HomeMy WebLinkAboutResolution - 2013-R0130 - Amendment To Contract - Carollo Engineers Inc.- Professional Services - 05/01/2013Resolution No. 2013-RO130
May 1, 2013
Item No. 5.11
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock is hereby authorized and directed to
execute for and on behalf of the City of Lubbock, Amendment No. 1 to that certain
Contract dated December 1, 2011 for professional services, by and between the City of
Lubbock and Carollo Engineers, Inc., and related documents. Said Amendment is
attached hereto and incorporated in this resolution as if fully set forth herein and shall be
included in the minutes of the City Council.
Passed by the City Council on May 1, 2013
GLr."ROBfiff SON, MAYOR
ATTEST:
Reb ca Garza, City Secretary
APPROVED AS TO CONTENT:
pL�t
R. Keith Smith, P.E., Chief Operating Officer
APPROVED AS TO FORM:
ad Weaver, Assistant City Attorney
vw:ccdocs; RES.Amend #1 Contract-Carollo Engineers, Inc.
April 17, 2013
City of Lubbock, TX
Capital Project
Project Cost Detail
May 1, 2013
Capital Project Number: 92249
Capital Project Name: SEWRP Solids Handling Facility Improvements
Budget
Encumbered/Expended
Bid Cost $ 177
City of Lubbock Staff Time 24,816
Carollo Engineers PC Contract 10544 - Design 3,199,860
Cleanserve, Inc. solids building drainage inspection 2,925
Agenda Item April 11, 2013
Amendment 1 to Contract 10544 with Carollo Engineers 99,994
Encumbered/Expended To Date 3,327,772
Estimated Costs for Remaining Appropriation
Remaining Appropriation
Total Appropriation
1,672,228
$ 5,000,000
Resolution N0. 2013-RO130
AMENDMENT NO. 1
TO CONTRACT NO. 10544 BETWEEN THE CITY OF LUBBOCK
AND CAROLLO ENGINEERS, INC.
AMENDMENT NUMBER 1 DATED May 1, 2013 to the AGREEMENT between the City of
Lubbock ("City") and Carollo Engineers, Inc. ("Engineer"), dated on December 1, 2011 ("the
Agreement") concerning Southeast Water Reclamation Solids Handling Improvements Project
("the Project"). The Engineer has entered into the Agreement with the City for furnishing of
professional services, and the parties now desire to amend the Agreement.
Amendment No. 1 extends the Agreement an additional 30 days from the expiration date of the
Agreement such that the Agreement and Amendment shall terminate at the close of business
on January 31, 2014. City and Engineer have established a not to exceed budget of $99,994 for
Amendment No. 1 to complete all services under Exhibit A.
This amendment includes additional services to be performed by Engineer and provisions for
additional compensation by the City to the Engineer, as set forth in Exhibit B hereto. All other
portions of the original Agreement and previous Amendments shall remain in place and are not
altered by this amendment.
IN WITNESS HEREOF, the parties have executed this Amendment as of the 1 st day of
May, 2013.
CITY OF LUBBOCK
0
APPROVED AS TO CONTENT
By: . �.
o Turpin, ief Water Utility Engineer
ROVED TO ORM
By:
Chad Weaver, Assistant City Attorney
CONSULTANT
Hani E. Michel, P.E.
Associate Vice Pr ident
Scott Hoff, P.E.
Vice President
EXHIBIT A
AMENDMENT No. 1
FOR
CITY OF LUBBOCK
SOUTHEAST WATER RECLAMATION PLANT
SOLIDS HANDLING IMPROVEMENTS PROJECT
The City of Lubbock (CITY) retained Carollo Engineers (ENGINEER) to provide professional
engineering services to complete the Solids Handling Improvements Project at the Southeast
Water Reclamation Plant (SEWRP). During design, additional items were identified for
evaluation and design as part of this project as described in the following Scope of Work.
1.0 SCOPE OF WORK
The following Scope of Work presents the tasks that will be performed by the ENGINEER.
TASK 1 DELETE CENTRIFUGE PILOT TESTING
Based on the City's review of the centrifuge pilot test plan information and drawings of
mechanical and electrical modifications required for conducting this testing, the evaluation and
selection process for centrifuge equipment was modified to eliminate the pilot testing step. The
ENGINEER's tasks to witness pilot testing and provide services of a testing lab are no longer
required.
