar ptirtenance;. complete to Iaac. •r caeh I} 2 5935 0 51,871 W116 Fumuh and install l2'X 12' Ia. mcludma all antsenenances complete In p line. •r caeh 0 1 51,15500 $1,15500117 Fumuh and install 12' gate tahe and nos, Including all apps menancos, complete to place per each 0 �,.,, 3 S3, 190 W $9,570.00 I]$ Fumuh and Install 12' 45 degree bend, Including all appu enencca, eomplae, to plata. per e h FA 0 ---- 2 $770 W E 1,540 00 119 Increase to Bondum LS 0 1 $1,70000 51,700.00 Furnishand install 10' C900UR 18 P VC a atcr line by other than open cut with 18' steel casing. LF 0 --- 110 $28453 531,298.30 120 mciudmu all labor, matrnal and winirm ilt. complete in place.. r linear foot 121 _ . _ Instnil coni pec on cast side ofRideauka Accnuc ncxth of 110th Suat IS 0 - -- - 1 5?6,372 50 S26372 50 SUBTOTAL r(E1115 M7 -#90: DOLLARS tS SUBTOTAL NEW ITEMS #113-X110: DOLLARS i5 SUBTOTAL ITEMS #73 - #91) and #113-#120: DOLLARS IS I 5 192,02584 5 _5 000 5 _3 14/.80250 _1 Original Alternate Bid Price 5192,02-5.84 New Alternate Bid Price S-421.797:7 Difference: 5229,771.43 345.952 97 7384430 1©t 3 Milwaukee Avenue and 98th Street December 17. 2012 Paving Improvements - ALTERNATE Revised Enzineer's Opinion of Probable Construction Cost REVISED COSTS ASSOCIATED WITH ILLUMINATION CHANGES Onginal Revised Ongmal Extended Revised Extended Item No. Description Unit Estimated Unit Price Estimated Unit price Amount Quantico Quantit) 20 Prepare right -or -way, including clearing, grubbing and removal oral[ items that are in conflict, per station STA 103 51.69700 S174,791.DO 103 51,69700 $174,791,GO 2 Rcmave Existing==I including remoml of trunk limbs, roots, and filling and compacting of EA 1 S2DO 00 $20.00 1 5200.00 $20.00 resultinghole with suitable material, rcach. 3 Remove Asphalt Pm'ing and/or Stabilized Base, including iicat removal ofexisting paving SY 30273 $LSO 545,40.30 30273 $I -SU $45,409.30 materials and ro dis for dis itioa r ware yard. 22 Remove Small Signs and/or Small Sign Assemblies, including nut removal of existing small SY 369 $36.63 513.516.47 369 $36.63 $13,516.47 4 signs and/or assemblies including Inundations and proper disposal or disposition, per each sign EA I 1 $10000 S1,100.00 11 $100.0 $1,1000 23 and/or assembly. All signs removed arc to be given to the City of Lubbock Streets Department to EA 7 580,00 $5,600.0 7 580.0 $5,60.0 salves c. 5 Remove Fence, including not removal of existing posts and/or assemblies including foundations LF 3122 $0.50 $1,561.0 3122 $0.50 51,561.0 and proper dis I or disposition. per linea foot. 6 Replace Fence. in luding Posts and/or assemblies and all appurtmarecs. per linear foot. LF 3122 S3 11 $9,70.42 3122 $3.11 $9,70.42 7 Remove Mailbox, including not removal ofexisting assemblies including foundations and proper EA 8 520.0 51.60.00 8 $20.00 SI,60.0 26 disposal or disposition. per cath mailbox. CY 180 549.0 58,820.00 180 549.0 $8,82000 Topsoil (4")(Furnish and Place), including securing necessary sources and royalties, famishing 8 topsoil; excavation at the source, loading, hauling, stockpiling and placing; watering; rolling: and SY 100 50.79 $790.00 1000 $079 5790.00 equipment, labor, materials, tools, and incidentals, by the square yard complete in place, 28 Embankment (Roadway), including borrow material as required, placement and density control to EA 2 $1,326.35 52,652.70 2 $1,326.35 $2,652.70 9 lines and grad" shown on drawings, as well as any incidental work per cubic yard as shown an CY 51417 $4.70 $241,659.90 51417 54.70 $241.659.90 29 this bid farm. EA 3 $1,326.35 $3,979.03 3 51,326.33 53,979.05, 10 Excavation (Roadway). to lines and grades shown on drawings, as well as any incidental work CY 39962 $3.25 $129,876.50 39962 5325 $129.876.50 30 r cubic van, as shown on this bid form. SF 20300 53.65 $74,05,00 2030 $3.65 $74,095.0 I I Ex -tion (Channel), to lines and grades shown on drawings, as well as any incidental work per Cti. 6780 $3.82 525,1199 60 6780 $3.82 525,899.60 31 cubic vard at shown on this bid f rmr. EA I $2,%%7.50 $2,887.30 1 52.8%7.50 $2,%%7.50 12 Excavation (Playa Lake). to lines and grades shown on drawings, as well as any incidental work Cti. 40840 $3,94 $10,909.60 40840 $3.94 $160,90.60 32 r cubic vard as shown on this bid form. LF 105 $225.75 523,703.75 105 $225.75 $23,703.75 Cher Excavation, at the unit bid price. of excavation beyond the limits to lines shown in the plans, as directed by the Engineer, to treat or replace deficient subgmde, including subgradc removal and 13 replacement with a suitable material, or approved treatment of unsuitable material, all borrow CY 20 $35.0 57,00.0 20 $35,0 $7,000.0 material, compaction, testing, and all labor and equipment necessary to complete this work in cubic vards. 