Loading...
HomeMy WebLinkAboutResolution - 2013-R0098 - CO Contract - Allen Butler Construction Inc.- Reroute Water, 2 Electrical Lines - 03/28/2013Resolution No. 2013-R0098 March 28, 2013 Item No. 5.5 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for and on behalf of the City of Lubbock, Change Order No. 1 to that certain Contract No. 10839 by and between the City of Lubbock and Allen Butler Construction, Inc.. to reroute a water line and two electrical lines that are servicing the Lake Alan Henry Maintenance Complex, and related documents. Said Change Order No. I is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council on March 28, 2013 All GLE .ROB ON, MAYOR ATTEST: Re&ca Garza, City Secretary APPROVED AS TO CONTENT: R. Keith Smith, P.E., hief Operating Officer APPROVED AS TO FORM: Chad Weav r, Assistant City Attorney vw:ccdocs/RES.ChgOrd#1 Contract -Allen Butler March 7.2013 Contract No: 10839 Change Order No.1 BID/RFP No. 12 -10839 -MA City of Lubbock Purchasing and Contract Management Change Order ro„t., ol— Allen Butler Constuctlon, INC. Contract Title: John T. Montlord Dam: Erosion Control Project Number: 8543.9241.30000 1. "Change Order" means a written order to a Contractor executed by the Owner in accordance with the contract authorizing an addition to, deletion from, or adjustment or revision of the requirements of the contract documents, or an adjustment to the enmpcnsation payable to Connector, or to [lie time for performance of the contract and completion of the Project. or a combination thcrcol{ which docs not alter the mature re oftlle thing to be constructed and is an integral part ofthe project objective. Ad a,tcut, to "Estimated Quantities" to a line item in u Unit Price contract do not require a Change Order. All work that alters Dcscriptinn of change (aheralion, deviation, addition, or deletion) caused by conditions encountered net covered by the spmifivalnur; and drawings of the project (attach addddenal pager %nomemo): This change order with Allen Butler Construction, INC. will allow the contractor to reroute a water line and two electrical lines that are servicing the the Lake Allen Henry Maintenance Complex. These lines are in the way of the dirt work and mat installation and must be relocated. This reroute includes all material, labor, and services that are needed to preform the work and to keep the Maintenance Complex in service. 2. Where the Change Order is negotiated, the Change Order must be fully documented and itemized as to costs, including material quantities, material costs, tons, insurance, employee benefits, other related costs, profit and overhead. Where certain unit prices ore contained in the initial contract, no deviations arc allowed in computing negotiated change order costs. ITEMIZED COSTS MUST BE FULLY DOCUMENTED AND ATTACHED TO THIS FORM. ITEM DESCRIPTION AMOUNT A. ORIGINAL CONTRACT VALUE: $3,448.940.¢0 B. AMOUNT OF THIS CHANGE ORDER: Cow d,,rod.ry.,rtJ /o... 525101 $28.129 COSTCENTER: 8211 ACCOUNT: 85e39341201xV C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER(B/A): 1'05 % D. AMOUNT OF PREVIOUS CHANGE ORDERS: $0 E. 'TOTAL AMOUNT OF ALL CHANGE ORDERS(B+D): $38128 F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS IDA): 2Jx orcrco,e 1.02 % -deumo.,e G. NEW CONTRACT AMOUNT AIE): $3,485,088.80 3. h is mutually agreed that the above dollar amount and the time extension, as applicable, as set forth in this Change Order constitutes full compcosation to the Connector for all costs, expenses and damages an the Contractor, whether direct, amsequamitil or otherwise. in anyway incident to, or arising out of or resulting directly or indirectly: mean the work performed or modified by the Contractor under this Choose Order. -l3 C n 2;0ad nqutn aCommrr ConrShnrand rheJolloWnR nlAna CITYOFLUBBOCK A SE (])MAYOR Date (a) CrIT 8 RETARY Oetc Council Dae: March 2R. 2017 Agenda Item 9: S S Resolutiond'. 2 1 —R .. PII945lR4v IM012)