TASK 2 PLANT 4 SECONDARY SCUM SYSTEM MODIFICATIONS
TASK 2.1 DOCUMENT REVIEW
ENGINEER will review existing information, in the form of available plans and specifications.
TASK 2.2 DEVELOP CONTRACT DOCUMENTS
ENGINEER will develop Civil, Mechanical, Electrical and Instrumentation Drawings and
Specifications for construction of piping modifications to allow pumping Plant 4 scum directly to
Digesters 8 & 9. The civil drawings will be included as a change order package to the Digesters
8 & 9 Improvements construction project to be constructed as part of that project. The
mechanical, electrical and instrumentation drawings will be included in the Contract Documents
for the Solids Handling Improvements Project as follows:
1. Modify piping to separate Plant 4 scum pump discharge from WAS pump discharge.
2. Install new piping and valving, including motorized valves at Digesters 8 & 9 to allow
direct pumping of Plant 4 scum to the two digesters.
Carollo Professional Agreement
Page 1 of 4
TASK 3 DESKTOP NPW SYSTEM EVALUATION
TASK 3.1 SITE INSPECTION
ENGINEER will make one site visit to inspect the NPW pump stations, and other NPW system
components for which access is available. The ENGINEER will compare the actual field
conditions to the information indicated in available drawings. The ENGINEER will also meet with
plant staff to gather additional information about the system, including their observations,
operating practices and possible recent physical system modifications that may not be reflected
in the drawings.
TASK 3.2 DOCUMENT REVIEW
ENGINEER will review existing NPW system information, in the form of available plans,
specifications, and/or shop drawings. Information gathered will be used in development of the
static hydraulic model.
TASK 3.3 HYDRAULIC MODELING
ENGINEER will develop a static hydraulic model using Hydrauh)(8 , the proprietary hydraulic
model developed by Carollo Engineers. The model will be developed for the following condition:
maximum NPW flow to new Solids Handling Building and odor control facilities, and maximum
assumed flow to facilities at the Headworks.
TASK 3.4 LETTER REPORT
ENGINEER will prepare a 1 to 2 page letter report summarizing the results of Tasks 3.1, 3.2
and 3.3. The letter report will discuss limitations of the NPW system, if any are found, and will
suggest improvements that could be made to address limitations, and provide a planning level
estimate of suggested improvements. ENGINEER has no control over the cost of labor,
materials, equipment, or services furnished by others, or over Contractor's methods of
determining prices, or other competitive bidding or market conditions, practices, or bidding
strategies. Cost estimates are based on experience and judgment. ENGINEER cannot and
does not guarantee that proposals, bids, or actual project construction costs will not vary from
cost estimates prepared by the ENGINEER.
TASK 4 SOLIDS HANDLING BUILDING ROOF REHABILITATION
TASK 4.1 DOCUMENT REVIEW
ENGINEER will review existing roofing information, in the form of available plans, specifications,
and/or shop drawings.
TASK 4.2 DEVELOP CONTRACT DOCUMENTS
ENGINEER will develop Architectural and Plumbing Drawings and Specifications for
construction of repairs to the roofing and roof drain systems to be included in the Contract
Documents for the Solids Handling Improvements Project as follows:
3. Remove existing roofing material down to the top of the double tee roof.
Carollo Professional Agreement
Page 2 of 4
4. Install new insulation and membrane roofing material, sloping to existing drain locations.
5. Replace all roof drains and skylights.
6. Replace roof drain piping in Solids Handling Building.
TASK 5 COVER REPLACEMENT AT SLUDGE HOLDING TANKS 6 & 7
TASK 5.1 DOCUMENT REVIEW
ENGINEER will review existing information, in the form of available plans, specifications, and/or
shop drawings.
TASK 5.2 DEVELOP CONTRACT DOCUMENTS
ENGINEER will develop Demolition, Structural and Mechanical Drawings and Specifications for
construction of cover replacement at Sludge Holding Tanks 6 & 7 to be included in the Contract
Documents for the Solids Handling Improvements Project as a "Bid Alternate" item as follows:
1. Demolish of existing floating domes.
2. Demolish existing digester gas piping, and associated appurtenances on the domes.
3. Demolish existing corbels.
4. Modify the existing tanks to accommodate new fixed covers.
5. Install new fixed cover domes.
6. Replace gas piping and appurtenances located above the new covers.
ENGINEER will develop work restrictions associated with the work described above and include
them in the Specifications. ENGINEER will also prepare an opinion of probable construction
cost for this work.