34 Flo viable Fill, at the unit bid price. of flowable backfill actually installed at the direction of the EA I 56,00 0 $6,00.0 1 S6.0N,0 $6,01X1,0 Engineer. Where the Contractor chooses on his own accord to install flowable fill, payment will 14 not be made directly, but will be subsidiary to the pertinent item(s) The unit price bid includes CY 100 $70.0 $7,0000 100 $70.0 57,000.00 full compensation for all materials, testing, materials, labor and equipment necessary to complete 36 the work per cubic mrd. EA 2 SI,00.0 $2,00.00 2 51,000.0 52,000.0 Surface Treatment, including surface preparation, famishing, preparing, hauling and placing IS Aggregate and Asphalt. removing existing pavement markers and excess aggregate: rolling: Sy. 72135 $034 524,525.90 72135 $0.34 $24,525.90 cleaning up stmkpil"; and equipment, labor, tools and incidentals, as complete in place, per square yard. 16 Hot Mix Asphalt Pavement (HMACRTY D) (2"), including necessary materials, shaping. density SY 27943 Sit.73 $327,771.39 27943 511.73 $327,771.39 controlled placement, complete and in place, per square yard. 17 Hot Mix Asphalt Pavement (HMAC)(TY B) (4"), including necessary materials, shaping. density SY 30507 $18.92 5577,192.44 30507 $18.92 5577,192.44 controlled placement, complete and in place, per square yard. 18 Hot Mix Asphalt Pavement (FLEXBASE), including necessary materials, shaping, density Sy. 30507 $8.39 $255.953.73 30507 $8.39 $255,953.73 controlled placement, complete and in place, per square yard. 19 Concrete Paying (Continuousl) Reinforced)(9"), including necessary materials and plat a Sy. 59218 $38.88 $2,302,395.84 59218 538.88 $2,302,395.84 complete and in place. per square mrd. 20 concrcm euro (mono), rncluamg necessary marenms, joining, tanning, inning, aria p accmenr of monolithic curb with continuously reinforced concrete pavement, complete and in place, per LF 16319 $7.59 $123.861.21 16319 $7.59 $123,861.21 linear foot as measured along the gutter line. Concrete Curb (Mono)(Sawacolh), including necessary materials, joining. forming, finishing, and 21 placement of monolithic curb with continuously reinforced concrete pavement, complete and in LF 100 $15.0 $1,50.0 I0 SI5.0 51,50.0 lace. per linor foot as measured along the gutter line. 22 Concrete Sidemlk (5"), including necessary materials for placement of concrete sidewalks, SY 369 $36.63 513.516.47 369 $36.63 $13,516.47 tom tete and in lace. per square mrd. 23 Concrete Sidewalk Ramp (In radius - w/ fared sides). including necessary materials for placement EA 7 580,00 $5,600.0 7 580.0 $5,60.0 of ram s. corn Icte and in place. per cath. 24 Concrete Alley Returns and Dri%ovays (6"), including necessary materials for placemen, of SY 255 $4508 511,475.0 255 545.0 $11,475.0 concrete alley returns and drivemvs. as complete and in place. per square ward. 25 Concrete Riprap (6"), including necessary materials for placement ofconerete ripmp. including Sy, 1370 $42.93 $58,814.10 1370 $42.93 $58,841.10 la wall foundations, curbs, "prom, sloped ramps, ctc., complete and in place. per square yard. 26 Stone Ripmp (Dr3)(Protalion), including necessary materials far placement of ripmp, complete CY 180 549.0 58,820.00 180 549.0 $8,82000 and in place including filler fabric, per cubic ward. 27 Culvert Pipe (24" RCP), including necessary materials, Pomished and installed. complete and in LF 406 5671.25 $27,70.30 40 S6ri.23 $27,70.50 place including excavation and backfilling, per linear foot. 28 Concrete Safety End Trounent (for 24" RCP), for Parallel culvert, including necessary materials, EA 2 $1,326.35 52,652.70 2 $1,326.35 $2,652.70 furnished and installed complete and in place, per each. 29 Concrete Safety End Treatment (for 24" RCP). for Crossing culvert, including necessary materials. EA 3 $1,326.35 $3,979.03 3 51,326.33 53,979.05, famished and installed, complete and in place, per cath. 30 Permanent Turf Reinforcement Mat (Tensa SC250 or equal) including necessary materials and SF 20300 53.65 $74,05,00 2030 $3.65 $74,095.0 equipment for placement of Mal. complete and in place. per square vard. 31 Concrete Curb Inlet (10 fl ), including necessary materials, famished and installed,nd complete a EA I $2,%%7.50 $2,887.30 1 52.8%7.50 $2,%%7.50 in lace includingucavation and bmkfrllin cath. 32 Precast Reinforced Concrete Box Cut%crl (5'x 3'), including necessary materials, furnished and LF 105 $225.75 523,703.75 105 $225.75 $23,703.75 excaation and backfilling. per hour foot. installed, complete and in place includingv Safety End Treatment (for 5' Span, Y Headwall) (3 1) for Parallel culvert, consisting of reinforced 33 concrete hudwmll/wingwalls and pipe runners in accordance with plan details, including necessary EA 1 $5,00000 $5,000,00 1 $5,(0.0 $5,00.00 materials, famished and installed, complete and in lace, each Safety End Treaunent (for S' Span, 3' Headwall) (6:1) for Parallel culvert, consisting of reinforced 34 concrete hudwmll/wingwmlls and pipe runners in accordance with plan details, including necessary EA I 56,00 0 $6,00.0 1 S6.0N,0 $6,01X1,0 materials. famished and installed, complete and in place. per cath 35 Adjusting Valve Boxes, including materials, including backfill as required, and for excavation, EA 6 5130.00 590.0 6 $150.0 S90000 [Dols, equipment, labor and incidentals, per cath valve adjusted. 36 Adjusting Manholes, including materials, including backfill as required, and for excavation. tools, _ ._ _ ._.__ __,.__.,_._._ __ __ ,_ __,__ _,...__, EA 2 SI,00.0 $2,00.00 2 51,000.0 52,000.0 2 aF3 Milwaukee Avenue and 98th Street December 17. 