HomeMy WebLinkAboutResolution - 2013-R0047 - Supplement To Amendment - Parkhill, Smith, & Cooper - LBB Improvements - 01/31/2013Resolution No. 2013—R0047
January 31, 2013
Item No. 5.30
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock is hereby authorized and directed to
execute for and on behalf of the City of Lubbock, Supplement to Amendment No. 5 for
construction phase services related to Phase 3 of the LBB Runway 08,126 and Taxiway
Improvements Project, by and between the City of Lubbock and Parkhill, Smith &
Cooper, and related documents. Said Agreement is attached hereto and incorporated in
this resolution as if fully set forth herein and shall be included in the minutes of the City
Council.
Passed by the City Council on January 31, 2013
0
• N. M A Y •
ATTEST:
Rebe a Garza, City Secretary
APPROVED AS TO CONTENT:
(Jam s Loomis, Executive Director of Aviation
APPROVED AS TO FORM:
Chad Weaver, Assistant City Attorney
vwxcdocs RES.Amend u5 -Parkhill Smith & Cooper
January 16, 2013
Resolution No. 2013—R0047
PARKHILL.SMITH&COOPER 4222 851h Street
1-ri
Lubbock. Texas 79423
806 473 2200
January 8, 2013
Mr. James W. Loomis, A.A.E.
Director of Aviation
Lubbock Preston Smith International Airport
Administration Office, 2nd Floor
5401 N. Martin Luther King Jr. Blvd., Unit 389
Lubbock,Texas 79403
Re: Supplement to Amendment No. 5
Construction Phase Services for LBB Runway 08/26 and Taxiway Improvements Phase 3
Dear Mr. Loomis:
As previously discussed, we have prepared a Supplement to Amendment No. 5 for construction phase
services related to Phase 3 of the LBB Runway 08/26 and Taxiway Improvements project. This
supplemental amendment is related to additional services provided by PSC due to the Contractor
overrunning the allotted contract time.
As a basis for the supplemental amendment, PSC has accounted for actual Construction Administration
and Resident Project Representative (RPR) services provided over and above the original Amendment 5
Task 1 maximum. Furthermore, we have included outstanding costs to complete the required project
closeout report and also perform the one year walkthrough associated with the standard project warranty.
Applying PSC's 2012 and 2013 Hourly Rate Schedule to the hours compiled above, and including
applicable reimbursable charges, yields a total additional services amount of $33,843. This is the amount
proposed in the Supplement to Amendment 5 as additional services. In order to offset the cost of additional
Construction Administration and RPR services, it is our understanding that the Contractor will be assessed
liquidated damages in a corresponding amount.
If the terms of this amendment are agreeable to you, please sign and return one copy of this letter to our
office. If you have any questions please call John Hamilton or me.
Abilene Amarillo EI Paso Las Cruces Lubbock Midland team-psc.com
Mr. James Loomis, A.A.E.
Supplement to Amendment No. 5
LBB Runway 08/26 and Taxiway
Improvements Phase 3
Sincerely,
PARKHILL, SMITH & COOPER, INC.
By _ A'�K�
Mark D. Haberer, PE
Firm Principal/Project Manager
B ---V A^... -nn
Hamilton, PE
Firm Principal/Transportation Sector Dir
Page 2
Accepted by:
CITY OF LUBBOCK
By
Gle&ne 4n
Mayor
Attest:
By
Q-e—�
Reb ca Garza
City Secretary
Approv as to Content:
B kill
J es W. Loomis, A.A.E.
