Loading...
HomeMy WebLinkAboutResolution - 2013-R0142 - PO - Houston Freightliner Inc.- Vac-Con Truck - 05/01/2013Resolution No. 2013—RO142 May 1, 2013 Item No. 5.17 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for and on behalf of the City of Lubbock, Purchase Order No. 31014513 for the purchase of Vac -Con truck with 9 cubic yard vacuum jetter combination unit as per HGAC Contract No. HT11-12, by and between the City of Lubbock and Houston Freightliner, Inc. of Houston, Texas. and related documents. Said Purchase Order is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council on m,,„ 1, 201-1 G *ROffERTSON, MAYOR ATTEST: Reb cca Garza, City Secret APPROVED AS TO CONTENT: I RC, &'I'f"l R. Keith Smith, P.E., Chief Operating Officer APPROV D AS TO FORM: Chad Weaver, Assistant City Attorney vw:ccdocs.fRES.Houston Freightliner-PurchaseOrd April 8, 2013 city of Lubbock TEXAS TO: PURCHASE ORDER HOUSTON FREIGHTLINER, INC. 9550 NORHT LOOP EAST HOUSTON Texas 77029 INVOICE TO: CITY OF LUBBOCK ACCOUNTSPAYABLE P.O. BOX 2000 LUBBOCK, TX 79457 SHIP TO: Page - 1 Date - 04/0&2013 Order Number 31014513 000 OP Rrnnrh/Plant 3526 CITY OF LUBBOCK FLEET SERVICES 206 MUNICIPAL DRIVE LUBBOCK Texas 79403 Director of Pdrehasina & Contract Ordered 04/02/2013 Freight Requested 09'20x''2013 Taken By D.TORRES Delivery PER M.TREVINO/REQ 41173 HGAC CONTRACT NO. HT11-12 Description/Su ; lier Item Ordered Unit Cost UM Extension__ Request Date Vac -Con Truck with 9 CY Vacuum 1.000 294,950.0000 EA 294,950.00 09'2012013 Jetter Combination Unit Total Order Terms NET 30 294,950.00 This purchase order encumbers funds in the amount of $294,950 awarded to Houston Freightliner Inc. of Houston, Texas on May 1, 2013. The following is incorporated into and made part of this purchase order by reference: Price Quotation dated March 20, 2013 from Houston Freightliner Inc. of Houston, Texas and Houston -Galveston Area Council (HGAC) Contract No. HT 11-12. Resolution#2013—R0142 CITY OF LffCK ATTEST: Glen C. Rebe ca Garza, City Secretary RGA CBUY CONTRACT PRICING WORKSHEET For INIOTOR VEHICLES Only Contract HT11-12 No.: Date 3/20/2013 Prepared: This Worksheet is prepared by Contractor and given to End User. If a PO is issued, both documents MUST be faxed to H -GAC @ 713-993-4548. Therefore please type or print legibly. Buying :City of Lubbock Agency: Contractor: :Houston Freightliner, Inc Contact Melissa Trevino Person: Prepared `:Michael McCarthy By: Phone: Phone: :713-530-8122 Fax: Fax: :713-676-1603 Email: ::intrevino@maii.ci.lubbock.tx.us mail.ci.lubbock.tx.us Ematt: EMike.McCarthy cr STRHouston.com Product F1=1Description: Code: 2014 Freightliner 114SD IX': Prki ct:.M6t:Bdse:ilnit Price Per Contractor's H -GAC Contract 85792 B :Pulillslied:Opt on9 Itemize below - Attach additional sheet(s) If necessary:=:Include O ...... ode:In:descriptcon if applicable. (Note. E ublished Qpttons are optiong Which were submitted and priced in �ontittCtoi's:bid ) Description Cost Description Cost 0 Air Conditoner 726 Allison 3500 RDS Transmission 7306 Air Cab Mounts 132 20000 LB Front Axle 2836 Tal ladegai'Air Ride Drive'nSeai 175 0 AM/FM Radio 225 0i91i1 0 VACCON 9 CU YD Combinatioin Unit 210,650 252" Wheelbase 1028 (per attached HGAC Worksheet) 7/16x3.5x11 1/8 Frame 875 1/4" Frame Liner 975 RH Outboard Under Step Exhaust with Vertical Stack 495 Vehicle Interface with PDM mtd EOF 645 Subtotal From Additional Sheet(s): 0 Subtotal B: '• 226068 E:::Unpublished Options:=.;Itemize. below l attach additional sheet(s): if necessary.:_ . (Note Unpublished options are items. which were -not submitted and 6rkW:in Contractor`s bi(L) .......... .. ..... Description Cost Description Cost Cummins ISC 350 HP Engine -9300 425/65822.5 Front Tires 1562 Subtotal From Additional Shect(s): Subtotal C: -7738 Check: Total cost of Unpublished Options (C) cannot exceed 25% of the total of the Base Unit; Price plus Published Options (A+B). For this transaction the percentage is. D •To1•al:Cust 6eWt :Ani :ApplleaW.T.rade-In / Other lUlawanc6/ Discounts (A+B+C} Quantity Ordered -IF 1 X Subtotal of A + B + C 304122 = Subtotal D: 304122 E. li-CAC Orden Processing Charge (Amount Per Current policy) Subtotal E: 600 F. Trade -fns iSpecial Discounts / Other Allowances/ Freight 7 Installation / Miscellaneous Charges Description Cost Description Cost Discount for Single Axle -9772 Subtotal F: -9772 Delivery Date:1 Ir G. Total Purchase Price