2012 Paving Improvements - ALTERNATE Revised Eneineer's Opinion of Probable Construction Cost REVISED COSTS ASSOCIATED WITH ILLUMINATION CHANGES Item No. Description Unit Ongmal Estimated mcd Unit Price Extended Rcvised Estimated Unit Price R cyixd Extended Quantity Amount Quantih Amount Illumination Pole AssembhTt. V STk30T-8)( 25 KW)S Pa7menl will be made at the unit price 37 bid per each roadwa) Illumination assembly installed, including famishing, installing, and testing EA 57 $2,467.50 $140,647.50 41 S3,24501 $133,045.00 lurn-cs per cash (Speeificed STEEL) Doll Shall (Roadway Illumination Pole)(30" Diameter), including full compensation for excavationfurnishing placing and removing casing (if necessan), furnishing. processing and rmovenng slum (if ncrossan), pumping, famishing and placing reinforcing steel. famishing and 38 placing concrete, including additional concrete required to fill an oversize casing or oversize LF 484 SISI 25 $63.523,00 3211 $13125 S43.o50 00 excavation conducting slump loss tests, backfilling, disposing of cullings and slum, and materials. tools, equipment, labor, and incidentals, measured by the linear fool of drilled shah indicated in the plans Conduit (PVC)(SCHD 40) (1 5 IM(TRENCH), including full compensation for furnishing and installing conduittrenchmg/cxcavating and furnishing and placing backfill, replacing pavement 39 structure. sod, riprapcurbs, or other surface, marking location of conduit, furnishing and LF 12671 $3.31 $41,941.01 a 53.31 S0,00 installing fittingsjunction boxes and expansion joints. and equipment, labor, tools and Incidentalscoat ktc and in place. r linear foot. Conduit (PVC)tSCHD 40) (2 IN)(TRENCH). Including full compensation for Ihmishmg and installing conduit. trenehmg/excmating and furnishing and placing backfill, replacing pavement 40 swcture. sod. nprap, curbs, or other surface. marking location of conduit, furnishing and LF 5002 $3.41 $17,056.82 115.1 $3.41 539,290.02 installing fittings junction boxes, and expansion joints, and equipment, labor, tools and Inndentals com letc and m lace per linear fool 4 I Elec Conductor (No %) (BARE) including furnishing, installing, and testing cleetrical conductors LF 12671 $0.63 57,982.73 0 $0 63 EU 00 and for equipment labor.tools, and Incidentals, per linear foot. d2 Elm Conductor (No 6) (INSULATED), including furnishing, installing, and testing electrical LF 25342 $0.79 520,020.18 11 $0.79 $0,00 conductors and for equip mcnt, labor, tools. and incidentals. acr linear foot Elm Service 7% A (240 480) 060 INS) SS(E) SP(0) This price is fu€l comps -acIn for ,3 firmAmS and instilling pavan; all Rcs. pertnits uual othcrcats, n+:kinganaa�nts with Tho ' EA E3,360.W $6.720.04 $3,360.00 $6,720.00 unlit) company for all work and mau:riaLs provided by the uninv cnmpar), campine en plxe_ per each 44 Ground Box T) A, complete in place inc ludmg furnishing and pla,Ing gravel bedding all labor EA 71 5393.75 S12,2G6.25 S $393.75 $1,968.75 and materials. pereach. _ 45 Ground Box Ty D, complete in place, including furnishing and placing gravel bedding, all labor EA 27 $446.25 $12,G48.75 27 5446.25 512,048.75 and materials, per ench. 46 Ground Box Ty I (ITS). complete in place, including famishing and placing gravel bedding, all EA I S3,675.00 53.675.00 1 $3.675.00 $3,675.00 labor and materials, per each. Conduit (Rigid MelaI)(2 IN)(fRENCH), including full compensation for famishing and installing conduit; trenchinglexcavaling, and famishing and placing backfill: replacing pavement 47 structure, sod. riprap, curbs, or other surface; =king location of conduit: famishing and LF 5 $10.50 $5250 5 $10.50 $52.50 installing fittings, junction boxes. and expansion joints: and equipment, labor, tools and incidentals, complete and in place. per linear foot. Conduit (PVC)(SCHD 40) (2 IN)(TRENCH), including full compensation for famishing and installing conduit, tienchinglexcavming, and famishing and placing backfill; replacing pavement 48 structure, sod, riprap. curbs, or other surface; making location of conduit; famishing and LF 77 S3.41 $262.57 77 53.41 5262.57 installing fillings, junction boxes. and expansion joints, and equipment, labor, tools and incidentals. complete and in place. per linear fool. Conduit (PVCHSCHD 40) (3 IN)(jRENCH), including full compensation for famishing and installing conduit, vonchingfc-,;fling and furnishing and placing backfill, replacing povcmenl 49 structure, sod, npmp. curbs, or other surface, making location ofconduit; famishing and LF 46 $420 5193 20 46 54.20 $193 20 installing ratings, junction boxes, Quid expansion joints, and equipment. labor, tools and incidentals, complete and in place, per linear foot. Conduit (PVC)(SCHD 40) (4 IN)(TRENCH), including full compensation for famishing and installing conduit; trenchinglescavming and furnishing and placing baulk: replacing pavement 50 structure, sod. npmp, cubs, or other surface; marking location ofconduit; furnishing and LF 58 $4.99 $289.42 58 54.99 $289.42 installing fillings, junction boxes, and expansion joints; and equipment, labor. tools and incidentals, complete and in place. per linear joint. Elm Sen icc Ty D (1201240) 060 (NS) SS(E) SP(0): This price is full compensation for 51 furnishing and installing paying all fees, permits and other costs, making arrangements with the EA 1 $2.940.00 52,94000 1 $2,94000 $2,940.00 utility company for all work and materials provided by the utility company, complete in place, per each. Small Sign Assemblies, including necessary materials, fumished and installed, complete and in 52 place. The unit price bid shall includes sign, post, concrete base, plaque, accessories, excavation' EA 30 5603.75 $18,112.50 30 5603.75 SI8,112.50 fulling, backfilling and all incidentals necessary to complete the work per each sign complete in lace. 53 Pavement Makings(4")(Whitc)(Broken)(Thcmmpkaslic), including necessary