irector of Aviation
Approved as Form:
By
Chad Weaver
City Attorney
IN TRIPLICATE
MDH/pas
Enclosures
k0atallPiojecls=11011 11 WOMINICONTRACTSIFINALIcontrad amendment 5 (supplement 1-&13) doc
January 8, 2013
PARKHILLSMITH&COOPER
III
Period Ending_[_Empio
Unbilled Task 1 charges through 12/28/12 (based on 2012 hourly rates)
12/28/2012 Professional Level VI
5.50
$
151.00
$
830.50
12/28/2012 Professional Level IV
16.00
$
116.00
$
1,856.00
12/28/2012 Professional Level III
18.00
$
98.00
$
1,764.00
12/28/2012 Support Staff III
4.30
$
76.00
$
326.80
12/14/2012 Professional Level IV
12.50
$
116.00
$
1,450.00
12/14/2012 Professional Level III
20.50
$
98.00
$
2,009.00
12/14/2012 Support Staff III
5.40
$
76.00
$
410.40
12/14/2012 Support Staff II
3.50
$
70.00
$
245.00
9/21/2012 Professional Level IV
35.80
$
116.00
$
4,152.80
9/21/2012 Professional Level III
3.00
$
98.00
$
294.00
9/21/2012 Support Staff III
5.50
$
76.00
$
418.00
9/21/2012 Support Staff II
7.40
$
70.00
$
518.00
9/7/2012 1 Professional Level IV 1
10.33
$
116.00
1 $
1,198.28
Subtotal unbilled Task 1 charges through 12/28/12
$
15,472.78
Task 1 charges
projected for project closeout and 1yr inspection (based on 2013 hourly rates)
Professional Level VI
18.00
$
158.00
$
2,844.00
Professional Level IV
67.00
$
122.00
$
8,174.00
Professional Level III
32.00
$
103.00
$
3,296.00
Support Staff III
47.00
$
80.00
$
3,760.00
Mileage Charges (assuming
35mi/trip and 5 trips)
1
175.001
$
0.55
$
96.25
Print Charges
1
1.00
$
200.00
1 $
200.00
Subtotal Task 1 charges projected for project closeout and 1 year inspection
$
18,370.25
Total Supplement to Amendment No. 5
$
33,843:03
Client: Lubbock Preston Smith International Airport
Project: LBB Runway 08/26 and Taxiway Improvements Phase 3
Agreement Date: January 8, 2013
Classification Hourly Rate
PROFESSIONAL LEVEL VII $178.00
Engineer VII
Architect VII
Landscape Architect VII
Interior Designer VII
PROFESSIONAL LEVEL VI $151.00
Engineer VI
Architect VI
Landscape Architect VI
Interior Designer VI
PROFESSIONAL LEVEL V $134.00
Engineer V
Architect V
Landscape Architect V
Interior Designer V
PROFESSIONAL LEVEL IV $116.00
Engineer III, IV
Architect IV, Intern (Architect) IV
Landscape Architect IV
Interior Designer IV
Technologist IV
Resident Project Representative IV
PROFESSIONAL LEVEL III $98.00
Engineer 1/11
Architect III, Intern (Architect) III
Landscape Architect III
Intern (Landscape Architect) III
Interior Designer III
Technologist III
Resident Project Representative III
PROFESSIONAL LEVEL II $87.00
Intern (Architect) II
Interior Designer II, Intern (Interiors) II
Landscape Architect II
Technologist II
Resident Project Representative II
Clerical Supervisor II
Expenses
Parkhill, Smith & Cooper, Inc.
Hourly Rate Schedule
Current through December 31, 2012
January 1, 2012
Classification Hourly Rate
PROFESSIONAL LEVEL I
Intern (Architect) I
Intern (Interiors) I
Intern (Landscape Architect) I
Technologist I
Resident Project Representative I
Clerical Supervisor I
SUPPORT STAFF III
Engineering Technician III, IV
CADD III, IV
Administrative Secretary III
Architect Technician III, IV
Project Assistant 1/II
SUPPORT STAFF II
Architect Technician I, II
Engineering Technician I, II
CADD I, II
Accounting Clerk I, II
Administrative Secretary I, II
Project Assistant EL
Word Processor I, II
Receptionist I, II
File Clerk I
SUPPORT STAFF I
Architectural Student EL
Engineering Student EL
Landscape Architecture Student EL
Interiors Student EL
CADD EL
Accounting Clerk EL
Word Processor EL
Receptionist EL
File Clerk EL
$79.00
$76.00
$70.00
$40.00
Reimbursement for expenses, as listed below, but not limited to, incurred in connection with the services, will be at cost plus fifteen percent for
items such as:
1. Maps, photographs, postage, telephone, reproductions, printing, equipment rental, and special supplies related to the services.