1.1 DELIVERABLES
Deliverables for this project include the following. All reproduction costs will be billed to CITY in
accordance with ENGINEER's Fee Schedule. Project Deliverables will be ENGINEER -Sealed
Documents as required by Texas law,
Contract documents for Plant 4 secondary scum system modifications, including
associated Civil, Mechanical, Electrical and Instrumentation Drawings and Specifications
Letter Report for the desktop NPW System Evaluation: six (6) hard copies and one (1)
electronic copy in Adobe PDF format.
Contract documents for roofing rehabilitation including associated Architectural and
Plumbing Drawings and Specifications.
4. Contract documents for replacement of Sludge Holding Tank 6 & 7 covers, including
associated Demolition, Structural and Mechanical Drawings and Specifications
Carollo Professional Agreement
Page 3 of 4
2.0 TIME OF PERFORMANCE
ENGINEER shall commence work immediately following authorization to proceed. After a
detailed review of the project schedule, ENGINEER has determined that a 90 -day extension in
contract time and project schedule would be needed to incorporate the additional work
described in Tasks 2 through 5 into the project. This schedule is based on approval to proceed
with the work on or before May 1st, 2013.
Delivery of 90 percent contract documents for replacement of the covers at Sludge Holding
Tanks 6 & 7 will lag behind the remainder of the project. These contract documents will be
submitted separately for review by the CITY. However, the final completion date for these
documents will match the remainder of the project.
ENGINEER and CITY mutually agree that they will work toward meeting the above schedules.
Should the Scope of Work be changed and/or should problems arise during the course of the
work effort that could affect the above schedule, it is understood that both CITY and ENGINEER
will develop a revised schedule and budget limit, if required, to address scope changes, delays
by CITY, or other problems.
3.0 BUDGET
CITY and ENGINEER have established a not -to -exceed budget of $99,994 to complete all
services under this Exhibit A. This amount will not be exceeded without a contract amendment.
CITY will pay the ENGINEER hourly, for services identified in Exhibit A, based on ENGINEER's
Fee Schedule presented, as EXHIBIT C in the Professional Services Agreement between the
CITY and ENGINEER dated December 1, 2011 for the Southeast Water Reclamation Plant
Solids Handling Improvements Project. The budget for each Task is presented in EXHIBIT B.
CITY and ENGINEER agree to allow redistribution of funds between Tasks 1 through 5, as
appropriate to allow flexibility in providing the needed services within the not -to -exceed budget.
ENGINEER agrees to complete these services for this amount unless the Budget is amended
by CITY and ENGINEER as a result of a change to the Scope of Work or Time of Performance.
Carollo Professional Agreement
Page 4 of 4
EXHIBIT B
c C, -a OR- 410-0 Estimated Work Effort
CITY OF LUBBOCK
SOUTHEAST WATER RECLAMATION PLANT
SOLIDS HANDLING IMPROVEMENTS PROJECT
AMENDMENT No.1
4'16/2013
Task
No. Description
Total Hours
Carollo
Cost Survey
Su"onsultent
Gootechnlcal
Fee's
Texas
Other
Tech Cost
Dlnct Total Cost
Per Task
1
Delete Centrifuge Pilot Testing
-80
S (14,6601 $
- f
- $
(24 000)
f (38.5601
2
Reroute Plant 4 Secondary Scum to Digesters
82
f 16,854 $
- f
- $
- $
- f 16,854
3
Desktop NPW System Eva uation
Be
f 16,054 f
- f
- $
- f
700 f 16,754
4
Solids Handling Bu Iding Roof Rehabilitation
110
f 22,770 f
- f
- $
- f
f 22,770
5
Icover Replacement at Sludge Hold ng Tanks 6 & 7
448
E 82,176 f
- f
- $
- f
f 82,176
TOTAL COST
1 648
S 123,294 It
- $
- f
(24,000) f
700 $ 99,994
FW: MianMarx t Ea Rei Ttl N eG6 c