materials, LF 22169 $0.62 $13.744.78 22169 S0.62 513,744.78 famished and installed, complete and in plam. per linear fool. 54 Pavement Markings(4"xWhile)(Solid)(Tliermoplastic). including nocesway materials, famished LF 7580 E0.G2 54,699.60 73%U $U,G2 $4,69900 and installed, complete and in lace. linear fool. 55 Pavement Markings (I2")(White)(Solid)(Themwplastic). including necessary materials.Punished LF 862 $3.68 $3,172.16 862 53.68 $3,172.16 and installed complete and in place. perr linear fool. SG Pavement Makings (4") (Yellow) (Broken) (Thermoplastic), including necessary materials and LF 14341 $0.62 S8,891.42 14341 S0.62 S8,891.42 incidentals. furnished and installed, complete and in place. per linea foot. 57 Pavement Makings (4") (Yellow) (Solid) (Thermoplastic). including neeessary materials and LF 22147 $0.62 $13,731.14 22147 $0,62 $13,731.14 incidentals, famished and installed complete and in place. per linea foot. 58 Pavement Makings(8")(White)lSolid)(Thermoplastic), including necessary materials, furnished LF 3472 $1.07 $3,715.04 3472 SI.07 S3,71504 and installed. complete and in place. per liner fool. S9 Pavement Markings (24") (White) (Solid) (Thermoplastic). including necessay materials and LF 267 57.61 S2,03I.87 267 $7.61 $2,031.87 incidentals, furnished and installed complete and in place. per linear foot. 60 Pavement Makings (Arrow)(WhileX hemioplastic). including necessary materials and EA 27 $126.00 $3,402.00 27 $126.00 $3,402.00 incidentals. furnished and installed complete and in place. per each. 61 Raised ReRectorind Pavement Markers (CL B)(Type I -C-R), including necessary materials and EA 954 53.68 53.510.72 934 $3.68 53,510.72 incidentals, furnished and instakkd, com Tele and in place. per each. 62 Raised Rcflmtori.M Pavtmenl Markers (CL B)(Type 11 -A -A), including necessary materials and EA 1035 $3.68 $3,882.40 1055 53.68 $3,882.40 incidentals. furnished and installed. complete and in place. per cath. 63 T. u: Buttons (4 )(WHITE), including necessay materials and incidentals, famished and LF 197 $3.68 $724.96 197 $3.68 $724.96 installed, complete and in place. per linear fool. Tempomry Raised Refcclurized Pavement Makers (CL B)TI)c I -C-R), including necessary 64 materials and incidentals, furnished and installed, complete and in place, Per cath. Placement is EA 30 $4.73 $N190 30 $4.73 $141.90 po ry' markings, including but not limited to solid markings, double for temporary construction parkin nuarkings. and broken markings. Temporary Raised Refeetorimd Pavement Markers (CL B)(Type II -A -A), including necessary 65 materials and incidentals. famished and installed, complete and in place, per each. Placement is EA 132 54.73 $624.36 132 $4.73 $624.36 for temporary construction makings, including but not limited to solid makings, double markings, and broken markings. 3M3 Milwaukee Avenue and 98th Street December 17. 2012 Paving Improvements - ALTERNATE Revised Engineer's Opinion of Probable Construction Cost REVISED COSTS ASSOCIATED WITH ILLUMINATION CHANGES Item No. Description Unit Original Ext nested Unit Price Original Extended Rcriscd Estimated Unit Price Rcriscd Extended Qraniti } Amount Quantiip Amount Temporary Traffic Buttons (4"RWHITE). including necessary materials and incidentals, famished 66 and installed, complete and in place, per arch. Placement is for temporary construction markings. EA 8 $3.68 $29.44 8 53.68 $2944 including but not limited to solid markings, double markings. broken markings and stop bars. Temporary Traffic Buttons (4')(YELLOW), including necessary materials and incidentals. 67 famished and installed, complete and in place, per tach. Placement is far temporaryconstmetion EA 526 53.68 S1,933.68 526 S368 $1.935.68 markings, including but not limited to solid markings, double markings, and broken markings. 68 Barricades and Traffic Control Do ices, including famishing and installation of materials and MID 12 $2,625.00 $31,500.00 12 52,625.00 $31,500 W remaxal thereof, per month. SWPPP / Temporary Erosion Control , including necessary materials and coordination for 69 compliance with storm water regulations nail ordinances. famished and installed, continuously LS 1 $78,318.50 $78,318.50 1 $78,318.50 $78,31850 monitored complete and in place. per Imp sum. Irrigation System - (Maintain Existing), includes preserving the integrity and operatiowl capacity of the existing irrigation in the areas adjacent to the Right of Way. Includes repair of the existing 70 s)stem which map be damaged by couuuction of rima sidewalk, mmmal, relation and/or LS 1 $2,415,00 $2,415.00 1 $2,41500 $2,415.00 mplacemrnt of the existing PVC mainline piping that mar be tiBccted by the goading work and/or su. construction, in shown on the plans. paid as tum m Pcatat Seed including necessary materials and equipment for placement of seed and mn 71 establishment of gross from the seed. vegetative watering and weed control, complete in place, per SY 33800 S1,61 564,418.00 33800 $1.61 $54,418.00 square yard. 72 Mobilisation, including costs associated with roma-in related equipment and labor, bid bond. LS 1 5424,022.00 $424,022. W 1 5424,022.00 5424.022.00 and construction bonds, and insurance. per tum sum. _Lafomance Conduit (PVC)(SCHD 4u) (2 INR BORE), including full compensation for furnishing and insallmg conduit boring and fumishmg and placing backfill replacing pmcment suucturc, sod. 73 npmp, curbs. or