2. Consultants, soils engineers, surveyors, contractors, and other outside services.
3. Rented vehicles, local public transportation and taxis, road toll fees, travel, and subsistence.
4. Special or job specific fees, insurance, permits, and licenses applicable to the work services.
5. Mileage at IRS approved rate.
Rate for professional staff for legal proceedings or as expert witnesses will be a rate one and one-half times the Hourly Rates specified above.
Excise and gross receipts taxes, if any, will be added as an expense.
The foregoing Schedule of Charges is incorporated into the agreement for the services provided, effective January 1, 2012 through
December 31, 2012. After December 31, 2012, invoices will reflect the Schedule of Charges currently in effect.
NDatal %Projects1201112711.11 W DMINICONTRACTS%FINAL\WAGE-2012-wdirects.doc
Client: Lubbock Preston Smith International Airport
Project: LBB Runway 08/26 and Taxiway Improvements Phase 3
Agreement Date: January 8, 2013
Classification Hourly Rate
PROFESSIONAL LEVEL VII $187.00
Engineer VII
Architect VII
Landscape Architect VII
Interior Designer VII
PROFESSIONAL LEVEL VI $158.00
Engineer VI
Architect VI
Landscape Architect VI
Interior Designer VI
PROFESSIONAL LEVEL V $141.00
Engineer V
Architect V
Landscape Architect V
Interior Designer V
PROFESSIONAL LEVEL IV $122.00
Engineer III, IV
Architect IV, Intern (Architect) IV
Landscape Architect IV
Interior Designer IV
Technologist IV
Resident Project Representative IV
PROFESSIONAL LEVEL III $103.00
Engineer 1/11
Architect III, Intern (Architect) III
Landscape Architect III
Intern (Landscape Architect) III
Interior Designer III
Technologist III
Resident Project Representative III
PROFESSIONAL LEVEL II $91.00
Intern (Architect) II
Interior Designer 11, Intern (Interiors) II
Landscape Architect II
Technologist II
Resident Project Representative II
Clerical Supervisor II
Expenses
Parkhill, Smith & Cooper, Inc.
Hourly Rate Schedule
Current through December 31, 2013
January 1, 2013
Classification Hourly Rate
PROFESSIONAL LEVEL I
Intern (Architect) I
Intern (Interiors) I
Intern (Landscape Architect) I
Technologist I
Resident Project Representative I
Clerical Supervisor I
SUPPORT STAFF III
Engineering Technician III, IV
CADD III, IV
Administrative Secretary III
Architect Technician III, IV
Project Assistant 1/11
SUPPORT STAFF II
Architect Technician I, II
Engineering Technician I, II
CADD I, II
Accounting Clerk I, II
Administrative Secretary I, II
Project Assistant EL
Word Processor I, II
Receptionist I, II
File Clerk I
SUPPORT STAFF I
Architectural Student EL
Engineering Student EL
Landscape Architecture Student EL
Interiors Student EL
CADD EL
Accounting Clerk EL
Word Processor EL
Receptionist EL
File Clerk EL
$83.00
$80.00
$73.00
$42.00
Reimbursement for expenses, as listed below, but not limited to, incurred in connection with the services, will beat cost plus fifteen percent for
items such as:
1. Maps, photographs, postage, telephone, reproductions, printing, equipment rental, and special supplies related to the services.
2. Consultants, soils engineers, surveyors, contractors, and other outside services.
3. Rented vehicles, local public transportation and taxis, road toll fees, travel, and subsistence.
4. Special or job specific fees, insurance, permits, and licenses applicable to the work services.
5. Mileage at IRS approved rate.
Rate for professional staff for legal proceedings oras expertwitnesses will be a rate one and one-half times the Hourly Rates specified above.
Excise and gross receipts taxes, if any, will be added as an expense.
The foregoing Schedule of Charges is incorporated into the agreement for the services provided, effective January 1, 2013 through
December 31, 2013. After December 31, 2013, invoices will reflect the Schedule of Charges currently in effect.
Watal lProjects1201112711.11 W DMINICONTRACTs1FINAL\WAGE-2013-wdirecis.doc