other sarfxe, making location of conduct. fumishmg and rmtalling fittings LF 0 50.00 I9t1 S1c..ca $3,135.00 junction boxes and cxpansionjoinis, and equipment, labor, tools and incidentals, complete and in lace ger linear foal 74 Elm Conductor (No 2) (INSULATED), including Furnishing. installing, and testing electrical LF U -- 50.00 137811 _ 53.115+S[8.452.50 S42.029.0U conductors and fore ui ment. labor, tools, and incidentals. per linear foot Elm Conductor (No 2) (BARE), including furnishing, installing, and testing electrical conductors _ 75 LF 0 Sti.0D 67111 52.75 and for ui menl labor, triols. and incidentals, r linear foot. SUBTOTAL ALTERNATE DI D (ITEMS I - 72): SUBTOTAL ITEM 01 - #72: SUBTOTAL NEW ITEMS #73 - k75: SUBTOTAL ITEMS 01 - H75: Original Alternate Bid Price New Alternate Bid Price Difference: DOLLARS (5 i. S 5.670.44450 (5 DOLLARS (S )- 3 U W (% DOLLARS IS )- 5 5,670,444 50 IS $5,670,444 50 $5,648,035 28 -522,4119 _2 )' $ 5,584,418 78 )• S 63,616.50 )- 5 5,648,035 28 M. 7L\2006\269706\CNID\W-SKETS\Pmkege 1 059_2693-YLNpp01-A.l.egn I •VJ u C1l J wcm 4W01 X08 LA .' x LAJ _ v0 _,cv� LA L4 0=mac m.NjmMW v N� LA �. �C37 M Z �Oo m� 3 m v CD r 3 �_ Ln oCD CD p I cn (� Oh I I I II C/) =r(D 83:8 •83:8 STA 59+50.00 I8. RT) i STATZ- 59.50100 (9.16 LTI ' i .283 89 I ,283 B9 BEGINT ASPHALT ' BEGIN APHALT cl) gm gm BEGIN TAPER i I li BEGIN TAPER Q rnI Ln "�� II CD CD + LM 3 7 I o ni I ,283 93 z 3,283 93 , o y - Q CD I I I to I I 1 I I I! 2. .28396 a 3,283 96 o ND TTI APER I, i EN�TA)' RY00 d19.00.LT1 = � I x w I x w 38.II Q rn I a I m + 14 I o Y .283 06 I o m ,283 06 I o m O I I o II Q p I u I x CD ,283 56 I I N 3.283 56 I I o N II I rn N l a a c o 3.28300 1+ 'om 3,28300 4 x o++, T ro ) \ o A 1 1 M I I CENTER OF RADIUS t- — I - o. 3.28219 �. � ,282 19 LA < < :- m H m N �-Ni \ m N .._ 114TH J % PI Slo. 62 0.92 c'• ~ ~ �' I o .p I + O 3,281.4 m �+ I o o, •o0 3.281.4 rn + 0 o .281.9 ,o w L. K o v 0 .281.9 ,o w In o 0 o• � x v v ------_--_ _ TA6 + 7 99 LTI --__------- _ •281.1 r Ln .281.1 r m -+ I IUs STA 63• (59,00 RT) I ,261.4 1 I N a •281.4 1• y N m I I I m 0) I I I mw I mw ^^ I N 7 O :) .281.9 I 0 3,287.9 0 ,� ,� I { ; o o ! 3.28089 c� nl 3.28089 • v N N CD �J 0 i I Q Ln N I. ern U) �� O XQ CA -' —I u -' —I O) N O 0 c') D C I N CD iv .281. C.3.287.8 —{ $ -Im .28054 .2604 om, CD X + SS 0)I IE a' fl7 I I Ut 3.282 1 6 m 1 I m CED -I CD + r I e p ,282 O6 .282 O6 w CD I I I oo ! r I .280 19 < -D 328019 < o I < I , 1 CID m r o0 x .Zl a I I I .ZI I a w -tni O w x Iii Q STA 5+5 0 I1 0 RT) I C ' STA 65+50 (10 119,00 LTI I �EGftr RII515 5.282 24 rr — 282 24 N c I N _ I .279 84 s c c M .279 84 c N x I o r nI � o o I o I + x , I m I �m (� .281. 4 I •281.4 I I o < CA 3.27977 I •279 7T I r,' X I d ! N= N N CD I �' I m`°mm3 X O) CD CD �< .281.4 I ,281.4 I O I i 7� 7 X CD I ' a ,279 69 I .279 69 1f I r m .N+ OD 11 I I I I Q. X. 1 I I Cp C- 0J N CD I I po 5,282 7 I , q I .�-, N , OD N D .281.4 .281.4 CSD G' Q N O c) i I i o I - O 3.27961 I 1 .279 61 1 I cr r , I I 7 Q CD I < < CD X I , m r CD N I 3.28064 I .28064 I rm- a CD Cn I .279 54 x l a p ,279 54 ,279. t x l N p D T d 0) RT) 1 1 X STA.. 7+7 44- T (P Imm o I mm o " END -� - END ASPHALT O I I i ^' I Q i =� 1 m CD E D TER �m I BEGIN CURB b GUTTER I 0O D :) 3.280 40 le 79 x ,7.F TJ I , o ,279 46 I l 3:2 46 I I X -gyp _0 I C3) O o I X I I I I O X I I 3: --:Z (A 3.280 .279 30 36 ) I 3.260 ,279 30 36 X cn I �-' Cn O � I I I I CL co N; D g x I I 0 O— X — CO °) OD I mN E-, 3E w I I r -I Y I`f I ! LA o+ n 1 3 4 1 •20020 O rOCD,28020 0 I1 1 Imo0 nr JD - .29 26 I zz 7 329 26 m~ 7 m CL7 r + mm I I ~I g P. "71 i N - I I ,Fl •� I I '� •m Z 1 I C C ti 4 .5' .2801(1 c I 3.28010 .279 16 I 3.279 t6 I �' m I fL 7-B-- - B A CD I I I I + o 0 , � cl)v p + -I MATCH LINE STA 70+00 3.279 06 3 279 06 , Q � _ �, �� 133 N — m u a w ni EXIST P ROW EAST EXISTI ROW WEST X O) CD CO ,op +, w ct n '+ct ow O {� w {� Ln rn <'� )( (3) -f mZ�m ��noOi ppm i +mi m•I ��mi PROW GUTTER EAST PROP q GLITTER WE ;T = N = 3 -• < z 3 -A pz m to pi m r Q, m Z n zm ay �im� fTl -,a E�o� mom CJl 'nr>�y y '0) r + y� Z. 'm Vl r' mu12'i~� ��� N. D A .62p .'pOti-� M.62A I— -C7 -�mct? �lssym mLj Zmm OD N o0O CD �p aaa � nth AO 'O~'z��E �$ pig z , (� o Cm0 Emm� m, o O 0m Q 8 bg �Z�i 2��� a =i> mz' (n Og0 u•�'x -m a� WOOpW Op ppx D Z m Z m z m 1 i 'n 1 m CA cn;Uz 1l IIII =m0 mr2 o j0� 00 ozim �$ �Zr Z m 'H & COOPER n: LQ WE J wcm 4W01 X08 oZ— >— ZvIF�� >Z .' x _ v0 _,cv� p�-1 Sm 0=mac m.NjmMW v N� 0m<00 �. �C37 M Z �Oo m� 'H & COOPER n: LQ WE N %:\2009\259105\uoo\00SIcn5\tae 1)om_2593-ULWppa2-ALi.agn ' Fl] r•I n C+J 0 (_ m p WN 0 Z- D LA LA 0-1 -1= L4 L4 --1 Sm m c-Nm�W LA N� L4 LA L4 3 M mZ iO F1 m N H /7 00 cn �„ °� W C? ° °' CCD <: CD cn --I> Iv 02 -n au v D sy c v ' CD r- O =N ---I -4 0 ., p CD 3 CD CO p�j co r1a 0 + CD < 0 =' CD CD CD n o MATCH LINE STA 70+00 < X. ° � z + ,280 00 3,280 00 cn c < < N r + o CD �, C1 CD Q .279 06 I I ,279 06 I I C7 0 -0 o = O, iD I - C O Q I I I (Q 0 I i co I CL O0 p' I 278 96 i i ,2TB 96 i r OCp CD cD 0 CD I ICD J I I (p X 0) I 0 O 27980 I 1 81.3 3.279,80 I I I I C-)+ r I CD 0 O ,278 86 I I 3.27886 I I I ❑, I I I I I I cn I STA 71-95.08 (4IU 5 T 3.27970 I TO I Cn i i CD �- .278 76 I 278 T6 I I I 1 I I N r - A T A T •8 4 Ll T05 I N 2 0 1 I 280 2 1 I y D CUR8 IU4 N 3.27960 .278 66 I ,279 ,2TB 60 66 I I rro STA 7? -16,58 154 99 LT �- o WAY CD I I I I I . EXIST I TIE TO I I I zz ,27950 56 1 I ,27950,278 ,278 56 1 I / I I �Ak 2+3 10 144 50 l,Tl e�pjS_ W p 1 I B7 6 ` I / Lw ` (4450 LT) c TACURB RADIUS .279 40 1 ,279 40 I I I O ,278 46 I I I ,278 46 i I I I TA T}'j.Q,B .X54_.01 LT) ( I ND CURB RADIUS I cN a� a N I I STA 73+ 0 - 1 I I i TIE TORIEX ST 3.27930 278 36930 :278 35 1 I g� x �I I I I I r1� m -� -� I < I , TA 7 +4,7 A +O 281.3 11.28059 < ® I I ,279 20 I ,279 20 I I ((�a g�� t o TAOP R��2A51US O L O ,278 26 1 om ,278 26 1 ®^+ I I j I I Oy I I EC7 I I Ym I B i6 z c i :2 I I 3,278116 1 I I I i I i STA 74.9688 (44 50 LT) 3 + zB1. 1 I E.280.29 I I I 1 O :278 O6 1 :278 D6 I I A i o I T T+ 4 7 7 `� o N U IU O I fTl I I I a, I I D (n m I I I m I I I j! ETA TR•3 (65.90 T I 1� MBA ' I TIE TO EXIST ,277 96 c I I (7 3:277 96 c I I O X EF aC �� TF�iY[IRBAAOIUS'`L`7 �1 5.28121 1 A I I I 2B0 56 a I I I I -I C7 O _ -I 0 m O X I ... ' Ir m j O .278 BO 2TB BO r — CT vi I I I TAI 75+7 0 (44.50 Tl O .277 B6 1 3,277 86 I (D : rv n _ - cn I I I I o O I I I I cr O CD CD O I I I i� D 0 10 � f,1 7 •_ I 4.5' 4.5' $ m 27870 .277 76 i I I m 327870 .277 T6 i I I r fl -> m �' O) = N x m _ M > _ B O B= i cn cn CO v I I I I CL cn D —I r + I ? D —I 00 �I � .28O J93 I I b.280,28 I I m ? v CD cn O V, j C2 + ^ �' -- -L O C.fl + C) �_ ' p -h + .278 .2TT 60 66 I ,278 .277 60 66 I I N CCD >CD N .-t I 1I 'D W Q, -4 Q .�., �` I ! 0 r _ C) (n D D (D CD -0 v o CD —ly -� -j m �-4 .Ar �-h + 0 ° n m 0 � Cn , 0 0 x X N G• '� + "'� r. I 0` r I -n .278 50 56 I 3,27850 56 I .277 I .277 I o rr �, �' S r T r 1 c>� Q cn Cfl j CD ! - O + 3.280.93 I 3'280[T I O � X ;u �' O 3.27840 .277 46 I ,278 ,277 40CD 46 I O n •o I i r n O 0 m I I I r n C 1 A I I 3,278 30 I ,278 30 ,277 36 ,277 36 i i i I A0TH ST co 3.28025 I I 1 + CD :27726 I I I I 3,27726 I �Cn v v O O ,27810 .27715 I .278 ,27716 10 I D I '� '1 -� v + N=z� I I Ln OD I I I OD x + In 80 6 1 7 74 1 01 O CU I. ' o I' [ 2 O 3,27800 ,277 06 I I .27800 .277 06 1 I (D (D 0 ---I + 1 a al (n O CD l Cn I r cn 2 v= 7rn w CJ9 I I I I N CD 0.1 o 0)—m`D v+ D CD m m I (n - '' I 3.27790 .27696 I I .277 3.27696 90 1 I O O �" Q. ____ rt O X ()D Q X O ri rI + i i i i CL I > O N CID I 41 I I co79 O I O O v I CD Q < CD + O U7 + X X ATCH LINE m 'TI N 0) 0 O + IT m `D :2 686 3.277 3.27666 80 c) p6 r mw N cilEXIST ROW EAST EXIST ROW WEST 1"c) n o o w A :0 -+� m +i [� N AAC T r, -+ mOP CD PROP GUTT R E T PROP GUTT R WET ao� 51 m x - A000m AIE Z Nom n �Mw O= -i- �'yy////��Z3m (_/% 9 W CD O [nom AA mN~� VE� E0 NC�0. DQW 00 N CD 3 DDr� mn Nmp@oOX ` Ommo Z [� O1 X =)0) Op�umi cz oA.,g 02 < � �g g O) -, O CD iD K CD "i CJl m pA m � X O O m m m >A O� m p m C- , gg �v=Ij < A K ppppm Z n m m < 0) .0+, + gA= pp"Am m < U3 r ©�� Nom= �= n�= (O > H EA (A 1 m mc) mr—_ � O� C) ►\)D� O—m -n0X $ Azr '9 Z m 6 rr V., 03 let, 7`� E 01 ie'' CU �, 0 Ilf - • ? og r $$pypYD rl >� s�ARKHILL SMITH & COOPER pQ 41 WA 0 (_ m p WN 0 Z- D 0-1 -1= m=7 r. --1 Sm m c-Nm�W N� 0m<00 Zm n �C3� � M mZ iO F1 m N H /7 6 rr V., 03 let, 7`� E 01 ie'' CU �, 0 Ilf - • ? og r $$pypYD rl >� s�ARKHILL SMITH & COOPER pQ 41 WA X.\2008\269106\OIDD\00SIEETS\Peckoge 1 061-2693-YENpp07-QTAp u LTJ C7 n OODF,M0 Z 0 :*r- < 44W o (D > 0 0=mac LA LA Om<0O �mm� LA OR, m Z � L'i Jn CD Ln 3 v CD �CDr 3 -1 °D MATCH L INE STA 81+00 o m* `D 27, 276 80 I 3: 76 B6 c ID CD I I CD 0 O = .276 TQ I 3,277 76 I I I cq a- ,276 76 I I 3,276 76 1 I I = CD 00 i I I I i 1 II II c N I I I I O 276 0 I I 3.277 3,275 60 66 I 1 I LN o I (7 CD O I I �] CD I I' !I = ,277 50 I 3,277 50 I I ,276 6 1 1 3,266 56 i I I I I I CD CD ' I �m I� 00 + O ,277 40 46 I 3,277 3,275 40 45 I f7l I X o ro 11 Q O .276 1 I I 11 CD 1 fl i t n nl o m .277 30 9 1 3,277 3,275 30 29 1 cr X I N I I ,276 1 1 . 0 CD OD o 0 x m o CD a- o 1 r 17A BQP 1 x O) LU °1 r I l a + + 9 c v I N 3,276 20 o v 1 7u N p- (D I a r Uj O ,27MM < of + I Ir.-'• I 3,275 98 < of + 1 I j O N N I o ' �< .�.. � i-1 m o, n m o (D (=D ^ I 4.5' 4.5' I I £ �" U) v D �:'V m (D O- 1lJ m I -B -B i� y a7 - -� 2 1 3,276 52 I (O/1 D CDD 1 + ,276 ,275 52 I I 3,275 52 I I O) -o D n ' I I m n O CD 1 1 II 3 Z3 D v A X �� r I, II CD o a +O 3,277 ,275 274 85 92 L. 3,2 4. 2 3,275 3,274 4 85 92 E ,2 4.92 { Cn O X X (A O I III -0i11 -�T y 1 (71 O ;u I �` I ,27518 .274 25 1 1 3,27518 3,274 25 1 O n I II x � I I I I I 1 O I r r 0 r I I I STA 86-48 0'yy_�(�p4�4,40 {,TJ a -IN, IL FUS` 3,276 12 4 ^ ' p ,274 51 I 3,274 51 I I 1 TA 4 254 1 LTl O 273 57 i 1 n I 3,273 57URiW 1 I N I I x_ I U) O-- S O \ I STA 06-64,48 ta459, ,•TI I I 1 I -�+ ❑. ,-,. I D V I ND DRIVEWAY , iE�XiSrT -4 W N aT ` I I - 1 ' ,263 ,272 84 0 I I I Gi 3,273 3,272 84 90 1 I n p x� x + I I +70, 4,�IuS�_l 02 I ' OD I I 11 (D p O ' � STA 86 '0 (44.00 61) 3.775 1714I I C (D -++ + I I 1 �' GIN CUB iU + 272 3 I ZJ 3.273 16 1 I N O) n I r+ i t 00 3,272 23 < r I I , STA 87+ 4 (44 SQ LT1 / T (D I I 8 ,' GIN - RADIUS I gm 1 x O O -.27249 ,271. 6 1 01 t r 3.272 3.271.6 49 I _ I F 1 I TA 8T+ 4 41 4 T I M M E I M AY TIE 0 EXIST ry 00 1 z o m y 1 1 OD 5.274.1713 I I I TA 87+64 39 (3 5 T � ,2T1. 2 I I 3,271.2 y O 3.270 ,88 3,270 BB m I I I " TA LTI I I 187+74,50 I I II ' I I II ,271.5 m 3,271.5 .27021 I i 3,270 21 1 1 i i cc En co C1 I I I I (n -� (D CD Efl + 1 1 1111, 1 O II (D G 3 00 3,27048 .269 4 '^ p I 3,270 3.269 48 54 i CD 11 ' 5 1 r o I Q / rCD I I ' � CD CD CD CD3269 i O X 268 SO 1 / 80 1 e -r - 7 1 I 3268 87 j IQ ' I CL C3 O ZNI i I CC +p ,269 .268 3 0 1 3,269 3.268 13 20 I _ (nC O p o I I i O i 0 (D '77 O N= w I �I I I 1 1 O o ss G�� �+° I I .268 46 I 3,268 46 I O E/I O O 11 O CJ7 1 0) ,267 2 I I 3,267 52 I 1 cn c (n - -I + I * C (D II Cn 0) CD 3.267 T9 m m CD o �_ r+ I v 3 I O O .267 266 79 I 3,266 88 I O O � ( (� C O SI 1 SI I O v O I` CD (D I Q. CD >r 1 < o w x 1 1 a 0= Q. O I 267.tt N 9 m x I y o q 3,267 3,266 t2 N 39 rn I I 4 pCD p 0,, p X r 1 1 I i d .266 I m O I n LO m O N x l O n N x 1 C O (� CD (D 1 I O x I O O x I CD N + o MATCH 'I" 92+00 ,267 .266.10 ' 26TOI 3.266 10 LINE STA O m p a w N �i EXIST ROW EAST EXIST ROW WEST toO+10 00jtm0 Oto ogWp O m CC _ pC pm -1 m 9Illp N<Np m -+ m M m R PROP GUTT R EA T PROP GUTT R WE T m -+ p p-, om x = 3 Z 3 N m >m 00 Z m y- p N Z m m mm Z M m< m WAy �.il .Zm10 ErnOp m m�A _c caM =f INAm mC opQ 'mA z 00 O y1-y n-0> mlmny i1NDDg1 mm+n Zmm0 Nmo m0 r �k urmitnP�w no cOo�v g pig Z O mj Z 9 0� g i Z��g bg mpP N _ti ss < IC/1 pp+1 N C VI zs Mz- C UI m 0 IA �D �r0 2 02. N to OODF,M0 Z 0 :*r- < 44W o (D > 0 0=mac c- NmW Om<0O �mm� OR, m Z � a L (a4 'H & COOER RE X:\2006\269306\CA00\00-.SHEE75\Poekoge 1 062-2693-ULNpp01-AL1.dgn I F91 n I r-7 W �, 3 0 Ln J14- G 3 c N � CD 3 _� N MATCH LINE STA 92+00 0 + 267 D 266 o C=D Z 326701 :266 1 I Z61 3:26610 I I I I o 1CD ( 0 p„ T EL. .266. T L. .2� 6. I (p I 1 X I 326691 0 I 266 1 1 Y$ 00 cr .265 8 c -I I I 3:265 98 I 1 - (, O 4 I .50' 44.50' ' 1' po = CD LID A I '0 ®X I 1 em n Cn I I -6 ' a 6 lg �- m a- -0 O CD W .266 4 I �� ,268 8 W I Ifl pN 0� N = O 1° X X O X I' O .266 1 n 266 1 c _ OJ .�« C0C C� o CD ' O 265 BB I it 3 65. i 0 3:265 88 i 3.2 S.BB z 0 N = I ^ G 7 cr 0 -I, C- I p 01 r. '- ��� ' v �'y In CL - O 3:265 71 78 I I 3 Zb 3265 7B 11 CDD r N I - N = CA7 x; _ - 3 Q 11 0) r p + I N E a* (0 I I I I m Cn O I I O a xcc ,265 8 3,264H2 N D (CL D O I I ' a + 0 CD OO :265 it 3.265 68 1 I CD -0 (C] i o (D < (j1 < > Q - I I (D p Cr CQ 1 1 — (D a CD 1 1 X CID o 1 I I O -, c3)rn a I I I CD Q x sw. :265 51 58 266 3:265 518 1 I Ul C7 r I 0 W CJt / I ;u -•i O I w I 0 n- cn to (0 I I —1 —I n criII .265 5 I ,26314 I I O_ O r 1 ' --_--_--_ —I - 266.41 :265 48 3266O 3:265,4.'l C) (� I _ j r r o�� a i I 104 r G. N — Cp I 3.265 38 I I 3,26538 1 1 (07 (2 + I --------------- I r► 01 0) O I O (0 I I 1 O C2 - a, I 0) t0 .264 9 I ,26311 1 0) cD r+ I 'I O 2 3265 1 8 I 1 .266 3,265 , 28 I 1 rt•� 0) I U CIL I 1 + C S 0o un , - -I 5(o x(17 , II I i CD II I I CID �Q 1 ��� ,2 .26518 1 I ,266 3,26518 1 I I 01 n 0 I = O I CID I i I I + I' .n-. �. I I I O> N I r 11 t ,263 9 .263 , [D �' 01 rn .265 08 I 3:255 08 I I ' S CD m I CO I I D I I m , O N - N In I �I * 3.26498 3 Z65 3: 64 91 98 I 7 O C coOD .262 1 262 2 I ' m I' - 00 26581 :264 88 I '� ,264 88 .6 1 9 0 I I _ H- I �.O 1 I O O X .264 78 I I r- rn S. 3,2Y.T64 7B I CD 1 i I i m °3' O I I I 7 I .261. T 1 ,262 B 1 r I I O O .264 68 I 3265 3:264 CID I 718 3265 71 CD 1 3.264 7M, 1 1 3,264 78 I 1 I 0 1 I o -0 I O ,261.9 ,261.4 00 'D I I I I t O 3265.81 3:264,88 1 I 326 3:264 8 8B I X O O I I Cn - I I 02 1 I I ,2 1 3,2 91 X I I I I I I 3.26498 I I 3,264 98 1 I --I ° I I 1 O I I O 1 I r I I I I + .261. 0 261.0 r I - I 00 .266 3.265 O8 I ,2 3.265 i 018 1 I I I I I 1 I I I .266 11 ,266 1 I I 1 I O I I I .26518 i i 3,26518 i i I I I I 1 O 1 I I I I I I I IV .261.3 1 I .261.0 I 18 O .265 2266 I I ,265 28 I I 1 1 O 1 I I I I I I I O I :265 38 I i 3:265 3B I I I I I I O I I I I I I I I I I LAJ 260 1 I 261.4 o 5265 :26548 41 3255 .26548 MATCH STA 103+00 LINE m P a w N Ci EXIST ROW EAST EXIS ROW WEST 0!j I In 11 n 0 0 VI o Oo Om CC_AC Am �' D m m, p O po m w p m N m yy In < W p m to -I to m ' �1 z PROP r• GUTTER EAT PROP CUTT R WE T l x; -'<Z;cc N I•ID2m ay In ZIn mr �1m m Hg'DS A0=� Nm FmO.'O ,0.,mp, NKtp-1 N 1� mOO pj~mpA m,�., mN�.Tyy1 r"1 .1o$l Ca p.11 > 11 9mmC1 (A �mg y <� �,nP�N c1a jp'IE G O pig Z 0c0 O cm0 cm mD00 8 �33�� b� SANK NZ N LA LA Uj LA LAho gs oL.Q N =mn M r = O N p�D O—m n O ;a Azria Z m 0 W 01 Z 0r < AjW o o r Z 0= 7�O�C�mO gm c-U)Wm�� 1 N� Om<00 MZm0 C 3 O 0h M mZ E*1 f+— N H r 'H & COO ' ER W m 0_ MATCH LINE STA 81+00 �gr r ocozo a C -n r PC W I I I I I I �cEX mZ �Oo � N x a '^ .i M m _ a Z -Amo Z M Az5 ;g mC C i I mm m MATCH LINE STA 70+00 K2q Kr��= W m MN PAS A�L ..�� 11011 n 4 .. o z 49�Q� 1, z FRO'gilluliq 01 r PAS 9 0 ocozo a C -n 20m�m omAH �cEX mZ �Oo � N x a '^ =0 mm _ C N * c MC A 1 Nm0 4h z mC u 0 MATCH LINE STA 92+00 sZ I +1 0 N W 8 1 i 1 I ' $ II � 1 II � I � C C, - g II 8 1041W Sr � II 'I 8 11 'I ,1 II I I In .10 9 II I 1 I I r I I a 8 I I I I I z mr^II 8 I — --- � ,I I I I II I i o rl I MATCH LINE STA 103+00 Wg 0 F<4 zo ��� G)0 I I `m -Ni Mm RmzAoUan 1 C'S x M Z �� rn x MATCH LINE STA 81+00 ... � I17, ll�'l g oaa.OTs�� ski �tltc�y� ••.. i Z j..r''� n c n II 1 a s=d o0�l "I �I A I! � r m ( O TCH LINE STA 92+00 I I r ®® m 0 I m 1 z o oaa.OTs�� ski �tltc�y� ••.. i Z j..r''� �oo•zoz � I cc MATCH LINE STA 114+00 I g ' NSI I I snl ' j S j I I ' 98711 Sr - T I In 4 r -c mmoo Y m z m o C N I srn� I r - ILLI O I 'I z n 0 �o 1K I ^ Ain r l O y I m� aC, v ♦ 8 I z C- C 1 aN �C,li �Ig oa I II rx a S 98711 Sr - T I In 4 r -c mmoo m z m o C N I srn� y r - ILLI O 1 pa ^ Ain I I I C 1 aN �C,li �Ig oa I II a �1 1 I I, SII 1 II N ro Q ------------ - - - - - - - - - - - - - .. MATCH LINE STA 103+00 I I I I I ' I I I I I a� II I I ' I I I I I I o� 2 v°�z0 4 0Mr�0 7c K�f mmoo m z m o C M � srn� y ■ lis N MATCH LINE STA 125+00 II I c n � 5 c O y li I I m I I I I I - L J - M a u N .Wglu i ri� e� ggm`zzo81 3& P3R10lmz 5o OML t; -a —o4 n 0m C c-(nm•om M7 A00 �MCc mZ N I - P3 8 J H 94TH ST I I I I I I I I 92ND Sr l .`o u' y W tt2t Fq �'` z i••' 5 ,� OF 0 0 20 - & A m m .d .r a� �I MCC , i nmp i0Z 1 0 N N N N M i�w °maZo ��co�' � mgn��=3 v+m3>>�m3 �=7C�r O�m�c � o (A 0! N j 7 x n� ano^— � � w X,�, c �o � c e , X .dr � c�o �on.33f° ON. 0�3o �? 3 A Lo o moo o o q R 3 o m 0 N� H° n rn !� J ° > > 3 010 d V odo SE Z Iii m 0o � � ri A L m o as � — � o D d �. a » w v D a c � a a F f r T r T r T r T r T m D m D rn C D»� C r T r r T T r T r T D D D A G T T T T T ��TT''II H�TT11 //1111 c A D D D� 10 O�AO�F+N�O ? N tf� N � ~MA -°i. a N��O�!•�Nd3 O O �y O L A m m .d .r a� �I MCC , i nmp i0Z 1 0 N N N N T C i�w °maZo ��co�' � mgn��=3 v+m3>>�m3 �=7C�r O�m�c � o (A 0! N j 7 x n� ano^— � � w X,�, c �o � c e , X .dr � c�o �on.33f° ON. 0�3o �? 3 A D o moo o o 3 3 o m 0 N� H° n — m 3 ° > > 3 010 d V odo SE Z Iii m 0o � � A o m o as � — � o D d �. a » w v D a c � a f r T r T r T r T r T m D m D rn C D»� C r T r r T T r T r T D D D A G T T T T T ��TT''II H�TT11 //1111 c A D D D� 10 O�AO�F+N�O ? N tf� N � ~MA -°i. a N��O�!•�Nd3 O O O m T A eu Lr N N N N T C i�w °maZo ��co�' � mgn��=3 -�a �=7C�r O�m�c � o (A 0! N j 7 v � c ano^— 7 m� x m e �o � c e , X .dr � c�o �on.33f° ON. n � �? 3 A D o o N o o 3 3 o m 0 N� H° n — m 3 ° > > 3 010 d V odo SE Z /D m 0o � � A O_ iu m o 1 � — A O d �. o. .O•• v D a c � a 3 D vi r T r r T T r T r T D D D obi A T T T T T ��TT''II H�TT11 //1111 c G D D D� 10 AN c o N��O�!•�Nd3 m T A NNOO W W e+ » A p N N N N T C i�w °maZo ��co�' � mgn��=3 -�a �=7C�r O�m�c � o (A 0! N j 7 m — m 7 m� X�° e .�Z` n c e C a! X .dr � c ON. n � �? 3 A D o o N o o 3 3 o m 0 N� H° n 01 ^ A A A 300. � odo m_a � � O � N O_ iu m o 1 � — A W N 7 o. d O a ? � a � D vi rrrrrm��77l1rt+Ce T T T � r o�� zvr5� NTC N T i�w °maZo ��co�' � -�a �=7C�r O�m�c � o ��aom ���7C �+ a�i1Dc°-nyX� Q. m 7 m� X�° e .�Z` n c e C a! p N N N NTC N T C= — i„m � o a�i1Dc°-nyX� m 7 7 e .�Z` n c e C a! X .dr C c ON. n � �? 3 A D o o N o o 3 3 o m 0 N� H° n 01 ^ A A A 300. � odo m_a � � O � N O_ iu m o 1 � — A W N 7 o. d O a ? � a � D vi rrrrrm��77l1rt+Ce T T T T T D A T T T T T ��TT''II H�TT11 //1111 c d D D D� A A A C AOO�ONiOr W M A A N � w O N O O N A O N O N R p N N N N T C= 7 7 .�Z` n v C C a! X .dr C 3"� 3 3 A m o N o H° 01 o00 300. � O � p o � v r o. x D N aS� rrrrrm��77l1rt+Ce T T T T T D A C A A ja AOO�ONiOr W M a o`�a •� � i � �s ttl ,r.ta'Z N :D• ,�Y �� Yr�N W jrrri2aFF,� •� z � � �� iZZltl111'1ti�1' f7 m m r jI � Z � i xCD �7 F- n < < n y� g a e y A 0 0 m 0 0 rn p c7 0 S D m = � � r 0 o m o n rn N � o E O O O O � o � m D D u� co) m rn n W D Rf D p n • C r G) vvvvw'.im a z m N O rn V O � S u m n � O D m A d N u 5 m S CL D O p O m m p C m CA m En CD z �g Z �2 m r � r V4�411 r r r r r r r z n r r r r r r r r r r r r r r r r r r r r r r O N�N QQ oSo rpT4 > C It�O� O r r N ZA Cp1_ Cl rllm y Y y N 1 p S N o p c p0p 0�g�o7�i m _ .9 rm, •• a m ' Z G y A = y ��x N N N N N N N N N N N N S r m N N N N N N �m5 m m 'C It -pz� rn O oc=i�a�'c"�iocmi 4mmzspZgD'�o m m W m m m D D D D D D D D D a D D D D D D D D D D D D D D D D D D D > D D D D D C L S H 2 C Zp H T p Z � OpO yO p 9 0 PL m 0 A z A p �m(A^mmm �= r r mppC m ,y -a.� F in D D a a D D D D D D D D D D D D > D D D D > D D D D D D > > D D D D D D D g3mm y = •••yppp 6 Gl < D D D � CT. CT. x x x x CT. C x F x x x C 2 5 N x x C C C Z G 7C m rfin m �i m m m 7CC m 7CC m 7CC m 7CC m 7CG m 7CG m m 7CC m m 7Cc m m m m m m m m m TC. m m m y m m m g �n 7CC m m m 7CC rn X71 m m mJ m mN mom m m m m m m m m rn m m m m m m m m m m m m m ym yuy y O m r m m m m m m m m mt m mt � y o m u m V � N ! p V N S N Om ID V Np A 9==rp-4 a + m V W m LN N + m m m' L fV.f + i00 ppmt� m p m m p fJ y N Y N O m m+ V fr y NN O 1� p;in� m � �+ y tli (OV + O V ♦ O tNil N m � � O V > ig� z m N N 10 � Y O V b m N N t•OIO N .4a1 � V � m N N .4a1 2 OI IT 10 N N 4f Y V LT V V V _ $ V V �I �I V V J m 0 m 0 A m m m m 0 m m m m m m O m V O 08 O V V' O J (TI L m m Q! a Ql V LII t0 LD N OI �I V V GI G1 GI �l V CO ® T G1 41 W N to O O O O O �1 LA fo It C m m r jI � Z � i xCD �7 F- n < < n y� g a e y A 0 0 m 0 0 rn p c7 S D m = � � r 0 o m o n rn N � o E O O O O � o � D D u� co) m rn n W D Rf D p n • C r G) vvvvw'.im a N O rn V O � S u m n � O D m A d N u 5 m S CL D r � r V4�411 r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r O N�N > Y p c N N N N N N N N N N N N N N N N N N m 'C O m m W m m m D D D D D D D D D D D D D D D D D D D D D D D D D D D D D > D D D D D C H � �= r r D D a a D D D D D D D D D D D D > D D D D > D D D D D D > > D D D D D D D D D D D � CT. CT. x x x x CT. C x F x x x C C x x C C C Z G 7C m rfin m �i m m m 7CC m 7CC m 7CC m 7CC m 7CG m 7CG m m 7CC m m 7Cc m m m m m m m m m TC. m m m m �n 7CC m m m 7CC rn X71 m m mJ m mN mom m m m m m m m m rn m m m m m m m m m m m m m m m m m m m m m m mt m mt � m V � N ! p V N S N Om ID V Np A N + m V W m LN N + m m m' L fV.f + i00 ppmt� m p m m p fJ y N Y N O m m+ V fr y NN O 1� � �+ y tli (OV + O V ♦ O tNil N m � � O V > r m N N 10 � Y O V b m N N t•OIO N .4a1 � V � m N N .4a1 2 OI IT 10 N N 4f Y V LT V V V V V V �I �I V V J m 0 m 0 A m m m m 0 m m m m m m O m V O O J (TI L m m Q! a Ql V LII t0 LD N OI �I V V GI G1 GI �l V CO ® T G1 41 W N to O O O O O �1 LA ��l � Z � i xCD �7 F- n � Z � i m F- n < < n g a e y A 0 0 m 0 0 rn p c7 m m = � � r 0 o m o n rn N � o E O O O O � o � D D u� co) m rn n W D Rf D p n • C r G) vvvvw'.im a N O rn V O � S u m n � N D m A d N u 5 m S CL D